Centerra Gold Inc. | TSX:CG | Equity research, 24 November 2026
Our maximum entry price is C$12.80 per share. CG closed at C$25.30 on 24 November 2026, so the decision is Wait. The strongest credible contrary case credits all of a C$23.93 bull fair value and half of Kemess's US$1.1bn early-stage PEA NPV, reaching about C$27.93 fair value, but its unpermitted development and the binding joint-downside cap leave the action at Wait. The base finite-asset value is C$19.00 and the 2027-29 capex and 2045 mine-life claims are why we do not capitalize the headline metal price. F01 F17 Kemess PEA
- Market close (CAD)
- C$25.30
- Base fair value (CAD/share)
- C$19.00
Company details
- Five-year hurdle price (CAD/share)
- C$17.59
- Maximum entry price (CAD/share)
- C$12.80
- Binding rule
- joint downside intrinsic cap
- Entry without downside rule (CAD/share)
- C$17.55
- Reduction from downside rule alone (CAD/share)
- C$4.75
- Total hurdle minus final entry (CAD/share)
- C$4.79
Issuer: Centerra Gold Inc. · Listing TSX:CG · Quoted currency CAD · Reporting and model currency USD · Materials / diversified gold, copper and molybdenum · Evidence cutoff 24 November 2026 regular TSX close. Next review: Q4 2026 results and Thompson Creek commissioning update.
| Base fair value | Five-year hurdle | Final entry | Binding rule | No-downside entry | Downside reduction | Hurdle minus final |
|---|---|---|---|---|---|---|
| C$19.00 | C$17.59 | C$12.80 | joint downside intrinsic cap | C$17.55 | C$4.75 | C$4.79 |
At the close, modeled five-year after-cost stock return is 1.81% a year, versus 7.49% after-cost XIC and a required 9.49%. The stock-XIC spread is -5.67 percentage points. All five common distributions are C$0.28 per share and are carried to year five at 9.5%. Decision worksheet Saved exact output
Investment Thesis
Two producing mines fund two builds. Mount Milligan has a 2045 plan, but only permits through 2035; Öksüt has a 2029 stated life. Thompson Creek must spend before mid-2027 molybdenum, and Goldfield before late-2028 gold. We give Kemess no standalone value while carrying its care cost. F16 F17 F19 F23 F28
Market Mispricing
The signed close-to-fair gap is −C$6.30; fair-to-entry is −C$6.20, summing to −C$12.50 close-to-entry. A price-only discount is insufficient: at unchanged output, costs, FX and capital, gold must average about US$5,440/oz in the model for the five-year hurdle price to reach C$25.30. This is conditional price-implied math, not consensus. Valuation worksheet
Recent Developments
Q3 revenue was US$500.3m and cash from operations US$143.1m. The quarter delivered 75,429 gold ounces and 12.8Mlb copper. Langeloth arranged a US$75m asset-based line November 4; the NCIB renewal was announced November 5. Facility availability is not added as cash. F05 F08 F50
Earnings Outlook
Three frozen checkpoints: 2026 total gold base 275koz, bear 260koz, bull 290koz against issuer 260–290koz guidance, settled by the Q4 production release; 2027 Thompson moly base 4.7Mlb, bear 0, bull 4.7Mlb, settled by the 2027 annual operational report; remaining Thompson restart cash base US$100m, bear US$112.7m, bull US$87.7m, settled by first-production cost disclosure. These are Peralta cases except the company guidance and 2024 study profile. F09 F21 F22 F24
Valuation Summary
Base finite 2027–45 cash PV is US$2,458.3m; the net parent bridge is US$154.3m. At 1.4296 CAD/USD and 196.619m conservatively diluted shares, equity is C$19.00/share. The five-year common exit is C$26.01 with annual C$0.28 dividends. F02 F03 F04 Model bridge
Recommended Action and Entry Price
Wait at C$25.30. Base fair, five-year hurdle, and final entry are C$19.00 / C$17.59 / C$12.80; the joint downside value C$9.60 divided by 0.75 sets the C$12.8024 raw downside cap, rounded down to C$12.80. Without only that cap, the same C$0.05 rule gives C$17.55; C$4.75 is the downside reduction. The total unrounded hurdle-to-final gap is C$4.79. Decision table
