Centrus Energy Corp. (NYSE: LEU) — first equity edition
Our maximum entry price is US$10.95 per share. At the November 25, 2026 NYSE unadjusted close of US$83.19, the decision is Wait; Needs underwriting: the modeled base loses 30.31% over five years at the close and the linked operating, funding and dilution downside loses 86.83%. Base fair value is US$31.61. The strongest credible contrary assumption is that new enrichment revenue reaches about US$1.05 billion by 2031, instead of our US$420 million; with all other base inputs unchanged, fair value reaches US$83.28, close to the traded price. Even then, an entry at the close needs a funded downside terminal share price above US$83.27, whereas the documented joint setback yields US$10.97. The US$10.95 ceiling is conditional arithmetic, not a qualified order: project cost, contract margin, DOE funding, decommissioning obligations and dilution have not been fully disclosed. Contingent backlog, rendered SEC 10-Q · Expansion spending · Frozen model.
- Market close (USD)
- US$83.19
- Base fair value (USD/share)
- US$31.61
Company details
- Maximum entry price (USD/share)
- US$10.95
- Decision
- Wait / Needs underwriting
Identity and cutoff. Centrus Energy Corp. Class A common stock trades as LEU on NYSE in US dollars; it is not an ADR. The report's information and quote cutoff is November 25, 2026, Vancouver time. The latest available financial statements are the September 30, 2026 10-Q filed November 5. The November 24 8-K schedules a December 7 Investor Day but contains no new financial forecast. The current Markdown publication head was empty at intake. The 2026-11-25 Bank of Canada FXUSDCAD observation is C$1.4219 per US$1; both stock trades and proceeds are converted at this frozen rate for the CAD portfolio test, without an FX forecast. Listing, SEC 8-K · 10-Q index · Bank of Canada daily rate · Dated market close.
Stock Price History · Valuation and price ceilings · Forecast. Amounts are US$ millions except per-share figures and where stated. Reported results, issuer plans and Peralta estimates are labeled separately.
Investment Thesis
Centrus supplies uranium enrichment and nuclear-fuel services today and is spending to establish commercial domestic centrifuge capacity. Its attractive scarce capability does not automatically accrue to this share: the LEU/HALEU book is substantially contingent on operational milestones, and spending precedes expected 2029 first new centrifuges. The dated case demands a funded, contracted path from plant capacity to cash per diluted share. 2025 segment sales · Contingent commitments · 2029 milestone.
Market Mispricing
At US$83.19 and 22.624 million pro forma participating shares, market equity value is roughly US$1.882 billion. The US$31.61 base DCF uses a 13× 2031 EBITDA exit, explicit US$1.15 billion 2027–31 capital spending, and the September balance sheet after Westerman and an estimated fourth-quarter burn. Holding the other inputs fixed, about US$1.05 billion of 2031 new-enrichment sales at a 24% gross margin closes the fair-value gap; that is a reverse solve, not an issuer forecast or consensus. Cash, debt and shares · Model.
Recent Developments
The November 5 filing reports Q3 revenue US$55.5 million, down from US$74.9 million a year earlier, and nine-month capex US$226.4 million. The October Westerman purchase used US$95 million cash and US$21 million stock, partly integrating centrifuge components. The November 12 Oklo agreements include prepayments and deliveries scheduled to start in 2029, but public terms do not disclose volume, price, margin or unconditional cash available to common holders. The November 24 8-K announced a December 7 Investor Day, the next near-term underwriting checkpoint. Q3 revenue · Capex · Westerman · Oklo and Centrus release · Investor Day 8-K.
Earnings Outlook
Our base forecasts 2027 revenue US$470 million, 2029 US$650 million and 2031 US$1.05 billion, including US$420 million from new enrichment in 2031. Base 2031 EBITDA is US$116 million after US$125 million overhead. The 2027–31 capex schedule is US$300/280/230/190/150 million, separate from working-capital additions. These are Peralta judgments, not guidance. They imply five annual cash deficits and no supported common dividend. Forecast rows · Filing's capital plan.
Valuation Summary
Base fair value is US$31.61 per share on a 12% US-dollar operating DCF. Base 2031 exit is US$58.03; linked downside exit US$10.97 after US$300 million new financing and 4.376 million additional shares. The benchmark net XIC CAGR is 7.4871%, so the stock base hurdle is 9.4871%. The base ceiling is US$36.8493 and the zero-nominal-return downside ceiling is US$10.9568; the lower floors once to a US$0.01 quotation increment. The cap is US$10.95. No distributions are credited. Generated bridge.
Recommended Action and Entry Price
Wait; Needs underwriting. The close exceeds both ceilings. The company has not published a project-by-project capex, reimbursement, margin, cash-restriction and conversion schedule sufficient to qualify the conditional price for a passing rank. A December 7 plant and financing disclosure can change the estimate; a move in the quote alone does not cure the missing underwriting. Issuer's funding and lease caveats · Downside model.
