Torex Resources (Peralta TXG; trading TSX:TXR) — 2026-11-24
Our maximum entry price is C$18.00 per share. At the November 24, 2026 regular TSX close of C$62.13, the rule says Wait. Our base fair value is C$25.95; the unrounded five-year return-hurdle ceiling is C$21.19. The strongest credible contrary case assumes US$5,300/oz gold throughout the modeled mine life, 5% higher physical volume, and full US$1,491m Los Reyes PEA credit: it raises the unrounded hurdle to C$64.75 and the whole-dollar entry to C$64, changing the price rule to Buy. We favor US$3,600 gold and 25% PEA credit because Los Reyes has no reserve and the Q3 US$4,324 realized price is a short-period observation. Peralta factual exhibit M01 Peralta factual exhibit O02 Peralta factual exhibit L01 Peralta factual exhibit L03
- Market close (CAD)
- 62.13
- Base fair value (CAD/share)
- 25.95
Company details
- Return-hurdle entry (CAD/share)
- 21.19
- Maximum entry price (CAD/share)
- 18.00
As-of: November 24, 2026 after the regular TSX close. Issuer: Torex Resources Inc. Exchange quote: TXR.TO, CAD. Peralta edition identity: TXG, preserving one issuer record. Model: finite Morelos mine plus risked Los Reyes option. Next review: Q4/FY2026 operating release in early 2027. Peralta factual exhibit I01
| Date | Close (CAD) | Entry (CAD) |
|---|---|---|
| 2026-11-20 | 58.69 | |
| 2026-11-23 | 63.47 | |
| 2026-11-24 | 62.13 | 18.00 |
The three regular TSX closes are unadjusted market observations. Yahoo TXR.TO history
Investment Thesis
Torex is a 100%-owned Morelos gold/copper/silver producer with a fully operating Media Luna mine and a preliminary second project at Los Reyes. Peralta factual exhibit O09 At a US$3,600 gold deck, the five-year cash and finite residual mine model does not support the C$62.13 close. The modeled base equity NAV is C$25.95; the entry rule is C$18.00. Model output
Market Mispricing
The close exceeds NAV by C$36.18 and the final entry by C$44.13. The gap rests mainly on the gold deck and willingness to capitalize Los Reyes before a reserve and funded construction plan. The US$5,300/full-PEA case reaches C$64.75 unrounded hurdle and C$64 whole-dollar entry; a lower gold price or partial project credit does not.
Recent Developments
The corporate name became Torex Resources and TSX symbol changed TXG to TXR on November 3, 2026; the same common equity is followed under the existing Peralta TXG record. Peralta factual exhibit I01 Q3 results available November 4 and the November 24 close define this cutoff. Peralta factual exhibit O01 Peralta factual exhibit M01
Earnings Outlook
For 2027 the model forecasts US$1622.9m net metals sales and US$271.9m common cash after growth spending, using Morelos-only physical-metal guidance. Peralta factual exhibit O06 This is an analyst forecast, not issuer guidance.
Valuation Summary
Base finite Morelos cash PV, excess cash, and 25% of Los Reyes PEA NPV yield C$25.95. Five-year distributions and a 2031 reserve-backed exit imply a C$21.19 unrounded hurdle entry; the joint stress and whole-dollar floor bind at C$18.00. Bridge
Recommended Action and Entry Price
Wait at C$62.13. The final C$18 entry is C$3 below the identically rounded C$21 no-downside ceiling; the unrounded hurdle-to-final difference is C$3.19. The binding constraint is the maximum 20% five-year capital loss under the defined joint stress, rounded down to whole CAD. The return-hurdle ceiling itself is C$21.19; the stress reduction on the same whole-dollar basis is C$3.
