B2Gold Corp. (NYSE American: BTG) — 25 November 2026
Our maximum entry price is US$0.23 per share. This is conditional on refinancing. BTG closed at US$4.48 on 25 November 2026, so the five-year price rule says Wait and any future entry Needs underwriting for refinancing; the US$1.50 finite-reserve base fair value is also below the close. This arithmetic entry is conditional on a 2030 refinancing of US$163.46 million in the joint downside and on the mine plans described below. A stronger contrary case converts more resources into reserves and develops Gramalote; management's published Gramalote study gives US$941 million after-tax NPV at US$2,500 gold, equal to about US$0.71 per current basic share before project and financing risk, but the project is excluded because no construction decision or fully financed plan was established at this cutoff. Gramalote study in November presentation · 25 November issuer quote
- Market close (USD/share)
- US$4.48
- Base fair value (USD/share)
- US$1.50
Company details
- Maximum entry price (USD/share)
- US$0.23
B2Gold reports in US dollars and operates Fekola and Fekola Regional in Mali, Goose in Canada, Masbate in the Philippines, and Otjikoto in Namibia. The latest available financial statements cover 30 September 2026 and were authorized on 4 November 2026. BTG is the NYSE American listing; BTO is the TSX listing of the same common equity, not an earlier BTG edition. The Bank of Canada 25 November USD/CAD rate was 1.4219, so the US$4.48 close is C$6.370112 before costs. Interim statements, Note 1 · Bank of Canada daily USD/CAD, 25 November
Closing prices
| Date | Close (USD) | Entry (USD) |
|---|---|---|
| 2026-11-17 | 4.77 | |
| 2026-11-20 | 4.12 | |
| 2026-11-23 | 4.42 | |
| 2026-11-25 | 4.48 | 0.23 |
Selected unadjusted NYSE American closes; the final close agrees with the issuer's 4 p.m. quote. Historical prices · Issuer quote
Investment Thesis
B2Gold owns a producing portfolio with material gold leverage and two near-term operating tests: Goose's crusher expansion and Fekola Regional's ramp. The thesis is conditional: ore and capital plans must translate into cash after state ownership, taxes, stream deliveries and the 2030 convertible. The base case values only disclosed operating reserves and gives no speculative terminal perpetuity. 2025 reserve table · Goose and Fekola operational outlook
Market Mispricing
At US$4.48, the market is US$2.98 above the finite-reserve fair NAV and US$4.25 above the maximum entry. Holding the reserve schedule fixed, the worksheet requires roughly US$1,609/oz added to every modeled gold year to lift fair NAV to the close; that is a conditional implication, not a gold-price forecast. Extra reserves or Gramalote can also close the gap. Frozen model · Valuation output
Recent Developments
The 4 November release lowered 2026 consolidated AISC guidance to US$2,230–2,410/oz while maintaining mine production guidance. It reported Q3 gold production of 193,321 ounces, down from about 254,000 ounces a year earlier, and stated Goose phase 1 crusher upgrades had reached 3,200 tonnes per day after October commissioning. Q3 release and MD&A · Q3 production table
Earnings Outlook
Peralta forecasts 810 thousand 100%-mine ounces in 2027, then 930 thousand in 2028 as Goose and Regional ramp; these are model estimates, not issuer guidance. Base 2027 common cash after modeled AISC, taxes, minority interests, stream deliveries and US$170 million of non-sustaining spending is US$445 million. The joint downside lowers it to US$58 million. Mine-level model · 2026 issuer guidance
Three frozen forecasts make this thesis testable. Ounces are 100% mine production, not B2Gold attributable sales; common FCF includes the ownership, tax, stream, AISC and growth-capital deductions defined in the worksheet.
| Forecast and settling period | Downside | Base | Upside | Disclosure that settles it |
|---|---|---|---|---|
| Goose gold produced, FY2027 (thousand oz) | 190 | 270 | 300 | 2027 audited mine production and MD&A |
| Fekola Regional gold produced, FY2028 (thousand oz) | 70 | 160 | 180 | 2028 audited Regional production and ownership |
| Common FCF, FY2027 (US$ million) | 58 | 445 | 757 | 2027 audited cash flows and mine-level AISC/capex bridge |
Forecast inputs · Case outputs
Valuation Summary
The US$1.50 base NAV discounts 2027–34 finite mine cash at 9%, adds estimated 2026 year-end cash and 70% of recorded nonoperating investments, and subtracts debt, including the US$460 million convertible because the modeled equity value is below its US$3.17 conversion price. The cash model deducts the Wheaton stream each year, so its US$254 million accounting liability is not subtracted again. Equity bridge · Debt and stream notes
Recommended Action and Entry Price
Wait at US$4.48; the conditional entry needs underwriting for a US$163.5 million 2030 financing whose availability is uncommitted at this cutoff. The five-year base hurdle ceiling is US$1.2844, while the zero-nominal-return joint-downside ceiling is US$0.2394; the lower is floored once to US$0.23. Do not confuse the price rule with an instruction to trade or a forecast of when the stock will visit that price. Decision output · Five-year calculation
Catalysts
The next reported Goose throughput and 2027 mine plan should test whether the mill can sustain the proposed mid-2027 4,000 tpd rate. Fekola Regional's first ore deliveries and 2028 ounces test the modeled 160 koz year. A Gramalote construction and funding decision could add project value that the base model excludes. November presentation, Goose · Fekola Regional outlook
Primary Risks to Thesis
The joint stress couples a slower Goose ramp with a delayed Regional start, higher Goose AISC and a lower gold deck. It leaves only US$58 million 2027 common FCF and requires US$163 million of 2030 funding to maintain a US$250 million modeled cash buffer after note repayment. The issuer's revolver matures in December 2028, so that future financing is an explicit condition. Liquidity and debt maturity · Joint model
Company Overview
B2Gold operates four mines in four countries, with its Vancouver head office and a Colombian development project. The Q3 filing identifies Fekola, Goose, Masbate and Otjikoto as the operating sites; Gramalote is not producing. Interim Note 1
Products and Services
Gold bullion is the core product. The issuer reports gold ounces produced, sold and realized price; Q3 2026 consolidated gold revenue was US$836 million on 195 thousand ounces sold at US$4,289 per ounce. The cash model uses ounces sold equal to produced over a full year, allowing no perpetual inventory benefit. Q3 MD&A operating table