Catalysts
The December 7 Investor Day should identify funded project cash and construction scope. By December 31 the Piketon lease extension should be resolved or its accounting risk clarified. FY2027 results will test consolidated revenue and capex against the frozen ranges below; new Ohio centrifuges are expected online in 2029. Investor Day filing · Lease and production milestone.
Primary Risks to Thesis
The joint case delays and shrinks new enrichment, holds its gross margin at 18%, raises capex to US$1.27 billion, uses 9× terminal EBITDA, and finances US$300 million with shares. It produces only US$10.97 terminal equity per initial participating share after the new issuance. The strongest omitted downside is another required financing or a lost lease; either can drive value below the conditional US$10.95. Q3 financing and warrants · Contingent backlog.
Company Overview
Centrus has two reported segments: Low-Enriched Uranium (LEU), which sells separative work units and uranium, and Technical Solutions, which provides engineering, manufacturing and government contract services. The new commercial centrifuge program is an investment within this structure, not yet a separately reported cash-generating segment. 2025 10-K, Items 1 and 8 · 2025 segment extract.
Products and Services
LEU customers buy enrichment work measured in SWU and, in some contracts, uranium. Technical Solutions includes DOE HALEU operations and engineering. HALEU supply for advanced reactors can become a new product stream, but the Oklo supply contracts begin expected delivery only in 2029. Q3 segment note and MD&A · Oklo release.
Business Model
Existing LEU contracts turn SWU and uranium deliveries into revenue; price, delivery timing and purchased input cost determine gross profit. Technical Solutions earns services revenue against contract performance. The growth program buys plant and centrifuge capability before incremental output; our cash model assigns new sales only from 2029 and charges capex before that date. Q3 revenue and cash statements · Forecast.
Revenue Drivers
FY2025 LEU sales were US$346.2 million and Technical Solutions US$102.5 million. Q3 2026 SWU volume rose 19% and average selling price 10%, yet average SWU unit cost rose 28%; a higher selling price alone does not validate expansion margins. Our modeled legacy LEU sales grow US$20 million annually from US$350 million in 2027, while new enrichment reaches US$420 million in 2031 base. 2025 split · SWU price and cost · Forecast.
Cost Structure
The model holds legacy LEU gross margin at 28% versus FY2025 combined gross margin 26.2%, gives Technical Solutions 10%, and gives new output 24% base after qualification. Overhead starts US$85 million in 2027 and rises US$10 million annually. Those are analyst assumptions because the filing does not isolate a completed commercial plant's economics. A four-point cut to new-output margin lowers base fair value in the generated sensitivity table. FY2025 gross profit and sales · Sensitivity.
Operating Levers
Piketon commissioning, qualified annual SWU output, contract realization and electricity/input cost jointly drive the return on more than US$560 million planned Oak Ridge investment. Our forecast uses dollar sales because issuer production capacity and contract economics are not yet disclosed by project. That is a material underwriting limitation, not a substitute for physical throughput. Investment and timing · Forecast.
Distribution
No cash dividend is assumed in any case. The cash balance is needed for construction, inventory and debt obligations; no modeled capital is both spent and paid to shareholders. The terminal cash balance is included once in exit equity, and earlier free cash remains inside it. Q3 cash and claims · Cash schedule.
Geographic Exposure
The issuer reports in US dollars, sells into the US and foreign nuclear-fuel markets, and depends on imported and domestic supply chains. FY2025 US revenue was US$335.3 million of US$448.7 million. The portfolio is CAD based, so a USD/CAD move changes realized CAD return; the price test freezes the November 25 rate rather than assuming a free FX benefit. 2025 10-K geography note · Bank of Canada rate.
Regulatory Environment
Enrichment requires DOE contracts, NRC licensing and secure nuclear-material handling. The current Piketon lease expires October 1, 2027; the filing says an extension is uncertain and failure to execute one by December 31, 2026 can require impairment of capitalized improvements. A US$900 million DOE HALEU task order is a contract ceiling and milestone path, not US$900 million of owner cash. Lease, 10-Q p.64 · DOE order.
Industry Structure
Uranium enrichment is a capacity and qualification market: utilities require assured fuel, while an advanced reactor can need higher-assay material. Import restrictions and domestic policy favour supply diversity, but contracts remain contingent and regulated. The issuer's 2025 10-K names Urenco as a much larger capacity competitor. Centrus 10-K competition · Urenco capacity extract.
Growth and Cyclicality
The US policy push creates a demand opening, but spent cash, industrial learning curves and fuel-delivery timing can diverge for years. The issuer's backlog extends to 2040; US$5.4 billion of LEU/HALEU commitments is contingent on milestones, so the model converts only a fraction into 2031 sales and separately tests failure. Q3 backlog note.
Competitors
Urenco is the direct enrichment capacity comparison, while Cameco is a uranium and fuel-cycle public company and BWXT is a nuclear manufacturing and services public company. Neither public peer is a clean domestic enrichment substitute. Their filings provide independent evidence for margin scale, but the model does not transplant a peer multiple without the distinct contract and capital profile. Centrus competitor disclosure · Cameco 2025 report · BWXT 2025 10-K.
