NOVAGOLD RESOURCES INC. (TSX: NG) — Donlin before the ownership change

Our maximum entry price is C$5.31 per share. At the November 24, 2026 regular TSX close of C$7.41, the price rule says Wait. The strongest credible contrary case is US$3,600 long-run gold with 70% realization by November 2031: its C$12.07 entry says Buy. We prefer the US$3,000, 55% base because the US$3,600 issuer sensitivity holds construction and operating costs fixed while a 2027 bankable feasibility study (BFS), remaining permits and a financing package are still ahead. The November 24 Barrick-note payoff was announced after the regular close; post-payment figures below are a labeled pro-forma update, not a claim that the C$7.41 close knew it. Technical report, reserve Table 1-4 · Issuer high-gold sensitivity, slide 17 · Peralta factual exhibit: US$100m note payoff · original November 24 SEC release

Stock Price History

Market close
7.41
Base fair value
6.78
Company details
Maximum entry price
5.31

Materials / gold development; quoted in Canadian dollars. Economic and quote cutoff: November 24, 2026; latest financial period: August 31, 2026. Horizon: November 24, 2031. Next review: expected December 1 transaction close, 2027 BFS and supplemental environmental decision. The five-year calculation assumes no common distributions and a future NYSE USD sale converted at C$1.40/US$; this is a forecast, while the Bank of Canada November 24 observation was C$1.4296/US$.

Investment Thesis

One old NG share becomes one voting share of the proposed U.S. parent if the arrangement closes. That parent would own all Donlin but issue 243.941 million new voting/non-voting shares to Paulson; the current share buys a diluted claim, not 100% of the mine divided by today's 438.816 million common shares. The mine's 32.797 million reserve ounces and 29.5 million planned payable ounces provide finite gold exposure, with no terminal perpetuity. Peralta factual exhibit: 243,940,561 new shares · original proxy, transaction terms and Schedule C-23 · Technical report, Table 1-4 · Table 22-1

Market Mispricing

The C$7.41 close exceeds C$6.78 fair value by C$0.63 and the C$5.31 maximum entry by C$2.10. The base 2031 exit of C$10.94 earns 8.08% annually after 5bp each side, below the 9.49% stock hurdle (assumed gross-7.5% XIC less 3bp each side, plus 200bp). The most influential variable is realization of a financed, permitted mine. At US$3,000 gold the close needs 58.68% realization by 2031; our base is 55%. This threshold is conditional price-implied economics, not consensus. Model output

Recent Developments

The November 3 shareholder vote approved the transaction, but the November 10 announcement still expected a December 1 closing and eventual TSX delisting. At the regular November 24 close NG still held 60%; our 100% case is conditional on closing. The November 24 note prepayment spent US$100 million and removed the US$177.5 million August carrying liability; it was announced after the close and is shown separately from close-known accounts. November 4 vote · November 10 timeline · November 24 note release

Earnings Outlook

This is not an earnings-multiple thesis. NOVAGOLD had no mine revenue and lost US$76.967 million in the first nine fiscal months of 2026; Donlin funding appears in investing cash flow, so GAAP loss understates the pre-production cash demand. Peralta expects no mine dividend through the November 2031 sale date, even if commercial production begins around then. Q3 10-Q, statements of loss and cash flows, pp. 2–3

Valuation Summary

The finite mine NAV bridge starts with the issuer's US$12.9 billion 5%-discounted 100% project case at US$3,000 gold. We explicitly finance 60% of US$9.233 billion initial construction cost with fairly priced project debt and 40% with US$3.693 billion new equity at C$7.41, issuing 712.523 million additional shares. Debt proceeds and an equal principal claim cancel in a project NAV that already deducts capex; a US$0.45 billion friction charge remains. The 45% current success weight on the funded share basis yields C$6.78 fair value. At US$3,600 the issuer's fixed-cost project sensitivity interpolates to US$18.74 billion, but that is not our base. Issuer July presentation, slide 17 · Technical report, all-equity assumption

Recommended Action and Entry Price

The base five-year hurdle entry is C$6.94. The joint downside's hurdle entry is C$3.68; we reserve half the C$3.26 gap, or C$1.63, giving a C$5.31 maximum entry after cent-level flooring. The C$7.41 close is C$2.10 too high. At C$5.31, the full joint case's C$5.80 terminal sale is a 9.2% capital gain before sale fees, while a complete failure could erase most of the purchase. Decision worksheet

Catalysts

The closing or failure of the arrangement, the 2027 BFS cost/schedule, supplemental EIS decision, dam certificates and financing terms each move an explicit model driver. We will reconsider if BFS initial capex exceeds US$11.5 billion without offsetting production or if a financing package transfers more than US$0.9 billion of value beyond the technical report's already modeled costs. Technical report, §§21–22 · 10-Q, permitting and liquidity

Primary Risks to Thesis

A lower long-run gold deck, a construction delay, capital issued cheaply, unavailable project debt or adverse tailings review could push realization below the market-implied 58.68%. The US$9.233 billion initial capital estimate has ±25% accuracy and 13.8% contingency. The 2027 BFS and financing terms will be more informative than today's preliminary funding menu. Technical report, §25.16 · 10-Q, funding discussion

Stock Price History

Closing Prices

DateClose (CAD)Entry (CAD)
2026-11-206.66—
2026-11-237.46—
2026-11-247.415.31

Historical rows are unadjusted TSX closes, with November 20 and 23 from TSX NG historical prices and the November 24 close independently matched to the batch XIC constituent observation.