Catalysts
The first checkpoint is Torex full-year 2026 production disclosure, expected with Q4 results in early 2027: 420–470 koz AuEq would meet guidance. The March 2027 reserve update and Los Reyes PFS can change mine life and project credit. Peralta factual exhibit O05 Peralta factual exhibit O07
Primary Risks to Thesis
Gold at US$5,300 throughout the explicit life plus full Los Reyes PEA value produces C$64.75 unrounded hurdle and C$64 whole-dollar entry, changing Wait to Buy at the November 24 close. This requires both materially stronger commodity economics than the US$3,600 base and removal of the PEA execution haircut. Peralta factual exhibit L01
Company Overview
Torex is an Ontario issuer whose consolidated operations and development assets are principally in Mexico. Morelos is wholly owned and the main cash engine; Los Reyes is a separate, earlier-stage project. Peralta factual exhibit O09
Products and Services
Its saleable metals are gold doré and gold/copper/silver concentrate. In Q3 2026 it produced 98,685 oz gold, 614.3 koz silver and 16.3 mlb copper; the reported AuEq total uses price conversion rather than a separate physical product. Peralta factual exhibit O01
Business Model
Underground ore from Media Luna and ELG feeds the Morelos plant, then metal sales turn into cash after operating, royalty, tax, capital and financing claims. The 2025 annual statements consolidate those activities; Los Reyes has no current production. Peralta factual exhibit F01 Peralta factual exhibit L03
Revenue Drivers
Physical ounces/pounds, recoveries and realized prices determine receipts. The base prices gold at US$3,600/oz, silver at US$50/oz and copper at US$5/lb; it takes 2% off gross metal value for realization and treatment, an analyst assumption tested in the worksheet. Peralta factual exhibit O06
Cost Structure
The 2026 AISC guide of US$2,000–2,100 per AuEq oz includes sustaining capital and lease payments; the model converts its midpoint to US$912.25m of annual cash burden and adds only non-sustaining growth spending. Peralta factual exhibit O05 Peralta factual exhibit F05
Operating Levers
Grade and recovery drove Q3 production up to 131.9 koz AuEq. Media Luna North first ore and plant throughput improvement can sustain the 2027–30 outlook, while reserve replacement controls the post-2030 cash tail. Peralta factual exhibit O01 Peralta factual exhibit O08
Distribution
The mine yields common cash through dividends and buybacks. Q3 YTD 2026 financing cash shows US$238.9m repurchases and US$32.0m dividends, but this model holds diluted shares constant and credits only C$0.64 annual cash dividends, with all remaining cash retained in the 2031 exit. Peralta factual exhibit F07
Geographic Exposure
Morelos is in Guerrero and Los Reyes in Sinaloa, making Mexican security, tax, labor and currency exposure material. There is no geographical diversity in the funded producing base. Peralta factual exhibit O09
Regulatory Environment
Operating permits, mine safety, water and tailings requirements govern cash generation. Los Reyes has no reserve; its PEA is not a construction sanction. The model caps project credit at one quarter of PEA NPV pending technical and permitting progress. Peralta factual exhibit L03
Industry Structure
Gold is price taking; Torex competes for capital, labor and processing technology rather than setting metal price. Copper by-product value diversifies revenue but makes AuEq comparison depend on the metal price deck. Peralta factual exhibit O01
Growth and Cyclicality
At unchanged 2027 physical volumes, US$600 less gold removes about US$193.5m gross revenue before tax, royalty response or mine-plan changes. This makes the gold deck the leading valuation variable. Worksheet
Competitors
Centerra is a producing North American gold/copper peer; Montage is an emerging West African producer. Their asset stage, jurisdiction and financing claims differ enough that direct AISC or NPV multiples cannot settle Torex value. Peralta factual exhibit P01 Peralta factual exhibit P03