Market Share
Centrus has not provided a comparable commissioned domestic commercial SWU capacity denominator for the planned plant. The 2025 10-K describes Urenco installed capacity around 17 million SWU annually, while Centrus' new centrifuges are expected online in 2029. We therefore do not assign a numerical market share or presume backlog share equals production share. Urenco scale · Centrus milestone.
Competitive Advantages
Centrus has operating nuclear-fuel relationships, a US centrifuge manufacturing base, a Piketon site and a DOE HALEU award. Those assets make a first-mover case credible but do not prove an adequate spread after construction, debt and dilution. The price model only earns new-output gross profit from 2029. DOE and Oak Ridge · Forecast.
Pricing and Cost Position
Q3 2026 SWU realized price rose 10% year over year while average unit cost rose 28%. This adverse unit-cost observation, despite higher volume, argues against treating an expanding price deck as a guaranteed margin. Our 24% new-enrichment gross margin is a testable midpoint, not a disclosed project price or advantage. Q3 MD&A cost and price.
Entry Barriers and Substitutes
Licensed centrifuge capacity, safeguards and qualified fuel are difficult to replicate. Utility buyers can nevertheless contract with existing enrichers or alter delivery timing, and advanced-reactor deployments can slip. The scarcity premium belongs in the model only after a funded, measurable path to shipments. Industry and risk discussion, 2025 10-K · Oklo delivery date.
Supplier and Customer Dynamics
The ten largest LEU customers supplied roughly 77% of FY2025 total sales; DOE and contractors represented 23% of company sales. Concentration gives each offtake, procurement and government funding decision material effect. Oklo prepayments can ease build funding but are obligations to deliver fuel, not shareholder distributions. 2025 concentration extract · Oklo arrangement.
Regulation and Structural Risks
The DOE's January task order is US$900 million with discretionary options, while current Technical Solutions backlog includes US$0.8 billion tied to a HALEU operation contract whose proposed FY2027 budget lacks further funding. The Piketon lease and NRC qualification add timing risk. We treat those as linked operating and financing exposures, not as separate additive haircuts to cash. Q3 task order and backlog · SEC filing detail.
Historical Performance
Annual sales were US$320.2 million in 2023, US$442.0 million in 2024 and US$448.7 million in 2025, while operating income stayed near US$50 million. Nine-month 2026 sales edged up to US$308.3 million from US$302.5 million, but operating income became a US$18.5 million loss from US$37.4 million profit. This is not a stable earnings base for a high-growth multiple. Annual income extract · Interim income extract.
Income Statement Analysis
Q3 gross loss was US$10.6 million on US$55.5 million sales; the Technical Solutions gross loss was US$3.7 million and LEU gross loss US$6.9 million. The 9M2026 US$58.4 million net income includes a US$46.4 million noncash gain from warrant liability remeasurement. Our operating model begins with segment revenue and gross margin rather than this net income. Statement and segment note, 10-Q pp.8,52 · Warrant mark.
Balance Sheet Analysis
September 30 cash was US$2,236.1 million, but long-term debt was US$1,178.8 million, the warrant liability US$220.4 million and customer advances were obligations to deliver. We subtract US$95 million Westerman cash and an analyst US$120 million Q4 burn before forecasting. Common economics use 19.734 million Class A plus 0.719 million Class B plus 2.006 million nominal-strike pre-funded warrants plus 0.165 million Westerman consideration shares, or 22.624 million. This share basis differs from the older 20.632 million Q3 weighted-average basic count. Q3 position · Pre-funded warrants · Westerman.
Cash Flow Analysis
FY2025 operating cash US$51.0 million less capex US$19.7 million was US$31.3 million before financing. In 9M2026, operating cash was negative US$11.1 million and capex US$226.4 million, a US$237.5 million deficit. The cash balance increased because of share and warrant issuance, not self-funded growth. Annual cash extract · Interim cash and financing.
Earnings Quality
The noncash US$46.4 million warrant-mark gain boosts reported net income even though it follows a lower estimated warrant value. Excluding that gain alone reduces 9M2026 pretax income from US$62.8 million to US$16.4 million; it does not erase cash capex. The Q3 statement also warns that interim results are not necessarily indicative of FY2026. Warrant row · 10-Q basis of presentation.
Nonrecurring Items
Westerman was acquired October 16, after the balance-sheet date, for US$116 million consideration including US$95 million cash. We deduct the cash once and include the issued shares once; its purchase price is not the same as an annual plant capex line. The Q3 warrant mark is stripped from modeled operating profit. No unreported Westerman synergy is credited. Subsequent event, 10-Q p.35 · Model inputs.
Funding and Cash Conversion
The Q3 cash statement shows US$493.8 million net proceeds from the September equity, pre-funded-warrant and common-warrant offering. Much of September cash therefore belongs to future construction and eventual debt settlement. The model burns US$120 million in Q4 2026 and US$1.15 billion capex during 2027–31; downside has US$1.27 billion capex and US$300 million issuance that adds 4.376 million shares. Because no project-level funding waterfall is filed, the exact cash available at exit is uncertain. Offering proceeds · Funding assumptions.
