Centerra Gold Inc. | TSX:CG | Equity research, 24 November 2026

Our maximum entry price is C$12.80 per share. CG closed at C$25.30 on 24 November 2026, so the decision is Wait. The strongest credible contrary case credits all of a C$23.93 bull fair value and half of Kemess's US$1.1bn early-stage PEA NPV, reaching about C$27.93 fair value, but its unpermitted development and the binding joint-downside cap leave the action at Wait. The base finite-asset value is C$19.00 and the 2027-29 capex and 2045 mine-life claims are why we do not capitalize the headline metal price. F01 F17 Kemess PEA

Stock Price History

Market close (CAD)
C$25.30
Base fair value (CAD/share)
C$19.00
Company details
Five-year hurdle price (CAD/share)
C$17.59
Maximum entry price (CAD/share)
C$12.80
Binding rule
joint downside intrinsic cap
Entry without downside rule (CAD/share)
C$17.55
Reduction from downside rule alone (CAD/share)
C$4.75
Total hurdle minus final entry (CAD/share)
C$4.79

Issuer: Centerra Gold Inc. · Listing TSX:CG · Quoted currency CAD · Reporting and model currency USD · Materials / diversified gold, copper and molybdenum · Evidence cutoff 24 November 2026 regular TSX close. Next review: Q4 2026 results and Thompson Creek commissioning update.

Stock Price History

Base fair valueFive-year hurdleFinal entryBinding ruleNo-downside entryDownside reductionHurdle minus final
C$19.00C$17.59C$12.80joint downside intrinsic capC$17.55C$4.75C$4.79

At the close, modeled five-year after-cost stock return is 1.81% a year, versus 7.49% after-cost XIC and a required 9.49%. The stock-XIC spread is -5.67 percentage points. All five common distributions are C$0.28 per share and are carried to year five at 9.5%. Decision worksheet Saved exact output

Investment Thesis

Two producing mines fund two builds. Mount Milligan has a 2045 plan, but only permits through 2035; Öksüt has a 2029 stated life. Thompson Creek must spend before mid-2027 molybdenum, and Goldfield before late-2028 gold. We give Kemess no standalone value while carrying its care cost. F16 F17 F19 F23 F28

Market Mispricing

The signed close-to-fair gap is −C$6.30; fair-to-entry is −C$6.20, summing to −C$12.50 close-to-entry. A price-only discount is insufficient: at unchanged output, costs, FX and capital, gold must average about US$5,440/oz in the model for the five-year hurdle price to reach C$25.30. This is conditional price-implied math, not consensus. Valuation worksheet

Recent Developments

Q3 revenue was US$500.3m and cash from operations US$143.1m. The quarter delivered 75,429 gold ounces and 12.8Mlb copper. Langeloth arranged a US$75m asset-based line November 4; the NCIB renewal was announced November 5. Facility availability is not added as cash. F05 F08 F50

Earnings Outlook

Three frozen checkpoints: 2026 total gold base 275koz, bear 260koz, bull 290koz against issuer 260–290koz guidance, settled by the Q4 production release; 2027 Thompson moly base 4.7Mlb, bear 0, bull 4.7Mlb, settled by the 2027 annual operational report; remaining Thompson restart cash base US$100m, bear US$112.7m, bull US$87.7m, settled by first-production cost disclosure. These are Peralta cases except the company guidance and 2024 study profile. F09 F21 F22 F24

Valuation Summary

Base finite 2027–45 cash PV is US$2,458.3m; the net parent bridge is US$154.3m. At 1.4296 CAD/USD and 196.619m conservatively diluted shares, equity is C$19.00/share. The five-year common exit is C$26.01 with annual C$0.28 dividends. F02 F03 F04 Model bridge

Recommended Action and Entry Price

Wait at C$25.30. Base fair, five-year hurdle, and final entry are C$19.00 / C$17.59 / C$12.80; the joint downside value C$9.60 divided by 0.75 sets the C$12.8024 raw downside cap, rounded down to C$12.80. Without only that cap, the same C$0.05 rule gives C$17.55; C$4.75 is the downside reduction. The total unrounded hurdle-to-final gap is C$4.79. Decision table

Catalysts

Near tests are Q4 2026 gold against 260–290koz guidance, the mid-2027 Thompson Creek first production and its US$425–450m all-in restart cost, then Goldfield first gold by end-2028. The next update should replace estimated site cash with reported cash and revise the maximum entry, not merely the target. F09 F22 F23 F28

Primary Risks to Thesis

Gold, a 10% Mount Milligan output miss, 8% higher mine cash costs and a one-year Goldfield delay can coincide. At US$3,600 gold those linked misses produce C$9.60 fair value. The 2045 plan requires permits past 2035 and substantial tailings capital; a separate stress at US$3,600 gold alone gives C$14.13 fair, C$13.19 hurdle and C$12.80 entry with the original downside cap held fixed. F16 F18 Sensitivity output

Stock Price History

Unadjusted regular-session TSX closes, CAD. The dated decision uses the November 24 close. F01 TMX quote

DateClose (CAD)Entry (CAD)
2026-11-1826.95
2026-11-1925.75
2026-11-2023.94
2026-11-2325.65
2026-11-2425.3012.80