Catalysts
Near tests are Q4 2026 gold against 260–290koz guidance, the mid-2027 Thompson Creek first production and its US$425–450m all-in restart cost, then Goldfield first gold by end-2028. The next update should replace estimated site cash with reported cash and revise the maximum entry, not merely the target. F09 F22 F23 F28
Primary Risks to Thesis
Gold, a 10% Mount Milligan output miss, 8% higher mine cash costs and a one-year Goldfield delay can coincide. At US$3,600 gold those linked misses produce C$9.60 fair value. The 2045 plan requires permits past 2035 and substantial tailings capital; a separate stress at US$3,600 gold alone gives C$14.13 fair, C$13.19 hurdle and C$12.80 entry with the original downside cap held fixed. F16 F18 Sensitivity output
Stock Price History
Unadjusted regular-session TSX closes, CAD. The dated decision uses the November 24 close. F01 TMX quote
| Date | Close (CAD) | Entry (CAD) |
|---|---|---|
| 2026-11-18 | 26.95 | |
| 2026-11-19 | 25.75 | |
| 2026-11-20 | 23.94 | |
| 2026-11-23 | 25.65 | |
| 2026-11-24 | 25.30 | 12.80 |
Company Overview
Centerra operates Mount Milligan in British Columbia and Öksüt in Türkiye, with Thompson Creek/Langeloth molybdenum in the US and Goldfield development in Nevada. Kemess and Endako are options and legacy obligations. F19 Q3 MD&A pp. 4, 17–18
Products and Services
Mount Milligan sells gold-copper concentrate after stream deliveries; Öksüt sells gold. Thompson Creek will supply molybdenum to an integrated processing network; Langeloth already sells finished molybdenum products, so its sales are not new mine output. F11 F12 F24 F25
Business Model
Operating cash pays mine costs, royalties, sustaining capital, taxes, growth builds and closure. Royal Gold purchases a defined portion of Mount Milligan production below spot; we reduce realized revenue once and do not subtract an extra stream liability. F11 F12 Q3 MD&A p. 28
Revenue Drivers
Gold ounces, copper pounds, realized prices, molybdenum volumes and realized processing spread are separate drivers. Our base holds gold US$4,250/oz, copper US$4.50/lb, moly US$22/lb against FS US$12.46/lb all-in sustaining cost, then varies only gold to US$3,600 in the common-deck sensitivity. The base is an analyst normalization, not company guidance. Thompson Creek US$12.46/lb AISC is a study LOM average inclusive of sustaining capital. F10 F24 Frozen inputs
Cost Structure
Mount Milligan 9M mine cash US$349.0m becomes only US$257.7m free cash after site investment and other adjustments; annualizing that high-price cash would overstate a normalized 2027. Öksüt cash includes a price-linked royalty and withholding; Goldfield AISC includes sustaining spend; Thompson Creek uses FS US$12.46/lb AISC, leaving a US$9.54/lb spread at US$22 moly. F13 F14 F48
Operating Levers
The Mount Milligan PFS assumes throughput growth and life to 2045; permitted operations currently end 2035. Thompson Creek has 4.7Mlb study output in 2027 before 12.4Mlb in 2028, contingent on remaining restart spend. F16 F17 F21 F24
Distribution
Production moves through concentrate smelters, mine gold sales and Langeloth processing/customer channels. Ocean-vessel timing affects Mount Milligan sales versus production, so the forecast uses annual production as a cash proxy and tests working capital via actual cash disclosures. Q3 MD&A pp. 13, 23
Geographic Exposure
Cash arises in Canada, Türkiye and the US. Our USD model converts once at the November 24 Bank of Canada 1.4296 reference; the TSX common share is quoted in CAD. F02 F19
Regulatory Environment
