Fortuna Mining Corp. | TSX:FVI | 24 November 2026
Our maximum entry price is C$4.30 per share. At the 24 November 2026 TSX regular-session close of C$10.91, we wait. Our finite-mine base fair value is C$8.34 and the five-year, 24 November 2031 exit is C$11.56. The base after-cost return at the close is 1.14% a year versus 7.49% for XIC, a -6.35-point gap. The strongest contrary assumption is that roughly US$4,300/oz gold persists across the same finite mine plan while Diamba is permitted on time: that lifts the unstressed five-year entry ceiling to C$11.05 and would justify buying at the close; we prefer US$3,400/oz because Q3 realized US$4,281/oz is above the mine-plan reserve decks and Diamba fiscal terms are unsettled. Our US$2,900/oz plus two-year Diamba-delay joint case caps the actual entry at C$4.30. The first test is Senegal’s final Diamba permit and mining convention, targeted by management for Q4 2026. F11 F16 F37
- Market close (CAD)
- C$10.91
- Base fair value (CAD/share)
- C$8.34
Company details
- Maximum entry price (CAD/share)
- C$4.30
- Five-year hurdle price, unrounded (CAD/share)
- C$7.3379
- Five-year exit (CAD/share)
- C$11.56
- Return at 24 November close, annual after cost
- 1.14%
- XIC assumed annual after cost
- 7.49%
- Stock minus XIC, percentage points
- -6.35
Closing Prices
| Date | Close (CAD) | Entry (CAD) |
|---|---|---|
| 2026-11-23 | 11.19 | |
| 2026-11-24 | 10.91 | 4.30 |
FVI TSX regular closes; 24 November is corroborated by XIC holdings and historical tape. XIC same-day close was C$54.34 from its TSX price history, versus FVI C$10.91 from FVI history. F36 F37
Investment Thesis
Fortuna combines three producing mines with a fully costed Senegal project, but the free cash of the current price cycle is not perpetual. We count contained reserves only once and give no value to unconverted Bambadji exploration. Gold, construction timing and state claims drive the entry. F10 F20 F39
Market Mispricing
The quoted C$10.91 exceeds our C$8.34 fair value by C$2.57. Holding all other inputs fixed, about US$4,257/oz across the finite plan is needed for a buyer at the close to earn XIC plus 200 bp. That is a conditional price-implied deck, not a spot forecast. model · frozen inputs · saved output
Recent Developments
In Q3 Fortuna bought the Bambadji exploration property for US$200m plus US$7.4m costs; the spent cash is reflected in September cash and we add no speculative resource value. The board authorized US$250m Diamba contracts before final exploitation permission. F04 F16
Earnings Outlook
The Q3 US$4,281/oz realized gold price and US$2,286/GEO consolidated AISC are observations, not our long-term margin. Our US$3,400 base, US$3,600 common comparison and US$2,900 downside are analyst judgments; the cost and production paths are explicit in frozen inputs. F11 model · frozen inputs · saved output
Valuation Summary
C$8.34 fair, C$7.34 unrounded return hurdle and C$4.30 stress-limited entry. Without the stress cap the same-rounded entry is C$7.30; the joint stress reduces it by C$3.00. A five-cent downward floor is the only entry rounding. model · frozen inputs · saved output
Recommended Action and Entry Price
Wait at C$10.91; do not treat a buyback as a dividend to an unchanged share. All five common cash distributions are modeled at zero, and the base return at C$4.30 is 21.84% a year after costs. The model treats retained cash as part of the 2031 sale value, not as a second payment. F09 F19 model · frozen inputs · saved output
Catalysts
Watch the final Diamba permit/convention by 31 December 2026, 2027 construction cash versus the FS schedule, and 2028–29 Séguéla output versus the >200koz target. Each is testable and moves the same mine-cash worksheet. F14 F15 F16 F25
Primary Risks to Thesis
