K92 Mining Inc. | TSX:KNT | Equity research, 24 November 2026
Our maximum entry price is C$4.80 per share. KNT closed at C$21.89 on 24 November 2026, so the price rule is Wait. The strongest credible challenge is successful Stage 4 resource conversion with US$3,700 gold and 12% more output: that raises fair value to C$13.30 and entry to C$7.65, still Wait. Q3 throughput and development support a continuing ramp, while the inferred-resource mine life remains unproved; the joint ramp, cost and US$2,900 gold downside reduces fair value to C$3.64 and sets the binding entry cap. F01 F02 F19 F25 F26
- Market close (CAD)
- C$21.89
- Base fair value (CAD/share)
- C$9.14
Company details
- Five-year hurdle price (CAD/share)
- C$8.24
- Maximum entry price (CAD/share)
- C$4.80
- Binding rule
- downside rule
- Entry without downside rule (CAD/share)
- C$8.20
- Reduction from downside rule alone (CAD/share)
- C$3.40
- Total hurdle minus final entry (CAD/share)
- C$3.44
Issuer: K92 Mining Inc. · Listing: TSX:KNT · Quoted currency: CAD · Reporting currency: USD · Sector: Materials / gold mining · Evidence cutoff: 24 November 2026 TSX close · Next review: Q4 2026 operating release and annual results.
| Base fair value | Five-year hurdle | Final entry | Binding rule | No-downside entry | Downside reduction | Hurdle minus final |
|---|---|---|---|---|---|---|
| C$9.14 | C$8.24 | C$4.80 | downside rule | C$8.20 | C$3.40 | C$3.44 |
The base fair value, five-year hurdle price, and entry are C$9.14 / C$8.24 / C$4.80, respectively. With identical base economics and the fair-value cap, removing only the downside cap gives C$8.20 after C$0.05 downward rounding. The downside rule therefore removes C$3.40 on the same rounding basis. The unrounded hurdle-to-final gap is C$3.4402: C$3.40 stress-only reduction plus C$0.0402 of no-stress rounding; the fair-value cap contributes zero. The five-year after-cost XIC expectation is 7.4871%; the required stock return is 9.4871%. At the close, modeled after-cost stock return is −9.9464% annually, a −17.4335 percentage-point spread to XIC. All five modeled common dividends are zero. Model · Frozen inputs · Saved decision
Investment Thesis
Kainantu is an operating high-grade gold-copper mine with a commissioned 1.2Mtpa Stage 3 plant, growing underground fronts and large cash reserves. We credit continuing mine cash after tax and growth spending, then stop at 2037; we assign no free value to Blue Lake or further discoveries. Stage 4 1.8Mtpa is a development case rather than reserve-backed output. F18 F25 F26
Market Mispricing
The close exceeds modeled fair value by C$12.75, and fair value exceeds the final entry by C$4.34. Those signed gaps sum to the C$17.09 close-to-entry gap. To meet the five-year hurdle from the close under our production, cost and cash-retention assumptions requires a gold-equivalent price of about US$5,552/oz through 2037, versus the US$3,300 base. That is a conditional break-even deck, not consensus or a quoted gold forecast. Worksheet
Recent Developments
On 16 November the company released Q3 results: 49,776 AuEq ounces, 250,042 tonnes processed and US$389.9 million September cash. Stage 3 commercial production began in January 2026; Q3 throughput annualizes to about 1.0Mt, still below its 1.2Mtpa design. The Q3 deferred PNG tax charge explains the quarterly GAAP loss and is treated separately from cash. F02 F06 F13 F18
Earnings Outlook
Our frozen forecasts have three checkpoints. 2026 AuEq output: company guidance 190–225koz; our base 207koz, downside 190koz, upside 225koz, settled by the Q4 2026 production release. 2027 AuEq output: base 230koz, downside 184koz, upside 258koz, settled by 2027 operating results. 2027 growth capital: base US$120m, downside US$170m, upside US$100m, settled by 2027 cash-flow and expansion disclosures. The last two ranges are Peralta scenarios, not issuer guidance. F03 F05
Valuation Summary
The finite 2027–37 mine NAV is US$1,384.9m at a 10% nominal USD discount rate, plus US$201.390m of adjusted net cash after named claims and the post-quarter tax payment. C$1.4296 per USD and 248.1 million diluted shares produce C$9.14 per share. The 24 November 2031 common equity exit is C$12.98 with no modeled cash dividends. F06 F07 F08 F09 F11 F34 Worksheet
Recommended Action and Entry Price