Mount Milligan extension beyond 2035 needs later authorizations; Goldfield and Thompson Creek require operational commissioning and environmental compliance. Öksüt has Turkish royalty and remittance tax. We carry the known closure provision and do not presume new permits. F16 F32 F48
Industry Structure
The peer set mixes streams, mine ownership and undeveloped optionality. Royal Gold receives a contractual share of Mount Milligan metals; this lowers Centerra realized gold/copper prices even when benchmark spot rises. F11 F12
Growth and Cyclicality
Gold and copper prices jointly affect Mount Milligan, while molybdenum creates a distinct industrial exposure. We hold copper and moly fixed in the US$3,600 gold case so it measures exactly one common commodity shock. Model input and sensitivity
Competitors
Torex is an operating gold/copper producer with a Mexican mine; Montage remains in a construction/ramp phase at Koné, unlike two producing Centerra mines. Torex 2026 nine-month CFO was US$608.4m, versus Centerra US$329.4m. F06 F44 Torex Q3 release
Market Share
Commodity markets price metal globally; Centerra does not claim retail-like market share or pricing power. The relevant scale is its 260–290koz 2026 gold guidance and 50–60Mlb copper guidance. F09
Competitive Advantages
A US$397.9m cash balance and undrawn US$600m corporate line support internal project funding. Liquidity is not surplus equity: the forecast still deducts Goldfield and Thompson Creek construction. F30 F36
Pricing and Cost Position
At the September quarter, Centerra reported US$1,775/oz consolidated by-product AISC; Torex reported US$1,803/oz AuEq. Definitions differ because Centerra credits copper against gold and Torex converts metals into AuEq, so neither spread proves superior mine economics. Centerra Q3 MD&A p. 5 Torex Q3 release
Entry Barriers and Substitutes
Permits, orebody quality, tailings, water and mill investment constrain replacement capacity. The PFS 2045 life is valuable only if later permits and US$925m life-of-mine capital arrive; alternate miners and bullion offer exposure without this site execution. F16 F18
Supplier and Customer Dynamics
Contracted smelting, equipment, energy and labour can change cash cost; ocean shipments shift sales timing. Langeloth has high concentrate working capital, invested US$138.3m in the first nine months. We allow only US$100m release in 2039, an analyst recovery assumption. F26 Q3 MD&A p. 13
Regulation and Structural Risks
Turkish royalties rise with gold prices and Mount Milligan beyond-2035 permits remain open. We model price-linked Öksüt royalty as 15.3% of gold revenue, derived from US$650/oz near US$4,250; the actual future statutory and site mix may differ. F16 F48
Historical Performance
2025 revenue of US$1,384.6m exceeded 2024 US$1,214.5m; 2026 first-nine-month revenue reached US$1,427.7m. Commodity prices, rather than identical production, explain part of the acceleration. F06 F37
Income Statement Analysis
2026 nine-month mine earnings were US$532.7m on US$1,427.7m revenue, a 37.3% margin before exploration and corporate expense. Q3 mine earnings were US$176.1m. Q3 MD&A p. 5
Balance Sheet Analysis
September cash US$397.9m sits beside US$176.8m equity investments; the bridge credits only half of investments. Closure provisions total US$275.6m current and long term, lease obligations US$43.0m, and a US$13.4m repurchase liability. F30 F31 F32 F33 F34 F35
Cash Flow Analysis
2026 9M CFO US$329.4m less US$286.2m cash PP&E gives US$43.2m pre-lease/free-cash proxy. That difference, not mine-only US$257.7m, is the parent cash available before dividends and buybacks. F06 F07 F14
Earnings Quality
2025 US$584.0m net income included a US$341.1m impairment reversal; 2026 9M US$240.2m included no impairment reversal; the 2025 9M comparative included US$193.5m. These are noncash accounting revisions and are not forecast as recurring mine receipts. F40 F41
Nonrecurring Items
