Bird Construction Inc. (TSX: BDT)
Our maximum entry price is C$28.59 per share. At the November 20, 2026 close of C$69.45, our decision is Wait. The signed book can support substantial growth. At the current price, shareholders also need margins well above trailing results, or materially cheaper capital.
- Market close
- C$69.45
- Base fair value
- C$36.20
Company details
- Maximum entry price
- C$28.59
Investment Thesis
At C$6.39bn, signed backlog represents 1.6 times trailing sales. Shareholders own the profit after crews, subcontractors, taxes and investment are paid. A large award can consume cash long before it earns a return. Evidence · pipeline Evidence · working
Market Mispricing
At C$69.45, base growth and funding assumptions imply a sustainable 8.42% operating margin. Bird's strong third quarter earned 6.63%; trailing results adjusted for a large customer loss earned 5.03%. Evidence · income Evidence · credit
Recent Developments
The issuer expects 62% of signed backlog to become revenue in the next twelve months, approximately C$3.96bn. The separate C$6.61bn pending book requires conversion into firm work. Neither figure predicts realized margin. Evidence · conversion Evidence · pipeline
Earnings Outlook
Nine-month sales grew 24% and operating income grew 67%. Cash flow improved almost C$200m, helped by a much smaller working-capital outflow. Project collections and margin are the two signals worth tracking separately. Evidence · profit Evidence · working
Valuation Summary
Base value is C$36.20. Our model allows 7.5% early sales growth and adds back most of the prior customer loss. A recurring loss allowance prevents a single successful collection year from defining the whole franchise. Evidence · credit
Recommended Action and Entry Price
Wait above C$28.59. There is a viable upside case: at 7.2% operating margin, 10% initial growth and a 7.5% capital cost, even the stressed entry clears today's price. Daily closing prices.
Catalysts
Compare the next twelve months' activity with C$3.96bn of projected conversion, and watch receivables relative to completed work. Unconverted awards give less information than recognized gross profit and collected cash. Evidence · conversion Evidence · assets
Primary Risks to Thesis
Reimbursable and collaborative work can sustain a higher margin than the historical average. Conversely, default on a near-complete project shows that execution on site does not guarantee payment. Evidence · mix Evidence · credit
Company Overview
Bird Construction Inc. is a Canadian construction and maintenance company listed on the Toronto Stock Exchange under BDT. The company provides construction and maintenance services across Canada through a national platform and more than 6,000 employees throughout the year. Issuer annual operating review. Evidence · mix
Products and Services
Bird provides construction and maintenance services across industrial, buildings and infrastructure markets. Industrial work includes projects and services for chemicals, oil and gas, LNG, natural resources, nuclear, power, renewable energy, water and wastewater, industrial buildings, maintenance, repair and operations, electrical and instrumentation, power-line construction, structural, mechanical, piping, fabrication and modular work. Issuer annual operating review. Evidence · mix
Business Model
Bird operates as a construction and maintenance contractor that earns revenue by delivering projects and recurring work programs for public and private clients. The company uses construction management, integrated project delivery, alliance, progressive design-build, cost-reimbursable, stipulated-sum, unit-price, design-build and public-private partnership delivery models. Issuer annual operating review. Evidence · mix
Revenue Drivers
Revenue is driven by contract awards, backlog conversion, project execution, construction and maintenance activity, recurring work programs, self-perform scopes, acquisitions, client demand in industrial, buildings and infrastructure markets, and the timing of project starts and schedules. Bird's backlog represents awarded contracts less work completed, including remaining performance obligations and work orders under multi-year recurring revenue arrangements. Issuer annual operating review. Evidence · mix
Cost Structure
Bird's cost structure is driven by construction costs, labour, subcontractor billings, materials, equipment, project overhead, general and administrative expenses, acquisition and integration costs, share-based compensation, financing costs, surety and insurance support, and estimates of remaining costs to complete contracts. Revenue and gross profit depend on estimates of contract revenue, schedules, material and labour costs, labour productivity, contract scope changes, subcontractor costs, contingencies, claims and recoveries. Issuer annual operating review. Evidence · mix
Operating Levers