Market Share
Torex’s 420–470 koz 2026 AuEq guidance gives a useful scale measure, not pricing power in global gold. Its market share is economically immaterial to gold price. Peralta factual exhibit O05
Competitive Advantages
Media Luna and existing Morelos processing/tunnel infrastructure avoid a new greenfield plant for the base plan; full ownership avoids a project-level minority haircut. These are execution advantages, not immunity from reserve depletion. Peralta factual exhibit O09 Peralta factual exhibit O07
Pricing and Cost Position
Torex Q3 AISC was US$1,803/AuEq oz; Centerra Q3 consolidated by-product AISC was US$1,775/oz. Centerra’s Mount Milligan 35% gold stream receives US$435/oz on that production, so its realized gold exposure differs sharply from an unencumbered US$3,600 deck. Peralta factual exhibit O03 Peralta factual exhibit P01 Peralta factual exhibit P02
Entry Barriers and Substitutes
Permitting, underground execution and mine development funding limit new supply. Investor substitutes include other gold producers and bullion; neither gives Torex a costless extension beyond its 2035 identified mine life. Peralta factual exhibit O07
Supplier and Customer Dynamics
Underground contractors, equipment, explosives, reagents and Mexican power/peso costs can raise the cash burden. Concentrate provisional pricing also makes reported revenue differ from spot metal proceeds. Peralta factual exhibit O03
Regulation and Structural Risks
Mexican taxes and royalties can absorb commodity upside. Centerra’s royalty/stream claims and Montage’s 90% Koné interest and deferred stream revenue show why ownership and funding terms must be taken to common equity before peer ranking. Peralta factual exhibit P02 Peralta factual exhibit P03 Peralta factual exhibit P04
Historical Performance
2025 revenue was US$1,305.6m and net income US$403.4m; the first nine months of 2026 already produced US$1,501.2m revenue and US$476.5m net income. Higher realized metal prices and post-ramp Media Luna output explain much of the change, so annualizing Q3 without price normalization would overstate the US$3,600 case. Peralta factual exhibit F01 Peralta factual exhibit F03
Income Statement Analysis
Q3 2026 revenue US$555.0m and reported net income US$155.2m include current tax expense US$100.5m. Adjusted earnings US$180.1m is a non-IFRS comparison, not the cash measure used for entry. Peralta factual exhibit O03 Peralta factual exhibit F06
Balance Sheet Analysis
At September 30 cash was US$225.9m and drawn debt zero; US$94.1m leases are operating claims whose payments are already in AISC/FCF. The model adds only US$75.9m of cash above a US$150m operating floor and does not subtract lease principal again. Peralta factual exhibit B01
Cash Flow Analysis
Q3 CFO US$231.0m fell to US$150.4m FCF after US$67.1m PP&E cash, US$4.3m VAT, US$6.5m lease and US$2.7m interest. This independent reconstruction sums exactly to issuer FCF. Peralta factual exhibit F05
Earnings Quality
Nine-month 2026 operating cash US$608.4m exceeds net income US$476.5m, but price-adjusted concentrate and tax timing affect conversion. The model starts with physical revenue and cash costs rather than treating EPS as distributable cash. Peralta factual exhibit F03 Peralta factual exhibit F04
Nonrecurring Items
Q3 adjusted earnings exceeded reported by US$24.9m, but the model gives no recurring credit to adjustments. Concentrate provisional gains and FX derivatives are excluded from the US$3,600 physical-metal forecast. Peralta factual exhibit F06
Funding and Cash Conversion
Torex returned US$270.9m through buybacks and dividends in nine months while operating cash generated US$608.4m. Los Reyes development is omitted from Morelos FCF because its PEA NPV already embeds upfront capital and future production; double inclusion would inflate common value. Peralta factual exhibit F07 Peralta factual exhibit L02
Key Ratios
Q3 FCF/CFO was 65.1% (150.4/231.0). The C$62.13 close against 91.05m modeled diluted shares implies C$5.66bn equity market value; this is a model denominator, not a contemporaneous exchange share count. Peralta factual exhibit F05 Peralta factual exhibit M01