The Additional Royal Gold Agreement appears as a US$72.800m financial asset beside US$24.877m linked deferred revenue, a net US$47.923m, or about C$0.35 per diluted share. We exclude both the net recognized value and unmodeled higher future stream payments rather than adding a gross asset to net realized revenue. Greenstone contingent metal is passed to Royal Gold, so we do not add nominal ounces again. F55 Q3 financial statements notes 6, 17 Q3 MD&A p. 20
Funding and Cash Conversion
Thompson Creek had spent US$337.3m toward US$425–450m to first production, leaving US$87.7–112.7m. We charge US$100m in 2027 before applying 4.7Mlb initial output; Goldfield pays US$200m in 2027–28 after about US$49m nine-month 2026 work. F21 F22 F24 F27 Q3 MD&A p. 16
Key Ratios
2026 9M parent CFO/ revenue was 23.1%, but CFO less cash PP&E / revenue just 3.0%. Torex on the same IFRS CFO less cash PP&E / revenue definition was 28.7% for the same nine months; currency and acquisition/build phase limit the inference. F06 F07 F44 F45
Forward Outlook
Our 2027, 2028 and 2029 post-tax consolidated cash forecasts are US$125.5m, US$320.0m and US$626.1m. The jump depends on Goldfield first full year and Thompson ramp after heavy 2027–28 investment; it is not an issuer forecast. Cash schedule F23 F28
Model Choice
We discount finite, site-level 2027–45 after-tax cash at 10% nominal USD, then bridge net parent cash and claims to a diluted common share. Year-one to year-five cash represents successive 24 November anniversaries through 2031, with each calendar-year operating forecast used as a one-year proxy. The XIC convention is 7.5% gross compounded five years, 3bp on each trade; required stock return is the after-cost XIC rate plus 2 percentage points. Stock trades cost 5bp each, and each C$0.28 annual dividend compounds at 9.5% to year five. No perpetuity or free exploration value is added. A 5% PFS NPV from July 2025 is evidence of a mine plan, not a current equity value to add to September 2026 cash. F17 Mount Milligan PFS Worksheet
Growth
Mount Milligan uses 150koz gold and 69Mlb copper in normal years, with 55Mlb copper in 2027 and declining stockpiles in 2043–45. Öksüt is finite through 2029. Goldfield follows the study profile of 22koz in 2028, then 114koz and 120koz in 2029–30; Thompson follows the published moly profile. F17 F19 F24 F28 F54
Profitability
Mount Milligan realized gold equals 65% spot plus 35% at US$435; realized copper equals 81.25% spot plus 18.75% at 15% spot. Cash cost starts US$380m and rises 1.2% a year; this is an analyst estimate anchored to 9M production costs US$275.7m, not a PFS quote. Öksüt uses price-linked royalty, 12.5% qualifying income tax from 2027 and 10% remittance charge. Reverting to 25% tax lowers fair/hurdle/entry to C$18.47 / C$17.19 / C$12.25. Thompson Creek earns the US$22/lb moly deck less US$12.46/lb FS AISC including sustaining capital. F11 F12 F48 F52 F53 Mine financial table p. 29
Reinvestment or Required Capital
Mount Milligan pays US$85m annual sustaining through 2030, US$30m in 2031–42 and US$15m in stockpile years, totaling US$745m future sustaining, plus US$184m future growth including two US$57m tailings tranches in 2032–33. The PFS had US$739m sustaining and US$925m total capital over its entire 2025–45 plan; our higher remaining budget is a conservative cost overrun assumption, not the PFS schedule. Goldfield pays US$80m/US$120m in 2027/28 and Thompson US$100m in 2027. F15 F18 F21 F22 F27 F51
Discount Rate
10% nominal USD exceeds the Mount Milligan PFS 5% technical NPV rate because this common share also funds projects, country risk and beyond-2035 permits. The rate is judgmental, not a measured WACC. At 8% fair/hurdle/entry become C$21.01 / C$18.21 / C$14.05; at 12%, C$17.28 / C$17.05 / C$11.65. Both base and bear use the changed rate. Editable input Robustness output F16