Key operating levers include backlog and pending backlog, project awards, contract mix, delivery model risk, project scheduling, execution productivity, labour availability and retention, self-perform work levels, subcontractor and supplier performance, material and labour cost inflation, change orders and claims, seasonality, acquisition integration, safety performance, surety support, working capital, and estimates of costs to complete. Bird's 2025 annual report highlighted record combined backlog, disciplined project selection, increased self-perform activity, collaborative work mix, capital allocation and acquisitions as drivers of operating visibility and margin performance. Issuer annual operating review. Evidence · mix
Distribution
Bird does not distribute consumer products; it goes to market by bidding, negotiating and partnering on construction and maintenance projects for owners across Canada. Client relationships include governments, public-sector institutions and private-sector industrial, commercial and infrastructure customers. Issuer annual operating review. Evidence · mix
Geographic Exposure
Bird operates from coast-to-coast-to-coast and services all of Canada's major geographic markets. Its operations and subsidiaries span provinces including Saskatchewan, Ontario, Alberta and British Columbia, and recent acquisitions added or expanded capabilities in Ontario, Alberta and British Columbia. Issuer annual operating review. Evidence · mix
Regulatory Environment
Bird operates in the Canadian construction industry, where projects are affected by federal, provincial and municipal rules, environmental legislation, occupational health and safety requirements, procurement requirements, building codes, contract law, surety and bonding requirements, Indigenous and community relationships, subcontractor and supplier obligations, and public-private project delivery frameworks. The AIF states that Bird is subject to environmental legislation in its areas of operation and identifies business risks related to project execution, cost estimates, subcontractors and suppliers, surety support, working capital, qualified personnel, competition, contract awards and cyclical or seasonal construction activity. Issuer annual operating review. Evidence · mix
Industry Structure
Bird operates in Canadian construction and maintenance across industrial, buildings and infrastructure markets. Its work ranges from general contracting and construction management to specialized self-performed electrical, civil, marine and other scopes. Issuer annual information form. Evidence · pipeline
Growth and Cyclicality
Demand follows public infrastructure programs, industrial capital spending, buildings investment and recurring maintenance needs. Bird's dated strategy emphasizes nuclear, energy, healthcare, defence, transportation and other complex work, but customer decisions and project starts can delay the conversion of those opportunities into revenue. Issuer annual information form. Evidence · pipeline
Competitors
The construction market includes international, national, regional and local contractors, and competition depends on project size, geography, specialist capability and procurement method. The annual report identifies reputation, experienced personnel, safety, financial capacity and project delivery as important to winning work. Issuer annual information form. Evidence · pipeline
Market Share
Bird generated approximately C$3.4 billion of revenue in 2025, substantially all in Canada. The May 14, 2026 presentation describes a national platform with 18 offices or operations and a 2025 business mix of roughly 40% buildings, 39% industrial and 21% infrastructure revenue. Issuer annual information form. Evidence · pipeline
Competitive Advantages
Potential advantages include national customer relationships, safety credentials, specialized project experience, financial capacity to support contract security and a growing range of self-performed trades. Acquisitions such as Jacob Bros and Fraser River Pile & Dredge broaden the scope Bird can execute and offer across its customer base. Issuer annual information form. Evidence · pipeline
Pricing and Cost Position
Contract structure governs how cost inflation affects returns. The AIF explains that subcontract scopes are generally awarded on fixed-price quotations and client terms are flowed down, mitigating some input-cost risk. Issuer annual information form. Evidence · pipeline
Entry Barriers and Substitutes
Large and technically demanding projects require experienced teams, a track record, safety systems, specialized equipment and financial resources. Many customers, including substantially all government clients according to the AIF, require surety support, making working capital and retained equity important to bidding capacity. Issuer annual information form. Evidence · pipeline
Supplier and Customer Dynamics