Forward Outlook
Three frozen tests: (1) FY2026 AuEq production, bear below 420 koz, base 445 koz, bull above 470 koz; the Q4/FY2026 operations release in early 2027 settles the issuer-guidance range. (2) FY2027 Morelos gold, model bear 314.4 koz, base 322.5 koz, bull 338.6 koz; the FY2027 operations release settles it. (3) FY2027 common cash after growth spend, bear US$134.4m, base US$271.9m, bull US$691.4m; FY2027 cash flow and MD&A capex, tax and lease reconciliation settle it. The second and third are model predictions rather than issuer guidance. Peralta factual exhibit O05 Peralta factual exhibit O06
Model Choice
A finite Morelos cash NAV is more suitable than a perpetual miner DCF. The worksheet models nine successive 12-month cash intervals ending each November 24 from 2027 to 2035, using issuer calendar-year 2027–30 guidance as an annual run-rate proxy. Thus the five-year exit is exactly November 24, 2031; calendar-year/stub differences are a timing limitation. Physical-metal receipts, cash costs including sustaining/leases, taxes, replacement spending and terminal closure are modeled. Los Reyes adds a single risked PEA option without separate project cash or capex. Public code · Frozen inputs
Growth
The explicit plan uses issuer 2027–30 physical-volume midpoints, then declines gold from 310 koz in 2031 to 260 koz in 2035. These later years are analyst assumptions constrained by the stated mine life, not issuer guidance. Peralta factual exhibit O06 Peralta factual exhibit O07
Profitability
2027 base net realized metal sales are US$1,622.9m: gross gold/silver/copper value US$1,656.0m less 2% realization. Cash AISC is US$912.25m, cash tax US$248.7m at an illustrative 35% marginal rate, and common cash after growth and working cash is US$271.9m. Forecast
| Year | Physical Au (koz) | Net metal sales (US$m) | AISC cash (US$m) | Cash tax (US$m) | Growth capex (US$m) | Common cash (US$m) |
|---|---|---|---|---|---|---|
| 2027 | 322.5 | 1622.9 | 912.2 | 248.7 | 170.0 | 271.9 |
| 2028 | 322.5 | 1622.9 | 930.5 | 242.3 | 150.0 | 280.1 |
| 2029 | 322.5 | 1622.9 | 949.1 | 235.8 | 140.0 | 278.0 |
| 2030 | 322.5 | 1622.9 | 968.1 | 229.2 | 130.0 | 275.6 |
| 2031 | 310.0 | 1559.2 | 987.4 | 200.1 | 120.0 | 231.6 |
| 2032 | 300.0 | 1504.3 | 1007.2 | 174.0 | 100.0 | 203.1 |
| 2033 | 290.0 | 1449.4 | 1027.3 | 147.7 | 100.0 | 154.4 |
| 2034 | 280.0 | 1389.6 | 1047.9 | 119.6 | 100.0 | 102.1 |
| 2035 | 260.0 | 1284.8 | 1068.8 | 75.6 | 90.0 | -134.2 |
Reinvestment or Required Capital
The 2027 US$170m non-sustaining growth/replacement budget approximates 2026 issuer US$165–175m guidance; it tapers to US$90m by 2035. Sustaining capital and lease cash are within AISC, so they are not deducted a second time. Los Reyes PEA includes US$515m upfront project capital; none is separately charged in Morelos FCF. Peralta factual exhibit L02 Peralta factual exhibit O05
Discount Rate
A 10% USD nominal mine cash rate is an analyst judgment for single-asset, commodity and country risk. At 12% with all other inputs held, Morelos value declines; the sensitivity belongs beside gold and project option in the executable worksheet. For the five-year common-share decision, XIC earns 7.5% gross with 3 bp per trade, the stock pays 5 bp per trade, and the required return is after-cost XIC plus 2 pp; five C$0.64 dividends are carried to November 24, 2031 at exactly 9.5%. Decision worksheet
Terminal Economics
The 2031 exit contains cash retained after five C$0.64 dividends, discounted 2032–35 mine cash and the still-risked Los Reyes option; there is no perpetuity. In 2031 net sales US$1,559.2m, AISC US$987.4m, tax US$200.1m, growth capital US$120m and FCF US$231.6m. The first residual year 2032 requires US$100m growth capital and US$203.1m FCF; a US$164.58m settlement is deducted in 2035; at 10% its September 2026 present value approximates the disclosed US$69.8m liability. Forecast
Bridge to One Common Share