The joint downside is US$2,900 gold, two years of Diamba delay, US$100m break cost, and only 50% of residual positive cash benefiting current shares: fair value C$4.33 and 2031 exit C$5.72. That is -60.3% fair-value loss at the close and +0.7% at entry, before further tail losses. model · frozen inputs · saved output
Company Overview
TSX:FVI and NYSE:FSM are the same Canadian common shares. Fortuna reports three active mines, Séguéla, Lindero and Caylloma, and the Diamba Sud development project. Its reporting currency is US dollars; the entry decision is CAD per TSX share. F01 F43
Products and Services
Séguéla and Lindero sell gold doré. Caylloma sells silver, lead and zinc concentrates; GEO conversion is a value comparison, not an ounce of physical gold. Diamba is expected to sell gold after construction. F10 F20 F43
Business Model
Volume times realized metal price less mine costs, royalties, sustaining and growth capital produces cash. In the nine months to September 2026, Lindero, Séguéla and Caylloma generated US$302.5m, US$536.2m and US$115.5m sales, summing to US$954.2m versus consolidated US$954.3m after rounding. F01 F43
Revenue Drivers
Séguéla delivered 56% of nine-month segment sales, Lindero 32% and Caylloma 12%; gold price and Séguéla tonnes dominate. The Diamba FS targets 1.053Moz recovered over 9.4 years, with first pour in 2028. F20 F43
Cost Structure
Sustaining capex and leases belong in AISC. We separately charge Séguéla’s US$109m expansion and use the Diamba after-tax FS cash flow, which already deducts its US$398m initial and US$79m sustaining/closure capital. No project capex is deducted twice. F14 F21 F25
Operating Levers
At constant output and tax, a US$100/oz move changes future gold-mine cash; the worksheet routes the change through Séguéla, Lindero and Diamba, while Caylloma’s silver/base-metal basket is frozen. Higher royalties at higher prices make a fixed AISC an approximation. A one-variable gold change from US$3,400 to US$3,600 lifts fair value by C$0.92. F11 F27 model · frozen inputs · saved output
Distribution
Q3 cash flow records a non-controlling dividend and 9M common repurchases, but no common dividend. An unchanged common share has zero contracted cash distributions in our five-year schedule. Buybacks may improve per-share claims only if funded after investment and not offset by awards. F09 F19
Geographic Exposure
Gold cash is exposed to Côte d’Ivoire, Argentina and future Senegal, with Peru silver/base metals. FX conversion uses the Bank of Canada 24 November USD/CAD 1.4296; political, local cost and repatriation risk are not diversified away by the dual listing. F38 F43
Regulatory Environment
Senegal’s final exploitation permit and convention were pending at the cutoff. Senegal receives a 10% free carry, and could acquire up to 25% further at a fair price; Côte d’Ivoire also has a 10% state carry at Séguéla. F16 F24 F42
Industry Structure
Gold is globally priced; Fortuna cannot set its product price. The competition is for reserve replacement, skilled contractors, permits and low-cost ore, rather than customer retention. Caylloma adds silver/base-metal prices, so its GEO is not identical to a gold ounce. F11 F41
Growth and Cyclicality
Fortuna’s Q3 realized gold was US$4,281/oz against our normalized US$3,400, so extrapolating Q3 cash would overstate finite-life economics. The 2025 continuing cash record and 2026 nine-month cash bridge show the cycle and investment demands. F11 F13 F32
Competitors
Agnico Eagle provides a diversified gold benchmark; Pan American Silver has mixed precious metals and more silver exposure. Their current earnings multiples serve only as a market cross-check because mine lives and reserve quality differ. AEM PAAS
Market Share
The source set does not disclose an independently comparable global gold market-share denominator. Our decision does not depend on one: the mine-by-mine recoverable ounces and cost envelopes, rather than a claimed share, produce NAV. F20 F39
