Vizsla Silver Corp. (TSX:VZLA) | 25 November 2026
Our maximum entry price is C$3.58 per share. At the 25 November 2026 TSX regular close of C$4.05, the five-year price rule says Wait. The strongest credible contrary case is a safe, timely site restart and on-study grades/capital: removing the active-risk reserve raises entry to C$6.03 and changes the decision to Buy at this close. I retain the reserve because the issuer has not made a production decision or formally returned to site; the November 19 H2 2028 production target has no updated economic study. Close Revised target No decision
- Market close (2026-11-25)
- C$4.05
- Base fair value
- C$6.61
Company details
- Maximum entry price
- C$3.58
Issuer: Vizsla Silver Corp.; listing TSX:VZLA; currency CAD; sector Materials / silver-gold development. Research and quote cutoff: 25 November 2026. Latest filed interim financials: 31 July 2026, authorized 4 September. Base fair value is C$6.61; forecast 25 November 2031 exit is C$9.50 per economically diluted share. The unstressed five-year hurdle ceiling is C$6.03; a C$2.45 stress-only reserve sets the final C$3.58 entry. No VZLA shareholder distribution is forecast. These are analyst estimates, not issuer guidance. Share date Study NAV
Stock Price History · Maximum entry C$3.58
Closing Prices
| Date | Close (CAD) | Maximum entry (CAD) |
|---|---|---|
| 2025-11-28 | 7.15 | |
| 2025-12-31 | 7.52 | |
| 2026-01-30 | 6.89 | |
| 2026-02-27 | 5.97 | |
| 2026-03-31 | 4.61 | |
| 2026-04-30 | 4.61 | |
| 2026-05-29 | 5.39 | |
| 2026-06-30 | 4.66 | |
| 2026-07-31 | 4.38 | |
| 2026-08-31 | 5.60 | |
| 2026-09-30 | 5.40 | |
| 2026-10-30 | 4.28 | |
| 2026-11-19 | 4.06 | |
| 2026-11-20 | 3.63 | |
| 2026-11-23 | 3.94 | |
| 2026-11-24 | 3.86 | |
| 2026-11-25 | 4.05 | 3.58 |
Month-end TSX regular closes from November 2025 through October 2026, followed by selected November event days and the 25 November close. This is a price context series, not dividend-adjusted total return. Frozen observations Yahoo Finance VZLA.TO history S&P Global recent daily history
Investment Thesis
One share is a residual claim on 100%-owned Panuco after its life-of-mine royalties, US$300 million convertible face, future corporate costs and roughly 382.2 million potential common shares. Panuco has a high-grade, short-payback study, but the active security interruption and one-year target shift create a genuine gap between the study and a funded producing mine. NPV Royalties Note
Market Mispricing
The C$4.05 close is C$2.56 below C$6.61 fair value, while fair exceeds the C$3.58 entry by C$3.03; the full close-to-entry gap is −C$0.47. The market price implies about US$1,132 million of project NAV on this share and claims basis, roughly 38% below the US$1,831 million base. That gap could be rational if investors assign roughly 40% probability to a no-restart salvage outcome; the probability is a two-state analytical illustration, not a forecast. Market observation Model
Recent Developments
The 19 November update put first silver in H2 2028 rather than H2 2027, reported 50% engineering and 85% of process equipment ordered, and said the old study economics were not revised. A September acquisition transferred the Panuco NSR to Elemental; that royalty remains in project cash costs and is not an asset owned by VZLA common. Timing Engineering NSR holder
Earnings Outlook
The latest July quarter had no material mining revenue, US$19.8 million of accounting loss and US$5.3 million operating cash use. The model puts preproduction project cash needs in 2027–28, then US$501 million of after-tax project cash in 2029 at the shared metal deck; the 2028 target can fail without falsifying the 2025 study grade. Quarter loss Cash use Study cash
Valuation Summary
The modeled US$1.831 billion project NAV plus estimated liquid assets, less the note and future overhead/coupon, is C$6.61 per diluted share. Rolling project NAV and cash to 2031 gives C$9.50; after stock dealing costs that is 18.57% annualized at the close versus 7.49% for XIC after ETF costs, a 11.08 percentage-point spread. The security/grade/capital stress reduces the hurdle ceiling from C$6.03 to C$3.58. Bridge Returns
