AbraSilver Resource Corp. (TSX:ABRA) | 24 November 2026
Our maximum entry price is C$9.83 per share. At the verified 24 November 2026 TSX regular close of C$8.70, the rule says Buy for a five-year holding period ending 24 November 2031. The strongest contrary case combines US$35 silver, US$3,350 gold, US$144 million of extra construction capital, a C$6 equity issue and a one-year ramp delay: its C$7.55 unstressed hurdle entry is below the close, so the call would reverse. The base case is favored because the July 2026 feasibility study supports the resource and initial mine design, while the lower US$40 silver deck and explicit financing dilution already cut its headline economics; the financing and first production milestones remain decisive. Mine plan Funding
- Market close (CAD/share; 2026-11-24)
- 8.70
- Base fair value (CAD/share)
- 11.35
Company details
- Maximum entry price (CAD/share)
- 9.83
Issuer: AbraSilver Resource Corp.; listing TSX:ABRA; quoted currency CAD; sector Materials / silver-gold development. Evidence cutoff and quote close: 24 November 2026. Latest available interim filing: 30 September 2026, authorized 12 November. Present fair value is C$11.35; modeled 2031 equity exit is C$16.68 per economically diluted share. The C$9.83 entry is the C$10.59 five-year benchmark hurdle ceiling less a C$0.76 stress-only reserve, rounded to cents. The 2031 exit is a forecast, not a target-price quotation. Share basis Project NPV
Closing Prices
| Date | Close (CAD) | Entry (CAD) |
|---|---|---|
| 2026-11-18 | 9.87 | |
| 2026-11-19 | 9.25 | |
| 2026-11-20 | 8.19 | |
| 2026-11-23 | 9.10 | |
| 2026-11-24 | 8.70 | 9.83 |
Source for the regular TSX daily closes, not adjusted for dividends: dated ABRA price history. The user-provided cutoff close was corroborated there. No dividends are declared in this period.
Investment Thesis
One ABRA share owns a diluted claim on the wholly owned Diablillos reserve mine plan, after funding the build and senior claims. The July study gives a 25-year life and US$3.003 billion after-tax NPV at 5% using US$50 silver and US$3,650 gold; those are project economics, not common equity value. Study Metals
Market Mispricing
At C$8.70 and 165.688 million basic shares, market equity is about C$1.442 billion. The market may be discounting financing, metal prices and schedule more than this model. The position is credible only if the US$964.84 million modeled debt/equity package can be obtained without a material stream. Shares Financing
Recent Developments
The feasibility study was filed July 2026; Worley began bridging engineering in August; 13 November board changes preceded financing and a targeted Q2 2027 final investment decision. The company had not disclosed binding project financing terms by the cutoff. Worley award Board update Financing
Earnings Outlook
The company has no operating revenue and lost C$44.391 million in nine months of 2026. Mine earnings do not start until the modeled late-2029 first doré and 2030 ramp. Loss First doré
Valuation Summary
The model uses the study's US$2.223 billion NPV8, adjusts metal prices, finances the build, rolls the residual project NAV to 2031 and divides remaining common equity by 276.75 million diluted shares. C$16.68 is the base exit, C$11.35 its 8% present value and C$9.83 the maximum entry after the benchmark and joint-stress reserve. NPVs Generated valuation
Recommended Action and Entry Price
Buy only at or below C$9.83 on this dated evidence. At the close, modeled stock return after 5 bp on each side is 13.88% annually, versus XIC's 7.49% after 3 bp each side, or 6.39 percentage points. The rule requires 2.00 percentage points; a full joint bear case fails. Return arithmetic
Catalysts
Signed financing and final investment decision in Q2 2027; first doré near November 2029; full-year 2030 realized metal and cost reports are the three milestones that can settle the base case. Schedule
Primary Risks to Thesis
Unfunded construction, an adverse metal deck, incomplete engineering and Argentina execution risk are material. The study's Class 3 cost range extends to +20%; even a delayed year and a smaller cost overrun can remove the entry margin. Cost range Funding
Company Overview
AbraSilver is a pre-revenue Canadian developer focused on the 100%-owned Diablillos silver-gold project in Salta and Catamarca, Argentina. The 2026 study is the only asset given material base-case value here. Issuer project page No revenue
Products and Services
The planned open-pit mine and 9,000-tonne-per-day plant would sell payable silver and gold in doré. The study estimates 147.4 million oz silver and 1.539 million oz gold recovered over mine life. DFS production Technical report
Business Model
There is no current mineral sales cash flow. Feasibility cash flow assumes construction from 2027 to 2029 and a finite reserve schedule; financing must precede production. No revenue Schedule