Opening cash US$225.9m less a US$150m operating floor gives US$75.9m excess; Morelos finite PV is US$1204.1m; 25% of the US$1,491m Los Reyes PEA NPV is US$372.75m. At 1.4296 CAD/USD and 91.048168m diluted shares, NAV is C$25.95. The November 19 NCIB release dates the freshest basic count at November 11: 90,251,272. We add 271,146 RSUs, 516,930 PSUs and 8,820 warrants at one share each; potential two-times PSU settlement is a sensitivity. The September 30 filed 91,078,630 count predates repurchases. Optional NCIB authorization is not an assumed future buyback. Peralta factual exhibit B01 Peralta factual exhibit B03 Peralta factual exhibit B04 Peralta factual exhibit B06 Peralta factual exhibit B07
| Common-equity bridge | US$m | CAD/share |
|---|---|---|
| Excess opening cash | 75.9 | 1.19 |
| Morelos finite cash PV | 1204.1 | 18.91 |
| Los Reyes risked PEA option | 372.8 | 5.85 |
| Base equity NAV | 1652.8 | 25.95 |
Price-Implied Expectations
Under full Los Reyes PEA credit and 5% higher physical volumes, gold near US$5,195.03 throughout the modeled life lifts the whole-dollar entry to C$63, enough to pass the November 24 close. US$5,300 yields C$64.75 unrounded hurdle and C$64 actionable entry. These are conditional model economics, not a spot or consensus forecast. Scenario output
Independent Cross-Check
The Q3 FCF bridge reproduces issuer US$150.4m independently. Annualizing that at Q3 US$4,324 realized AuEq would be US$601.6m, but the US$3,600 deck, lower 2027 physical gold production and replacement capital reduce modeled 2027 common cash to US$271.9m. Centerra’s stream and Montage’s minority/stream claims prevent a naive peer multiple transfer. Peralta factual exhibit F05 Peralta factual exhibit P02 Peralta factual exhibit P04
Conclusion and Change from Prior Edition
This is the first authored TXG edition: no published predecessor price exists. Base NAV C$25.95 and final entry C$18.00 are new research values, not an update to a stale TXG target. The US$3,600 deck and Los Reyes haircut dominate the decision.
Peer Selection
Centerra offers a cash-producing gold/copper comparator; Montage offers a construction-to-production comparator. Neither is a control for Torex’s asset ownership and claim structure. Peralta factual exhibit P01 Peralta factual exhibit P03
Dated Ratio Table
| As-of measure | Torex | Centerra | Montage |
|---|---|---|---|
| 2025 sales, US$m | 1,305.6 | 1,384.6 | N/M, preproduction |
| Nov 24 equity value, C$bn | 5.607 | 4.90 | ~5.237 |
| Equity value / 2025 sales at 1.4296 FX | 3.00x | 2.48x | N/M |
| Q3 2026 AISC, US$/oz | 1,803 per AuEq | 1,775 by-product gold | N/M |
| Economic claim | 100% Morelos; US$94.1m leases | Mount Milligan 35% Au and 18.75% Cu streamed | 90% Koné; US$700m deferred stream |
| The sales multiple uses the same dated market close, 2025 fiscal sales and FX; ramp stage, geography and stream claims still limit transfer. AISC denominators differ. Peralta factual exhibit F01 Peralta factual exhibit P01 Peralta factual exhibit P02 Peralta factual exhibit P03 Peralta factual exhibit P04 Peralta factual exhibit P05 Peralta factual exhibit M03 Peralta factual exhibit M04 |
Comparability Adjustments
At US$3,600 spot, Centerra’s streamed 35% gold portion at US$435 implies a gross blend of approximately US$2,492/oz before refining, not US$3,600; Torex has no corresponding Morelos stream in reviewed filings. Montage’s 90% Koné ownership and delivery obligations mean a project NPV must be reduced before comparing per-share equity. Peralta factual exhibit P02 Peralta factual exhibit P03 Peralta factual exhibit P04
Implications for Value
Torex’s own US$3,600 cash model produces C$25.95 NAV, C$21.19 hurdle entry and C$18.00 final entry; the peer disclosures support a disciplined cash/claim bridge rather than lifting a quoted producer multiple. Output
Bear Case
US$3,200 gold, US$100/AuEq oz extra cash cost, 2.5% lower metal volume and zero Los Reyes option produce C$8.24 fair and C$6.87 unrounded hurdle entry. This is a durable mine stress through 2035.