Bird coordinates owners, designers, subcontractors, suppliers, joint-arrangement partners and its own workforce. Fixed-price supplier quotations and flow-down provisions help align obligations, yet execution still depends on availability, quality and financial performance of counterparties. Issuer annual information form. Evidence · pipeline
Regulation and Structural Risks
Construction exposes Bird to environmental requirements, workplace safety, contractual performance standards and project-specific permitting and security obligations. Failures can lead to correction costs, penalties, lost work or litigation. Issuer annual information form. Evidence · pipeline
Historical Performance
Annual sales were virtually flat at C$3.4bn in FY24 and FY25. Operating income fell C$71.6m, with C$62.2m attributable to a single customer impairment. Evidence · annual Evidence · credit
Income Statement Analysis
Q3 gross profit rose from C$101.9m to C$153.0m. After G&A and equity-accounted investments, operating income reached C$86.2m. Finance costs and taxes reduced the common claim to C$51.1m. Evidence · income Evidence · common
Balance Sheet Analysis
Receivables of C$1.36bn and contract assets of C$200m make payment terms material. Customer advances rose C$157m, helping finance the operating balance sheet. Evidence · assets Evidence · advance
Cash Flow Analysis
Nine-month CFO rose from negative C$76.8m to positive C$122.8m. C$136.3m of that improvement came from a smaller working-capital drain. Extrapolating the full improvement would overvalue recurring cash. Evidence · cash Evidence · working
Earnings Quality
A signed award can increase revenue visibility without increasing returns. The C$885m collaborative and reimbursable category includes several contract forms with different allocations of price risk. Evidence · mix
Nonrecurring Items
Adding back the C$62.2m customer loss lifts trailing EBIT from C$139.2m to C$201.4m. We then deduct an assumed recurring credit charge of 0.30% of sales, about C$12m. Evidence · credit Evidence · profit
Funding and Cash Conversion
Borrowings and leases rank ahead of shareholders. We reserve C$200m of cash for project performance and test both extremes of that assumption. Evidence · debt Evidence · advance
Key Ratios
Q3 gross margin of 11.8% and operating margin of 6.6% exceeded nine-month margins of 10.7% and 5.1%. A seasonal execution peak is an aggressive long-term benchmark. Evidence · income Evidence · profit
Forward Outlook
At 7.5% growth our first forecast year has C$4.30bn of sales. Converting the expected share of existing backlog would cover roughly 92% of that forecast; new awards and timing still matter. Evidence · conversion
Model Choice
The operating DCF separates project margins and reinvestment from financing and customer warrants. It recognizes revenue when delivered, without capitalizing the face value of awards. Evidence · conversion Evidence · warrants
Growth
The forecast starts from trailing sales of C$4.005bn. Growth is 7.5% for five years and declines to 2% by year ten. A high conversion rate in year one provides less visibility on years six through ten. Evidence · annual Evidence · profit
| Year | Sales | EBIT | NOPAT | Net reinvestment | FCFF | Discounted FCFF |
|---|---|---|---|---|---|---|
| 1 | 4,304.9 | 203.6 | 149.6 | 61.4 | 88.2 | 81.3 |
| 2 | 4,627.7 | 218.9 | 160.9 | 66.0 | 94.8 | 80.6 |
| 3 | 4,974.8 | 235.3 | 172.9 | 71.0 | 102.0 | 79.8 |
| 4 | 5,347.9 | 252.9 | 185.9 | 76.3 | 109.6 | 79.1 |
| 5 | 5,749.0 | 271.9 | 199.8 | 82.0 | 117.8 | 78.4 |
| 6 | 6,117.0 | 289.3 | 212.6 | 75.2 | 137.4 | 84.2 |
| 7 | 6,441.2 | 304.6 | 223.9 | 66.3 | 157.6 | 89.0 |
| 8 | 6,711.7 | 317.4 | 233.3 | 55.3 | 178.0 | 92.7 |
| 9 | 6,919.8 | 327.3 | 240.5 | 42.5 | 198.0 | 95.0 |
| 10 | 7,058.1 | 333.8 | 245.3 | 28.3 | 217.1 | 96.0 |
Profitability
Base EBIT margin is 4.73% after a recurring credit allowance. On growth to C$4.30bn, this yields about C$204m EBIT and C$150m after tax. Evidence · credit
| Trailing EBIT to FCFF | CAD millions |
|---|---|
| Reported TTM operating earnings | 139.2 |
| Through-cycle adjustment | 50.2 |
| Forecast sales growth | 14.2 |
| Tax on operating profit | -54.0 |
| Net investment | -61.4 |
| Year-one FCFF | 88.2 |
Reinvestment or Required Capital
We divide incremental after-tax operating profit by a 17% assumed incremental capital return. First-year net investment of C$61.4m covers growth in operating assets above depreciation. Reported acquisition spending and the swing in work-in-progress illustrate why a fixed return is an approximation. Evidence · working Evidence · annualcash
Discount Rate
The nominal CAD WACC is an 8.5% underwriting assumption, 4.81 points above the November 20 government ten-year. The adverse case raises the rate to 9.5% as contract returns weaken. These are sensitivity inputs, with no issuer-reported WACC. Bank of Canada yield.