Competitive Advantages
Séguéla’s reserve update to 1.616Moz as of March 2026 and planned 30% mill expansion support a longer production path. This is a resource conversion and execution advantage only if the 2028 throughput and recovery milestones are achieved. F14 F15 F39
Pricing and Cost Position
Diamba’s FS average AISC is US$1,332/oz over mine life, but its US$398m build and 10% state carry matter to the common claim. The Q3 consolidated AISC of US$2,286/GEO is much higher and reflects mine mix, royalties and unusual costs. F11 F21 F24
Entry Barriers and Substitutes
Permits, capital and ore access constrain new production; gold itself is fungible, so these barriers do not create pricing power. XIC is the liquid CAD opportunity-cost benchmark for the same 24 November purchase date. F16 F37
Supplier and Customer Dynamics
The Q3 Séguéla contractor equipment shortfall and artisanal-miner stoppage demonstrate that contractor capacity and social access can interrupt ore. Doré and concentrates ultimately clear against market metal prices, while Caylloma has smelter/offtake concentration. Q3 MD&A pp. 8, 15
Regulation and Structural Risks
The Diamba FS fiscal assumptions still refer to a prior convention and permit review can change royalties, taxes or investment credit. We do not assume that the 5% FS discount rate is an equity hurdle; our common NAV uses 10%. Diamba FS physical pp. 258, 262–266 F23 F24
Historical Performance
FY2025 sales were US$947.1m versus US$677.2m in 2024; 9M2026 reached US$954.3m versus US$676.8m in 9M2025. The 2025 total common earnings include discontinued operations, so the operating comparison uses continuing figures in the statement table. F01 F29 F30
Income Statement Analysis
Nine-month segment operating income was US$136.3m Lindero, US$298.8m Séguéla and US$54.3m Caylloma; US$50.1m corporate cost reconciles to US$439.3m consolidated operating income. Q3 common net income was US$47.8m. F02 F44
Balance Sheet Analysis
Cash declined from US$554.0m at 2025 year-end to US$443.3m at September 2026 despite operating cash, partly because Bambadji cost US$207.4m and buybacks US$106.6m. The convertible is modeled by conversion shares or debt redemption, never both. F04 F09 F31
Cash Flow Analysis
Nine-month continuing CFO US$460.0m less US$163.8m capex and US$25.6m lease payments equals US$270.6m actual FCF. Management’s US$350.7m ongoing figure adds back US$79.2m growth capital and other items. Capital cannot be both spent on growth and paid to shareholders. F06 F07 F08 F12 F13
Earnings Quality
The Q3 cash bridge supports profit, but gold price and mine mix make current margins cyclical. Share awards can dilute the common claim; we use a maximum 2.919m PSU shares rather than the 1.459m units at face value. F02 F03 F11 F17
Nonrecurring Items
The 2025 comparison includes sold San Jose and Yaramoko operations; Q3 2025 benefited from a Lindero impairment reversal. Our valuation begins with current continuing mine plans and treats Bambadji’s completed purchase as cash already spent, with no incremental discovery value. Q3 MD&A pp. 2, 10 F04
Funding and Cash Conversion
September cash US$443.3m and an undrawn US$150m revolver support development, but the board’s US$250m Diamba authority and Séguéla’s US$109m expansion compete with buybacks. The model deducts a full US$95m FS 2026 Diamba bucket against September cash as a conservative post-balance reserve; exact spending by 24 November is not disclosed and could raise value if already spent. F04 F14 F16 F25
Key Ratios
Q3 operating cash/sales was 38.3%; 9M actual FCF/sales was 28.4%. These are cycle-period ratios, not perpetual margins. At the 24 November close, the approximate trailing P/E is 8.2x using continuing common income US$302.4m and ~325m economic diluted shares with USD/CAD 1.4296. F01 F02 F06 F13 F38