Business Model
B2Gold mines and processes ore and sells refined gold into the market. Its revenue varies with ounces sold and the achieved gold price; margin depends on extraction, royalties, sustaining capital, site overhead and corporate costs. AISC is a non-IFRS cost measure and does not include all cash needs, especially income tax and non-sustaining investment. AISC definition and reconciliation
Revenue Drivers
Fekola, Goose, Masbate and Otjikoto contributed Q3 revenue of US$382 million, US$135 million, US$227 million and US$92 million respectively, summing to US$836 million. The modeled revenue is ounces times gold price by mine; Fekola Regional begins as its own source of ounces and minority ownership. Segment revenue · Forecast rows
Cost Structure
Q3 production cost was US$263 million and royalties/production taxes were US$83 million, before depreciation and income taxes. The 2026 consolidated AISC guidance is US$2,230–2,410/oz, but Goose's Q3 AISC was US$4,816/oz during crusher disruption. Peralta assigns separate mine AISC paths instead of one group margin. Q3 operations · Goose AISC
Operating Levers
Goose's sustained mill throughput, Fekola stripping and Regional ore feed are the largest modeled operating levers. Management expects Goose crusher phase 2 by mid-2027 and Regional production above 150 koz from 2028; the base forecasts 270 koz Goose in 2027 and 160 koz Regional in 2028, with slower bear paths. Goose outlook · Regional outlook
Distribution
The company sells gold rather than branded consumer goods. For holders, the distribution mechanism is cash dividends and repurchases: three US$0.02 quarterly dividends were paid in the first nine months of 2026 and a fourth was declared in November. The model counts only dated common cash dividends as investor distributions and retains other FCF in the exit cash balance. Q3 Note 12
Geographic Exposure
The mine footprint spans Mali, Nunavut, the Philippines and Namibia, with differing state claims and operating risks. Fekola Mine is 80% owned by B2Gold, Regional is prospectively 65% after the 2023 Mining Code, Goose is 100%, Masbate is reported on a 100% project basis and Otjikoto is 90%. The base excludes future Otjikoto output because disclosed 2025 reserves were just 90 koz. Ownership and Regional change · Reserve interests
Regulatory Environment
Mining depends on permits, mineral tenure, environmental compliance and the Mali state participation terms. Menankoto's exploitation permit was granted in August 2026, but Regional's 65% prospective ownership differs from the reserve table's historical 90% classification; Peralta applies 65% to future cash. Regional permit and ownership · 2025 reserve note
Industry Structure
Gold miners sell a commodity priced in a global market. Mine-specific grade, recovery, strip ratio, jurisdiction and sustaining capital determine whether a producer converts the same gold price into shareholder cash. B2Gold's four-mine footprint is less diversified than Agnico Eagle's much larger mine base; the model therefore stresses simultaneous site and gold setbacks. B2Gold AIF property summary · Agnico Q3 report
Growth and Cyclicality
B2Gold's Q3 realized gold price of US$4,289/oz was far above the US$3,133/oz comparison a year earlier, while Q3 gold volume fell from 254 koz to 193 koz. The resulting revenue rose only from US$783 million to US$836 million. This illustrates why a higher gold price alone need not produce a proportionate cash increase when mining volumes and tax payments change. Q3 operating comparison
Competitors
Alamos Gold and OceanaGold offer current comparisons for gold operating margins, while Agnico Eagle provides a larger, more diversified producer reference. Their Q3 2026 operating releases are independently published; different by-product credits, taxes, project spending and geography limit direct multiple substitution. Alamos Q3 results · OceanaGold Q3 results
Market Share
B2Gold's 193 koz Q3 output is small relative to Agnico Eagle's 814 koz Q3 output. This gives B2Gold no demonstrated price-setting power in bullion; the comparative advantage must come from costs, reserves and execution rather than market share. B2Gold Q3 production · Agnico Q3 production
Competitive Advantages
Goose has high-grade reserves of 2.38 million ounces on a 100% basis at December 2025, and the established Fekola mill can process regional feed. Those assets offer scale within their districts, but the benefit depends on crusher throughput, ore delivery and spend. No premium is assigned to unproved reserve conversion. AIF reserve table · Fekola mill diagram
Pricing and Cost Position
Q3 AISC divided by realized gold price was about 60.7% for B2Gold (US$2,602 / US$4,289), versus 45.9% for Alamos (US$1,956 / US$4,258) and 44.1% for OceanaGold (US$1,874 / US$4,249). This is a quarter-specific operating ratio, not an EV multiple; B2Gold's Goose disruption and different AISC methods limit direct inference. B2Gold rows · Alamos rows · OceanaGold rows
Entry Barriers and Substitutes
Permits, reserves, capital, processing and access to remote sites constrain new mine supply. The substitute for BTG as an investment is another gold producer or bullion itself: bullion avoids mine operating and dilution risk but has no mine cash return. Peralta's entry hurdle uses CAD XIC rather than a bullion benchmark because the decision is a portfolio capital-allocation test. AIF risk discussion · Model policy
Supplier and Customer Dynamics
Mining equipment, energy, labour and logistics affect cost; Goose's Arctic supply route and crushing equipment are especially consequential. Gold buyers do not depend on B2Gold's brand, so the modeled revenue uses a commodity deck rather than negotiated price increases. The US$200/oz deck sensitivity changes fair NAV from US$1.50 to US$1.11. Goose logistics in AIF · Sensitivity output
Regulation and Structural Risks
The Mali state ownership step from 90% historical Regional reserves to 65% prospective economic interest is material. A model using 90% for the Regional ramp would overstate common cash. Canadian and Philippine permits and mine reclamation also constrain reserve conversion and terminal cash. Regional ownership · AIF closure estimate
Historical Performance