Wait at C$21.89. Reconsider only if the quote falls to C$4.80 or the documented production, reserves, gold deck and capital requirements raise the rule-derived ceiling. The C$4.80 rule limits a drop to the C$3.64 bear fair value to 25%, before transaction costs; it is not a stop loss or a forecast of market trading. Decision output
Catalysts
Watch the Q4 2026 production result against 190–225koz full-year guidance, Phase 4 ventilation and paste commissioning, and 2027 ore development around the 1,200m/month Stage 4 requirement. A reserve update that converts inferred Stage 4 material, with a new capex schedule, would change the mine-life evidence. F03 F19 F20 F26
Primary Risks to Thesis
Gold remains the largest value driver: cutting the common deck to US$3,000 reduces fair value to C$7.18. Stage 4 resource conversion, higher AISC and late capital can coincide; our joint case reaches C$3.64. Country, permit, tailings and safety risks can also delay production. F26 F27 Sensitivity
Stock Price History
The following TSX closes are unadjusted CAD observations. F01 Original series
| Date | Close (CAD) | Entry (CAD) |
|---|---|---|
| 2026-11-16 | 24.71 | |
| 2026-11-17 | 23.71 | |
| 2026-11-18 | 23.18 | |
| 2026-11-19 | 22.51 | |
| 2026-11-20 | 21.38 | |
| 2026-11-23 | 22.71 | |
| 2026-11-24 | 21.89 | 4.80 |
Company Overview
K92 owns and operates Kainantu in Papua New Guinea and explores nearby Kora, Judd, Arakompa and Blue Lake. The modeled common share owns the operating mine and net parent claims; the optional properties receive zero standalone value pending a mine plan and funding schedule. 2025 AIF
Products and Services
The output is gold doré and gold-copper-silver concentrate. AuEq converts metals at period-specific prices; it is an operating unit, not a fixed amount of gold revenue. YTD Q3 2026 gold output was 133,016oz and total AuEq output 142,612oz. Q3 MD&A p. 3
Business Model
Ore mined through underground fronts is processed, sold as doré or concentrate, then settled with provisional-price adjustments. The annual audit flags concentrate sales and subsequent settlement remeasurement as a key audit matter. Our model values cash after production, sustaining, exploration, expansion, corporate tax and PNG remittance tax. 2025 FS pp. 2–4
Revenue Drivers
2026 YTD gold sold was 133,123oz at an average payable US$4,463/oz; copper and silver add value. The forecast varies AuEq volumes and the realized-price proxy once, avoiding a second by-product credit. The US$3,300 base deck is our normalized judgment below the 2026 realized price, not management guidance or a 24 November spot quote. F30 F31
Cost Structure
Co-product AISC of US$1,480–1,580 per AuEq ounce in 2026 guidance includes sustaining and site overhead but not our separately listed growth and exploration programs. We start 2027 at US$1,600 and grow it 2% nominally, while keeping the same AuEq denominator as the revenue proxy. F04 F05
Operating Levers
Q3 processed 250,042t, mined 252,744t and achieved 6.1g/t Au feed grade. Three fronts, ventilation and paste determine whether tonnes can rise without diluting grade or cost. We forecast 230koz AuEq in 2027 and 335koz in 2030–34, below the Stage 4 PEA 413.6koz run-rate. F02 F25 F28
Distribution
The 2026 Trafigura agreement covers 100% of concentrate until the later of 2032 or a 600,000 DMT minimum. That creates settlement and counterparty concentration rather than broad consumer distribution. No ordinary common dividend is assumed for 2027–31. F32 2025 AIF pp. 23, 29
Geographic Exposure
Mine operations, permits, tax and community relations sit in PNG; shares trade in CAD and financial reports use USD. We convert one USD common-equity value at C$1.4296 per USD, rather than mixing metal and share currencies. F34 Q3 FS
Regulatory Environment
ML150 is due for renewal in June 2034. Our mine cash to 2037 is therefore conditional on renewal; failure removes the last three forecast years and can also strand Stage 4 capital. This is a valuation risk, not a guaranteed mine horizon. F27
Industry Structure
K92 sells price-taking precious and base metals into global markets. Its advantage, if maintained, is ore grade and recoveries rather than the ability to set gold prices. The Stage 3 DFS assumed US$1,900 gold while 2026 realized gold was much higher, illustrating commodity sensitivity. F21 F31
Growth and Cyclicality