Revenue Drivers
Payable ounces times realized USD metal prices drive revenue. The first five production years average 13.938 million oz silver and 89.1 thousand oz gold annually in the study; a delayed ramp or lower recoveries reduces earlier and more valuable cash. Ounces
Cost Structure
The study includes US$70.2 million before FID, US$720.6 million FID-to-first-silver, US$45.4 million early sustaining, then ongoing sustaining and closure. It already embeds mine operating costs, royalties and Argentine taxes in project NPV. Capital Royalties
Operating Levers
Silver price and silver recovery dominate study sensitivity; its NPV5 at US$40 silver is US$2.670 billion holding other assumptions constant. The study used US$65.75 WTI in fuel cost; an US$80 WTI stress is discussed under Valuation, with no fabricated direct earnings conversion because diesel volumes by contract are not separately frozen in this package. Silver sensitivity WTI
Distribution
No dividend or buyback is assumed before the 2031 exit. Mine cash after sustaining capital, tax, coupon and principal is first retained or used for debt service. Cash schedule
Geographic Exposure
The operating asset and primary execution risk are in Argentina; parent equity trades in Canadian dollars while the study and financing model are in US dollars. The base assumes CAD1.40 per US dollar, matching the study's headline CAD conversion. Project page
Regulatory Environment
Salta and Catamarca exploitation approvals and RIGI acceptance were reported, while water and infrastructure authorizations remain execution dependencies. The model uses the study's stated RIGI tax economics, without independent legal opinion. DFS physical p53
Industry Structure
Diablillos competes for mine construction capital and labor with other unbuilt projects; output is sold into global silver and gold markets. This company is a price taker, so metal assumptions deserve greater weight than a claimed competitive moat. DFS market assumptions
Growth and Cyclicality
The study's US$50 silver is 25% above this report's US$40 base and a major driver of value. The July price sensitivity gives a US$333 million NPV5 loss for that difference, before the gold adjustment. Silver row
Competitors
Denison's Phoenix uranium build and Perpetua's Stibnite gold-antimony build illustrate how financing and engineering maturity vary; neither metal mix or jurisdiction is a clean ABRA valuation proxy. Denison Perpetua
Market Share
The study's 13.938 million oz initial five-year average silver is meaningful planned output, but no defensible share of global supply is inferred from a single project study. Ounces
Competitive Advantages
The long reserve life and completed feasibility study are strengths. The source does not establish a persistent unit-cost advantage after funding or political risk; the model gives no premium for one. DFS
Pricing and Cost Position
The study reports US$19.7/oz AgEq AISC in its first five years of production at its own equivalence prices; that cannot be compared directly to silver-only cash cost or the report's lower metal deck. DFS physical p59
Entry Barriers and Substitutes
Reserves, permitting and capital form barriers to another mine, while investors can choose operating miners with established cash flow. An unbuilt asset faces a higher financing hurdle than an operating miner. Funding
Supplier and Customer Dynamics
Process plant procurement and power supply are critical; the study states no grid-power agreement was signed at its date and expects diesel until 2032. No customer concentration or offtake price premium is assumed. DFS physical p694
Regulation and Structural Risks
RIGI benefits and remaining water, tailings and access approvals can affect tax and timing. A one-year delay is explicitly run in the joint downside. DFS physical pp53,696
Historical Performance
There is no sales trend to extrapolate. Annual losses increased from C$25.096 million in 2024 to C$57.638 million in 2025; 2026 nine-month loss was C$44.391 million. Annual Interim
Income Statement Analysis
Nine-month 2026 exploration expense was C$35.744 million. Share-based pay of C$4.044 million explains part of loss versus cash use; both the cash burn and dilution matter before FID. Exploration Financial statements p3
Balance Sheet Analysis
September cash and deposits totaled C$57.346 million against C$4.424 million current liabilities. They are insufficient to fund US$836.3 million installed cost. Cash Deposits Liabilities Capital
Cash Flow Analysis
Operating cash use rose to C$47.243 million for nine months of 2026 from C$30.759 million a year earlier. Net equity proceeds of C$48.755 million financed that run rate. Operating Equity
Earnings Quality
Current loss contains noncash share compensation, but cash use remains large. Future project NPV is study cash flow, not recurring reported earnings or distributable corporate cash. Financial statements p3 and p5