Forward Outlook
Frozen checkpoints: (1) final Diamba permit and convention by 2026-12-31, base granted, downside delayed beyond 2027; government notice resolves it. (2) FY2027 Diamba plus Séguéla expansion spend US$259m base, downside above US$340m, upside below US$240m; 2027 audited capex and project updates resolve it. (3) FY2029 Séguéla gold output 200koz base, downside below 165koz, upside above 210koz; 2029 operating release resolves it. Each changes entry via cash timing or recovered ounces. F14 F15 F16 F25 model · frozen inputs · saved output
Model Choice
A finite mine cash NAV, not a perpetuity, reflects exhaustible reserves. The 2026–37 Diamba FS annual after-tax schedule is interpolated for gold price and charged once for construction; Séguéla, Lindero and Caylloma use reserve-constrained annual ounce paths, AISC, 32% normalized tax, expansion and closure cash. F20 F21 F25 F26 model · frozen inputs · saved output
| Year | Séguéla | Lindero | Caylloma | Diamba Sud | Parent | Total |
|---|---|---|---|---|---|---|
| 2026 | 0.0 | 0.0 | 0.0 | -95.0 | 0.0 | -95.0 |
| 2027 | 86.5 | 105.4 | 20.4 | -189.0 | -28.0 | -4.7 |
| 2028 | 141.2 | 110.7 | 20.4 | 57.9 | -28.0 | 302.2 |
| 2029 | 189.7 | 110.7 | 20.4 | 362.1 | -28.0 | 654.9 |
| 2030 | 189.7 | 110.7 | 20.4 | 294.7 | -28.0 | 587.5 |
| 2031 | 175.5 | 110.7 | 20.4 | 132.2 | -28.0 | 410.7 |
| 2032 | 166.0 | 110.7 | 20.4 | 170.9 | -28.0 | 440.0 |
| 2033 | 151.8 | 105.4 | 4.0 | 26.3 | -28.0 | 259.5 |
| 2034 | 113.8 | 100.1 | 0.0 | 216.0 | -28.0 | 402.0 |
| 2035 | 29.7 | 92.8 | 0.0 | 35.8 | -28.0 | 130.2 |
| 2036 | 0.0 | 75.4 | 0.0 | 104.0 | -28.0 | 151.4 |
| 2037 | 0.0 | 0.0 | 0.0 | 36.9 | -28.0 | 8.9 |
Growth
Séguéla grows from 165koz in 2027 to 200koz in 2029–30 only after US$70m/US$39m modeled expansion spending in 2027–28; the total US$109m matches board approval. Diamba first gold in 2028 and its 2029 179koz sales are already in the FS; no free 500koz perpetuity is added. F14 F15 F26
Profitability
Base gold is US$3,400/oz. Operating mine cash equals production times gold minus site AISC, after a 32% analytical tax and state interest. Diamba uses the study’s explicit after-tax cash, adding 65% of gold-revenue differences to approximate tax and royalty leakage. This simplified sensitivity is a material model limit. F11 F23 F27 model · frozen inputs · saved output
Reinvestment or Required Capital
Diamba FS 2026 and 2027 cash of −US$95m and −US$189m already includes the planned development period; the US$398m initial total includes its 2028 portion. Séguéla US$109m is separately paired with higher output. Closure is modeled by mine and included in Diamba FS. F14 F21 F25 F26
Discount Rate
The 10% nominal USD NAV discount is our risk judgment, above Diamba’s 5% project-study rate because common equity bears permit, funding, state and mine execution risk. The five-year investor hurdle is separately XIC 7.5% gross, 3 bp each side, plus 200 bp; FVI costs are 5 bp each side. No currency hedge is assumed. F23 F24 F37 F38 model · frozen inputs · saved output
Terminal Economics
The final explicit mine year is 2037 and first year after is 2038 with zero production, cash and terminal value. At 2031 exit, only the 2032–37 finite remaining cash, US$828.4m captured PV, is sold; its 2031–32 step includes sustaining/closure spending. Carrying the last-year US$8.9m cash forward forever would add artificial value and is excluded. F20 F28 model · frozen inputs · saved output
Bridge to One Common Share