Gold, copper and silver prices can move independently of mine execution; fixed underground, processing and capital costs magnify cash-flow swings. A US$300 move in the DFS gold deck changed its historical NPV5 by about US$205m, though that 2024-base study cannot be transplanted into today's NAV. F21 F24 DFS p. 407
Competitors
AEM is a multi-mine gold operator; PAAS is a multi-mine silver and gold operator. Both have geography and portfolio diversification K92 lacks. Their current P/E ratios are context only because K92's Q3 withholding charge and divergent metal mixes distort earnings comparability. AEM quote PAAS quote
Market Share
K92 has no meaningful pricing share of global bullion markets. Its 190–225koz 2026 guidance is material for the company but does not influence realized gold prices. We therefore hold price independent of volume in the sensitivity. F03
Competitive Advantages
Q3 gold recovery reached 94.1%, and lateral development 1,162m/month, close to the Stage 4 1,200m/month threshold. The operating record reduces near-term ramp risk, but a single high-grade orebody and unproven long-term reserve conversion remain limits. F19 F20 F28
Pricing and Cost Position
Our 2027 AISC assumption US$1,600/AuEq ounce is slightly above 2026 guidance and inflates thereafter. AISC is a non-IFRS measure; project economics must still deduct growth and exploration cash. Comparing a gold-only by-product AISC to AuEq revenue would flatter the margin, so we use co-product AISC. F04 F05
Entry Barriers and Substitutes
The underground resource, lease, processing infrastructure and local relationships are difficult to replicate. Investors can substitute diversified miners or bullion exposure for this single-mine, development-heavy equity; that raises the return needed for an entry. F18 F27
Supplier and Customer Dynamics
K92 needs mining contractors, equipment, power and transport while selling all concentrate through Trafigura under the 2026 agreement. Higher equipment or contractor cost would flow into AISC and development capital; 10% higher AISC is included in the joint bear. F32 Sensitivity
Regulation and Structural Risks
PNG royalties, the 30% income tax regime and a 15% intercompany dividend withholding tax reduce common proceeds. The DFS used a 2% royalty and 0.5% levy; our observed co-product AISC baseline includes operating levies, while corporate and remittance tax are explicit. This simplification should be revisited if cost reporting changes. F08 DFS p. 404
Historical Performance
Revenue rose from US$350.6m in 2024 to US$595.2m in 2025, then reached US$618.1m in the first nine months of 2026. That growth contains a large gold-price component: YTD Q3 2026 payable gold averaged US$4,463, up from US$3,075 a year earlier. It cannot be extrapolated at the same price. F12 F15 F31
Income Statement Analysis
Q3 revenue US$176.5m produced US$111.9m mine earnings, but the US$90.3m deferred PNG withholding charge drove a US$39.5m net loss. Nine-month net earnings were US$161.8m. We do not add back the tax and simultaneously assume tax-free future distributions. F08 F12 F13
Balance Sheet Analysis
September cash US$389.886m exceeds loan US$34.517m, but US$3.816m leases, US$8.163m closure, US$90.3m recognized withholding and a subsequent US$51.7m tax payment narrow common-accessible liquidity. Our adjusted opening bridge is US$201.390m. Working capital remains necessary for operations, so this is a valuation bridge rather than cash available for immediate dividends. We conservatively credit no Q4 2026 operating cash after September: the nine-month simple cash residual averages US$61.8m per quarter, or C$0.36/share, but that is only a scale test before Q4 taxes, deposits and investment. F06 F07 F08 F09 F14
Cash Flow Analysis
2025 reported operating cash US$280.9m less PP&E cash US$208.8m was US$72.2m before equipment deposits, financing and timing. Nine-month 2026 operating cash US$312.1m less PP&E cash US$126.7m was US$185.4m on the same partial definition. No 2026 annualization is used as the 2027 forecast because gold price and expansion spending differ. F14 F16
Earnings Quality
The 2025 auditor called concentrate revenue recognition and provisional settlements a key audit matter. Q3 2026 GAAP loss is dominated by a deferred tax recognition, while operating cash was positive. We value future remittance after tax; a non-cash charge does not become free cash. F08 F13 2025 auditor report