Base Case
US$3,600 gold, US$50 silver, US$5 copper, the finite Morelos schedule and 25% Los Reyes PEA credit give C$25.95 fair, C$21.19 return-hurdle entry and C$18 final entry. Inputs
Bull Case
US$5,300 gold, 5% higher physical volumes and full US$1,491m Los Reyes PEA credit give C$79.72 fair and C$64.75 unrounded hurdle, rounded to C$64 actionable entry; C$62.13 would pass. Full PEA credit is aggressive because Los Reyes has no reserve. Peralta factual exhibit L01 Peralta factual exhibit L03
Outcomes at Close and Entry
| Assumption | Close | Fair value | Maximum entry | Price rule |
|---|---|---|---|---|
| Base | 62.13 | 25.95 | 18.00 | Wait |
| Joint downside | 62.13 | 14.68 | 11.00 | Wait |
| Gold $3,200, cost +$100, volume -2.5%, no Los Reyes | 62.13 | 8.24 | 6.00 | Wait |
| Gold $5,300, full Los Reyes PEA, volume +5% | 62.13 | 79.72 | 64.00 | Buy |
| Case bridge | Fair CAD/share | Unrounded hurdle CAD/share | Whole-dollar entry CAD/share | Binding rule |
|---|---|---|---|---|
| Base | 25.95 | 21.19 | 18.00 | 20% joint-stress capital-loss cap |
| Joint downside | 14.68 | 11.86 | 11.00 | five-year return hurdle |
| Gold $3,200, cost +$100, volume -2.5%, no Los Reyes | 8.24 | 6.87 | 6.00 | five-year return hurdle |
| Gold $5,300, full Los Reyes PEA, volume +5% | 79.72 | 64.75 | 64.00 | five-year return hurdle |
At C$18 entry, the joint stress 2031 exit of C$14.82 plus five C$0.64 dividends limits modeled five-year capital loss to less than 20%; the severe bear case is materially worse and is not insured by this ceiling. Exact output
Market-Implied Case
With full Los Reyes PEA credit, 5% higher physical volumes and unchanged cost/FX, gold near US$5,195.03 is needed for the whole-dollar entry to reach C$63 and pass C$62.13. An unrounded hurdle crossing alone does not change the whole-dollar price rule. A PFS below full PEA economics weakens the market case. Worksheet
Analyst Assessment
The base Wait call survives 10% mine discounting and a conservative diluted share denominator. The first change that could reverse it is sustained gold above about US$5,195 combined with independently de-risked full Los Reyes value, not merely a strong quarter of spot metal prices. Peralta factual exhibit L01
Operating Risks
A 2.5% production miss plus US$100/AuEq oz additional cash cost reduces entry in the joint stress. Media Luna grades/recovery and Media Luna North first ore must sustain the physical-volume midpoint. Peralta factual exhibit O01 Peralta factual exhibit O08
Financial and Liquidity Risks
Cash US$225.9m is partly operating liquidity; the US$350m credit facility is undrawn and is not cash. US$191.2m current income tax payable and US$69.8m decommissioning claim matter to cash timing and closure. Peralta factual exhibit B01 Peralta factual exhibit B02
Regulatory and Legal Risks
Guerrero security, Mexican tax assessments, permits and tailings responsibilities can change the capital schedule. The 2025 audit identified uncertain tax positions as a key audit matter; an adverse settlement would lower excess cash or future distributions. Audited original