Recommended Action and Entry Price
Wait for C$3.58 or lower on unchanged evidence, or for documented security, permitting and financing progress that permits the risk reserve to be recalibrated. C$4.05 is above the defended maximum despite high modeled base return. The 2 percentage-point hurdle is measured above net XIC, with 5 bp share costs and 3 bp ETF costs on each side. Decision worksheet
Catalysts
A formal site restart, remaining permits, a final investment decision and a revised detailed construction budget are the first tests. The first operating forecast checkpoint is payable silver toward 13.945 Moz in the first full year, rather than the construction date alone. FID First-year silver
Primary Risks to Thesis
Security could prevent restart, delay receipts and keep fixed costs running. A joint US$35 silver/US$3,100 gold deck, 10% grade loss, US$100 million capex increase and another year of delay lowers modeled fair to C$3.81, the 2031 exit to C$5.64 and final entry to C$3.58; a no-restart salvage illustration is only C$0.16. Delay Grade sensitivity
Company Overview
Vizsla is a pre-revenue Canadian developer of the Panuco silver-gold district in Sinaloa, Mexico. The model attributes material operating value only to the feasibility mine plan; exploration ground remains optionality with zero separately assigned NAV. Revenue status Decision state
Products and Services
The planned Copala and Napoleon underground mines would process ore on site and sell silver-gold doré. The study estimates 94.725 Moz payable silver and 0.776 Moz payable gold over its initial 9.4-year life. Payable metals Issuer project description
Business Model
Today common holders finance study, procurement, security and site work. If the mine starts, revenue is ounces sold times realized metal prices, less refining, royalties, site operating cost, tax, sustaining capital, closure and financing claims. The issuer owns 100% of Panuco but does not own back the transferred private NSR. Unlevered project model Royalty transfer
Revenue Drivers
The FS models 13.945 Moz payable silver and 0.102 Moz gold in its first full project year; this report applies US$40/oz and US$3,600/oz rather than the FS US$35.50/US$3,100. Those commodity prices are analyst assumptions shared with ABRA, not spot quotations or issuer guidance. Volume FS prices
Cost Structure
The study specifies US$239 million initial capital, US$287 million sustaining capital and US$38 million closure cost. Its US$10.61/oz AgEq AISC uses study equivalence prices and cannot be compared with a silver-only cash cost at a different metal deck. Capital AISC
Operating Levers
The initial 3,300 t/d plant is expected to rise to 4,000 t/d in year four; grade, recovery and site availability dominate per-share value. A 10% lower grade cuts the FS post-tax NPV5 by US$268 million before this model’s 8% scaling. Capacity Grade sensitivity
Distribution
No commercial channel or offtake premium is valued before production. Doré sales and metal prices determine future cash; the report assumes no dividends through 2031 and zero future VZLA payments in the investor return. Pre-revenue Study sales basis
Geographic Exposure
Sinaloa hosts the project and its mineral, security, community and Mexican regulatory exposure; Canadian incorporation and TSX listing do not diversify the operating asset. The November update describes security planning with Mexican federal authorities and a conditional phased site return. Timeline Site status
Regulatory Environment
A full construction decision depends on detailed engineering, financing arrangements and required permits. Mexican royalties and taxes are embedded in the study NAV; the model does not assume a permit is granted merely because a production target was published. Conditions Royalty treatment
Industry Structure
Silver mine supply is price-taking; investors can substitute other developers and producers. Panuco competes for specialist contractors, risk capital and investor attention with projects such as ABRA’s Diablillos, rather than selling a differentiated product. Panuco output ABRA benchmark
Growth and Cyclicality