The generated bridge below starts with US$443.253m September cash, less US$10.9m vendor financing and a conservative US$95m 2026 Diamba reserve, then adds US$1558.7m finite captured cash. The 325.048m if-converted denominator includes 295.957m common, 2.919m max PSU and 26.172m note conversion shares; note principal is not also subtracted. Redemption instead gives C$8.24. AISC includes lease payments and mine closure is modeled as cash, so neither liability is subtracted again. F04 F05 F17 F18 F25 model · frozen inputs · saved output
| Common claim bridge, base | US$m unless stated |
|---|---|
| September 30 cash | 443.253 |
| Vendor financing | −10.900 |
| Post-cutoff 2026 Diamba construction reserve | −95.000 |
| Captured finite future mine cash, PV at 10% | 1558.670 |
| Common claim | 1896.023 |
| If-converted shares incl. max PSU, millions | 325.048 |
| Fair CAD/share at 1.4296 USD/CAD | 8.34 |
| Redemption alternative CAD/share | 8.24 |
| Captured 2027–31 cash added to exit | 1461.838 |
| Remaining post-2031 finite NAV at exit | 828.363 |
| 2031 exit CAD/share | 11.56 |
Price-Implied Expectations
At the close, the base exit produces 1.14% annual after-cost return and a -6.35-point XIC spread. The inverse solution needs US$4,257/oz at all modeled production years to just meet XIC plus 200 bp. Q3 realized US$4,281/oz is near this threshold, but one quarter cannot establish a 2037 metal path; FS reserve design uses lower gold prices. F11 F20 F27 model · frozen inputs · saved output
Independent Cross-Check
The Diamba FS 100% NPV5 is US$1,009m at US$3,500 and US$1,148m at US$3,750. Linear interpolation gives US$1,064.6m at US$3,600 before state share and higher 10% risk discount; 90% would be US$958.1m. Our worksheet retains year-by-year construction and after-tax mine cash, so it never books that headline NPV as an additional asset. F22 F23 F24 F27 model · frozen inputs · saved output
Conclusion and Change from Prior Edition
This is FVI’s first authored edition; there is no predecessor to reprice. Current close, mine plans and cash claims yield C$8.34 fair and C$4.30 entry. Exact 24 November post-quarter cash, tax and project spending are not reported, so the cash bridge uses September statements with an explicit full 2026 Diamba reserve. F04 F25
Peer Selection
AEM and PAAS are same-day TSX precious-metal comparators, not direct substitutes: AEM is more diversified and PAAS has a different silver/gold mix. We use simple price/earnings as a weak cross-check, not a mine NAV input. AEM quote PAAS quote
Dated Ratio Table
| TSX issuer, 24 Nov 2026 | Close CAD | Trailing P/E | Denominator and limit |
|---|---|---|---|
| FVI | 10.91 | ~8.2x | Rebuilt continuing common earnings / economic diluted shares |
| AEM | 223.35 | 12.72x | Vendor trailing EPS; diversified gold |
| PAAS | 44.40 | 8.37x | Vendor trailing EPS; mixed silver/gold |
FVI uses US$269.714m FY2025 continuing common earnings plus US$234.338m 9M2026 less US$201.652m 9M2025 = US$302.4m; the approximate P/E is 8.2x after conversion to CAD and 325.048m shares. The peer vendor ratios and closes are 24 November observations. 2025 40-F physical p160 F02 F17 F18 F38 AEM PAAS
Comparability Adjustments
FVI’s 2025 disposals and convertible notes affect the denominator; AEM’s diversified reserve duration and PAAS’s metal mix differ. The approximate FVI P/E uses continuing earnings while vendor peers use reported TTM EPS, so it cannot support a precise fair-value spread. F18 F30
Implications for Value
FVI near 8.2x and PAAS near 8.4x do not refute our finite NAV. The discount to AEM is directionally consistent with FVI’s shorter visible reserve life and Diamba permitting risk. We give this ratio no weight in the entry formula. model · frozen inputs · saved output
Bear Case
US$2,900 gold, 2-year Diamba delay, US$100m break cost and 50% cash capture put fair value at C$4.33. The delay shifts production as well as spend; it does not create another mine after 2037. At C$10.91 the fair-value loss is -60.3%. model · frozen inputs · saved output
Base Case