Revenue rose from US$1.902 billion in 2024 to US$3.061 billion in 2025 and reached US$2.784 billion in the first nine months of 2026. This was largely price-led; the nine-month 2026 gold output of 635 koz was below 677 koz a year earlier. A simple revenue growth rate therefore overstates production progress. Audited annual operations · Q3 operating table
Income Statement Analysis
Q3 2026 revenue was US$836.5 million and gross profit US$366.0 million, versus US$782.9 million and US$390.3 million a year earlier. Q3 reported net income of US$413.6 million included a US$253.5 million impairment reversal, making adjusted earnings and cash flow more useful for trend assessment. Q3 operations
Balance Sheet Analysis
At 30 September, cash was US$293.6 million, debt US$546.2 million including the convertible's carrying value, and the Goose stream liability US$254.4 million. Long-term investments and associates carried US$384.6 million together. The model recognizes 70% of those investments, uses US$350 million estimated year-end cash, and deducts debt but accounts for the stream in future ounces. Q3 balance sheet · Investments note
Cash Flow Analysis
Q3 operating cash was US$238.6 million, nine-month cash US$699.3 million. Nine-month mine capital was US$502.8 million and other exploration US$44.3 million; the Finland asset sale brought US$324.9 million in investing cash but is not recurring mine output. The model's AISC includes sustaining investment and deducts separately budgeted growth/exploration spending. Q3 cash-flow statement
Earnings Quality
Reported nine-month net income of US$1.039 billion includes the US$292.4 million Finland sale gain and US$253.5 million Fekola impairment reversal. Neither is capitalized as recurring production. The model starts from ounces and costs rather than EPS; the sale proceeds are already reflected in reported cash, not added again as a project. Q3 operations · Sale note
Nonrecurring Items
The prepaid gold sales were completed in June 2026 and no contracts remained at September 30. Gold collars still covered 66,548 ounces through January 2027, with a US$3,294 average ceiling; the model charges only a final US$5 million 2027 collar settlement and no recurring hedge drag thereafter. This estimate should be reconciled to the 2026 annual filing. Prepay note · Collar table
Funding and Cash Conversion
Actual cash returned in the first nine months was US$78.1 million of dividends and US$205.2 million of repurchases, while option exercises provided US$45.0 million. The forward model assumes no buybacks and US$0.08 per-share annual dividends only when the US$250 million operating cash buffer is funded. In the downside, dividends stop for 2027–30 and a US$163.5 million 2030 refinancing is assumed; the revolver's 2028 expiry makes this a material funding test. Financing cash flows · Liquidity and revolver
Key Ratios
Q3 AISC/realized gold price was 60.7%, up from a reported US$1,479 AISC and US$3,133 realized price in Q3 2025 (47.2%). This is not a stable margin estimate: Goose's start-up and inventory timing raised reported AISC, while the 2026 gold price was higher. The dated peer table below uses the same ratio definition. Q3 operating rows
Forward Outlook
Three frozen checks make the next forecast falsifiable: 2027 Goose production (base 270 koz, bear 190, bull 300), 2028 Regional production (base 160 koz, bear 70, bull 180), and 2027 common FCF after required investment (base US$445 million, bear US$58 million; the bull worksheet output is the upper case). Compare each with the next annual/quarterly site production, cash flow and capital tables on the same 100%-site or common basis. Forecast input · Forecast output
Model Choice
A finite-reserve NAV fits a depleting miner better than a perpetual earnings multiple. Peralta forecasts 2027–34 cash from four mine sources, caps production to the operating reserves remaining after estimated 2026 output, and assigns no post-2026 base cash to Otjikoto despite its remaining 2025 reserves, and excludes inferred resources, Antelope and Gramalote. The exclusions bias NAV downward; the entry rule is separately tested against operating and funding setbacks. AIF probable reserves · Model schedule
Growth
The base moves from the latest Q3 193 koz produced to 810 koz in full-year 2027 and 930 koz in 2028, driven by Goose 270→300 koz and Regional 50→160 koz. Goose's 2027 base is below management's medium-term >300 koz ambition because phase 2 crusher completion is planned only for midyear. The Fekola Mine schedule declines with reserve depletion and 2027 pre-stripping. Q3 production · Goose target · Fekola outlook
Profitability
Base gold is US$3,500/oz in 2027, US$3,400 in 2028, US$3,300 in 2029 and US$3,200 thereafter. These are analyst judgments below the Q3 realized US$4,289/oz, not a spot quote. AISC is mine-specific and includes sustaining capital; Goose falls from a modeled US$2,700 in 2027 to US$2,450 in 2028 as throughput improves. Taxes are modeled at 25–35% by mine and a further 5% Mali repatriation leakage; these are judgmental cash proxies, not reported effective tax rates. Q3 realized price and AISC · Frozen inputs
Reinvestment or Required Capital
AISC covers sustaining expenditure, so the worksheet separately deducts US$170 million of 2027 growth/exploration spending, US$110 million in 2028 and a declining schedule thereafter, plus US$200 million of closure cash in 2032–34. The 2027 amount is an analyst estimate against nine-month 2026 mine capital of US$503 million and other exploration of US$44 million; the company has not supplied a complete 2027–34 capital schedule. A US$50 million 2027 capex overrun is included in the joint downside. 2026 capital by mine · AIF closure estimate
Discount Rate
The 9% nominal USD discount rate is an analyst requirement for mine cash exposed to commodity, jurisdiction and operating risks. It is not presented as an observed WACC or CAPM estimate. At 11%, the finite-life base fair NAV falls from US$1.50 to US$1.42, while the binding downside ceiling moves from US$0.23 to US$0.24 because later negative closure cash is discounted more heavily; the counterintuitive entry direction is visible in the worksheet and is not a claim that risk increases value. Sensitivity table · Closure schedule
Terminal Economics