The FS has finite reserves and a 9.4-year initial life, so maintaining output after that period requires reserve conversion or new ore. Commodity cycles change project NAV disproportionately because fixed capital and royalties persist. LOM metal Silver sensitivity
Competitors
ABRA is the direct shared-deck comparison: its published model uses US$40 silver and US$3,600 gold but has different jurisdiction, funding needs and mine timing. The Panuco 2025 FS has a smaller initial capital requirement, while VZLA carries already-issued convertible debt and an active security-related schedule miss. Peer deck Debt Delay
Market Share
Neither a preproduction mine nor a study output is current market share. Panuco’s 17.4 Moz AgEq average annual output is a forecast at study equivalence prices, not verified sales; no share of world silver supply is assigned. Study production
Competitive Advantages
The study’s high early payable ounces and existing ordered equipment support a shorter path to cash if access resumes. These advantages enter the forecast through the study cash schedule; no additional strategic premium is layered onto NAV. Year one Equipment
Pricing and Cost Position
The US$35.50 silver and US$3,100 gold FS deck produces US$1.525 billion NPV8. At the shared deck, a linearized interpolation from source sensitivity tables adds about US$320 million before the date adjustment; uncertainty in price sensitivity and tax interactions is visible in the worksheet. NPV8 Silver Gold
Entry Barriers and Substitutes
High-grade underground geology and sunk exploration work are barriers to replicating the project. They do not protect against substituting another silver investment; a delayed or unsafe restart can erase the economic advantage. Operating delay Ore profile
Supplier and Customer Dynamics
The ordered plant equipment and awarded engineering work reduce procurement uncertainty, yet the main mining contract and safe site return remain open. Doré buyers receive commodity-priced output; customer concentration is unmodeled because no binding offtake terms were evidenced at cutoff. Procurement Open decision
Regulation and Structural Risks
The Mexican tax and private NSR burden is already in FS cash flow. A changed permit condition, security cost or royalty enforcement would require a fresh after-tax model; the transferred royalty cannot be bought back under the acquisition terms cited. NSR Uncapped transfer
Historical Performance
The issuer has no significant mining revenue. FY2026 loss was US$38.685 million versus US$5.820 million FY2025, restated to USD presentation; July 2026 quarter loss was US$19.819 million. These losses are preproduction financing and corporate results, not mine margins. Annual losses Latest loss
Income Statement Analysis
FY2026 finance costs and mark-to-market items distort comparisons. The July loss includes noncash derivative remeasurement, capped-call loss and share compensation; treating it as recurring cash mine loss would overstate project spending. Reported quarter July FS, pp3 and 5
Balance Sheet Analysis
Cash fell from US$427.310 million at April 30 to US$406.495 million at July 31. The note is US$300 million principal despite US$240.366 million IFRS carrying value, and its embedded derivative cannot be added as a second face-value claim. Cash Carrying values Face
Cash Flow Analysis
FY2026 operating cash use was US$11.198 million and exploration cash was US$32.752 million. In the July quarter operating use was US$5.252 million, exploration US$3.085 million and coupon cash US$9.625 million. The US$28 million July-to-cutoff cash stub is an analyst estimate, not a reported November balance. Annual cash Exploration Latest cash Coupon
Earnings Quality
A net accounting loss is a poor measure of project cash before commissioning. The report anchors liquidity to cash, debt face and cash flow, while the FS project NAV separately includes planned mine capital and tax. It does not count exploration assets at book value on top of NAV. Cash Project finance assumption
Nonrecurring Items
