B2Gold Corp. (NYSE American: BTG) — 25 November 2026

Our maximum entry price is US$0.23 per share. This is conditional on refinancing. BTG closed at US$4.48 on 25 November 2026, so the five-year price rule says Wait and any future entry Needs underwriting for refinancing; the US$1.50 finite-reserve base fair value is also below the close. This arithmetic entry is conditional on a 2030 refinancing of US$163.46 million in the joint downside and on the mine plans described below. A stronger contrary case converts more resources into reserves and develops Gramalote; management's published Gramalote study gives US$941 million after-tax NPV at US$2,500 gold, equal to about US$0.71 per current basic share before project and financing risk, but the project is excluded because no construction decision or fully financed plan was established at this cutoff. Gramalote study in November presentation · 25 November issuer quote

Stock Price History

Market close (USD/share)
US$4.48
Base fair value (USD/share)
US$1.50
Company details
Maximum entry price (USD/share)
US$0.23

B2Gold reports in US dollars and operates Fekola and Fekola Regional in Mali, Goose in Canada, Masbate in the Philippines, and Otjikoto in Namibia. The latest available financial statements cover 30 September 2026 and were authorized on 4 November 2026. BTG is the NYSE American listing; BTO is the TSX listing of the same common equity, not an earlier BTG edition. The Bank of Canada 25 November USD/CAD rate was 1.4219, so the US$4.48 close is C$6.370112 before costs. Interim statements, Note 1 · Bank of Canada daily USD/CAD, 25 November

Stock Price History

Closing prices

DateClose (USD)Entry (USD)
2026-11-174.77
2026-11-204.12
2026-11-234.42
2026-11-254.480.23

Selected unadjusted NYSE American closes; the final close agrees with the issuer's 4 p.m. quote. Historical prices · Issuer quote

Investment Thesis

B2Gold owns a producing portfolio with material gold leverage and two near-term operating tests: Goose's crusher expansion and Fekola Regional's ramp. The thesis is conditional: ore and capital plans must translate into cash after state ownership, taxes, stream deliveries and the 2030 convertible. The base case values only disclosed operating reserves and gives no speculative terminal perpetuity. 2025 reserve table · Goose and Fekola operational outlook

Market Mispricing

At US$4.48, the market is US$2.98 above the finite-reserve fair NAV and US$4.25 above the maximum entry. Holding the reserve schedule fixed, the worksheet requires roughly US$1,609/oz added to every modeled gold year to lift fair NAV to the close; that is a conditional implication, not a gold-price forecast. Extra reserves or Gramalote can also close the gap. Frozen model · Valuation output

Recent Developments

The 4 November release lowered 2026 consolidated AISC guidance to US$2,230–2,410/oz while maintaining mine production guidance. It reported Q3 gold production of 193,321 ounces, down from about 254,000 ounces a year earlier, and stated Goose phase 1 crusher upgrades had reached 3,200 tonnes per day after October commissioning. Q3 release and MD&A · Q3 production table

Earnings Outlook

Peralta forecasts 810 thousand 100%-mine ounces in 2027, then 930 thousand in 2028 as Goose and Regional ramp; these are model estimates, not issuer guidance. Base 2027 common cash after modeled AISC, taxes, minority interests, stream deliveries and US$170 million of non-sustaining spending is US$445 million. The joint downside lowers it to US$58 million. Mine-level model · 2026 issuer guidance

Three frozen forecasts make this thesis testable. Ounces are 100% mine production, not B2Gold attributable sales; common FCF includes the ownership, tax, stream, AISC and growth-capital deductions defined in the worksheet.

Forecast and settling periodDownsideBaseUpsideDisclosure that settles it
Goose gold produced, FY2027 (thousand oz)1902703002027 audited mine production and MD&A
Fekola Regional gold produced, FY2028 (thousand oz)701601802028 audited Regional production and ownership
Common FCF, FY2027 (US$ million)584457572027 audited cash flows and mine-level AISC/capex bridge

Forecast inputs · Case outputs

Valuation Summary

The US$1.50 base NAV discounts 2027–34 finite mine cash at 9%, adds estimated 2026 year-end cash and 70% of recorded nonoperating investments, and subtracts debt, including the US$460 million convertible because the modeled equity value is below its US$3.17 conversion price. The cash model deducts the Wheaton stream each year, so its US$254 million accounting liability is not subtracted again. Equity bridge · Debt and stream notes

Recommended Action and Entry Price

Wait at US$4.48; the conditional entry needs underwriting for a US$163.5 million 2030 financing whose availability is uncommitted at this cutoff. The five-year base hurdle ceiling is US$1.2844, while the zero-nominal-return joint-downside ceiling is US$0.2394; the lower is floored once to US$0.23. Do not confuse the price rule with an instruction to trade or a forecast of when the stock will visit that price. Decision output · Five-year calculation

Catalysts

The next reported Goose throughput and 2027 mine plan should test whether the mill can sustain the proposed mid-2027 4,000 tpd rate. Fekola Regional's first ore deliveries and 2028 ounces test the modeled 160 koz year. A Gramalote construction and funding decision could add project value that the base model excludes. November presentation, Goose · Fekola Regional outlook

Primary Risks to Thesis

The joint stress couples a slower Goose ramp with a delayed Regional start, higher Goose AISC and a lower gold deck. It leaves only US$58 million 2027 common FCF and requires US$163 million of 2030 funding to maintain a US$250 million modeled cash buffer after note repayment. The issuer's revolver matures in December 2028, so that future financing is an explicit condition. Liquidity and debt maturity · Joint model