There is no perpetuity. The first terminal checkpoint is the 2031 exit, at which remaining 2032–34 reserve cash is discounted to 2031 and added to retained cash and recognized nonoperating investments; remaining debt is subtracted. The final 2034 forecast includes last Goose ounces and closure payments. Holding 2032–34 growth/exploration at the 2031 US$60 million rate adds US$10 million, US$20 million and US$30 million of outlays. At 9%, this cuts November 2031 residual NAV by US$48.8 million, or US$0.037 per share; the base ceiling falls by about US$0.023 per share and the binding downside ceiling also declines. Reserve exhaustion does not justify zero closure or sustaining cost. Year schedule and terminal bridge
Bridge to One Common Share
At 30 September 2026, 1,317.053 million basic shares were outstanding. Peralta adds 12 million assumed award shares and treats the US$460 million 2030 convertible as repayable, because the base fair value is below its approximately US$3.17 conversion price; the 144.996 million potential conversion shares are therefore excluded from the base denominator. Do not subtract the principal and add conversion shares simultaneously. The Wheaton stream haircut is deducted from Goose annual cash, not again from common equity. Q3 share note · Convertible EPS table · Stream Note 15
Price-Implied Expectations
At the US$4.48 close, the five-year investor hurdle needs a 2031 exit near US$6.55 per share after the modeled US$0.08 annual dividends, fixed 1.4219 USD/CAD and trading costs. Base 2031 exit is US$1.51. If all other finite-reserve assumptions remain fixed, fair value reaches US$4.48 only after adding about US$1,609/oz to the entire 2027–34 gold deck, bringing 2027 gold to about US$5,109/oz; the actual market may instead price further reserves or Gramalote. Price-implied worksheet calculation · Currency conversion source
Independent Cross-Check
The issuer's Gramalote study cites US$941 million after-tax NPV at US$2,500 gold and US$740 million pre-production capital. Adding the entire reported NPV mechanically would lift the current 1,329 million-share base NAV by about US$0.71 per share to roughly US$2.21—still below US$4.48—though that NPV uses a different date, discount rate, gold deck and permit/funding state, so it is a sensitivity rather than an additive valuation. An independent Decimal reconstruction of the saved five-year terminal cash and ceilings is retained privately for review. Gramalote study · Common NAV bridge
Conclusion and Change from Prior Edition
This is the first BTG Markdown edition: BTG has no predecessor publication head. The older BTO CAD listing report is the same issuer but a different edition identity and a stale May 2026 economic cutoff, so its CAD target and chart are not carried into the US-dollar decision. The finite-reserve method yields Wait at the US$4.48 close, with substantial unmodeled option value disclosed. BTG public history · BTO published reference
Peer Selection
Alamos Gold and OceanaGold are gold producers with current Q3 operating disclosures. They give a check on cash cost intensity, not a direct NAV substitute: OceanaGold includes copper economics, Alamos has separate expansion spend, and B2Gold has Goose commissioning and Mali participation. All figures below are US dollars per ounce for the three months ended 30 September 2026. Alamos Q3 · OceanaGold Q3
Dated Ratio Table
| Producer | Q3 realized gold US$/oz | Q3 AISC US$/oz sold | AISC / realized price | Source and definition |
|---|---|---|---|---|
| B2Gold | 4,289 | 2,602 | 60.7% | Q3 MD&A, selected results |
| Alamos Gold | 4,258 | 1,956 | 45.9% | Q3 release, per-ounce table |
| OceanaGold | 4,249 | 1,874 | 44.1% | Q3 release, results overview |
Comparability Adjustments
This ratio uses each issuer's own non-IFRS AISC and realized gold price for the same quarter. Different by-product credits, royalty treatment, inventory changes, tax and growth capital make it a diagnostic rather than an interchangeable cash yield. B2Gold's US$4,816/oz Goose AISC was unusually high after crusher damage and lower sales; the base assumes improvement, so the peer gap is a challenge to that assumption. Goose Q3 AISC · Agnico discussion of AISC comparability
Implications for Value
B2Gold needs a sustained Goose cost decline and more Regional ounces to close the operating ratio gap. The peer table does not prove a cheap stock: B2Gold's reported earnings include nonrecurring gains and its mine lives differ. The reserve-constrained cash model remains the primary value test; peer data sets a measurable challenge to the 2028 Goose US$2,450/oz AISC assumption. Cost forecasts · Peer rows above
Bear Case
Joint downside holds gold at US$3,000 in 2027 and US$2,800 from 2029, reduces Goose to 190 koz in 2027, delays Regional's first ounces to 2028 and holds Goose 2027 AISC at US$3,100/oz with US$50 million extra growth spending. These linked misses reflect the recent crusher disruption and still-pending Regional ramp. The case needs US$163.46 million conditional 2030 financing to retain a US$250 million cash buffer after convertible repayment. Goose event and forecast · Regional ramp · Bear output
Base Case
Base gold steps from US$3,500 to US$3,200, Goose reaches 300 koz from 2028, Regional reaches 160 koz, and capital plus closure are paid explicitly. Finite mine NAV is US$1.50 per share; 2031 sale value is also about US$1.50 before fees, with retained cash replacing depleted reserves. The model excludes unapproved new projects rather than assuming free mine-life extension. Input deck · Annual mine bridge
Bull Case
Bull uses US$3,900–4,000 gold, faster Goose and Regional production and lower Goose AISC, while still respecting the modeled reserve cap. The bull is a sensitivity to the operating portfolio, not a value for Gramalote or inferred resources. The model will include additional shares if the convertible conversion case is economically in the money. Bull inputs · Exact model output
Outcomes at Close and Entry
| Assumption | Close | Fair value | Maximum entry | Price rule |
|---|---|---|---|---|
| Base | US$4.48 | US$1.50 | US$0.23 | Wait |
| Gold -US$200/oz | US$4.48 | US$1.11 | US$0.00 | Wait |
| Discount +2 pp | US$4.48 | US$1.42 | US$0.24 | Wait |
| Joint downside | US$4.48 | US$0.22 | US$0.15 | Wait |
These rows rerun both ceilings with the named change. A zero maximum entry means no positive purchase price survives that joint capital-preservation case. The discount-rate result is governed by negative late closure cash, not a general positive relation between risk and value. Generated decision table
Market-Implied Case