Key Ratios
FY2025 operating margin was 11.2% (50.2/448.7). The TTM revenue through September 2026 is US$454.5 million (448.7+308.3−302.5), but TTM operating income is a US$5.7 million loss (50.2−37.4−18.5). TTM operating cash is negative US$59.5 million and capex US$236.0 million. A conventional TTM EV/EBIT multiple is therefore not meaningful. Annual rows · Interim rows · Cash rows.
Forward Outlook
Three frozen forecasts are measurable against future filings: (1) FY2029 consolidated sales, US$ millions, base 650, downside 580, upside 730, settled by the FY2029 10-K revenue statement; (2) FY2027 cash capex, US$ millions, base 300, downside 320, upside 280, settled by the FY2027 cash-flow statement; (3) end-2031 economically participating common shares, millions, base and upside 22.624, downside 27.000, settled by the FY2031 cover, warrant note and share roll-forward. FY2027 capex is the first numeric checkpoint; the December 7, 2026 Investor Day may revise it sooner. Each value is Peralta's forecast, with filing dates and share definitions frozen here. Forecast worksheet · Investor Day timing.
Model Choice
We use a five-year segment revenue, gross-profit, overhead, capital and cash model through 2031, then a 2031 EBITDA exit multiple. The public worksheet separately computes an operating DCF fair value and two policy price ceilings. A sales multiple or full-backlog capitalization would miss the construction cash and contingent milestones. Model code · Q3 backlog.
Growth
Base legacy LEU sales rise from US$350 million in 2027 by US$20 million annually; Technical Solutions start at US$120 million and also rise US$20 million annually. New enrichment starts US$100 million in 2029 and reaches US$420 million in 2031. That last number is less than one tenth of the US$5.4 billion contingent book in a single year, though a backlog-to-sales percentage is not a contract margin. Downside reaches only US$160 million new sales by 2031; upside US$650 million. 2025 starting revenue split · Forecast.
Profitability
Base 2031 gross profit is US$241.2 million: US$120.4 million legacy LEU, US$20.0 million Technical Solutions, US$100.8 million new enrichment, less US$125 million overhead gives US$116.2 million EBITDA. The 24% new gross margin is judgment; Q3 2026 showed a 28% SWU unit-cost rise. At 20% new margin, fair value falls to the generated sensitivity figure while the downside ceiling remains binding. Q3 cost pressure · Forecast math.
Reinvestment or Required Capital
The 2027–31 base capex totals US$1.15 billion and bears US$1.27 billion. Annual working-capital additions start in 2028 and scale with new output. Terminal cash uses eleven-twelfths of FY2031 cash movement to match the November 25 five-year exit; the annual capex table shows the full FY2031 plan. These cash outflows come before the 2029 production revenue in the model. The issuer has stated plans to invest more than US$560 million in Oak Ridge, plus other Piketon spending; it has not disclosed a complete combined project cost or reimbursement timing. Capital plan · Annual forecast.
Discount Rate
The 12% nominal USD operating discount rate is an analyst risk assumption reflecting project delay and concentration, not a peer beta estimate. A 10% rate lifts base DCF fair value by about US$2.13 per share; a 14% rate lowers it by about US$1.86 (holding operating inputs fixed). The published entry rule uses the CAD portfolio's net XIC CAGR plus two points, not this DCF rate; its base hurdle is 9.4871%. DCF code · Policy output.
Terminal Economics
At 2031 base EBITDA US$116.2 million, 13× gives US$1,510.6 million operating value. Add US$981.15 million terminal cash after modeled deficits and debt interest, subtract US$1,178.8 million debt, and divide US$1,312.95 million equity by 22.624 million shares for US$58.03 exit. We conservatively retain the September US$220.4 million warrant mark in present fair value, but do not subtract it from 2031 proceeds: modeled exit prices remain below the disclosed common-warrant strikes and those warrants expire by September 2031. The mark's stale-date sensitivity is US$9.74 per share on current shares. Balance and warrants · Warrant strike · Model.
Bridge to One Common Share
The DCF starts with pro forma cash US$2,021.1 million (2,236.1−95−120), subtracts debt US$1,178.8 million and the stale warrant mark US$220.4 million, adds discounted operating FCFF of negative US$763.99 million, and adds discounted 2031 enterprise value. It yields US$31.61 per 22.624 million participating shares. The cash waterfall explicitly excludes customer prepayments as free distributions and credits none of the US$7 billion backlog without sales and margin. Cash and debt · Detailed output.