Nonrecurring Items
The current income statement includes foreign exchange gains and other income; neither is capitalized as recurring project cash. Exploration spending is separated from project capex where the study omits parent sunk cost. Q3 FS p3
Funding and Cash Conversion
The analyst funding plan raises US$400 million debt and US$564.84 million total new equity, including a US$64.84 million funding gap above the initial US$500 million assumption. Uses to first silver are US$1,005.8 million: US$790.8 million pre-FID/FID mine spending, US$35 million corporate cost, US$25 million fees, US$120 million three-year coupon and US$35 million buffer. Sources are current cash US$40.96 million plus the two raises. The US$45.4 million early sustaining sits inside 2030's net project cash, not in these pre-silver uses. Future operational cash services debt; US$0 remains at the base 2031 exit. These are assumed funding terms, not announced agreements. Capital Financing Generated bridge
Key Ratios
The study's NPV5 / FID-to-first-silver capex is 4.17x, but that excludes US$70.2 million pre-FID and ignores the common-share financing. The model's C$16.68 exit / C$8.70 close is 1.92x gross price; investor wealth after costs is 1.91x because no distributions are forecast. NPV Capital
Forward Outlook
Three frozen checkpoints: (1) Q2 2027 signed funding must cover at least US$1.006 billion sources and uses at ≤277 million diluted shares and ≤US$400 million debt; a worse package invalidates base. (2) first doré by December 2029 and 2030 silver/gold production moving toward 13.938 Moz / 89.1 koz annual study averages; compare actual payable metal and recovery. (3) 2031 project after-tax net cash at least US$620 million and debt fully repaid by exit; compare issuer cash flow, sustaining spend and debt note. Downside tests are respectively >US$144 million extra capex/C$6 issue, one-year delay, and <US$350 million 2030 / <US$620 million 2031 project net cash. Study Timing Model schedule
Model Choice
A finite-life NAV is appropriate for a nonproducing reserve mine. The study's project cash flow includes capital, sustaining, closure, royalty and tax, but assumes 100% equity finance and excludes parent sunk cost. The worksheet changes metal prices, rolls project NAV through 2031 cash, adds financing proceeds to parent cash, pays coupons/principal, then deducts residual debt and divides by post-financing diluted shares. This is an analyst approximation, not the issuer's undisclosed annual cash-flow model. DFS physical pp58,696 Worksheet
Growth
The reserve plan supports first doré in November 2029, 2030 ramp and 25 mine years. Exploration and a proposed heap-leach expansion carry zero value until a technical and funding plan can be modeled; the 2026 assays are not converted into reserves in this report. Schedule DFS opportunities p63
Profitability
The base US$40 silver and US$3,600 gold imply US$1.949 billion project NPV8 at construction start by scaling the study's separate NPV5 price sensitivities to its NPV8/NPV5 ratio. This proportional scaling is a large analytical approximation, not an issuer scenario. A US$80 WTI cross-check lies US$14.25 above the DFS fuel premise; the absence of a separable contracted diesel volume prevents a precise entry adjustment, so fuel cost is covered by the capex/cost stress and watched at procurement. Silver Gold WTI
Reinvestment or Required Capital
The model includes US$70.2 million pre-FID and US$720.6 million FID-to-first-silver in 2027-29 project cash and US$45.4 million early sustaining within 2030 net project cash. The 2030 US$350 million and 2031 US$620 million net project cash are analyst scheduling estimates calibrated around the study NAV; their breakdown is not independently reported. No perpetuity is appended to the finite reserve NAV. Capital Generated years
Discount Rate
The study gives US$3.003 billion NPV5 and US$2.223 billion NPV8. Eight percent is used as the project discount rate and present fair-value discount here; it is an explicit analyst risk judgment, not a measured ABRA cost of equity. At five percent the project anchor increases by US$780 million before financing. A 10% rate, using a linear extrapolation of those two study NPVs, lowers present fair to C$9.06 and the maximum entry to C$8.51, reversing the call at the cutoff close. This extrapolation is an uncertainty test, not another technical-study result. NPVs
One-factor acceptance tests
| Assumption and rule at C$8.70 | Fair value (CAD/share) | Entry after same stress reserve (CAD/share) |
|---|---|---|
| Base — Buy | 11.35 | 9.83 |
| Silver US$30/oz — Buy | 10.14 | 8.70 |
| Project discount 10% — Wait | 9.06 | 8.51 |
| Equity issue C$5 — Wait | 9.53 | 8.13 |
One-factor cases hold the base stress reserve constant. The 10% project NPV anchor linearly extrapolates the DFS 5% and 8% NPVs; it is an analyst approximation.