| Assumption | Fair CAD/share | Hurdle CAD/share | Entry CAD/share |
|---|---|---|---|
| 8% USD discount | 21.01 | 18.21 | 14.05 |
| 10% USD discount | 19.00 | 17.59 | 12.80 |
| 12% USD discount | 17.28 | 17.05 | 11.65 |
| US$45m late Mount sustain | 18.62 | 17.21 | 12.30 |
| Öksüt 25% tax throughout | 18.47 | 17.19 | 12.25 |
Terminal Economics
The last explicit year is 2045: Mount Milligan stockpile revenue less US$220m cash cost and US$15m sustaining gives US$47.07m site cash; after US$40m parent overhead, consolidated cash is US$7.07m. First terminal year 2046 and perpetuity are zero because the mine is finite. Raising 2031–42 sustaining from US$30m to US$45m cuts fair/hurdle/entry to C$18.62 / C$17.21 / C$12.30, with both base and bear changed. Closure provisions are deducted separately. 2027–45 schedule Robustness output F17
Bridge to One Common Share
PV US$2,458.29m + cash US$397.892m + 50% of US$176.797m investments − US$275.588m reclamation − US$43.036m leases − US$13.385m repurchase liability = US$2,612.57m. At 1.4296 CAD/USD and 196.619143m diluted shares (October 31 issued shares plus the October 29 options and RSUs included, no exercise proceeds credited), C$19.00/share. The US$600m undrawn line is excluded. The cash snapshot is September 30, not November 24: a ±US$50m unreported Q4 stub changes fair by about ±C$0.36/share at fixed shares, and does not reverse Wait. F02 F03 F04 F30 F31 F32 F33 F34 F35 F36
Price-Implied Expectations
With every other base input fixed and five C$0.28 dividends carried at 9.5%, the gold deck needs about US$5,440/oz to lift the stock hurdle price to C$25.30. A later 2035+ permit denial or weaker project ramp raises that threshold. The observed 2026 Q3 average gold market price was US$4,262/oz, so this is a demanding sustained path rather than an extrapolation of one quarter. Q3 MD&A p. 5 Robustness output Model
| Market gap test | Value |
|---|---|
| Gold needed for five-year hurdle at C$25.30 | US$5,440/oz |
| Bull fair plus 50% Kemess PEA NPV | C$27.93/share |
Independent Cross-Check
Mount Milligan PFS after-tax NPV5 was about US$1.49bn at US$2,600 gold and US$4.30 copper, with a July 2025 valuation date and PFS cost/permit assumptions. Our higher-gold but 10%-discount current site NAV should not be compared or added without rebasing; its separate 2027 cash near US$98m at lower copper illustrates why realized stream and remaining capex matter. PFS original Model site schedule
Conclusion and Change from Prior Edition
This is CG's first Markdown edition: current head was empty at drafting. Base fair C$19.00 is below the C$25.30 close and downside caps entry at C$12.80. A mine-permit grant, Goldfield first production or a disclosed Thompson cost/ramp change would trigger a fresh edition; no predecessor value has been silently carried forward. F01
Peer Selection
Torex offers a same-period operating-miner cash conversion comparison. Montage is a construction/ramp reference but not a valid nine-month operating cash comparator. Neither controls Centerra's Royal Gold stream, Turkish tax or moly restart. Torex Q3 Centerra Q3
Dated Ratio Table
As of the 30 September 2026 nine-month filings, in USD millions and using reported operating cash flow less cash PP&E additions, divided by reported revenue for both issuers:
| Issuer | 9M revenue | CFO | Cash PP&E | CFO less PP&E | Cash conversion |
|---|---|---|---|---|---|
| Centerra CG | 1,427.7 | 329.4 | 286.2 | 43.2 | 3.0% |
| Torex TXR | 1,501.2 | 608.4 | 177.4 | 431.0 | 28.7% |
Comparability Adjustments
The definition is consistent but neither amount removes unusual working capital; Centerra is funding Thompson and Goldfield while Torex finished a different capital cycle. Torex's own non-GAAP FCF subtracts leases and interest and is US$401.9m, below the comparable US$431.0m CFO-less-PP&E numerator. Torex Table 8 F21 F27