| Case | FY2031 revenue (US$m) | FY2031 EBITDA (US$m) | FY2027–31 capex (US$m) | Nov 25 2031 cash (US$m) | Exit EV (US$m) | Exit diluted shares (m) | 2031 equity/share (US$) | DCF fair/share (US$) |
|---|---|---|---|---|---|---|---|---|
| Bear | 790.00 | 44.20 | 1,270.00 | 1,077.13 | 397.80 | 27.00 | 10.97 | 6.63 |
| Base | 1,050.00 | 116.20 | 1,150.00 | 981.15 | 1,510.60 | 22.62 | 58.03 | 31.61 |
| Bull | 1,280.00 | 197.40 | 1,090.00 | 1,155.45 | 2,961.00 | 22.62 | 129.85 | 73.37 |
| Price test | US$ / share | CAD / share at 1.4219 |
|---|---|---|
| Base ceiling at 9.4871% CAGR | 36.8493 | 52.3960 |
| Joint downside zero nominal ceiling | 10.9568 | 15.5795 |
| Binding quoted entry, floored once | 10.95 | 15.5698 |
| Base 5y gain/loss at US$83.19 close | -30.31% | same at static FX |
| Joint downside 5y gain/loss at close | -86.83% | same at static FX |
| Joint downside 5y gain/loss at entry | 0.06% | same at static FX |
Price-Implied Expectations
Holding base costs, margins, capex, multiple and share count fixed, 2031 new enrichment revenue near US$1.05 billion makes DCF fair value US$83.28. That is 2.5× the base US$420 million and is not a statement of street consensus. To buy at US$83.19 under the common five-year rule would also require a funded downside terminal price above US$83.27 and a base exit high enough for 9.4871% CAGR; today's conditional downside is US$10.97. Reverse solve · Policy equations.
Independent Cross-Check
Independently reconstructing base exit gives 116.2×13+981.15−1,178.8=US$1,312.95 million, divided by 22.623963 million shares = US$58.0334. Rebuilding downside separately gives 44.2×9+1,077.13−1,178.8=US$296.13 million, divided by 26.999963 million = US$10.9678. The 2031 downside cash includes US$300 million raised for 4.376 million new shares; removing either side alone would distort the bridge. This challenge preserves the Wait decision. Model output.
Conclusion and Change from Prior Edition
There is no prior Markdown edition. The first fair value is US$31.61 and conditional entry US$10.95. A plausible but still unpriced high-output case can exceed the current quote, so the report is a decision framework with a specific December 7 evidence test, not an assertion that the market has no path to its price. Scenario output · Investor Day 8-K.
Peer Selection
Urenco is the closest operating competitor but has no separately listed common share. Cameco provides a public uranium and fuel-cycle reference, and BWXT a public nuclear manufacturing reference. Neither supplies a pure enrichment trading multiple; their audited operating margins are a scale and contract-economics check only. Urenco in Centrus 10-K · Cameco annual report · BWXT annual report.
Dated Ratio Table
The same ratio below is FY2025 GAAP/IFRS consolidated operating income divided by FY2025 reported revenue, in each issuer's own reporting currency. Different accounting and product mixes limit direct use as an exit-margin input. Centrus statements · Cameco FY2025 consolidated operations · BWXT FY2025 consolidated operations.
| FY2025 issuer / currency | Revenue (m) | Operating income (m) | Operating margin |
|---|---|---|---|
| Centrus / USD | 448.7 | 50.2 | 11.2% |
| Cameco / CAD | 3,481.9 | 618.1 | 17.8% |
| BWXT / USD | 3,198.4 | 404.5 | 12.6% |
Comparability Adjustments
Cameco sells mined uranium and holds Westinghouse exposure; BWXT's government nuclear components and services carry different contract margins. Centrus also has unusually high financing cash relative to current revenue and TTM operating loss, so its current enterprise value and TTM earnings are unstable valuation denominators. We use none of the peer equity multiples as a direct growth-plant price. Peer business descriptions · BWXT 10-K · Centrus TTM calculation.
Implications for Value
The base 2031 EBITDA margin is 11.1% (116.2/1,050), below the peer FY2025 operating-margin levels despite using an EBITDA numerator. This does not validate the 13× exit multiple; it highlights how little incremental cash the assumed program yields after overhead and capital. A strong market case needs both higher new-output volume and enough margin to monetize it. Forecast · Price-implied solve.
Bear Case
New enrichment reaches US$160 million in 2031 at 18% gross margin after a 2029 start of just US$30 million. FY2027–31 capex is US$1.27 billion, terminal EBITDA US$44.2 million, 9× exit enterprise value US$397.8 million, and 2028 US$300 million financing raises 4.376 million shares. November 25, 2031 cash is US$1,077.13 million after net cash burn and new equity; debt is US$1,178.8 million. This linked setback gives US$10.97/share, before sale costs. The grant or lease could fail more severely than modeled. Contingent backlog and lease · Bear schedule.
Base Case
New output reaches US$420 million sales in 2031 at 24% gross margin. FY2027–31 capex totals US$1.15 billion; EBITDA reaches US$116.2 million, 13× exit enterprise value US$1,510.6 million, and November 25, 2031 cash US$981.15 million. The US$58.03 terminal per-share price requires no new common issuance beyond the known pro forma count and no distributions. Base schedule · Share facts.
Bull Case
New sales reach US$650 million in 2031 at 28% gross margin after US$180 million in 2029. Capex is US$1.09 billion, terminal EBITDA US$197.4 million and 15× enterprise value US$2,961.0 million. Exit equity per share is US$129.85. This is a genuinely funded success case, not the published base or a management forecast. Bull schedule.