The capped-call and convertible derivative marks create earnings volatility without changing the US$300 million face. The September VROY sale means its July US$6.951 million associate mark is stale: 11.519m held shares at C$4.13 election value imply C$47.6m gross consideration, with the actual cash/Elemental-share mix subject to proration. Along with US$8.4m July other marketables, I use a US$37m haircut estimate pending the next filing; each US$5m of value changes fair by about C$0.02/share. Old mark Held shares Election terms
Funding and Cash Conversion
Starting with July US$406.495 million cash, an estimated US$28 million four-month use gives US$378.495 million at cutoff. The project -US$88 million and -US$146 million study preproduction cash draws can be met from this pool if the timing and budget hold, but note repayment in January 2031 and corporate costs also need liquidity. July cash Project schedule Maturity
Key Ratios
Book P/E and EV/EBITDA are not meaningful while the mine earns no revenue. At C$4.05 and 355.057 million basic shares, market capitalization is about C$1.438 billion; the project NAV/common price comparison is more useful than a trailing earnings multiple. Close Shares
Forward Outlook
Freeze three falsifiable forecasts: first full production year payable silver 13.945 Moz base (10.0 downside, 15.0 upside); project after-tax 2029 FCF US$501 million base (US$250m downside, US$600m upside); and remaining 2031 cash after US$300m note repayment US$923m base (US$379m joint downside, US$1.10bn upside). The issuer’s first annual production, cash-flow/capex and note settlement disclosures settle them. The exact calendar mapping is Peralta’s judgment following the revised H2 2028 target. Study volume Maturity Timeline
Model Choice
A finite-life project NAV fits a reserve mine better than a perpetual company DCF. The FS 8% NPV is US$1.525 billion at its own metal deck, with 100% equity project funding and no parent note or corporate burn; those claims are added separately. Other district exploration receives zero incremental base value. NPV8 Funding basis
Growth
The FS processes 3,300 t/d initially and 4,000 t/d from year four. I map its two preproduction cash years to 2027–28 and first full project year to 2029, consistent with H2 2028 first silver but a simplification of the FS monthly/quarterly cash model. An additional year delay is the key risk reserve. Revised first silver No refreshed economics
Profitability
FS NPV8 at US$35.50 silver and US$3,100 gold is lifted by US$168.5m for US$40 silver and US$151.5m for US$3,600 gold. Those slopes are Table 22-6 NPV5 single-metal sensitivities scaled by 1,525/1,802; joint metal/tax effects are an approximation. 8% baseline Silver slope Gold slope
Reinvestment or Required Capital
The study already deducts US$239m initial, US$287m sustaining and US$38m closure costs; no second subtraction of these amounts is made from project NAV. Forecast cash after project spending is then used for coupons, parent spend and note repayment. The joint stress adds US$100m overrun and C$150m of equity at C$4, diluting shares by 37.5m. Capital Project basis
Discount Rate
An 8% project rate uses an actual FS sensitivity node rather than an invented beta; 5% gives US$1.802bn, 8% US$1.525bn and 10% US$1.370bn at the study deck. Moving only the project rate to 10% changes fair to C$6.05 and entry to C$3.57 with the same C$2.45 reserve. The project rate is not XIC’s investor hurdle. Study nodes Scenario table
Terminal Economics
The asset expires; there is no perpetuity. The annual FS Table 22-2 already includes US$287m sustaining and US$38m closure. Its project-year three after-tax cash is US$278m with US$31m sustaining; year four is US$339m with US$34m sustaining. Carrying year-three sustaining forward would raise year-four FCF by about US$3m before tax and less than C$0.02 per share at today’s date. End-year discount of rounded annual FS cash gives about US$1.433bn NPV8 versus reported US$1.525bn because the FS uses monthly/quarterly mid-period timing; the US$92m timing residual remains embedded in the calibrated NAV rather than treated as unexplained cash. Life capital Boundary cash and capital Full FS, Table 22-2
Bridge to One Common Share
| Bridge | US$m / shares m |
|---|---|
| Study NPV at 8%, US$35.50 silver / US$3,100 gold | 1525.0 |
| Shared-deck silver uplift | 168.5 |