Terminal Economics
There is no perpetual terminal year. At 24 November 2031, after 2030-31 modeled mine cash, the remaining finite reserve project NAV is US$2.770 billion. Carrying the 2031 US$620 million project cash into 2032 instead would leave a correspondingly larger residual asset but less parent cash at exit; discount timing changes value. The US$45.4 million early sustaining is already included; subtracting it again would double count. Output Capital
Bridge to One Common Share
At exit: US$2,770.16 million residual project NAV + US$529.75 million residual parent cash − US$0 debt − US$3.16 million current liabilities = US$3,296.75 million equity, or C$4,615.45 million at CAD1.40/USD. Divide by 276.75 million shares (165.688 basic, 4.686 options, 0.943 RSUs and 105.437 construction shares) to get C$16.68. The options are counted fully, with no exercise proceeds credit. The US$400 million loan is included as cash at source, then serviced by three construction coupons and two operating coupons and repaid; it is not a free addition to NAV. Shares Liabilities Output
Price-Implied Expectations
The C$8.70 close requires a C$13.70 exit to earn XIC net plus 200 bp with no distributions and stated costs. Holding the base project value and financing fixed, a lower 2031 exit can be produced by about US$588 million less common equity value, or ~US$588 million lower 2031 common value. A full joint bear exit of C$11.89 falls short. These are conditional reverse-market arithmetic, not consensus forecasts. Decision Output
Independent Cross-Check
The issuer's raw 5% NPV of C$4.204 billion divided by 165.688 million basic shares is C$25.37, not an investable price: it omits debt service and construction dilution. Applying the study's 8% NPV and lower metals, then the funded share bridge produces C$11.35 present fair. The C$13.70 hurdle exit test is an independent investor-return check. NPV Shares
Conclusion and Change from Prior Edition
The first ABRA Markdown edition was published at this cutoff. A title-only reader correction followed. The one-factor investment tests were added after live evaluation. This revision puts each Buy/Wait call beside its assumption on phones; the base model and entry are unchanged. Before first release, funding the US$144 million stress overrun lowered the joint bear exit from C$12.30 to C$11.89 and entry from C$9.82 to C$9.83. Moving part of FID capital into 2027 then moved the base exit to C$16.68 and entry to C$9.83. Generated model
Peer Selection
Denison Phoenix and Perpetua Stibnite are late-stage financed/developing mines with published NPV and initial capex. They serve only as development-capital efficiency checks; uranium and antimony, US vs Canadian jurisdictions, tax and discount rates differ. Denison Perpetua
Dated Ratio Table
| Issuer / project | Source date | After-tax project NPV | Initial capex | NPV/capex | Basis |
|---|---|---|---|---|---|
| ABRA / Diablillos | 20 Jul 2026 | US$3,003m at 5% | US$720.6m FID-to-silver | 4.17x | DFS silver US$50/gold US$3,650 evidence T01 evidence T03 |
| DML / Phoenix | Jan 2026 update | C$1,570m at 8% | C$600m post-FID | 2.62x | Adjusted tax assets, uranium evidence P01 |
| PPTA / Stibnite | 31 Dec 2025 TRS | US$3,457m at 5% | US$2,576m | 1.34x | Gold/antimony, US jurisdiction evidence P02 |
Comparability Adjustments
These are project NPV/capex ratios, not EV/EBITDA or trading multiples. Denison includes entity tax attributes; ABRA excludes pre-FID from the capex denominator; Perpetua's debt support and byproduct economics differ. No peer ratio is plugged into ABRA per-share fair value. Denison update Perpetua annual
Implications for Value
ABRA's apparently high 4.17x ratio does not remove the need for nearly US$1.0 billion of funded uses or protect against share issuance. It supports project quality but cannot decide the common-share entry alone. Funding
Bear Case
US$35 silver, US$3,350 gold, US$144 million incremental build cost, C$6 financing and a one-year ramp delay yield C$11.89 exit, C$8.09 present fair and C$7.55 unstressed hurdle. It is a plausible linked financing-and-operating miss given 19% engineering progress and no agreed financing; it is not a probability-weighted forecast. Class 3 Output