Terminal Economics
The terminal model grows 2% and reinvests roughly 11.8% of after-tax operating profit at 17% incremental returns. Discounted terminal cash accounts for about 64% of operating enterprise value.
Bridge to One Common Share
From C$2.36bn operating value, deduct loans, leases and the marked customer warrant liability, and add C$67.8m assumed excess cash. Divide by 55.403m shares. Contingent warrants are valued as a separate claim; the denominator therefore excludes the same contingent shares. Evidence · debt Evidence · warrants Evidence · common
| Claim | CAD millions |
|---|---|
| PV of explicit cash flows | 856.1 |
| PV of terminal operations | 1,502.5 |
| Enterprise value | 2,358.6 |
| Borrowings | -278.8 |
| Lease debt | -111.4 |
| Warrant claim | -30.6 |
| Excess cash | 67.8 |
| Common equity | 2,005.6 |
Price-Implied Expectations
The 8.42% operating margin implied by the quote exceeds even the recent 6.63% quarter. Allowing all C$267.8m of cash as surplus only adds C$3.61 to base value. Evidence · assets Evidence · income
| Question | Result |
|---|---|
| Sustainable EBIT margin implied by close at base funding and growth | 8.42% |
| Quarterly reported operating margin | 6.63% |
| Fair value if all reported cash is excess | C$39.81 |
| Fair value if no reported cash is excess | C$34.98 |
Independent Cross-Check
Aecon's comparable Q3 operating margin was 4.3%. Bird's 6.6% provides evidence of a better recent mix. It does not yet establish a durable 8.4% margin through a full construction and collections cycle. Aecon Q3. Evidence · income
Conclusion and Change from Prior Edition
Our first edition treats the credit event as partly unusual and gives credit for signed backlog conversion. To justify a higher entry, we would need stronger realized margin or lower capital needs on additional work. Evidence · pipeline Evidence · working
Peer Selection
Aecon is a Canadian-listed contractor serving infrastructure and industrial customers. Both companies reported to September 30, allowing a same-quarter comparison in CAD. Aecon consolidated results. Evidence · income
Dated Ratio Table
| Q3 2026 | Sales growth | Gross margin | Operating margin |
|---|---|---|---|
| Bird | 36.7% | 11.8% | 6.6% |
| Aecon | 25.5% | 10.5% | 4.3% |
Figures use reported consolidated sales and profit. Evidence · income Aecon interim results.
Comparability Adjustments
Aecon has concessions, equity-accounted projects and legacy work. The companies also classify depreciation differently within project cost, making operating margin more informative than gross profit in isolation. Aecon results and definitions.
Implications for Value
Bird's quarterly operating advantage was about 2.3 percentage points. At the base growth rate the share price needs another 1.8 points above Bird's own quarterly margin sustained over the forecast. Evidence · income
Bear Case
A 3.5% margin, 2.5% initial growth, 12% incremental ROIC and a 9.5% WACC produce C$14.94. Poor bids, collection losses and rising financing costs can occur together. Evidence · credit
Base Case
Base fair value is C$36.20. The entry rule raises WACC by 50bp and reduces sustainable operating margin by 50bp within each scenario.