The market close would need approximately US$6.55 2031 exit value with the base dividends to earn the XIC net CAGR plus two percentage points over five years, versus base exit US$1.51. Alternatively, holding mines and costs fixed, a roughly US$1,609/oz gold-deck uplift makes present NAV equal to the close. A formal market-implied path should also allow reserve conversion and project value, so this fixed-reserve result is a diagnostic, not a claim about investor beliefs. Five-year terminal arithmetic · Frozen inputs
Analyst Assessment
The strongest contrary case is that Goose stabilizes, Regional enters production on time, Gramalote receives approvals and financing, and future drilling converts enough resources to extend the portfolio. The base excludes the last two because they lack a funded, approved mine plan as of this cutoff. A reserve revision or project FID with verified after-tax cash would justify rebuilding fair value; simply applying a higher gold price without cost and tax changes would not. AIF reserves · Gramalote study
Operating Risks
The most direct failure is a prolonged Goose crusher shortfall: Q3 2026 site AISC of US$4,816/oz shows the cash cost of a constrained mill, while phase 2 targets 4,000 tpd only by mid-2027. Base 2027 Goose 270 koz at US$2,700/oz AISC is therefore an execution forecast. A full-year 2027 result below 190 koz or AISC above US$3,100 would push the model toward the joint downside. Goose Q3 and crusher discussion · Goose forecasts
Financial and Liquidity Risks
The US$460 million 2.75% convertible matures February 2030; the initial conversion price is about US$3.17. If the intrinsic share price stays below that threshold, holders have a repayment claim, while conversion above it dilutes the shares. The joint downside's US$163.46 million refinancing is conditional because the existing US$800 million revolver matures December 2028. A failed 2030 refinancing would leave approximately US$86.5 million after note repayment before 2031 cash generation, below the analyst US$250 million operating buffer; asset sales, lower capital, or equity dilution would then be needed to restore that buffer. The US$0.23 entry is conditional and remains Needs underwriting until a credible facility or funded mine plan closes the gap. Q3 debt terms · RCF maturity · Funding output
Regulatory and Legal Risks
Mali's 2023 Mining Code and the Regional permit produce a prospective 65% B2Gold interest rather than the older 90% reserve attribution. The Fekola Mine remains 80% owned. A further tax, royalty, priority-dividend or ownership change would flow into attributable common cash and the entry ceiling. Verify the actual Regional partnership and first state distributions in subsequent filings. Regional ownership · 2025 reserve attribution
Industry and Competitive Risks
Gold price dominates economics: the base declines from US$3,500/oz in 2027 to US$3,200, and a US$200/oz reduction lowers base NAV by roughly US$0.39 per share. Higher royalties or diesel/labour costs can coincide with a price drop, so a single independent gold stress is insufficient. The joint downside combines gold, Goose volumes and costs, Regional delay and extra capital. Q3 price and cost rows · Sensitivity
Thesis-Specific Risks and Reconsideration Triggers
The largest upside omission is funded reserve growth or Gramalote FID; the strongest downside is a Goose delay persisting through 2028 with Regional failing to reach 130 koz. Reconsider after the 2026 audited reserve statement, the first 2027 Goose throughput and capex disclosure, the 2028 Regional run-rate, or any Gramalote financing decision. A signed project schedule should replace analyst capex proxies. AIF reserve basis · Management operating path
Downside at the current price
The linked downside has lower gold and delayed Goose/Regional output while higher Goose unit cost and extra capital persist. It yields a 2031 modeled sale of US$0.1771 per share before the 5 bp sale fee plus the declared US$0.02 December 2026 dividend and three modeled US$0.01 quarterly payments in 2031; cash from the sale and dividend carried to exit totals C$0.3406 per original share. The base yields C$2.8747 total, including dated dividends. At 25 November FX of 1.4219, the base XIC-net-plus-two-points ceiling is C$1.8263, or US$1.2844; zero-nominal-return downside ceiling is C$0.3405, or US$0.2394. The lower downside ceiling is floored once to US$0.23. Complete five-year bridge · Frozen policy inputs
At the US$4.48 close, the base five-year total gain is -54.9% and the joint downside -94.7%; at US$0.23 entry, the base gain is 778.6% and the downside is 4.1%. These are model outputs, not probabilities. The 2030 US$163.46 million refinancing condition and reserve exclusions matter most; if it cannot be funded, the downside eligibility must be reconsidered. The next disclosure is the 2026 audited mine plan and a 2027 capital/financing update; these determine whether the conditional entry can qualify. Scenario output · Debt maturity
Environmental Factors
Mine tailings, water, energy and closure obligations require sustained investment. The AIF estimates about US$200 million of aggregate undiscounted closure and reclamation costs across operating mines; Peralta puts that cash in 2032–34 rather than treating mine depletion as free. The timing is an analyst simplification and should be replaced with site plans. AIF closure estimate · Closure input
Social Factors
Goose operates in Nunavut under an agreement with the Kitikmeot Inuit Association; access, jobs, supply transport and local consent affect continuity. Fekola Regional's Mali state participation and local stakeholder arrangements influence how much mine cash reaches the public parent. These are financial risks through delays and distributable cash, not separate ESG score bonuses. Goose agreement · Regional state share
Governance Factors
The 2026 buyback authorization allows up to 10% of issued shares, but execution is discretionary; 41 million shares were repurchased in the first nine months. The model freezes 1,317.053 million September shares plus assumed awards and assigns zero future buybacks, avoiding unsupported accretion. The 2030 convert adds a countervailing dilution/repayment choice that directors must fund. Q3 share and NCIB note · Convertible note
Financially Material Risks and Opportunities
The financially material ESG exposures are closure cash, Nunavut supply logistics and Mali fiscal/state sharing. A credible opportunity is high-grade Goose production at designed throughput; the model tests it only after sustaining and growth capital. Neither responsible-mining goals nor management targets are counted as cash without a funded path. AIF property and closure discussion · Goose production path