Base Case
US$40 silver, US$3,600 gold, US$400 million debt at 10%, US$564.84 million equity at C$7.50, first doré 2029 and staged project cash produce C$16.68 exit. Silver sensitivity Gold sensitivity Output
Bull Case
Study US$50 silver / US$3,650 gold with the same financing and schedule lifts the exit to C$18.65; it still uses 8%, dilution and no extra exploration value. Study metals Output
Outcomes at Close and Entry
| Assumption | Close | Fair value | Maximum entry | Price rule |
|---|---|---|---|---|
| Base | 8.70 | 11.35 | 9.83 | Buy |
| Joint bear | 8.70 | 8.09 | 7.55 | Wait |
| Bull | 8.70 | 12.69 | 11.84 | Buy |
| Case | 2031 exit CAD/share | Present fair CAD/share | Five-year net return at C$8.70 | Decision at C$8.70 |
|---|---|---|---|---|
| Joint bear | 11.89 | 8.09 | 6.43% | Wait |
| Base | 16.68 | 11.35 | 13.88% | Buy |
| Bull | 18.65 | 12.69 | 16.45% | Buy |
At the C$9.83 entry, base net return is about 11.13% versus 7.49% XIC net; the entry reserve exceeds the 200 bp requirement. Bear loss at entry to its 2031 exit is not a nominal loss, but bear net return misses the benchmark hurdle. All cases assume zero actual distributions; the 9.5% distribution carry is therefore zero. Output
Market-Implied Case
The market's C$8.70 price plus a 200 bp net spread implies the C$13.70 required exit. Under the base share count this means roughly US$2.71 billion 2031 common equity; the model produces US$3.30 billion. A financing stream or lower metal realization absorbing ~US$588 million of 2031 common value closes that gap. A signed stream's attributable ounces and debt covenant package will test this case. Output
Analyst Assessment
The base is a conditional Buy with C$1.13 of entry headroom. The joint downside lowers the unstressed hurdle by C$3.04 and clearly fails. Individually, a C$5 financing issue or a 10% project discount rate also flips the call; US$30 silver is near the boundary. Quarterly financing terms, first doré timing and net project cash should control the next edition. Funding Sensitivity
Operating Risks
Recoveries, high-altitude logistics and grid-power timing can reduce cash or delay ramp. The scenario moves first meaningful project cash by one year; the next engineering and production disclosures are tests. DFS physical pp57,694
Financial and Liquidity Risks
The company had C$57.346 million cash/deposits and no signed construction financing in the reviewed filing. The model needs US$564.84 million new equity and US$400 million debt. A stream would have to be valued as both financing proceeds and surrendered metal cash, never as free proceeds. Cash Deposits Financing
Regulatory and Legal Risks
RIGI treatment and provincial approvals support the study, but water, infrastructure and Argentine foreign-exchange rules remain financially material. A tax or access change should be reflected in project cash before a new price recommendation. DFS physical pp53,701
Industry and Competitive Risks
Global metal prices determine revenue; ABRA has little price control. A sustained US$35 silver deck is enough, with linked build misses, to eliminate the base margin. Silver sensitivity
Thesis-Specific Risks and Reconsideration Triggers
Reconsider on binding financing above 277 million diluted shares or an expensive stream, capex above US$836.3 million plus disclosed pre-FID burn, first doré after 2029, or 2030 payable ounces far below the study ramp. A private challenge specifically required financing sources-and-uses and no double count of study capex/royalties; both are addressed in the worksheet. Capital Production
Environmental Factors
The study includes US$74.1 million closure cost and designs tailings and water works; that cost is already in NAV. Water permits and grid power remain cash and schedule risks. DFS physical pp55,53
Social Factors
The project crosses two Argentine provinces. Exploitation environmental approvals are in place, but land and water authorizations are still on the critical path; no unsupported social-license premium is assigned. DFS physical p53