Industry and Competitive Risks
Gold price is the dominant variable. At US$3,200 with cost pressure, the worksheet bears materially less value than C$18 entry; a US$5,300 multi-year deck and full Los Reyes success instead validate the close. Scenarios
Thesis-Specific Risks and Reconsideration Triggers
If the March 2027 reserve update fails to replace depletion, shorten the 2032–35 tail. If Los Reyes PFS shows capex above US$515m or lower after-tax NPV at the same US$3,600/US$50 deck, reduce the 25% option credit. If the diluted share count differs materially from 91.048m, recompute per-share values. Peralta factual exhibit O07 Peralta factual exhibit L02 Peralta factual exhibit B03
Environmental Factors
The 2025 issuer report says 83% water reused/recycled and zero reportable spills; the new Guajes in-pit tailings facility creates ongoing closure and water obligations. The US$164.58m modeled 2035 settlement has an approximately US$69.8m value at a 10% discount rate, not free upside. Peralta factual exhibit E01 Peralta factual exhibit E04 Peralta factual exhibit B02
Social Factors
2025 lost-time injury frequency was 0.07 and total recordable frequency was 0.73 per million hours; Q3 2026 reached six quarters without lost-time injury. Maintaining workforce and community access is necessary for the annual throughput and the 2027 volume checkpoint. Issuer responsibility report Peralta factual exhibit O01 Peralta factual exhibit E05
Governance Factors
2025 issuer disclosure reports 37% women on the board and independent membership of all board committees. These are governance indicators, not a valuation premium; the more material governance test is capital allocation between buybacks and Los Reyes development. Peralta factual exhibit E03 Peralta factual exhibit F07
Financially Material Risks and Opportunities
A reserve-extending drilling result would add positive post-2035 mine cash; a tailings remediation or Mexican tax settlement would consume it. No unquantified discovery value is included. Peralta factual exhibit O07 Peralta factual exhibit E04
Annual Results
| US$m except EPS | FY2024 | FY2025 |
|---|---|---|
| Revenue | 1,115.5 | 1,305.6 |
| Net income | 134.6 | 403.4 |
| Diluted EPS (US$) | 1.55 | 4.53 |
| Audited annual statements, physical p8 Peralta factual exhibit F01 Peralta factual exhibit S01 Peralta factual exhibit S02 |
Interim Results
| US$m except EPS | Q3 2025 | Q3 2026 | 9M 2025 | 9M 2026 |
|---|---|---|---|---|
| Revenue | 416.4 | 555.0 | 840.3 | 1,501.2 |
| Net income | 114.4 | 155.2 | 236.6 | 476.5 |
| Diluted EPS (US$) | 1.31 | 1.67 | 2.71 | 5.05 |
| Q3 filing, physical p4 Peralta factual exhibit F03 Peralta factual exhibit S03 Peralta factual exhibit S04 Peralta factual exhibit S05 Peralta factual exhibit S06 |
Trailing Results
FY2025 less 9M2025 plus 9M2026 gives trailing revenue US$1,966.5m and net income US$643.3m. This twelve-month arithmetic spans a ramp-up and a higher realized price environment; it is not the US$3,600 forecast.