US$3,400 gold, 75% cash capture, on-schedule Diamba and the reserve-limited mine paths yield C$8.34 fair and C$11.56 2031 exit. No ordinary common distributions are assumed. model · frozen inputs · saved output
Bull Case
US$4,000 gold with the same operations and cash capture yields C$11.09 fair and C$15.49 exit. This is still below the price needed for the five-year hurdle at the close. model · frozen inputs · saved output
Outcomes at Close and Entry
At the close, base after-cost return is 1.14% versus XIC 7.49%; at C$4.30 base return is 21.84%. Bear fair value is C$4.33 versus entry C$4.30, leaving only C$0.03 fair-value cushion; losses beyond this joint case remain possible. Entry is five-cent rounded down from the lowest of base fair, five-year hurdle and joint fair. model · frozen inputs · saved output
| Assumption | Close | Fair value | Maximum entry | Price rule |
|---|---|---|---|---|
| Base | C$10.91 | C$8.34 | C$4.30 | Wait |
| Common US$3,600 | C$10.91 | C$9.26 | C$4.30 | Wait |
| Joint downside | C$10.91 | C$4.33 | C$3.60 | Wait |
| Bull | C$10.91 | C$11.09 | C$4.30 | Wait |
| Case | Gold US$/oz | Diamba delay | Cash capture | Fair CAD/share | 2031 exit CAD/share | Entry at close? |
|---|---|---|---|---|---|---|
| base | 3,400 | 0 years | 75% | C$8.34 | C$11.56 | Wait |
| common_3600 | 3,600 | 0 years | 75% | C$9.26 | C$12.87 | Wait |
| bear | 2,900 | 2 years | 50% | C$4.33 | C$5.72 | Wait |
| bull | 4,000 | 0 years | 75% | C$11.09 | C$15.49 | Wait |
Market-Implied Case
Without the joint stress cap, US$4,300 gold sustained through each finite mine year gives C$11.05 return-based entry and a buy at C$10.91. The threshold is about US$4,257; the same price path requires timely Diamba permits and the expansion output, so it is not supported merely by the Q3 realized price. F11 F14 F16 model · frozen inputs · saved output
Analyst Assessment
The strongest contrary case is plausible because Q3 realized gold was US$4,281; we reject it as the base because reserve shells, future fiscal terms and growth spending need to endure for years. The common US$3,600 comparison yields C$9.26 fair and C$12.87 exit, still a wait at the close. The first decisive evidence is the Diamba convention’s royalty/credit terms. F11 F16 F23 F27 model · frozen inputs · saved output
Operating Risks
Séguéla’s Q3 stoppage and contractor availability threatened mine sequencing. In our plan, FY2029 output below 165koz versus 200koz base cuts saleable ounces and makes the US$109m expansion harder to recover. Q3 MD&A physical pp. 8, 15 F14 F15
Financial and Liquidity Risks
US$443.3m September cash is not fully free cash: US$172.5m notes may convert, US$93.1m leases and US$47.6m closure are future burdens. We put lease and closure in mine cash, and show a separate debt-redemption alternative. Diamba’s US$250m contract authority can consume liquidity before the permit. F04 F05 F16 F18
Regulatory and Legal Risks
Final Diamba exploitation permission and fiscal convention remained pending on 24 November. A two-year delay and US$100m break cost are analyst stresses, not management guidance; the Senegal 10% free carry is explicit. Permit grant with no adverse fiscal terms reduces this risk. F16 F24
Industry and Competitive Risks
A gold price below US$2,900 for years, local cost inflation or worse recovery could make the modeled entry unsafe. AISC is not fixed across gold decks because royalties rise with sales; our 65% Diamba price-flow factor and flat operating AISC are simplifications. F11 F27 model · frozen inputs · saved output
Thesis-Specific Risks and Reconsideration Triggers
Check Q4 2026 permit/convention, FY2027 growth cash above US$340m, and FY2029 Séguéla below 165koz. A changed state interest, construction schedule or non-controlling cash leakage must be rerun in the per-share bridge; a short-term rally alone does not alter mine value. F14 F16 F24 model · frozen inputs · saved output
