Vizsla Silver Corp. (TSX:VZLA) | 25 November 2026

Our maximum entry price is C$3.58 per share. At the 25 November 2026 TSX regular close of C$4.05, the five-year price rule says Wait. The strongest credible contrary case is a safe, timely site restart and on-study grades/capital: removing the active-risk reserve raises entry to C$6.03 and changes the decision to Buy at this close. I retain the reserve because the issuer has not made a production decision or formally returned to site; the November 19 H2 2028 production target has no updated economic study. Close Revised target No decision

Stock Price History · Maximum entry C$3.58

Market close (2026-11-25)
C$4.05
Base fair value
C$6.61
Company details
Maximum entry price
C$3.58

Issuer: Vizsla Silver Corp.; listing TSX:VZLA; currency CAD; sector Materials / silver-gold development. Research and quote cutoff: 25 November 2026. Latest filed interim financials: 31 July 2026, authorized 4 September. Base fair value is C$6.61; forecast 25 November 2031 exit is C$9.50 per economically diluted share. The unstressed five-year hurdle ceiling is C$6.03; a C$2.45 stress-only reserve sets the final C$3.58 entry. No VZLA shareholder distribution is forecast. These are analyst estimates, not issuer guidance. Share date Study NAV

Stock Price History · Maximum entry C$3.58

Closing Prices

DateClose (CAD)Maximum entry (CAD)
2025-11-287.15
2025-12-317.52
2026-01-306.89
2026-02-275.97
2026-03-314.61
2026-04-304.61
2026-05-295.39
2026-06-304.66
2026-07-314.38
2026-08-315.60
2026-09-305.40
2026-10-304.28
2026-11-194.06
2026-11-203.63
2026-11-233.94
2026-11-243.86
2026-11-254.053.58

Month-end TSX regular closes from November 2025 through October 2026, followed by selected November event days and the 25 November close. This is a price context series, not dividend-adjusted total return. Frozen observations Yahoo Finance VZLA.TO history S&P Global recent daily history

Investment Thesis

One share is a residual claim on 100%-owned Panuco after its life-of-mine royalties, US$300 million convertible face, future corporate costs and roughly 382.2 million potential common shares. Panuco has a high-grade, short-payback study, but the active security interruption and one-year target shift create a genuine gap between the study and a funded producing mine. NPV Royalties Note

Market Mispricing

The C$4.05 close is C$2.56 below C$6.61 fair value, while fair exceeds the C$3.58 entry by C$3.03; the full close-to-entry gap is −C$0.47. The market price implies about US$1,132 million of project NAV on this share and claims basis, roughly 38% below the US$1,831 million base. That gap could be rational if investors assign roughly 40% probability to a no-restart salvage outcome; the probability is a two-state analytical illustration, not a forecast. Market observation Model

Recent Developments

The 19 November update put first silver in H2 2028 rather than H2 2027, reported 50% engineering and 85% of process equipment ordered, and said the old study economics were not revised. A September acquisition transferred the Panuco NSR to Elemental; that royalty remains in project cash costs and is not an asset owned by VZLA common. Timing Engineering NSR holder

Earnings Outlook

The latest July quarter had no material mining revenue, US$19.8 million of accounting loss and US$5.3 million operating cash use. The model puts preproduction project cash needs in 2027–28, then US$501 million of after-tax project cash in 2029 at the shared metal deck; the 2028 target can fail without falsifying the 2025 study grade. Quarter loss Cash use Study cash

Valuation Summary

The modeled US$1.831 billion project NAV plus estimated liquid assets, less the note and future overhead/coupon, is C$6.61 per diluted share. Rolling project NAV and cash to 2031 gives C$9.50; after stock dealing costs that is 18.57% annualized at the close versus 7.49% for XIC after ETF costs, a 11.08 percentage-point spread. The security/grade/capital stress reduces the hurdle ceiling from C$6.03 to C$3.58. Bridge Returns

Recommended Action and Entry Price

Wait for C$3.58 or lower on unchanged evidence, or for documented security, permitting and financing progress that permits the risk reserve to be recalibrated. C$4.05 is above the defended maximum despite high modeled base return. The 2 percentage-point hurdle is measured above net XIC, with 5 bp share costs and 3 bp ETF costs on each side. Decision worksheet

Catalysts

A formal site restart, remaining permits, a final investment decision and a revised detailed construction budget are the first tests. The first operating forecast checkpoint is payable silver toward 13.945 Moz in the first full year, rather than the construction date alone. FID First-year silver

Primary Risks to Thesis

Security could prevent restart, delay receipts and keep fixed costs running. A joint US$35 silver/US$3,100 gold deck, 10% grade loss, US$100 million capex increase and another year of delay lowers modeled fair to C$3.81, the 2031 exit to C$5.64 and final entry to C$3.58; a no-restart salvage illustration is only C$0.16. Delay Grade sensitivity