Nonrecurring Items
Q3 includes a one-time US$90.3m balance-sheet recognition tied to management's intent to distribute PNG earnings. Its cash realization is future and applies to existing earnings; the model subtracts it once from opening claims and applies 15% only to forecast positive cash. A tax-policy change would require a full bridge revision. F08
Funding and Cash Conversion
The trailing nine-month operating cash less PP&E cash is US$185.4m. Our 2027 mine cash falls to US$109.8m because the model resets the realized-price proxy to US$3,300, explicitly funds US$120m expansion and US$35m exploration, and charges corporate and remittance tax. This is a modeled bridge, not issuer guidance. The US$51.7m post-quarter tax payment is deducted from starting cash, not this 2027 cash flow. F09 F14 Forecast
Key Ratios
At C$21.89 and 245.73m issued shares, equity capitalization is about C$5.38bn. The trailing P/E quoted by Stock Analysis is 16.08x, but Q3's tax charge makes the denominator volatile. The more useful model ratio is market capitalization to our US$1.586bn common NAV, about 2.37x on matched CAD/USD. F10 F13 KNT market data
Forward Outlook
We use 230koz AuEq in 2027, 290koz in 2028, then a conditional 335koz plateau for 2030–34 before depletion. At 1.8Mtpa and 94% recovery, 335koz requires about 6.15g/t AuEq feed grade; Q3 2026 gold grade was 6.1g/t before copper and silver credits. The 2027–37 plan totals 3.23Moz AuEq, exceeding the 2.6Moz M&I Kora/Judd resource estimate from September 2023 before subsequent depletion. The unconverted difference is a real dependency, not booked reserves. Cash flows stop after 2037 with no terminal multiple. F25 F26 F27 F28 Kora/Judd resource table Forecast
Model Choice
A finite mine cash-flow NAV is preferable to a perpetual corporate DCF. We price 2027–37 AuEq output, US$3,300/oz realized-value proxy, growing AISC, explicit expansion and exploration, 30% corporate tax, 15% remittance tax and a 10% nominal USD discount rate. The remaining Stage 3 DFS is an engineering cross-check; Stage 4 is conditional and receives a haircut through lower-than-PEA volumes. F21 F25 F26
Growth
Q3 2026 annualized output is about 199koz, consistent with 190–225koz full-year guidance. Our 2027 230koz and 2030–34 335koz require growth in mining fronts and paste, but remain 19% below the Stage 4 PEA 413.6koz run-rate. This haircut acknowledges inferred resource conversion risk without pretending that a reserve already exists. F02 F03 F25 F26
Profitability
At US$3,300 gold-equivalent realized value and US$1,600 2027 co-product AISC, mine margin is US$1,700/oz before exploration, growth and tax. The annual cost rate rises 2%; the realized deck stays flat nominally, creating declining real margins. Co-product AISC and AuEq volumes retain the same denominator. F04 Worksheet
Reinvestment or Required Capital
We deduct US$120m and US$100m of growth capital in 2027 and 2028, tapering only as the expansion becomes productive, plus US$35m annual exploration through 2034. AISC includes sustaining capital; we avoid subtracting it a second time. The historical DFS contained US$346.1m sustaining and US$194.4m initial capex from a 2024 start, so simply appending its NPV would double count past cash. F05 F22 F23
Discount Rate
Our 10% nominal USD mine discount rate is a judgment for single-country, single-mine and resource-conversion risk; it is higher than the 5% DFS engineering convention. Raising it to 12%, with physical and cash assumptions fixed, lowers fair value from C$9.14 to C$8.42; the downside cap still binds, with entry C$4.50. This is not a CAPM estimate. F21 Sensitivity
Terminal Economics
There is no perpetuity. The model's last full year 2036 and final year 2037 carry AISC, exploration, limited growth spending and remittance tax; cash flow becomes zero in 2038. The existing US$8.163m closure provision is subtracted in the opening bridge; the remaining final-year US$5m is growth spending, not an extra closure allowance. ML150 renewal is required after 13 June 2034. Prorating 2034 ounces, operating cost and exploration to that date, retaining its full committed growth spending and deleting later production cuts base fair value from C$9.14 to C$7.56, and the rule-derived entry from C$4.80 to C$3.95. F07 F27 Boundary table