Environmental Factors
Mine closure is a real cash claim, not free terminal value. September closure provision was US$47.6m; our explicit closure rows total US$70m for the existing mines, and Diamba’s US$15m is in its FS schedule. This can understate tailings and remediation overruns; update after the next provision note. F05 F21 model · frozen inputs · saved output
Social Factors
The Q3 Séguéla site-wide stoppage following an artisanal-miner blockade shows that local access can reduce output even with intact reserves. The base path requires stable contractor and community access; the downside delays output and halves captured cash. Q3 MD&A physical pp. 6, 8 model · frozen inputs · saved output
Governance Factors
Board authorization of US$250m Diamba commitments before permit increases execution speed and cancellation exposure. The 2026 proxy reports no holder with more than 10% voting control; cash-settled and performance awards still require dilution review. F16 F17 F34
Financially Material Risks and Opportunities
If the new Senegal convention preserves the FS investment tax credit and royalty, Diamba’s finite cash can support the base. If those terms weaken, the after-tax FS schedule and entry must be cut. The next test is the signed convention and first audited construction outlay, not a generic ESG score. Diamba FS physical pp. 258, 262–266 F16 F23
Annual Results
| US$m, years to Dec 31 | 2024 | 2025 |
|---|---|---|
| Continuing sales | 677.243 | 947.059 |
| Operating income | 156.147 | 408.391 |
| Continuing common income | 84.493 | 269.714 |
| Total common income incl. disposals | 128.735 | 287.469 |
2024 comparisons were restated for disposed operations. 2025 40-F physical p160 F29 F30
Interim Results
| US$m, nine months to Sep 30 | 2025 | 2026 |
|---|---|---|
| Continuing sales | 676.818 | 954.319 |
| Mine operating income | 318.501 | 531.872 |
| Operating income | 294.263 | 439.283 |
| Continuing common income | 201.652 | 234.338 |
Q3 statement physical p2 F01 F02
Trailing Results
Trailing continuing sales = FY2025 947.059 + 9M2026 954.319 − 9M2025 676.818 = US$1,224.560m. Trailing continuing common income = 269.714 + 234.338 − 201.652 = US$302.400m; neither includes San Jose/Yaramoko disposal profit. F01 F02 F29
Material Adjustments
FY2025 total common income exceeded continuing by US$17.755m after discontinued items. The model uses future ore/cash rather than multiplying either reported earnings line; 2025 Lindero impairment reversal and commodity windfall are not assumed recurring. 2025 40-F physical p160 Q3 MD&A physical p10
Annual Positions
| US$m, Dec 31 | 2024 | 2025 |
|---|---|---|
| Cash | 231.328 | 553.985 |
| Total assets | 2,115.532 | 2,360.641 |
| Debt carrying value | 126.031 | 134.410 |
| Lease obligations | 67.977 | 76.886 |
| Closure provisions | 75.337 | 50.257 |
Interim Positions
| US$m | Dec 31 2025 | Sep 30 2026 |
|---|---|---|
| Cash | 553.985 | 443.253 |
| Total assets | 2,360.641 | 2,575.932 |
| Debt carrying value | 134.410 | 148.166 |
| Lease obligations | 76.886 | 93.139 |
| Closure provisions | 50.257 | 47.570 |
Q3 statement physical p4 F04 F05
Capital and Claims Reconciliation
The model’s starting cash US$443.253m excludes restricted cash; vendor financing US$10.9m is removed. The note is resolved by if-converted 26.172m shares, with a separate US$172.5m principal redemption outcome. Lease payments are inside AISC and closure appears in finite cash, avoiding a second subtraction. State minorities are handled in attributable project cash. F04 F05 F18 F24 model · frozen inputs · saved output
Annual Flows
| US$m, continuing operations | FY2024 | FY2025 |
|---|---|---|
| Operating cash | 235.696 | 455.366 |
| Mineral property/PP&E additions | (161.080) | (178.004) |