Bull Case
The collaborative upside case assumes 7.2% operating margin, 10% early growth, 22% incremental ROIC and a 7.5% WACC. C$86.55 of fair value exceeds the close by about 25%. Evidence · mix
Outcomes at Close and Entry
| Assumption | Close | Fair value | Maximum entry | Price rule |
|---|---|---|---|---|
| Base | C$69.45 | C$36.20 | C$28.59 | Wait |
| No customer-loss addback | C$69.45 | C$24.91 | C$18.23 | Wait |
| Sustained quarterly margin | C$69.45 | C$53.28 | C$44.29 | Wait |
| Adverse project and funding cycle | C$69.45 | C$14.94 | C$10.73 | Wait |
| Collaborative contract upside | C$69.45 | C$86.55 | C$71.85 | Buy |
Market-Implied Case
At the base cost of capital and growth, even sustaining the best recent quarterly margin produces only C$53.28. A change in reinvestment efficiency or duration of growth is also material. Evidence · income
Analyst Assessment
Base underwriting supports Wait. Upgrade if several reporting periods demonstrate stronger gross-to-operating conversion, recurring collections and little incremental capital per new revenue dollar. Evidence · profit Evidence · working
Operating Risks
Fixed bids expose Bird to labour availability, procurement costs and revised cost-to-complete estimates. A shift to collaborative projects can moderate these exposures while leaving execution risk. Evidence · mix
Financial and Liquidity Risks
Project cash moves with advances, milestones and holdbacks. A reversal of advances could require new borrowing even when reported profits are positive. Evidence · advance Evidence · assets
Regulatory and Legal Risks
Bonding, project approvals and environmental or safety requirements affect eligibility and schedule. Delays may defer billing or create disputed claims. Annual information form.
Industry and Competitive Risks
Competing contractors can bid down expected project returns. Peer margin and conversion data are more useful than the dollar value of a procurement pipeline alone. Aecon outlook. Evidence · pipeline
Thesis-Specific Risks and Reconsideration Triggers
One customer default eliminated most of a year's reported operating-profit growth potential. Review provisions and collection history whenever contract assets grow faster than billings. Evidence · credit Evidence · assets
Environmental Factors
Bird Construction's selected source-card documents present environmental factors through the company's Build Green and Work Green pillars, which address sustainable construction, sustainable energy and decarbonization, infrastructure supporting electrification, greenhouse gas and energy performance, environmental stewardship and sustainable supply chain. The 2025 Sustainability Overview says Bird delivers projects using LEED, Green Globes, Passive House, WELL Standard and Zero Carbon Building requirements and has LEED-accredited professionals across Canada. Issuer operating and risk disclosures. Evidence · mix
Social Factors
Bird's selected source-card documents emphasize health and safety, Indigenous relations, people and culture, learning and development, stakeholder engagement and community connections. The 2025 Sustainability Overview says Bird has a workforce of more than 6,000 people and uses a safety-first approach. Issuer operating and risk disclosures. Evidence · mix
Governance Factors
Bird's selected source-card documents describe governance through Board oversight, Board committees, enterprise risk management, ethics policies, supply-chain standards and ESG program accountability. The 2025 Sustainability Overview says Bird's sustainability program is based on research, industry best practices, business and stakeholder materiality, specialized teams and external guidance. Issuer operating and risk disclosures. Evidence · mix
Financially Material Risks and Opportunities
The selected source packet identifies ESG risks and opportunities tied to construction-site environmental controls, greenhouse gas and energy performance, climate change, lower-carbon transition, health and safety, Indigenous relations, workforce inclusion, human rights, supply chain, ethics, privacy, data security and enterprise risk management. Bird's Sustainability Overview says its enterprise risk management framework identifies current and developing material risks that could affect strategic execution or sustainability, including fraud, bribery and corruption, regulatory and legal compliance risks specific to its operating environment, and ESG-program implementation. Issuer operating and risk disclosures. Evidence · mix