Bridge to One Common Share
| Year | AuEq koz | US$/AuEq | AISC US$/AuEq | Revenue US$m | AISC US$m | Growth US$m | Explore US$m | Corp tax US$m | Remit tax US$m | FCF US$m | PV US$m |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 2027 | 230 | 3,300 | 1,600 | 759.0 | 368.0 | 120.0 | 35.0 | 106.8 | 19.4 | 109.8 | 98.9 |
| 2028 | 290 | 3,300 | 1,632 | 957.0 | 473.3 | 100.0 | 35.0 | 134.6 | 32.1 | 182.0 | 148.9 |
| 2029 | 325 | 3,300 | 1,665 | 1,072.5 | 541.0 | 50.0 | 35.0 | 148.9 | 44.6 | 252.9 | 188.2 |
| 2030 | 335 | 3,300 | 1,698 | 1,105.5 | 568.8 | 30.0 | 35.0 | 150.5 | 48.2 | 273.0 | 184.7 |
| 2031 | 335 | 3,300 | 1,732 | 1,105.5 | 580.2 | 25.0 | 35.0 | 147.1 | 47.7 | 270.5 | 166.3 |
| 2032 | 335 | 3,300 | 1,767 | 1,105.5 | 591.8 | 25.0 | 35.0 | 143.6 | 46.5 | 263.6 | 147.3 |
| 2033 | 335 | 3,300 | 1,802 | 1,105.5 | 603.6 | 25.0 | 35.0 | 140.1 | 45.3 | 256.5 | 130.4 |
| 2034 | 335 | 3,300 | 1,838 | 1,105.5 | 615.7 | 25.0 | 35.0 | 136.4 | 44.0 | 249.4 | 115.2 |
| 2035 | 290 | 3,300 | 1,875 | 957.0 | 543.6 | 10.0 | 30.0 | 115.0 | 38.8 | 219.6 | 92.2 |
| 2036 | 250 | 3,300 | 1,912 | 825.0 | 478.0 | 10.0 | 25.0 | 96.6 | 32.3 | 183.1 | 69.9 |
| 2037 | 170 | 3,300 | 1,950 | 561.0 | 331.6 | 5.0 | 15.0 | 64.3 | 21.8 | 123.3 | 42.8 |
| Bridge | Value |
|---|---|
| Sep 2026 cash | 389.886 |
| Post Sep PNG tax instalment | -51.700 |
| Loan | -34.517 |
| Lease | -3.816 |
| Closure obligation | -8.163 |
| Legacy PNG remittance tax | -90.300 |
| Opening adjusted cash / claims | 201.390 |
| Mine FCF NAV at 10% | 1384.891 |
| Common equity US$m | 1586.281 |
| USD/CAD | 1.4296 |
| Diluted shares m | 248.1 |
| Fair value CAD/share | C$9.14 |
| Cash retained at 24 Nov 2031 US$m | 1262.187 |
| Remaining mine NAV at 24 Nov 2031 US$m | 989.961 |
| Year-5 24 Nov 2031 exit CAD/share | C$12.98 |
| Finite boundary | FCF US$m | Growth US$m |
|---|---|---|
| 2036 | 183.1 | 10.0 |
| 2037 final production | 123.3 | 5.0 |
| 2038 onward | 0.0 | 0.0 |
The US$90.3m legacy withholding claim is subtracted from September cash before future cash flow; the 15% tax on future positive cash is deducted only in each forecast year. The US$51.7m tax instalment paid after the balance-sheet date is a second distinct adjustment. We use 248.1m shares, above 245.733m issued, to allow currently dilutive awards; no financing issue is modeled because even the joint bear's cumulative cash remains positive. F06 F08 F09 F10 F11
Price-Implied Expectations
The 24 November 2031 exit at the base deck is C$12.98 with five zero dividends, producing −9.9464% annualized after costs at a C$21.89 purchase, versus 7.4871% after-cost XIC. Holding the mine plan, cost and residual value fixed, US$5,552/oz realized AuEq value is needed for the five-year hurdle price to reach the close. This is materially above both our US$3,300 and US$3,600 common comparison decks; it assumes the same 2037 end. Model result
Independent Cross-Check
The historical Stage 3 DFS stated US$680.5m NPV5 at US$1,900 gold from a 2024 base, 6.18Mt to 2030 and no Stage 4 inferred tail. Our value is higher at US$3,300 and with conditional Stage 4 cash, but the 2024 NPV is not current net asset value. Separately, the 24 November quote implies about C$5.38bn equity value versus our C$2.27bn base, leaving a C$3.11bn valuation claim on a stronger price deck, longer resource life, or both. F21 F22 F24 F26
Conclusion and Change from Prior Edition
This is KNT's first Markdown edition; there is no comparable predecessor entry or fair value. Current fair value is C$9.14, and the entry is C$4.80 after the five-year hurdle and quantified bear-loss rule. The major unresolved judgment is whether Stage 4 can convert inferred material fast enough to support a longer mine life. F26
Peer Selection
AEM provides diversified gold exposure; PAAS provides diversified precious-metals exposure and mining capital risk. Neither is a clean single-mine PNG analogue. We use them only as an external market sanity check, not a terminal multiple. AEM quote PAAS quote
Dated Ratio Table
| TSX issuer, 24 Nov 2026 | Close CAD | Trailing P/E | Denominator / limitation |
|---|---|---|---|
| KNT | 21.89 | 16.08x | TTM earnings includes Q3 deferred PNG tax; single mine |
| AEM | 223.35 | 12.72x | TTM earnings; diversified gold mines |