| Lease payments | (15.773) | (24.374) |
| After-investment FCF | 58.843 | 252.988 |
2025 40-F physical p163 F32 F33
Interim Flows
| US$m, continuing operations | Q3 2026 | 9M 2026 |
|---|---|---|
| Operating cash | 112.365 | 460.006 |
| Mineral property/PP&E additions | (50.620) | (163.778) |
| Lease payments | (9.821) | (25.643) |
| Actual after-investment FCF | 51.924 | 270.585 |
| Management ongoing FCF, rounded | 90.8 | 350.7 |
The first four rows are filing arithmetic; the last is a non-IFRS issuer reconciliation. F06 F07 F08 F12 F13
Trailing Flows
Trailing continuing CFO = FY2025 455.366 + 9M2026 460.006 − 9M2025 293.047 = US$622.325m. Trailing capex needs the matching 9M2025 US$133.516m, so 178.004 + 163.778 − 133.516 = US$208.266m; leases 24.374 + 25.643 − 17.697 = US$32.320m. Thus trailing after-investment FCF is US$381.739m at elevated metals. 2025 40-F physical p163 Q3 statement physical p5
Reconciliation to Common Shareholders
Nine-month actual FCF US$270.6m funded US$106.6m common repurchases, US$23.5m non-controlling dividends and about US$140.5m residual before acquisition financing, restricted cash and other investing. Bambadji’s US$207.4m acquisition consumed more than that residual; beginning cash funded the difference. We project no common dividend and count only 75% of future positive residual in base common value, 50% in joint downside; the uncredited portion absorbs exploration, overhead leakage and poor capital allocation. Cash deficits reduce the full starting cash. F09 F13 F19 model · frozen inputs · saved output
Primary Sources and Locators
The public factual row index gives each claim a unique highlighted row and the issuer PDF physical page. Original Q3 financials, MD&A, 2025 40-F, Diamba technical report, Séguéla technical report, 2026 circular, April reserve update, Bank of Canada and the same-day FVI TSX close and XIC TSX close are the authorities. The Q3 statements, MD&A, 2025 40-F and Diamba technical report are archived as owner-only SEC filing HTML; the other originals are linked externally. The issuer PDF mirrors were blocked for direct archival retrieval. The row index is Peralta reconstruction, not an issuer PDF.
Frozen Inputs and Assumptions
Model JSON freezes quote, XIC C$54.34 same-day close, Bank of Canada 1.4296 USD/CAD, shares, mine volumes, AISC, capex, tax, state shares, discount, cash capture and friction. Reserve estimates are contained rather than fully recoverable ounces; modeled production is capped below each remaining estimate. Gold, cost, depletion, tax, cash capture and risk rates are Peralta judgments. Séguéla 1.616Moz is March 2026, with a conservative 120koz remaining-2026 depletion estimate; F37 F38 F39 F40 F41 model · frozen inputs · saved output
Worksheets and Saved Outputs
| Worksheet | Output |
|---|---|
| Finite mine valuation | Decision · Mine cash and bridge |
Run from the edition root with PYTHONDONTWRITEBYTECODE=1 PYTHONPATH=. /Users/johnperalta/johnperalta4vanilla/.venv/bin/python support/valuation.py using Python 3.12.13 and standard library only. It reads public frozen JSON and writes the two linked Markdown outputs plus exact JSON. The report copies the generated decision and bridge tables; alter a material input once in JSON and rerun to see price and return change. model · frozen inputs · saved output
Changes from the Preceding Edition
The first FVI edition is retained under its immutable publication ID. This same-cutoff correction adds the direct 24 November XIC historical-close link and clarifies which originals were archived; no quote, cash flow, model input or valuation changed.
| Revision driver | Fair value | Maximum entry |
|---|---|---|
| Prior | C$8.34 | C$4.30 |
| XIC source-link correction | C$0.00 | C$0.00 |
| Rounding | C$0.00 | C$0.00 |
| Current | C$8.34 | C$4.30 |