| Shared-deck gold uplift | 151.5 |
| Discount to 25 Nov 2026 | -14.1 |
| Project NAV today | 1830.9 |
| Cash after July-to-November stub | 378.5 |
| Marketable investments | 37.0 |
| Option exercise proceeds | 36.7 |
| Convertible face and current claims | -307.5 |
| PV of corporate costs, coupons, foundation | -159.6 |
| Fully issued shares (m) | 382.2 |
| CAD/USD | 1.40 |
| Fair value, CAD/share | 6.61 |
The denominator includes 355.057m September basic shares, 18.172m in-the-money options with approximately US$36.7m exercise proceeds, 5.906m RSU/PRSU/DSU equivalents and 3.022m property shares to issue. Some property shares may have issued after the disclosed date; this conservative fully issued approach can temporarily overcount them. The base exit at C$9.50 (US$6.80) exceeds the note conversion strike of US$5.84 but is below the US$10.5075 capped-call cap. The matched cash-settled call is assumed to offset conversion value above the US$300m principal; its US$25m July book mark is therefore not added separately. Above the cap, unhedged conversion cost would lower value. Basic Options Awards Property shares Capped call
Price-Implied Expectations
At the close, the same net assets/claims imply US$1,132m Panuco NAV, US$699m less than base. With a no-restart case of C$0.16 after an illustrative US$100m remediation, a roughly 40% failure probability reconciles fair to close. For the investor hurdle at the close, required 2031 exit is about C$6.38, between joint stress C$5.64 and base C$9.50; a safe restart and grade near the FS would invalidate the no-restart interpretation. Close Restart condition
Independent Cross-Check
The US$1.845bn shared-deck construction NAV is close to a separate arithmetic bridge: US$1.525bn FS NPV8 plus US$168.5m silver and US$151.5m gold. The FS one-factor NPV8 sensitivity has US$1.295bn at -10% combined metals and US$1.755bn at +10%, consistent with about US$230m per 10% combined shift. The common-share bridge deducts claims and dilution that neither project number includes. Discount table Silver Gold
Conclusion and Change from Prior Edition
First edition without a predecessor. The maximum entry is C$3.58; no prior Peralta VZLA price is presented as a revision. A formal site restart, revised budget and definitive financing/permit disclosure can change the reserve and decision; a metal-price move alone does not certify construction readiness. Next evidence
Peer Selection
ABRA’s Diablillos is the closest published Peralta silver-gold developer model on the same US$40 silver/US$3,600 gold and CAD1.40/USD assumptions. Its Argentine jurisdiction and need for new construction funding contrast with VZLA’s existing US$300m note and Sinaloa site interruption. Peer deck VZLA note
Dated Ratio Table
| Issuer / observation | Close CAD | Project NPV8 US$m | Initial capex US$m | NPV8 / initial capex | 2031 exit CAD | Net five-year CAGR |
|---|---|---|---|---|---|---|
| VZLA, 25 Nov 2026 | 4.05 | 1,845 shared-deck | 239 | 7.72 | 9.50 | 18.57% |
| ABRA, 25 Nov 2026 close / 24 Nov model | 8.97 | 1,949 shared-deck | 791 initial through silver | 2.46 | 16.68 | 13.18% |
VZLA’s NPV ratio is at construction and excludes parent claims; ABRA’s reported project capex includes a different financing perimeter, so this ratio is a screening measure only. Both CAGRs use the five-year CAD exit, zero distributions, 5 bp share costs on each side, and each stock’s verified 25 November close. VZLA close ABRA close ABRA exit ABRA project inputs
Comparability Adjustments
Study NPV is not common equity value: VZLA’s face note, capped-call settlement and ~382m potential shares versus ABRA’s proposed debt/equity raise are modeled separately. ABRA’s 2031 exit uses its November 24 study inputs, while both quote closes are November 25. No false claim is made that both technical reports have identical tax or reserve methods. ABRA denominator VZLA unlevered NAV
Implications for Value