Outcomes at Close and Entry
| Assumption | Close | Fair value | Maximum entry | Price rule |
|---|---|---|---|---|
| Base | US$83.19 | US$31.61 | US$10.95 | Wait |
| Expansion gross margin 20% | US$83.19 | US$25.50 | US$10.95 | Wait |
| 2031 new enrichment sales US$650m | US$83.19 | US$50.47 | US$10.95 | Wait |
| Construction +US$100m in 2028 | US$83.19 | US$28.08 | US$10.95 | Wait |
Holding the joint downside fixed makes it the binding entry test under every one-variable base sensitivity shown. At the US$83.19 close, the base five-year sale gain/loss is −30.31% and the joint downside −86.83%; at US$10.95 entry, the joint downside is +0.062% after both trades, consistent with flooring the maximum price to cents. The base return at entry is +429.46% over five years, well above the 9.4871% annual hurdle, because the downside constraint binds. Returns exclude dividends, since none are supported. Policy output.
Market-Implied Case
To explain the US$83.19 close as DCF fair value with every other base input fixed, 2031 new sales must reach about US$1.05 billion at 24% gross margin. That is US$630 million above base and roughly 2.5× it. To pass the entry rule at the close, the base terminal value must also exceed the 9.4871% required path, and the joint downside proceeds must preserve US$83.19 after costs. The latter requires evidence that the financing/lease failure is far less severe than the present joint case. Reproducible reverse solve inputs · Model output.
Analyst Assessment
The bull enterprise scale is technically possible if plant construction, funding, qualified output and demand all align. At the cutoff, none of the public project disclosures specifies a full capacity, price, margin, reimbursement and dilution waterfall. We weight the observed nine-month cash deficit, pre-2029 spending and contingent commitments more heavily than the backlog headline. Investor Day is a useful falsification point, and FY2027 capex is the first annual cash test. Cash evidence · Backlog.
Operating Risks
The installed cascade and the new plant are different scales. Production qualification, component yield and SWU unit cost may lag; the Q3 unit-cost rise of 28% is a live warning. If new 2031 sales reach only US$160 million instead of US$420 million, downside EBITDA falls to US$44.2 million with the associated margin and capital stress. Reconsider on commissioned centrifuges and achieved saleable output, rather than a construction press release. Unit costs · Linked scenario.
Financial and Liquidity Risks
September cash US$2.236 billion is financed in part by convertible notes and the US$493.8 million September offering. It is needed for the US$560 million-plus Oak Ridge plan, Piketon, inventory and other commitments. In the joint case an assumed US$300 million raise at about US$68.56 per share buys cash but dilutes the share count from 22.624 million to 27.000 million. This price is an analyst assumption, not a financing term. An independent stress at US$40 per share increases the denominator to 30.124 million and lowers the conditional downside ceiling to US$9.82. Unquantified cleanup liabilities could lower it further. Reconsider when the issuer reconciles funded and unfunded project uses and decommissioning security. Q3 position · Financing · Conditional decommissioning obligation.
Regulatory and Legal Risks
The Piketon lease expires in October 2027; management warns that no extension by December 31, 2026 could force impairment. DOE options and operating contract funding are discretionary and appropriations dependent. A lease extension and documented obligated funding would narrow the downside duration; failure would widen it. Lease and funding, Q3 filing · Lease extract.
Industry and Competitive Risks
Urenco's existing capacity and other enrichers can meet some utility demand before Centrus' new machines are online. Advanced-reactor customers may delay deployments; Oklo's initial 2029 delivery schedule is an expectation, not a recognized revenue amount. The downside delays the new sales ramp and uses a lower terminal multiple to capture both duration and execution. Urenco capacity · Oklo release.
Thesis-Specific Risks and Reconsideration Triggers
The US$5.4 billion contingent backlog could fail to convert on milestones; the US$0.8 billion Technical Solutions book has DOE budget risk. A full project cost and margin schedule at December 7, a lease extension by the stated 2026 deadline, then FY2027 capex versus US$280–320 million are staged tests. If a funded project shows at least US$1.05 billion 2031 new sales with credible margin and a demonstrably resilient downside, the current Wait call must be revisited. Backlog and funding · Model thresholds.
Downside at the current price
From November 25, 2026 to November 25, 2031, the linked downside produces US$10.9678 per initial participating share from terminal sale before the 5 bp sale fee and US$0.00 from interim distributions. Net terminal proceeds are US$10.9623; the base has US$58.0334 gross sale and US$58.0044 net, also no distributions. Purchase costs are 5 bp once. Using gross XIC 7.5% with 3 bp each way yields net 7.4871% annual, plus two points gives a 9.4871% base hurdle. The base ceiling is US$36.8493; zero-nominal downside ceiling US$10.9568; the downside binds and floors once to US$10.95. At the US$83.19 close, modeled base and downside five-year gains/losses are −30.31% and −86.83%; at entry the downside is +0.062% and the base +429.46%. The CAD computation at frozen 1.4219 FX has the same returns; no FX gain is assumed. This is Needs underwriting because full project funding, cost and payout rights are undisclosed. An unfavorable Piketon lease or added financing can make even US$10.95 unsafe. See Scenarios and the public calculation. Lease and funding evidence.