Implications for Value
This comparison warns against valuing Centerra at a mature-cash multiple before builds finish. It does not say CG must trade at Torex's multiple: one share has distinct mine lives, stream economics and claims. The finite site schedule, not the peer ratio, determines entry. Cash schedule F11 F19
Bear Case
US$3,600 gold, 10% lower Mount Milligan gold/copper output, 8% higher Mount cash cost and one-year Goldfield delay produce C$9.60 fair. These linked misses can coincide through mine grade, tailings work and construction execution. It caps entry at C$12.80 for a 25% fair-value loss from purchase. F16 F18 F27 Case output
Base Case
US$4,250 gold, US$4.50 copper, US$22 moly, on-time restart and Goldfield construction produce C$19.00 fair, C$17.59 hurdle and C$12.80 entry. The 2027–29 site cash sequence and each share claim are visible in the saved schedule. Frozen input Cash output
Bull Case
US$4,700 gold, 4% more Mount output and 2% lower Mount cash cost yield C$23.93 fair, still below the close before granting speculative Kemess value. Full PEA success at Kemess could close the gap but carries development funding and permitting. Case output Kemess context
Outcomes at Close and Entry
At C$25.30 all three cases say Wait. At C$12.80, bear intrinsic C$9.60 is a 25.0% mark-to-value loss before costs. At the close, base five-year return is 1.81% a year, -5.67 points below after-cost XIC. Decision Exact output
| Assumption | Close | Fair value | Maximum entry | Price rule |
|---|---|---|---|---|
| Base | C$25.30 | C$19.00 | C$12.80 | Wait |
| Bear: gold/volume/cost/delay | C$25.30 | C$9.60 | C$9.10 | Wait |
| Bull: gold/volume/cost | C$25.30 | C$23.93 | C$12.80 | Wait |
| Gold US$3,600 only | C$25.30 | C$14.13 | C$12.80 | Wait |
Market-Implied Case
Price-implied gold is about US$5,440/oz sustained, with fixed copper, moly, FX and site inputs, for the five-year hurdle price to equal C$25.30. This conditional result is stronger than merely equating spot market capitalization to a technical NAV; it includes dividends and trade costs. Worksheet
Analyst Assessment
At US$3,600 gold alone, fair/hurdle/entry are C$14.13 / C$13.19 / C$12.80. Only the gold input changes from base; the original C$9.60 downside cap stays fixed for this one-input comparison. Öksüt royalty cash follows the unchanged 15.3% rule, and Goldfield collars remain in the formula. Other metals, FX and capital inputs stay fixed. Sensitivity F29 F48
Operating Risks
Mount Milligan grade/recovery, tailings expansion and Goldfield construction timing drive the joint downside. A 10% Mount volume miss and one-year Goldfield delay are explicitly run, not left as adjectives. F16 F18 F28 Joint case
Financial and Liquidity Risks
Thompson Creek could exceed the remaining US$87.7–112.7m range; Langeloth has tied up US$138.3m working capital. The US$600m undrawn corporate facility and a US$75m Langeloth line offer access to financing, but borrowing would not create common equity value. F21 F22 F26 F36 F50
Regulatory and Legal Risks
Mount Milligan requires future authorizations after 2035. Turkish royalties/remittance and reclamation obligations can change distributable cash; the current US$275.6m closure claim is charged once at parent level. F16 F32 F33 F48
Industry and Competitive Risks
Gold and copper commodity moves can dominate site cost savings. The US$3,600 gold only case cuts fair value by C$4.89/share from base; molybdenum has independent demand and price exposure, for which US$22/lb is a judgmental normalized input. Cases F24
Thesis-Specific Risks and Reconsideration Triggers
We would revisit the action after 2026 gold below 260koz, Thompson first production slipping past mid-2027 or restart spend exceeding US$450m, Goldfield production slipping past 2028, or Mount Milligan extension permits failing before the 2035 authorization horizon. Each changes a frozen forecast or claim and calls for model rerun. F09 F22 F23 F28 F16