VZLA has 18.57% base net CAGR at C$4.05 against ABRA 13.18% at C$8.97, but its live security risk sets C$3.58 entry, so ABRA remains the actionable Buy under each own entry rule. If only half of positive residual cash benefits existing holders while all deficits remain funded, VZLA falls to 14.01% and ABRA to 11.30%; the other half is treated as spending with zero common value, not an extra dividend. Both still beat the 7.49% net XIC baseline, but this does not erase VZLA’s entry reserve. Comparison arithmetic
Bear Case
The observed security interruption can delay construction and preserve corporate costs while lower grade and cheaper silver reduce receipts. The joint case has US$35 silver, US$3,100 gold, 10% grade loss, another one-year delay, US$100m extra capex and C$150m equity at C$4. It produces C$3.81 fair and C$5.64 2031 exit; no-restart salvage is far lower. Issuer delay Grade sensitivity
Base Case
US$40 silver and US$3,600 gold are shared with ABRA; the FS mine plan is retimed to the issuer’s H2 2028 target without new grade uplift, and the US$300m note is repaid. The base is a conditional operating case, not a probability-weighted forecast. FS deck Target Note
Bull Case
US$45 silver with US$3,600 gold, no additional delay and otherwise unchanged funding gives C$7.29 fair and C$4.19 entry after the same C$2.45 reserve, changing the rule to Buy at the close. Price exposure is supported by FS sensitivity, but the metal deck is an analyst scenario. Sensitivity
Outcomes at Close and Entry
| Assumption | Close | Fair value | Maximum entry | Price rule |
|---|---|---|---|---|
| Base | C$4.05 | C$6.61 | C$3.58 | Wait |
| Silver US$35, gold US$3,600 | C$4.05 | C$5.93 | C$2.97 | Wait |
| Project discount 10% | C$4.05 | C$6.05 | C$3.57 | Wait |
| Silver US$45, gold US$3,600 | C$4.05 | C$7.29 | C$4.19 | Buy |
| Joint security, grade, metal and capex stress | C$4.05 | C$3.81 | C$3.58 | Wait |
The one-factor rows retain the base stress-only reserve; the joint row applies its own stressed hurdle ceiling once. The joint misses are linked: prolonged unsafe access raises carrying and mobilization costs while grade variability lowers recoverable ounces. The stress persists through the mine NAV, rather than one quarter only. Frozen calculation
Market-Implied Case
C$4.05 requires about C$6.38 2031 exit to earn XIC net plus two points after share costs. The market’s implied project NAV of US$1.116bn is between the shared-deck base US$1.831bn and stressed construction NAV near US$1.069bn. If the next site and engineering disclosure confirms safe access plus no budget escalation, the full active-risk reserve becomes too severe. Price-implied bridge Site condition
Analyst Assessment
The strongest challenge to Wait is that engineering and equipment are already substantially advanced, and the revised target could hold. However, the issuer itself says the schedule is not an updated economic study and no production decision exists. A verified safe return, detailed budget and first payable-ounce evidence would justify reducing the reserve; until then the C$3.58 threshold is the decision. Readiness Caveat
Operating Risks
Underground grade, dilution, recovery and process uptime can miss FS. A 10% grade shortfall lowers the issuer NPV5 by US$268m at its baseline deck and is incorporated at US$226m NPV8 in the joint stress. Reassess when the first annual mine reconciles payable ounces and mill grades. Grade test Year-one ounces
Financial and Liquidity Risks
The US$300m note matures 15 January 2031; base 2030 cash of US$863m covers face and the final US$7.5m coupon before 2031 operating receipts. The C$150m stress issue is credited in 2028 before the 2029 overrun; stressed 2029 minimum cash is US$31.6m, and US$68.2m remains immediately after the January 2031 note payment. A deeper outage may require another raise. The convertible can create unhedged value above US$10.5075 per share; the capped call offsets only to that level. Maturity Cap Cash schedule
Regulatory and Legal Risks
Permits, security measures and site access can delay or prevent a production decision. The no-restart salvage case is C$0.16/share after an illustrative US$100m remediation but is not probability-weighted into the headline. Reassess on formal permits, safe site return and binding construction authorization. Required conditions
Industry and Competitive Risks