| PAAS | 44.40 | 8.37x | TTM earnings; mixed silver and gold assets |
P/E means same-listing unadjusted CAD close divided by data vendor TTM diluted EPS, with the vendor's 24 November 2026 timestamp. KNT AEM PAAS
Comparability Adjustments
KNT's one-time deferred withholding charge depresses TTM net earnings without immediate cash movement, while PAAS and AEM have different mine portfolios and shareholder payouts. Currency cancels within each P/E but accounting and asset lives do not. We do not infer KNT NAV by multiplying its current P/E by normalized earnings. F08 F13
Implications for Value
KNT's 16.08x trailing multiple is above both comparison names despite greater single-asset and Stage 4 resource risk. That reinforces a high evidence burden at C$21.89, yet the ratio does not set our entry. The finite NAV and shareholder cash test do. F26 Valuation worksheet
Bear Case
US$2,900 AuEq realized value, 20% fewer ounces, 10% higher co-product AISC and US$50m additional growth capital in each of 2027–28 combine to C$3.64 fair value. These misses can coincide if paste/ventilation delays reduce throughput while fixed cost and contractor expense continue. The joint condition persists through the finite model, with temporary extra capital in the first two years. F19 F20 F25 F26
Base Case
US$3,300, 230koz in 2027, a 335koz plateau, 10% NAV discount and no public dividend deliver C$9.14. The plan pays for growth and exploration and stops in 2037. It gives Stage 4 conditional value at reduced output, not the full PEA case. F25 F26 Forecast
Bull Case
US$3,700 AuEq realized value and 12% more output than base produce C$13.30 fair value before any additional discovery beyond 2037. The same expansion capital is assumed, which makes this an optimistic execution and metal-price test rather than an independently funded new mine. Scenario output
Outcomes at Close and Entry
| Assumption | Close | Fair value | Maximum entry | Price rule |
|---|---|---|---|---|
| Base | C$21.89 | C$9.14 | C$4.80 | Wait |
| Joint ramp / cost / gold bear | C$21.89 | C$3.64 | C$3.20 | Wait |
| Stronger Stage 4 and US$3,700 gold | C$21.89 | C$13.30 | C$7.65 | Wait |
| US$3,600 common gold | C$21.89 | C$11.10 | C$6.95 | Wait |
| 12% NAV discount | C$21.89 | C$8.42 | C$4.45 | Wait |
| No renewal after 13 Jun 2034 | C$21.89 | C$7.56 | C$3.95 | Wait |
The base loss from C$21.89 to bear NAV is 83.4% before dealing costs. At the C$4.80 entry it is 24.3%, within the 25% modeled downside tolerance after C$0.05 downward rounding. The common US$3,600 deck is a peer-comparison sensitivity: it raises fair value to C$11.10, C$1.96 above KNT's US$3,300 base, holding AuEq ounces, co-product AISC, capital, tax and FX fixed. AuEq composition would change slightly with metal-price ratios; we do not silently reclassify copper or apply a separate royalty. F25 Sensitivity
Market-Implied Case
With all other base inputs fixed and no dividends, the stock would need roughly US$5,552/oz AuEq realized value to clear the benchmark-plus-2-point hurdle from C$21.89. This is a conditional solution for price, not an analyst forecast or a spot quote. The FY2027 AuEq output and AISC reports will test whether a stronger physical path can lower the required price. Model
Analyst Assessment
The strongest alternative is an extended, economically converted Stage 4 ore inventory at higher gold. The present PEA's inferred-resource caveat and the 2034 lease renewal make that case investable only after new evidence. The common US$3,600 sensitivity does not close the gap; even its fair value C$11.10 remains below C$21.89. F26 F27
Operating Risks
Stage 3's Q3 1.0Mt annualized throughput is below 1.2Mt design, and Stage 4 needs sustained development near 1,200m/month. Missed paste and ventilation commissioning could couple fewer tonnes with higher unit cost. Watch 2027 production below 184koz or development below the required pace. F02 F18 F20
Financial and Liquidity Risks
The US$389.9m cash headline overstates common-accessible cash after debt, leases, closure, withholding and the post-quarter tax payment. Trafigura holds security over the mine holding company and has a default-triggered conversion right capped at 4.5% of common shares. Current net cash makes default a contingency, so the conversion is excluded from the base 248.1m denominator; a capex overrun plus cash shortfall could activate it and require a revised per-share bridge. F06 F07 F08 F09 F35 2025 AIF pp. 23, 29