Environmental Factors
Mount Milligan tailings and water are capital constraints, with 20.5m tonnes of Centerra-wide tailings reported in 2025 (the SASB table excludes Thompson Creek) and a future TSF build in the PFS. We charge two future US$57m tailings tranches plus the disclosed closure provision; a failure to permit or build would affect the 2045 mine plan. F47 F18 F32
Social Factors
First Nations relationships, local labour and Turkish operating permissions affect schedule. The model treats delay as a cash loss; one-year Goldfield delay is a direct case. The 2025 sustainability report is issuer-reported evidence. Sustainability release Model
Governance Factors
2026 nine-month repurchases used US$125.2m, exceeding US$29.9m dividends; the US$13.4m repurchase liability is deducted. We do not assume repeat buybacks in the five-year exit, avoiding an unverified share-count benefit. F35 F42
Financially Material Risks and Opportunities
2025 scope 1+2 emissions were 198,110 tCO2e and tailings volume is material; cash consequences flow through operating costs, future tailings capex and reclamation. No carbon-credit premium or discovery optionality is added without a funded plan. F46 F47 F18 Sustainability source
Annual Results
USD millions, calendar years, audited 2025 statements pp. 2–3.
| Item | FY2024 | FY2025 |
|---|---|---|
| Revenue | 1,214.5 | 1,384.6 |
| Production costs | 710.3 | 808.5 |
| Mine earnings | 378.0 | 463.8 |
| Net income | 80.4 | 584.0 |
F37 F40 Original audited statements
Interim Results
USD millions, Q3 and nine months ended September 30, 2026, versus 2025 comparative.
| Item | Q3 2025 | Q3 2026 | 9M 2025 | 9M 2026 |
|---|---|---|---|---|
| Revenue | 395.2 | 500.3 | 983.0 | 1,427.7 |
| Mine earnings | 136.4 | 176.1 | 300.4 | 532.7 |
| Net income | 292.2 | 88.7 | 391.2 | 240.2 |
Trailing Results
FY2025 less 9M 2025 plus 9M 2026 gives TTM revenue US$1,829.3m (1,384.6−983.0+1,427.7). TTM net income contains part of the 2025 reversal, so it is not capitalized. F06 F37 F40 F41
Material Adjustments
The 2025 US$341.1m annual impairment reversal and US$193.5m nine-month comparative portion are separated from forward cash; 2026 9M had none. Cash price settlements, working capital, royalty and taxes remain in realized operating cash; no generic EBITDA multiplier substitutes for the mine schedule. F40 F41 Q3 cash flow
Annual Positions
USD millions, 2025 audited statement p. 2. Accounting book value includes noncash asset remeasurement and is not the finite NAV. 2025 audited statements F40
| Item (USDm) | 2024-12-31 | 2025-12-31 |
|---|---|---|
| Cash | 624.7 | 528.9 |
| Shareholders equity | 1,655.9 | 2,059.8 |
Interim Positions
USD millions at September 30, 2026. The model starts from cash and investments, not total accounting equity. F30 F31 Interim statement p. 1
| Item (USDm) | 2025-12-31 | 2026-09-30 |
|---|---|---|
| Cash | 528.9 | 397.9 |
| Non-current equity investments | 105.9 | 176.8 |
| Total assets | 2,958.7 | 3,210.5 |
| Shareholders equity | 2,059.8 | 2,217.6 |
Capital and Claims Reconciliation
We deduct US$270.444m long-term plus US$5.144m current reclamation, US$9.054m current plus US$33.982m long-term lease obligations, and US$13.385m repurchase liability. The Additional Royal Gold US$72.800m asset less US$24.877m linked deferred revenue, net US$47.923m or C$0.35/share, is excluded along with its unmodeled uplift cash; stream economics already reduce realized revenue. Goldfield hedge payoff is handled in modeled collars, so its derivative mark is not deducted twice. Operating payables remain in cash forecasts. F32 F33 F34 F35 F55 F11
Annual Flows
USD millions, audited statement p. 4.