Governance Factors
The November board/CFO changes occur during financing negotiation. Large prospective equity issuance makes issue price, warrants and insider rights material to common owners. Board release Dilution
Financially Material Risks and Opportunities
Failure to secure water, grid or non-dilutive funding can delay cash or impair NAV. Conversely, reserve expansion and heap leach are upside options assigned zero until a study and financing plan quantify them. DFS opportunities p63
Annual Results
| CADm unless stated | FY2024 | FY2025 | Source |
|---|---|---|---|
| Revenue | 0 | 0 | evidence F16 |
| Evaluation and exploration | 20.348 | 42.246 | FY25 FS p6 |
| Net loss | 25.096 | 57.638 | evidence F12 |
| Basic weighted-average shares (m) | 121.915 | 151.404 | FY25 FS p6 |
Interim Results
| CADm unless stated | 9m Sep 2025 | 9m Sep 2026 | Source |
|---|---|---|---|
| Revenue | 0 | 0 | evidence F16 |
| Evaluation and exploration | 29.216 | 35.744 | evidence F06 |
| Net loss | 38.473 | 44.391 | evidence F05 |
| Basic weighted-average shares (m) | 149.211 | 161.831 | Q3 FS p3 |
Trailing Results
Trailing 12-month loss to Sep 2026 is C$63.556 million = FY2025 C$57.638 million + 9m2026 C$44.391 million − 9m2025 C$38.473 million. This is not forecast mine income. Annual Interim
Material Adjustments
Noncash share pay and FX affect loss-to-cash conversion. The NAV starts from study after-tax cash, not reported loss; no reported earnings multiple is applied. Q3 FS pp3,5
Annual Positions
| CADm | 2024-12-31 | 2025-12-31 | Source |
|---|---|---|---|
| Cash and deposits | 13.726 | 58.459 | evidence F14 |
| Total assets | 39.680 | 86.061 | FY25 FS p5 |
| Total liabilities | 10.929 | 7.244 | FY25 FS p5 |
Interim Positions
| CADm | 2025-12-31 | 2026-09-30 | Source |
|---|---|---|---|
| Cash + term deposits | 58.459 | 57.346 | evidence F01 evidence F02 |
| Total assets | 86.061 | 92.196 | evidence F04 |
| Current liabilities | 7.243 | 4.424 | evidence F03 |
| Working capital | 51.917 | 53.875 | evidence F11 |
Capital and Claims Reconciliation
Current liabilities of US$3.16 million equivalent remain a deduction at exit. No project debt exists at the interim date; US$400 million is forecast debt raised in 2027 and fully repaid in base by 2031. Royalties and closure are inside study NAV, so they are not separate exit claims. Liabilities Royalties Output
Annual Flows
| CADm | FY2024 | FY2025 | Source |
|---|---|---|---|
| Operating cash use | 23.128 | 44.171 | evidence F13 |
| Net equity proceeds | 19.959 | 101.459 | FY25 FS p8 |
Interim Flows
| CADm | 9m Sep 2025 | 9m Sep 2026 | Source |
|---|---|---|---|
| Operating cash use | 30.759 | 47.243 | evidence F07 |
| Net equity proceeds | 56.220 | 48.755 | evidence F08 |
Trailing Flows
Trailing operating cash use = FY2025 44.171 + 9m2026 47.243 − 9m2025 30.759 = C$60.655 million. Forecast parent pre-FID cash burn of US$35 million is an assumption, distinct from study project spend. Annual Interim
Reconciliation to Common Shareholders
From 2030 project net cash US$350 million, pay US$40 million coupon, US$12.5 million parent overhead, then US$297.5 million debt principal, retaining US$35 million. In 2031, US$620 million project cash pays US$10.25 million coupon, US$12.5 million overhead and US$102.5 million remaining principal, leaving US$529.75 million cash. There are no dividends; the cash stays in exit equity once, and the 2031 debt claim is zero. If project cash misses, debt remains senior and common value falls. Generated cash schedule
Primary Sources and Locators
The Peralta factual exhibit is a four-page reconstruction with claim-specific numeric rows and original document/page references. Full originals are owner-only due to redistribution uncertainty. Publisher originals: Q3 2026 financial statements, Q3 2026 MD&A, FY2025 audited statements, Diablillos technical report, Denison capex update, Perpetua annual report. Physical PDF pages in the exhibit are 1-4; original pages are printed in each row. The exhibit is factual reconstruction, not the original issuer page.