Regulatory and Legal Risks
ML150 renews in 2034; without renewal, 2035–37 mine cash is at risk. PNG dividend withholding at 15% adds a transfer cost, while environmental and mining permits can delay Stage 4. The issuer's 2025 AIF and Q3 MD&A identify these exposures. F08 F27 2025 AIF
Industry and Competitive Risks
Gold has no company-set price floor; a US$300 reduction from the base deck cuts fair value by about C$1.96. Diversified gold miners can offer lower single-asset risk. A higher cost of capital alone reduces the modeled fair value by C$0.72 when moving from 10% to 12%. Sensitivity
Thesis-Specific Risks and Reconsideration Triggers
Stage 4's 2028 413.6koz PEA run-rate requires inferred material, capacity and capital to resolve together. Our 3.23Moz 2027–37 output exceeds the 2.6Moz M&I estimate before 2024–26 depletion, making resource conversion essential even at our haircut. Reconsider when a reserve update, 2027 actual output, AISC and growth capital can be put into one refreshed mine schedule; one isolated exploration intercept is insufficient. F25 F26 Kora/Judd resource table
Environmental Factors
The underground paste system is designed to reduce surface tailings storage, but commissioning and tailings management remain cash and permit risks. Our AISC includes sustaining and the bridge subtracts existing closure obligations; a revised closure estimate must change both cash and claims once. F07 F33
Social Factors
Kainantu relies on local landowner and PNG government relationships. A fatal surface-contractor incident announced in February 2026 is material to safety oversight; it should be assessed through subsequent safety disclosures rather than dismissed as a one-time cost. K92 safety release 2025 AIF
Governance Factors
David Medilek succeeded John Lewins as CEO in 2026. The board's decisions on Stage 4 capital, resource disclosure, PNG cash remittance and potential dilution will determine per-share returns; our 248.1m denominator includes current award dilution but no new equity raise. K92 leadership release F11
Financially Material Risks and Opportunities
Improved paste and tailings handling could sustain underground grades and reduce future surface storage needs, supporting modeled AuEq output. Failures could require extra capex and slow mining; the joint bear applies both lower volume and US$100m additional early growth spending. F25 F33 Scenario output
Annual Results
| USD millions, year ended 31 Dec | 2024 | 2025 |
|---|---|---|
| Revenue | 350.623 | 595.249 |
| Cost of sales | (142.237) | (156.912) |
| Mine earnings | 208.386 | 438.337 |
| Net earnings | 111.224 | 270.193 |
These are consolidated IFRS issuer figures. F15 F29 2025 FS pp. 3–4
Interim Results
| USD millions | Q3 2025 | Q3 2026 | 9M 2025 | 9M 2026 |
|---|---|---|---|---|
| Revenue | 177.547 | 176.547 | 418.491 | 618.073 |
| Mine earnings | 133.738 | 111.892 | 308.190 | 431.450 |
| Net earnings | 85.671 | (39.456) | 195.112 | 161.756 |
The Q3 comparison is affected by US$90.3m deferred withholding in 2026. F08 F12 F13 Q3 FS p. 3
Trailing Results
TTM through September 2026 equals FY2025 plus 9M2026 less 9M2025: revenue US$794.831m and net earnings US$236.837m. The net figure includes the deferred tax charge and is not a cash measure. F12 F15 F29 Q3 FS p. 3
Material Adjustments
We do not replace reported IFRS earnings with a one-off adjusted figure for valuation. Instead the NAV forecasts underlying production and cash taxes and subtracts the recognized existing withholding obligation. The TTM P/E comparator retains reported earnings, with this limitation explicit. F08 F13
Annual Positions
| USD millions, 31 Dec | 2024 | 2025 |
|---|---|---|
| Cash | 140.073 | 230.878 |
| Total assets | 628.269 | 957.817 |
| Loans, current + noncurrent | 59.211 | 49.309 |
| Equity | 474.740 | 767.555 |
The annual periods are audited; restricted 2024 cash is not counted as free cash. F17 2025 FS p. 2
Interim Positions
| USD millions | 31 Dec 2025 | 30 Sep 2026 |
|---|---|---|
| Cash | 230.878 | 389.886 |
| Total assets | 957.817 | 1,194.489 |
| Loans, current + noncurrent | 49.309 | 34.517 |
| Deferred tax liability, total | 33.669 | 131.738 |
| Equity | 767.555 | 938.358 |