Material Adjustments
Q3 adjusted earnings US$180.1m exceed reported US$155.2m by US$24.9m; the model does not capitalize that adjustment. US$100.5m current income tax expense is a reminder that margin is not common cash. Peralta factual exhibit F06
Annual Positions
| US$m | Dec 2024 | Dec 2025 |
|---|---|---|
| Cash | 110.2 | 119.5 |
| Debt | 62.9 | 27.6 |
| Lease obligations | 78.3 | 105.6 |
| Decommissioning | 37.6 | 73.2 |
| Audited annual balance sheet, physical p7 Peralta factual exhibit B05 |
Interim Positions
| US$m | Dec 2025 | Sep 2026 |
|---|---|---|
| Cash | 119.5 | 225.9 |
| Debt | 27.6 | 0.0 |
| Lease obligations | 105.6 | 94.1 |
| Income taxes payable | 171.0 | 191.2 |
| Decommissioning | 73.2 | 69.8 |
| Q3 balance sheet, physical p3 Peralta factual exhibit B01 Peralta factual exhibit B02 |
Capital and Claims Reconciliation
The equity bridge uses 91.048168m diluted shares: November 11 basic 90.251272m plus 0.271146m RSUs, 0.516930m PSUs and 0.008820m warrants, each treated as one share. Cash-settled DSUs are excluded. Lease payments reside in AISC; the 2035 closure settlement is modeled once in the last cash interval. Neither is a second opening subtraction. Peralta factual exhibit B06 Peralta factual exhibit B04 Peralta factual exhibit B02
Annual Flows
| US$m | FY2024 | FY2025 |
|---|---|---|
| Operating cash | 449.5 | 489.0 |
| PP&E additions | 553.7 | 352.6 |
| Share repurchases | 0.0 | 33.9 |
| Dividends paid | 0.0 | 10.2 |
| Audited cash flows, physical p10 Peralta factual exhibit F02 Peralta factual exhibit S07 Peralta factual exhibit S08 |
Interim Flows
| US$m | Q3 2025 | Q3 2026 | 9M 2025 | 9M 2026 |
|---|---|---|---|---|
| Operating cash | 186.8 | 231.0 | 244.7 | 608.4 |
| PP&E additions | 60.9 | 67.1 | 285.2 | 177.4 |
| Repurchases | 7.2 | 83.9 | 7.2 | 238.9 |
| Dividends | 0.0 | 10.8 | 0.0 | 32.0 |
| Q3 cash flows, physical p6 Peralta factual exhibit F04 Peralta factual exhibit F07 |
Trailing Flows
FY2025 less 9M2025 plus 9M2026 yields trailing operating cash US$852.7m and PP&E spending US$244.8m. These include higher 2026 metal prices, working-capital timing and no assumption that all residual cash is paid to common.
Reconciliation to Common Shareholders
Q3 US$231.0m CFO less US$67.1m PP&E, US$4.3m VAT, US$6.5m lease and US$2.7m interest gives US$150.4m issuer FCF. Nine-month 2026 US$401.9m FCF funded US$270.9m dividends/buybacks; US$131.0m residual plus opening cash, debt repayment and other financing/investing timing reconcile to the observed cash increase. In the model, 2027 US$271.9m common cash funds about US$40.8m dividends; the rest stays in 2031 equity cash, with no assumed buyback benefit. Peralta factual exhibit F05 Peralta factual exhibit F07
Primary Sources and Locators
Original 2025 audited statements, Q3 2026 statements/MD&A, and 2026 circular are held owner-only in this package. First-click inline links target Peralta-authored factual rows, each identifying issuer original and physical page. Original issuers: 2025 FS, Q3 FS, Q3 MD&A, 2026 circular, Nov 17 NYSE release, Nov 19 NCIB, Los Reyes PEA, Centerra Q3, Montage Q3, Bank of Canada FX, TXR TSX close.
Frozen Inputs and Assumptions
Frozen JSON records the cutoff, CAD close, Bank of Canada FX, USD metal deck, physical volumes, AISC cash, cash tax, replacement capex, dividends, 10% mine discount and Los Reyes risk weight. Guidance and statement inputs are identified in the factual exhibit; all later-year decline, tax, realization, discount and project haircut are Peralta judgments. Peralta factual exhibit M02
Worksheets and Saved Outputs
| Worksheet | Output |
|---|---|
| Finite mine and decision worksheet | Valuation output, decision output, exact JSON |
| Run with Python 3.12.13 from the edition folder; it reads only public frozen inputs. The output below is saved from that code, not an illustrative spreadsheet. |
Changes from the Preceding Edition
First edition without a predecessor. The canonical Peralta TXG entity previously had a May 2026 working payload, but no published report or comparable entry price; no historical value is invented.