Frozen Inputs and Assumptions
Frozen inputs identify reported basis and analyst assumptions; the main judgment calls are US$40 silver, US$3,600 gold, 8% discount, 1.40 CAD/USD, US$400 million debt at 10%, C$7.50 equity issue, 2030-31 net mine cash and stress weighting. The original DFS and interim rows are cited beside each corresponding claim above. The absence of a binding funding package and full annual DFS cash table available in this source copy are material limitations. Financing Study NPV
Worksheets and Saved Outputs
Run from this folder with Python 3.12.13 and no third-party packages: PYTHONDONTWRITEBYTECODE=1 PYTHONPATH=. /Users/johnperalta/johnperalta4vanilla/.venv/bin/python support/valuation.py. A portable Python 3.12 installation can substitute for the absolute interpreter path. The script reads only frozen public JSON and emits the linked Markdown/JSON. It includes the zero-payment five-year stock/XIC comparison; transaction costs are 5 bp stock and 3 bp XIC per side. No dividend carry is needed because distributions are zero.
| Worksheet | Output |
|---|---|
| Valuation and decision | Decision · Valuation, funding and cash · One-factor sensitivities · Exact JSON |
ABRA valuation output
| Measure | Base | Joint bear | Bull |
|---|---|---|---|
| Silver deck (US$/oz) | 40.00 | 35.00 | 50.00 |
| Gold deck (US$/oz) | 3,600.00 | 3,350.00 | 3,650.00 |
| DFS project NPV at 8%, adjusted (US$m) | 1,948.62 | 1,542.02 | 2,223.00 |
| Project NPV at cutoff (US$m) | 1,884.71 | 1,491.44 | 2,150.09 |
| 2031 residual project NAV (US$m) | 2,770.16 | 3,008.28 | 3,160.09 |
| New funding equity (US$m) | 564.84 | 708.84 | 564.84 |
| 2031 residual cash (US$m) | 529.75 | 35.00 | 529.75 |
| 2031 debt claim (US$m) | 0.00 | 180.00 | 0.00 |
| 2031 diluted shares (m) | 276.75 | 336.71 | 276.75 |
| 2031 equity exit (C$/share) | 16.68 | 11.89 | 18.65 |
| Present fair (C$/share) | 11.35 | 8.09 | 12.69 |
| Unstressed hurdle (C$/share) | 10.59 | 7.55 | 11.84 |
Unstressed hurdle C$10.5894; joint stress reduction at 25% weight C$0.7604; maximum entry C$9.8291. At C$8.70, expected net annual return 13.88%; XIC net 7.49%; spread 6.39 percentage points.
| Year | Project after-tax net cash US$m | Parent cash US$m | Debt US$m |
|---|---|---|---|
| 2027 | -250.00 | 655.80 | 400.00 |
| 2028 | -300.00 | 315.80 | 400.00 |
| 2029 | -240.80 | 35.00 | 400.00 |
| 2030 | 350.00 | 35.00 | 102.50 |
| 2031 | 620.00 | 529.75 | 0.00 |
Changes from the Preceding Edition
The predecessor is edition 2026-11-24-03. Its economic cutoff, forecast, fair value, entry and call are retained; this revision moves the one-factor calls into the first column for 390px readability. Earlier editions remain immutable.
| Revision driver | Fair value | Maximum entry |
|---|---|---|
| Prior | 11.35 | 9.83 |
| Mobile table layout | 0.00 | 0.00 |
| Rounding | 0.00 | 0.00 |
| Current | 11.35 | 9.83 |