The US$90.3m newly recognized PNG withholding is within, not in addition to, the total deferred-tax liability. F06 F08 Q3 FS p. 2
Capital and Claims Reconciliation
The modeled opening equity claim is US$389.886m cash minus US$51.7m subsequent tax, US$34.517m loans, US$3.816m leases, US$8.163m closure and US$90.3m existing remittance tax = US$201.390m. We do not subtract the full US$131.738m deferred-tax balance because other components are reflected in the future tax schedule. The exact bridge appears in the worksheet output. F06 F07 F08 F09 Bridge
Annual Flows
| USD millions, year ended 31 Dec | 2024 | 2025 |
|---|---|---|
| Operating cash | 185.088 | 280.910 |
| PP&E cash outflow | (158.508) | (208.759) |
| Simple residual before deposits / financing | 26.580 | 72.151 |
The residual is not declared shareholder cash; equipment deposits and debt service also matter. F16 2025 FS p. 4
Interim Flows
| USD millions, nine months to 30 Sep | 2025 | 2026 |
|---|---|---|
| Operating cash | 169.252 | 312.106 |
| PP&E cash outflow | (146.248) | (126.728) |
| Simple residual | 23.004 | 185.378 |
Working-capital and settlement timing make the nine-month simple residual unsuitable for straight annualization. F14 Q3 FS p. 4
Trailing Flows
TTM operating cash through September 2026 is US$423.764m, and TTM PP&E cash outflow US$189.239m. The simple US$234.525m difference includes extraordinary 2026 gold prices and is not forecast distributable cash. TTM = FY2025 + 9M2026 − 9M2025. F14 F16
Reconciliation to Common Shareholders
For 2027 the model begins with 230koz × (US$3,300 − US$1,600) = US$391.0m mine margin. It subtracts US$35m exploration, US$106.8m current corporate tax, US$120m growth capital and US$19.4m remittance tax, leaving US$109.8m after required investment. Modeled shareholder dividends are US$0; all residual remains company cash and builds the 2031 exit once. No buyback, acquisition or debt refinancing is assumed. The Q3 2026 historical residual cannot be paid out without considering the existing tax and investment obligations. F04 F05 Forecast
Primary Sources and Locators
The public factual locator exhibit is Peralta-authored from the linked originals. The issuer originals remain owner-only in this package because public redistribution rights were not confirmed. Critical numeric citations above link to a specific exhibit row, and the following publisher documents identify the physical PDF pages for verification:
| Source | Cutoff-relevant content | Original publisher |
|---|---|---|
| Q3 2026 financial statements | pp. 2–4 balance sheet, earnings, cash; pp. 23–24 withholding and post-quarter tax | K92 PDF |
| Q3 2026 MD&A | pp. 4–5 operating and financial; p. 8 guidance; p. 18 dilution | K92 PDF |
| FY2025 audited statements | pp. 2–4 2024/25 comparative statements | K92 PDF |
| 2025 annual information form | operations, ownership and risk sections | K92 PDF |
| Amended Stage 3 DFS | physical pp. 403–407, inputs, capex, NAV and gold sensitivity | K92 PDF |
| Updated Stage 4 IDP release | PEA run-rate and inferred-resource caution | K92 release |
| 24 Nov TSX KNT close | 24 Nov 2026 unadjusted closing row | Market series |
| 24 Nov USD/CAD | Daily indicative reference | Bank of Canada |
Frozen Inputs and Assumptions
Frozen JSON labels the USD/CAD rate, share count, 2027–37 production, US$3,300 base, US$2,900 bear and US$3,600 common gold decks, AISC, capital, taxes, 10% discount, XIC 7.5% pre-cost and all trading frictions. The US$3,300 deck, 10% discount, mine life and production path are Peralta judgments. The 2026 Q3 statements, MD&A and historical DFS are reported evidence. F21 F25 F34
Worksheets and Saved Outputs
Run PYTHONDONTWRITEBYTECODE=1 PYTHONPATH=. /Users/johnperalta/johnperalta4vanilla/.venv/bin/python support/valuation.py from the edition root with Python 3.12.13. It reads only support/inputs/model.json and writes the three outputs below. No network or owner credentials are needed. Five annual common dividends are exactly zero; year-five exit and the after-cost hurdle are generated in JSON. Full forecast
| Worksheet | Output |
|---|---|
| Mine NAV and entry | Decision, Forecast and equity bridge, Exact JSON |
Changes from the Preceding Edition
First edition without a predecessor. The historical Stage 3 DFS is a source reference, not a prior Peralta entry price. No prior-to-current revision arithmetic is implied. F24