Annual Results
| US$ million, fiscal year ended 31 December | 2024 | 2025 |
|---|---|---|
| Gold revenue | 1,902.0 | 3,061.2 |
| Production costs | 681.8 | 745.4 |
| Royalties and production taxes | 146.6 | 344.2 |
| Gross profit | 706.2 | 1,530.8 |
| Operating income (loss) | (248.3) | 1,382.3 |
| Net income (loss) attributable to shareholders | (629.9) | 401.9 |
The 2024 operating loss included a major impairment, while 2025 benefited from higher gold prices; the table is reported IFRS, not normalized cash. 2025 audited operations, physical p.160
Interim Results
| US$ million, three/nine months ended 30 September | Q3 2025 | Q3 2026 | 9M 2025 | 9M 2026 |
|---|---|---|---|---|
| Gold revenue | 782.9 | 836.5 | 2,007.3 | 2,784.5 |
| Production costs | 195.2 | 262.7 | 517.5 | 732.8 |
| Royalties and production taxes | 92.8 | 82.7 | 213.3 | 344.5 |
| Gross profit | 390.3 | 366.0 | 979.5 | 1,284.0 |
| Net income attributable to shareholders | 19.3 | 408.9 | 231.3 | 1,026.2 |
Each amount is a reported IFRS figure in US$ millions, rounded once from the issuer's US$ thousands table. Q3 statements, physical p.2
Trailing Results
Revenue for the twelve months through 30 September 2026 is FY2025 plus 9M2026 minus 9M2025: US$3,838.5 million. This perimeter includes four operating mines but a changing Goose commercial ramp and higher gold prices; it should not be treated as a stable run rate. The same arithmetic gives about US$1,835.3 million gross profit, with unusual impairment and sale gains below that line. Annual operations · Interim operations
Material Adjustments
The US$292.4 million Finland disposal gain and US$253.5 million Fekola impairment reversal explain much of reported 9M2026 earnings growth but are not future gold sales. The annual/interim comparison also crosses Goose's October 2025 commercial-production date, so the 2026 cash profile is not a simple same-mine price bridge. Q3 unusual rows · Goose commercial date
Annual Positions
| US$ million at 31 December | 2024 | 2025 |
|---|---|---|
| Cash and equivalents | 337.0 | 380.4 |
| Total assets | 4,814.0 | 5,879.3 |
| Current liabilities | 580.7 | 1,061.3 |
| Long-term debt, excluding current | 421.5 | 564.4 |
| Gold stream, current plus long-term | 166.4 | 282.7 |
| Total equity | 3,035.7 | 3,641.5 |
These are book values and do not replace the future stream-delivery model. 2025 audited balance sheet, physical p.163
Interim Positions
| US$ million at date | 31 Dec 2025 | 30 Sep 2026 |
|---|---|---|
| Cash and equivalents | 380.4 | 293.6 |
| Total assets | 5,879.3 | 6,220.0 |
| Current liabilities | 1,061.3 | 644.2 |
| Long-term debt, current plus noncurrent | 598.3 | 546.2 |
| Gold stream, current plus noncurrent | 282.7 | 254.4 |
| Long-term investments plus associates | 384.2 | 384.6 |
Prepaid gold sales had fallen to zero by September; the 2025 current obligation was US$285.5 million. Q3 balance sheet, physical p.5
Capital and Claims Reconciliation
The model starts from US$293.6 million 30 September cash and assumes US$56.4 million net Q4 cash build to US$350 million year-end; this is an analyst stub requiring the 2026 audited filing. It subtracts US$164.4 million of nonconvert repayment claims (US$95 million RCF principal, US$19.8 million equipment loans and US$49.6 million leases) and the full US$460 million convertible principal from finite mine NAV. The convertible is carried at only US$386.5 million in reported debt; the model uses principal due. It does not subtract the US$254.4 million stream liability again because deliveries are modeled ounce by ounce. It recognizes US$269.2 million of US$384.6 million book investments/associates. Q3 balance and Note 15 · Equity bridge
Annual Flows
| US$ million, fiscal year ended 31 December | 2024 | 2025 |
|---|---|---|
| Operating cash provided | 877.6 | 895.8 |
| Cash used in investing | (763.3) | (892.7) |
| Mine and exploration capital | (918.4) | (862.8) |
| Dividends paid | (184.6) | (103.4) |
| Buybacks | — | (9.8) |
| Ending cash | 337.0 | 380.4 |
2024 CFO includes US$500 million prepaid-gold financing receipts within operating activities, so the unadjusted 2024 CFO comparison overstates recurring mine cash. The 2025 cash-flow statement separately shows US$288.8 million delivered into prepaid sales. Audited cash flows, physical p.162
Interim Flows
| US$ million, three/nine months ended 30 September | Q3 2025 | Q3 2026 | 9M 2025 | 9M 2026 |
|---|---|---|---|---|
| Operating cash provided | 175.6 | 238.6 | 609.5 | 699.3 |
| Mine and exploration capital | (259.5) | (190.6) | (688.2) | (547.1) |
| Cash before financial distributions | (83.9) | 48.0 | (78.7) | 152.3 |
| Dividends paid | (25.9) | (25.8) | (77.4) | (78.1) |
| Buybacks | (9.8) | (33.3) | (9.8) | (205.2) |
Rows are rounded from the interim cash-flow statement. The apparent 9M2026 shareholder payout of US$283.2 million exceeds US$152.3 million cash after mine capital; the Finland disposal and balance-sheet movements funded the difference, so that payout is not a sustainable 2027 forecast. Q3 cash-flow statement, physical p.4
Trailing Flows
Twelve-month CFO to September 2026 is US$985.7 million (FY2025 + 9M2026 − 9M2025); trailing mine/exploration capital is US$721.7 million on the same basis, leaving US$264.0 million before interest, debt repayment, dividends and buybacks. The trailing series mixes prepay deliveries, Goose ramp, gold price changes and a discontinued Finland asset, so it is a reference rather than the model's first-year cash. Annual cash flow · Interim cash flow
Reconciliation to Common Shareholders
Q3 2026 CFO of US$238.6 million less about US$190.6 million mine/exploration capital left US$48.0 million. US$25.8 million dividends plus US$33.3 million buybacks consumed US$59.1 million, exceeding that cash by about US$11.1 million before other investing/financing flows. The forecast instead pays only US$0.08 per share annually while keeping a US$250 million operating cash buffer; excess cash increases terminal cash, not an additional dividend. The joint downside pays no 2027–30 dividend and uses a conditional US$163.5 million 2030 refinancing; no buyback benefit is forecast. Interim cash-flow rows · Forecast cash roll
Primary Sources and Locators
- Q3 2026 unaudited consolidated statements: operations p.2, cash flows p.4, balance sheet p.5, shares and diluted EPS pp.16–17, stream p.19. Original publisher: B2Gold issuer PDF.