Environmental Factors
Enrichment consumes electricity and handles regulated nuclear material; process tails, decommissioning and security are material obligations, not a generic low-carbon premium. Under the October lease amendment, Enrichment Corp. or ACO would assume certain DOE decontamination and decommissioning liabilities subject to NRC approval of ACO's funding plan. The October DOE transfer also puts facility, security and environmental compliance costs on ACO for certain HALEU materials. The model has no stand-alone cleanup reserve beyond known debt and modeled capital because the amount is not quantified in the Q3 filing; a documented obligation would reduce value dollar for dollar before any share division. Lease and conditional liability, rendered SEC 10-Q · DOE material transfer.
Social Factors
A trained nuclear workforce and secure operations are prerequisites for the 2029 deployment path. The issuer describes a 150,000-square-foot Piketon training and maintenance facility and high-rate Oak Ridge manufacturing plan. Delayed staffing or certification delays saleable output while capital keeps flowing. We represent that by the bear's later, smaller ramp and higher capex, without claiming a quantified workplace incident rate. Q3 facility plans · Capital extract.
Governance Factors
The April 2026 proxy gives Toshiba America 718,200 of 719,200 Class B shares and a conditional investor-designated director. Class B and Class A rank equally economically but differ in designated-director voting. This is a governance influence, not an additional economic claim beyond the Class B shares already in the denominator. The September capital raise materially diluted common holders, and the US$46.4 million warrant mark complicates headline earnings. Proxy ownership extract · Q3 warrants and mark.
Financially Material Risks and Opportunities
Domestic enrichment may advance supply security, but value to the shareholder requires permitted output above full lifecycle cost. A clean-energy label does not replace a project cash-flow forecast. The most material ESG-related price risks are lease and stewardship obligations, plant safety/licensing and secure fuel handling; new liabilities or commissioning delays would lower the terminal cash in the model. 10-K risk factors · Q3 lease.
Annual Results
The table is consolidated US$ millions for fiscal years ending December 31. Operating profit excludes financing and the later warrant remeasurement. Audited 2025 10-K statement.
| FY, US$m | 2023 | 2024 | 2025 |
|---|---|---|---|
| Revenue | 320.2 | 442.0 | 448.7 |
| Gross profit | 112.1 | 111.5 | 117.5 |
| Operating income | 52.4 | 48.0 | 50.2 |
| Net income | 84.4 | 73.2 | 77.8 |
Interim Results
The nine-month comparison shares a September 30 period end; Q3 revenue is displayed separately to show the delivery cadence. Q3 10-Q p.8 factual extract.
| Period, US$m | 9M2025 | 9M2026 |
|---|---|---|
| Revenue | 302.5 | 308.3 |
| Gross profit | 82.5 | 70.8 |
| Operating income/(loss) | 37.4 | (18.5) |
| Net income | 60.0 | 58.4 |
| Q3 revenue | 74.9 | 55.5 |
Trailing Results
TTM revenue through September 30, 2026 is US$454.5 million and TTM operating result is negative US$5.7 million by FY2025 + 9M2026 − 9M2025. The nominal TTM net income is contaminated by the US$46.4 million 2026 warrant-mark gain; it is not our normalized earnings proxy. Annual income · Interim income.
Material Adjustments
The first valuation adjustment is to discard noncash warrant remeasurement from operating profitability. The second is to account for the October Westerman cash and share issuance after September 30. The third is an explicit US$120 million analyst Q4 2026 burn; it is not reported and therefore shown as a sensitivity rather than attributed to the issuer. Q3 warrant mark · Westerman · Inputs.
Annual Positions
Audited year-end US$ millions; 2024/2025 cash reflects major financing inflows, so it is not a proxy for free distributable capital. 2025 10-K balance sheet, rendered SEC original.
| December 31, US$m | 2024 | 2025 |
|---|---|---|
| Cash and equivalents | 671.4 | 1,957.2 |
| Total assets | 1,093.4 | 2,445.9 |
| Long-term debt | 472.5 | 1,174.8 |
| Stockholders' equity | 161.4 | 765.1 |
Interim Positions
The September snapshot precedes Westerman and the unreported Q4 cash period. Q3 filing p.7 factual extract.
| US$m | Dec 31, 2025 | Sep 30, 2026 |
|---|---|---|
| Cash and equivalents | 1,957.2 | 2,236.1 |
| Total assets | 2,445.9 | 2,871.6 |
| Long-term debt | 1,174.8 | 1,178.8 |
| Warrant liability | 0.0 | 220.4 |
| Stockholders' equity | 765.1 | 1,105.1 |
Capital and Claims Reconciliation
At the model's opening, September cash less US$95 million Westerman cash and US$120 million assumed Q4 burn is US$2,021.1 million. Debt and the dated warrant mark total US$1,399.2 million; net opening liquid value in the DCF is US$621.9 million. Customer deferred revenue and inventory owed are operating obligations addressed through gross margin and working capital, not ignored cash assets. Terminal warrants are absent because the modeled November 2031 price is below the strike and the warrants expire earlier, while debt remains a senior claim. Balance rows · Warrant terms · Model.