Silver and gold prices are outside Vizsla’s control. At the unchanged C$2.45 reserve, a US$35 silver one-factor case lowers entry to C$2.97; stronger competitors may attract capital if this mine remains idle. Sensitivity Peer deck
Thesis-Specific Risks and Reconsideration Triggers
A budget above US$239m initial, meaningful extra senior claims or more than ~382m diluted shares makes C$3.58 optimistic. Conversely, a documented site return and detailed H2 2028 schedule can reduce the stress reserve. The first formal financing and engineering package is the near-term checkpoint. Initial capital Share commitments FID
Environmental Factors
The FS includes underground mining, tailings management and US$38m closure cost; sustaining and closure stay in the NAV. A more expensive water, tailings or reclamation permit would lower common value and belongs in the next budget. Closure Technical report
Social Factors
The January 2026 tragedy and continued security concerns are financially central: site return is conditional and first production moved by one year. Vizsla committed an initial US$5m foundation contribution, explicitly deducted here, while future profit-linked contributions are not quantified and remain a downside limit. Delay Foundation
Governance Factors
The October meeting recorded 355.057m issued shares at its August record date; outstanding options and awards create potential dilution. The model includes them and option proceeds, while future grants are unmodeled. Directors’ ability to settle the convertible in cash or shares makes capped-call and liquidity disclosure a recurring governance test. Share basis Options Settlement
Financially Material Risks and Opportunities
A safe restart and stable construction budget would narrow the C$2.45 entry reserve. An extended suspension increases parent cash use and risks new share issuance even though the July balance sheet held US$406.5m cash. The social commitment has a small direct modeled cost but the security pathway is the principal value driver. Cash Site condition
Annual Results
| USDm, year ended 30 Apr | FY2025 restated | FY2026 |
|---|---|---|
| Mining revenue | 0.0 | 0.0 |
| Net loss | (5.820) | (38.685) |
| Weighted average basic shares, m | 267.327 | 338.886 |
FY2025 was restated from CAD to USD presentation for comparability. Annual loss FY2026 FS pp5-6
Interim Results
| USDm, quarter ended 31 Jul | 2025 | 2026 |
|---|---|---|
| Mining revenue | 0.0 | 0.0 |
| Net income (loss) | 1.222 | (19.819) |
| Operating cash flow | (2.583) | (5.252) |
The 2025 profit reflected nonoperating items, not mine sales. Interim earnings Operating cash
Trailing Results
Latest trailing twelve months through 31 July 2026 net loss is approximately US$59.726m: FY2026 -US$38.685m plus July 2026 -US$19.819m less July 2025 +US$1.222m. This signed arithmetic crosses the USD restated FY2026 base. FY2026 Quarter comparison
Material Adjustments
Do not normalize the accounting loss into mine EBITDA. The fair-value movements on note derivative/capped call and share compensation are separated from true cash burn, while new mining revenue is zero until production. Revenue status Derivative values
Annual Positions
| USDm, 30 Apr | 2025 restated | 2026 |
|---|---|---|
| Cash | 96.016 | 427.310 |
| Exploration assets | 174.869 | 244.208 |
| Total assets | 300.423 | 731.499 |
| Total liabilities | 4.628 | 300.138 |
The note financing explains much of the cash and liability growth. Cash Financing
Interim Positions
| USDm, date | 30 Apr 2026 | 31 Jul 2026 |
|---|---|---|
| Cash | 427.310 | 406.495 |
| Total assets | 731.499 | 716.781 |
| Current liabilities | 13.301 | 7.509 |
| Convertible carrying amount | 237.355 | 240.366 |
The last row is accounting carrying value, not principal due. Cash Note carrying Current claims
Capital and Claims Reconciliation
The July balance sheet shows US$240.366m host debt plus US$41.829m derivative; the economic obligation starts with US$300m face, 5% coupon and capped-call interaction. The model adds no US$25.012m capped-call book asset because it uses the offset in the exit settlement. The VROY holding’s July US$6.951m mark is replaced with a haircut transaction estimate after September completion. Accounting Call Old VROY Transaction