- Q3 2026 MD&A: selected operating results pp.4–5, Goose pp.7–8, liquidity and financing pp.15–16. Original publisher: B2Gold issuer PDF.
- 2025 audited Form 40-F: audited operations, cash flows and balance sheets on physical pp.160, 162–163. Issuer original.
- 2026 AIF, year-end 2025 reserves: probable reserves table and attribution note physical p.22; management risk and operating history throughout. Issuer original.
- November 2026 issuer presentation: crusher and project development outlook; management forecasts are not Peralta forecasts. Issuer original.
- 2026 management circular, 13 April record date: Voting Shares and Principal Holders; external original because the issuer's PDF has an unreadable page tree in the local PDF tooling.
- B2Gold's 25 November 4 p.m. BTG close, Bank of Canada USD/CAD daily rate, and NYSE American daily history: quote, FX and the frozen four-date price chart.
Frozen Inputs and Assumptions
Public model inputs freeze the mine ounces, 2025 reserve caps, ownership, AISC, gold prices, tax proxies, growth/closure cash, claims, shares, FX, dividends, discount rate and policy costs. Reported observations and analyst estimates are identified in the adjacent prose. Reserve ounce caps do not establish economically recoverable cash at each forecast price; mining schedules and taxes remain judgmental, with no booked value for new discoveries. AIF reserve table · Q3 claims
Worksheets and Saved Outputs
| Worksheet | Output |
|---|---|
| Finite mine NAV and five-year entry | Decision and sensitivity, mine cash, claims and ceilings |
Run with Python 3.12.13 and no third-party packages from the edition's support/ directory: PYTHONDONTWRITEBYTECODE=1 PYTHONPATH=. /Users/johnperalta/johnperalta4vanilla/.venv/bin/python valuation.py. It reads only the public frozen JSON and writes the two linked Markdown tables plus exact JSON output. The exit is exactly 25 November 2031. The worksheet allocates 11/12 of 2031 operating cash before sale, values the December 2031 stub with 2032–34 remaining reserve cash, includes the declared 15 December 2026 payout and three 2031 quarterly payments, and carries every distribution from its stated date. Its 9.5% carry applies only after receipt. Decision output · Detailed output
The following tables are the saved worksheet outputs, in US$ millions except stated per-share and ounce units.
| Year | Mine | 100% oz (koz) | Ownership | Gold (US$/oz) | AISC (US$/oz) | Revenue (US$m) | AISC cash (US$m) | Stream (US$m) | Tax (US$m) | NCI (US$m) | Common cash (US$m) |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 2027 | Fekola mine | 300.00 | 80% | 3,500.00 | 2,400.00 | 1,050.00 | 720.00 | 0.00 | 115.50 | 42.90 | 163.02 |
| 2027 | Fekola Regional | 50.00 | 65% | 3,500.00 | 2,500.00 | 175.00 | 125.00 | 0.00 | 17.50 | 11.38 | 20.07 |
| 2027 | Goose | 270.00 | 100% | 3,500.00 | 2,700.00 | 945.00 | 729.00 | 21.55 | 54.45 | 0.00 | 140.01 |
| 2027 | Masbate | 190.00 | 100% | 3,500.00 | 1,450.00 | 665.00 | 275.50 | 0.00 | 97.38 | 0.00 | 292.12 |
| 2028 | Fekola mine | 280.00 | 80% | 3,400.00 | 2,450.00 | 952.00 | 686.00 | 0.00 | 93.10 | 34.58 | 131.40 |
| 2028 | Fekola Regional | 160.00 | 65% | 3,400.00 | 2,350.00 | 544.00 | 376.00 | 0.00 | 58.80 | 38.22 | 67.43 |
| 2028 | Goose | 300.00 | 100% | 3,400.00 | 2,450.00 | 1,020.00 | 735.00 | 23.26 | 73.29 | 0.00 | 188.46 |
| 2028 | Masbate | 190.00 | 100% | 3,400.00 | 1,500.00 | 646.00 | 285.00 | 0.00 | 90.25 | 0.00 | 270.75 |
| 2029 | Fekola mine | 270.00 | 80% | 3,300.00 | 2,500.00 | 891.00 | 675.00 | 0.00 | 75.60 | 28.08 | 106.70 |
| 2029 | Fekola Regional | 160.00 | 65% | 3,300.00 | 2,400.00 | 528.00 | 384.00 | 0.00 | 50.40 | 32.76 | 57.80 |
| 2029 | Goose | 300.00 | 100% | 3,300.00 | 2,500.00 | 990.00 | 750.00 | 22.57 | 60.88 | 0.00 | 156.55 |
| 2029 | Masbate | 190.00 | 100% | 3,300.00 | 1,550.00 | 627.00 | 294.50 | 0.00 | 83.12 | 0.00 | 249.38 |
| 2030 | Fekola mine | 270.00 | 80% | 3,200.00 | 2,550.00 | 864.00 | 688.50 | 0.00 | 61.42 | 22.81 | 86.70 |
| 2030 | Fekola Regional | 160.00 | 65% | 3,200.00 | 2,450.00 | 512.00 | 392.00 | 0.00 | 42.00 | 27.30 | 48.17 |
| 2030 | Goose | 300.00 | 100% | 3,200.00 | 2,550.00 | 960.00 | 765.00 | 21.89 | 48.47 | 0.00 | 124.64 |
| 2030 | Masbate | 190.00 | 100% | 3,200.00 | 1,600.00 | 608.00 | 304.00 | 0.00 | 76.00 | 0.00 | 228.00 |