Annual Flows
Reported US$ millions for fiscal years ending December 31. Audited 2025 10-K cash-flow statement · 2025 factual extract.
| FY, US$m | 2023 | 2024 | 2025 |
|---|---|---|---|
| Operating cash flow | 9.1 | 37.0 | 51.0 |
| Capital expenditures | (1.6) | (4.1) | (19.7) |
| Free cash before financing | 7.5 | 32.9 | 31.3 |
| Financing cash flow | 13.9 | 437.1 | 1,224.9 |
Interim Flows
The same nine-month period comparison makes the industrial pivot visible. Financing covers the operating plus investing deficit. Q3 10-Q p.9 factual extract.
| Nine months, US$m | 2025 | 2026 |
|---|---|---|
| Operating cash flow | 99.4 | (11.1) |
| Capital expenditures | (10.1) | (226.4) |
| Free cash before financing | 89.3 | (237.5) |
| Financing cash flow | 841.4 | 547.0 |
Trailing Flows
FY2025 plus 9M2026 minus 9M2025 gives TTM operating cash negative US$59.5 million and TTM capex US$236.0 million, or negative US$295.5 million before financing. That cash measure is a snapshot amid expansion, not a steady-state perpetuity. Annual and interim cash rows · Audited annual cash.
Reconciliation to Common Shareholders
The model starts with operating EBIT, pays modeled cash tax, adds D&A, subtracts capital and incremental working capital, then subtracts cash note interest in the cash roll-forward. It leaves annual free cash inside the corporation until exit and subtracts senior debt before dividing by pro forma shares. The September cash raised from securities is included once, as is the paired dilution in the bear. No dividend or buyback is assumed. Forecast worksheet · Q3 financing.
Primary Sources and Locators
This public edition includes the complete SEC HTML originals: 2025 Form 10-K filed February 11, 2026; Q3 2026 Form 10-Q filed November 5; 2026 proxy filed April 24; and Oklo's November 11 8-K. Public Peralta factual-extract PDFs reproduce the exact rows cited beside material claims and name SEC filing pages and URLs; they are labeled secondary exhibits, not issuer-authored PDFs. The original 10-K, 10-Q, proxy, November 24 8-K, Oklo/Centrus contracts, NYSE quote and Bank of Canada rate provide public context. Peer originals are linked in the comparison section. Every inventoried file in this edition is public.
Frozen Inputs and Assumptions
Frozen inputs identify the observed quote, FX, financial position, common/pre-funded-warrant count and policy costs, then separate Peralta's growth, margin, overhead, capital, financing and multiple assumptions. The US$120 million Q4 cash burn, 12% discount rate, 13× terminal multiple, 24% new-output gross margin and US$300 million downside raise are not issuer guidance. The specific cost and dilution terms most likely to reverse the entry are unreported; Needs underwriting removes this ticker from passing ranks. Source to input to formula to decision: Q3 cash/debt/share rows → frozen JSON → Python model → exact JSON → opening and Scenarios tables. The first forecast checkpoint is FY2027 capex, then FY2029 sales, then FY2031 share count.
Worksheets and Saved Outputs
From the checked-out edition directory, run the linked Python worksheet with Python 3.12.13 in the approved app venv. Set PYTHONDONTWRITEBYTECODE to 1 and PYTHONPATH to the current directory. The worksheet uses only standard-library modules and the public frozen model inputs. It writes the linked Markdown tables and exact JSON. The quote/CAD policy calculation retains full precision and floors only the final US-dollar quote to cents. The Output tab links the actual generated bytes.
| Worksheet | Output |
|---|---|
| Valuation | Opening decision · Valuation and ceilings · Forecast |
Changes from the Preceding Edition
This is a presentation correction to the first edition, published as immutable ID d673f464-1356-4f63-96e7-8c5a6477a2c6. It removes a long inline command that widened the phone page and corrects the description of public source files. The valuation, forecast, decision, cutoff and quote are unchanged. Future updates must isolate new evidence, revised project assumptions, quote changes and correction effects.
| Revision driver | Fair value | Maximum entry |
|---|---|---|
| Prior | US$31.61 | US$10.95 |
| Presentation and access wording | US$0.00 | US$0.00 |
| Rounding | US$0.00 | US$0.00 |
| Current | US$31.61 | US$10.95 |
Stock Price History
The source gives unadjusted NYSE closes in US dollars, without a dividend adjustment; the last row freezes this edition's close and conditional entry. Dated quote source.
| Date | Close (USD) | Entry price (USD) |
|---|---|---|
| 2026-11-20 | 81.43 | |
| 2026-11-23 | 86.81 | |
| 2026-11-24 | 84.04 | |
| 2026-11-25 | 83.19 | 10.95 |