Annual Flows
| USDm, year ended 30 Apr | FY2025 restated | FY2026 |
|---|---|---|
| Operating cash flow | (5.199) | (11.198) |
| Exploration asset cash | (19.842) | (32.752) |
| Net share proceeds | 77.595 | 117.508 |
| Note net proceeds | 0.000 | 286.613 |
The US$47.490m capped-call purchase appears in FY2026 investing cash and is already reflected in current cash. Operating Exploration Financing
Interim Flows
| USDm, quarter ended 31 Jul | 2025 | 2026 |
|---|---|---|
| Operating cash flow | (2.583) | (5.252) |
| Exploration cash | (6.687) | (3.085) |
| Coupon cash | 0.000 | (9.625) |
| Ending cash | 205.546 | 406.495 |
The coupon includes the first payment cycle and is not an annual run rate. Operating Exploration Interest
Trailing Flows
Trailing operating cash use through July 2026 is US$13.867m: FY2026 -11.198 plus July 2026 -5.252 less July 2025 -2.583. Trailing exploration cash use is US$29.150m by the same method. Both are before the November schedule reset. FY operating Quarter operating FY exploration Quarter exploration
Reconciliation to Common Shareholders
| Calendar year | Project after-tax FCF US$m | Residual project NAV US$m | Parent cash US$m |
|---|---|---|---|
| 2027 | -88.0 | 2065.4 | 250.5 |
| 2028 | -146.0 | 2376.6 | 64.5 |
| 2029 | 501.3 | 2065.5 | 525.7 |
| 2030 | 377.6 | 1853.0 | 863.4 |
| 2031 | 330.8 | 1670.5 | 922.9 |
Project cash is after planned mine capital; parent cash starts at estimated US$378.5m, pays US$25m annual parent cost, US$67.5m aggregate modeled coupons, US$300m note face, foundation and current liabilities, then receives US$36.7m assumed option exercise proceeds and US$37m marketable asset value by 2031. No dividend or buyback is modeled. Base residual cash stays in common value; if only half of positive residual benefits holders, the other half is treated as zero-value spending, while every negative cash year is funded in full. The separate VZLA and ABRA returns are in the frozen comparison output. Note Opening cash Cash worksheet
Primary Sources and Locators
The Peralta factual exhibit reconstructs exact compact rows and names original document/page locations. It is secondary; originals were opened and are retained owner-only because redistribution rights are uncertain. Originals: Panuco 2025 FS, 553 physical PDF pages, July 2026 financials, July 2026 MD&A, FY2026 audited financials, FY2026 MD&A, 19 November 2026 update, Convertible closing terms, Royalty transaction, TSX history via S&P Global, and ABRA comparator edition. The exhibit’s PDF page is an exact reader locator; its annotation lists the original physical page or issuer document.
Frozen Inputs and Assumptions
Public model inputs fix dates, CAD1.40/USD, US$40/US$3,600 metal deck, study sensitivities, share count, cash stub, parent costs, 8% project discount and 7.5% gross XIC return. The XIC benchmark assumes 3 bp on ETF purchase and sale, and the stock assumes 5 bp on both sides. VZLA has no forecast distribution; any dated distributions elsewhere in the ranking are carried at 9.5% to 25 November 2031. Key analyst judgments are the US$28m cash stub, US$37m haircut marketable assets, annual project calendar map, US$25m annual parent spend and full joint stress reserve.
Worksheets and Saved Outputs
| Worksheet | Output |
|---|---|
| Finite-life NAV and entry | Decision and scenarios · NAV bridge · Annual cash · Machine output |
The Python worksheet reads only frozen inputs, uses the standard library and rewrites its saved public outputs. It is runnable from any public-only checkout. Source-row to input and formula links are stated in the relevant sections.
Changes from the Preceding Edition
The preceding 25 November 2026 first edition is retained. This correction prints the C$3.58 maximum entry in the chart heading so the marker amount is visible on phone and desktop. Economic inputs, fair value, entry and decision are unchanged. The next economic checkpoint is formal site, permit, financing and budget disclosure.
| Revision driver | Fair value | Maximum entry |
|---|---|---|
| Prior | C$6.61 | C$3.58 |
| Visible chart marker amount | C$0.00 | C$0.00 |
| Rounding | C$0.00 | C$0.00 |
| Current | C$6.61 | C$3.58 |