| 2031 | Fekola mine | 220.00 | 80% | 3,200.00 | 2,600.00 | 704.00 | 572.00 | 0.00 | 46.20 | 17.16 | 65.21 |
| 2031 | Fekola Regional | 160.00 | 65% | 3,200.00 | 2,500.00 | 512.00 | 400.00 | 0.00 | 39.20 | 25.48 | 44.95 |
| 2031 | Goose | 300.00 | 100% | 3,200.00 | 2,600.00 | 960.00 | 780.00 | 21.89 | 44.27 | 0.00 | 113.84 |
| 2031 | Masbate | 190.00 | 100% | 3,200.00 | 1,650.00 | 608.00 | 313.50 | 0.00 | 73.62 | 0.00 | 220.88 |
| 2032 | Fekola mine | 90.00 | 80% | 3,200.00 | 2,650.00 | 288.00 | 238.50 | 0.00 | 17.32 | 6.43 | 24.45 |
| 2032 | Fekola Regional | 160.00 | 65% | 3,200.00 | 2,550.00 | 512.00 | 408.00 | 0.00 | 36.40 | 23.66 | 41.74 |
| 2032 | Goose | 300.00 | 100% | 3,200.00 | 2,650.00 | 960.00 | 795.00 | 21.89 | 40.07 | 0.00 | 103.04 |
| 2032 | Masbate | 190.00 | 100% | 3,200.00 | 1,700.00 | 608.00 | 323.00 | 0.00 | 71.25 | 0.00 | 213.75 |
| 2033 | Fekola mine | 0.00 | 80% | 3,200.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| 2033 | Fekola Regional | 30.00 | 65% | 3,200.00 | 2,600.00 | 96.00 | 78.00 | 0.00 | 6.30 | 4.09 | 7.22 |
| 2033 | Goose | 300.00 | 100% | 3,200.00 | 2,700.00 | 960.00 | 810.00 | 21.89 | 35.87 | 0.00 | 92.24 |
| 2033 | Masbate | 130.00 | 100% | 3,200.00 | 1,750.00 | 416.00 | 227.50 | 0.00 | 47.12 | 0.00 | 141.38 |
| 2034 | Fekola mine | 0.00 | 80% | 3,200.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| 2034 | Fekola Regional | 0.00 | 65% | 3,200.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| 2034 | Goose | 125.00 | 100% | 3,200.00 | 2,750.00 | 400.00 | 343.75 | 9.12 | 13.20 | 0.00 | 33.93 |
| 2034 | Masbate | 0.00 | 100% | 3,200.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Year | Production (koz) | Mine common cash (US$m) | Growth/exploration (US$m) | Closure (US$m) | Common FCF (US$m) | PV at 9% (US$m) |
|---|---|---|---|---|---|---|
| 2027 | 810.00 | 615.22 | 170.00 | 0.00 | 445.22 | 408.46 |
| 2028 | 930.00 | 658.04 | 110.00 | 0.00 | 548.04 | 461.27 |
| 2029 | 920.00 | 570.43 | 80.00 | 0.00 | 490.43 | 378.70 |
| 2030 | 920.00 | 487.50 | 70.00 | 0.00 | 417.50 | 295.77 |
| 2031 | 870.00 | 444.88 | 60.00 | 0.00 | 384.88 | 250.14 |
| 2032 | 740.00 | 382.99 | 50.00 | 60.00 | 272.99 | 162.77 |
| 2033 | 460.00 | 240.84 | 40.00 | 70.00 | 130.84 | 71.57 |
| 2034 | 125.00 | 33.93 | 30.00 | 70.00 | -66.07 | -33.16 |
| Common equity bridge | US$m |
|---|---|
| PV 2027-34 finite mine common cash | 1,995.54 |
| Estimated 2026 year-end cash | 350.00 |
| Recognized nonoperating investments (70% of book) | 269.25 |
| Nonconvert debt | -164.38 |
| Convertible principal (repayment path) | -460.00 |
| Common equity NAV | 1,990.41 |
| Economic shares (million) | 1,329.05 |
| Fair NAV (US$/share) | 1.50 |
| Year | FCF (US$m) | Interest/collar (US$m) | Debt repayment (US$m) | Dividends (US$m) | Refinancing draw (US$m) | Retained cash (US$m) |
|---|---|---|---|---|---|---|
| 2027 | 445.22 | 25.87 | 0.00 | 106.32 | 0.00 | 663.03 |
| 2028 | 548.04 | 20.87 | 164.38 | 106.32 | 0.00 | 919.50 |
| 2029 | 490.43 | 12.65 | 0.00 | 106.32 | 0.00 | 1,290.95 |
| 2030 | 417.50 | 12.65 | 460.00 | 106.32 | 0.00 | 1,129.47 |
| 2031 | 352.80 | 0.00 | 0.00 | 79.74 | 0.00 | 1,402.54 |
| Five-year test | Base | Joint downside |
|---|---|---|
| 2031 sale price (USD/share) | 1.51 | 0.18 |
| Sale after fee (CAD/share) | 2.15 | 0.25 |
| Dated distributions carried to 2031 (CAD/share) | 0.72 | 0.09 |
| Total terminal proceeds (CAD/share) | 2.87 | 0.34 |
| Base hurdle / downside target | 9.4871% | 0.0000% |
| Price ceiling (CAD/share) | 1.83 | 0.34 |
| Price ceiling (USD/share) | 1.28 | 0.24 |
| Five-year gain/loss at US$4.48 close | -54.89% | -94.66% |
| Five-year gain/loss at US$0.23 entry | 778.58% | 4.11% |
Changes from the Preceding Edition
This same-cutoff reader correction follows the first BTG edition. It selects four dates for legible desktop chart ticks, corrects a mislabeled FX link and clarifies two sentences; the model and decision are unchanged. The separate BTO listing's May 2026 CAD archive is a same-issuer reference, not a prior BTG USD price. BTO archive
| Revision driver | Fair value | Maximum entry |
|---|---|---|
| Prior | US$1.50 | US$0.23 |
| Reader labels and chart dates | US$0.00 | US$0.00 |
| Rounding | US$0.00 | US$0.00 |
| Current | US$1.50 | US$0.23 |