| Cash item | FY2024 | FY2025 |
|---|---|---|
| CFO | 298.4 | 348.6 |
| PP&E cash additions | 159.8 | 253.6 |
| CFO less PP&E | 138.6 | 95.0 |
F38 F39 2025 audited statements
Interim Flows
USD millions, nine months ended September 30. Q3 2026 alone CFO was US$143.1m. F05 F06 F07 F42 Interim cash flow p. 3
| Cash item | 9M 2025 | 9M 2026 |
|---|---|---|
| CFO | 245.6 | 329.4 |
| Cash PP&E | 162.5 | 286.2 |
| CFO less PP&E | 83.1 | 43.2 |
| Dividends | 31.1 | 29.9 |
| Repurchases | 64.0 | 125.2 |
Trailing Flows
TTM CFO through September 2026 is US$432.4m = 348.6−245.6+329.4; TTM cash PP&E is US$377.4m = 253.6−162.5+286.2; TTM CFO less PP&E is US$55.0m. This combines calendar periods on the same basis and reflects growth builds. F06 F07 F38 F39 2025 comparative cash flows
Reconciliation to Common Shareholders
Nine-month CFO US$329.4m less cash PP&E US$286.2m leaves US$43.2m; cash dividends US$29.9m leave US$13.3m, but US$125.2m repurchases then exceed residual by US$111.9m, funded from beginning cash; other investing and financing flows explain the remaining cash change of −US$131.039m from US$528.931m to US$397.892m. Working capital is already in CFO. We give future buybacks no per-share accretion, carry only C$0.28 annual common dividends, and leave other post-investment cash in the modeled five-year exit once. F06 F07 F42 Exit worksheet
Primary Sources and Locators
The Peralta factual exhibit has individually highlighted, authored rows F01–F55. Full originals are retained owner-only where redistribution rights are uncertain: Q3 MD&A pp. 4–29; Q3 interim financials, statements pp. 1–3 and notes 6, 17; 2025 audited annual report, statements pp. 2–4; Mount Milligan PFS and technical report; Thompson FS; Goldfield study; Öksüt site; Torex Q3 tables; TMX quote; Bank of Canada FX; November 5 company release; 2025 sustainability release; 2025 sustainability report SASB waste table; Mount Milligan 2035 permit release. Exhibit rows are factual reconstructions, not reproductions of original pages.
Frozen Inputs and Assumptions
Public input JSON freezes gold US$4,250, copper US$4.50, moly US$22, 1.4296 CAD/USD, 10% USD discount rate, 196.619143m diluted shares, 2027–45 operating lives, project capital and parent claims. Reported items map to F01–F55; forecast costs and tax approximations are Peralta judgments. The September 30 balance is used at the November 24 close because later financials were not available; ±US$50m cash moves fair by ±C$0.36 but the price rule remains Wait. Exact output F02 F03 F04
Worksheets and Saved Outputs
Run PYTHONDONTWRITEBYTECODE=1 PYTHONPATH=. /Users/johnperalta/johnperalta4vanilla/.venv/bin/python support/valuation.py from this edition root with Python 3.12.13; standard library only. It writes the public tables and exact JSON below. The authoring PDF script uses reportlab only and is owner-only.
| Worksheet | Output |
|---|---|
| Finite NAV and return | Decision, Site cash and bridge, Exact JSON |
The saved decision table is reproduced at the start of this report. Change one input in a private copy and rerun; do not mutate the immutable edition.
Changes from the Preceding Edition
This is the first edition without a predecessor. The CG Markdown head was empty at drafting. The 2025 PFS and FY2025 financials are historical inputs; the Q3 2026 statements, 24 November quote and FX define this new dated decision. Later developments require a new edition.