Annual Results
| CAD millions | FY24 | FY25 |
|---|---|---|
| Sales | 3397.346 | 3396.766 |
| Gross profit | 328.759 | 356.908 |
| Operating income | 146.561 | 75.006 |
| Net earnings | 100.099 | 47.411 |
Interim Results
| CAD millions | 9M Sep 2025 | 9M Sep 2026 |
|---|---|---|
| Sales | 2519.757 | 3127.525 |
| Gross profit | 259.501 | 335.080 |
| Operating income | 95.585 | 159.763 |
| Net earnings | 61.367 | 92.781 |
Trailing Results
| CAD millions | 12M Sep 2026 |
|---|---|
| Sales | 4004.534 |
| Gross profit | 432.487 |
| Operating income | 139.184 |
| Net earnings | 78.825 |
Trailing results combine FY25 and the two comparable nine-month periods. Evidence · annual Evidence · profit
Material Adjustments
The standalone impairment charge depresses trailing margin. The 4.73% base grants a partial economic addback; the sensitivity table also values the full reported loss as recurring. Evidence · credit
Annual Positions
| CAD millions | Dec 2024 | Dec 2025 |
|---|---|---|
| Assets | 1806.643 | 1856.885 |
| Liabilities | 1376.362 | 1425.067 |
| Common equity | 430.281 | 431.818 |
| Cash | 177.445 | 167.007 |
Interim Positions
| CAD millions | Dec 2025 restated | Sep 2026 |
|---|---|---|
| Assets | 1857.740 | 2516.220 |
| Liabilities | 1425.298 | 2025.019 |
| Common equity | 432.442 | 491.201 |
| Cash | 167.007 | 267.813 |
The latest interim comparative reflects a prior acquisition purchase-price adjustment. Evidence · assets
Capital and Claims Reconciliation
C$491.2m of book equity equals C$2.516bn assets less C$2.025bn liabilities. The valuation credits C$67.8m excess cash because much of the balance funds projects. Evidence · assets Evidence · advance
Annual Flows
| CAD millions | FY24 | FY25 |
|---|---|---|
| Operating cash | 114.238 | 113.110 |
| PP&E and intangibles | -33.777 | -41.285 |
| Lease repayments | -32.052 | -38.654 |
| Dividend cash | -30.003 | -46.521 |
| Net investing | -131.298 | -104.784 |
| Net financing | 16.827 | -18.137 |
Interim Flows
| CAD millions | 9M Sep 2025 | 9M Sep 2026 |
|---|---|---|
| Operating cash | -76.750 | 122.754 |
| PP&E and intangibles | -23.376 | -27.629 |
| Lease repayments | -29.913 | -31.595 |
| Dividend cash | -34.890 | -34.896 |
| Net investing | -7.926 | -14.026 |
| Net financing | 21.714 | -8.025 |
Trailing Flows
| CAD millions | 12M Sep 2026 |
|---|---|
| Operating cash | 312.614 |
| PP&E and intangibles | -45.538 |
| Lease repayments | -40.336 |
| Dividend cash | -46.527 |
| Net investing | -110.884 |
| Net financing | -47.876 |
The working-capital improvement materially boosts trailing operating cash. Evidence · working
Reconciliation to Common Shareholders
Of C$122.8m in nine-month operating cash, C$27.6m went to equipment and intangibles, C$31.6m to leases and C$34.9m to dividends. These are actual cash payments. Forward FCFF instead taxes operating profit and funds net growth investment before capital providers divide it. Evidence · cash Evidence · capex
Primary Sources and Locators
The signed and pending award definitions come from the interim report and MD&A. Public highlights are Peralta factual exhibits with physical page locators to the issuer documents. Evidence · pipeline Evidence · conversion Evidence · credit
Frozen Inputs and Assumptions
Statements and model are in CAD millions except per-share amounts. Source dates, November 20 closing prices and explicit underwriting inputs travel with the edition. Price series.
Worksheets and Saved Outputs
Changes from the Preceding Edition
First edition without a predecessor. The principal valuation judgments are project margin, loss recurrence, incremental capital return and how much project cash can be distributed.
Daily Closes
| Date | Close (CAD) |
|---|---|
| 2025-11-24 | 25.27 |
| 2025-11-25 | 26.05 |
| 2025-11-26 | 26.53 |
| 2025-11-27 | 26.44 |
| 2025-11-28 | 26.48 |
| 2025-12-01 | 26.50 |
| 2025-12-02 | 26.40 |
| 2025-12-03 | 26.50 |
| 2025-12-04 | 27.33 |
| 2025-12-05 | 27.20 |
| 2025-12-08 | 27.61 |
| 2025-12-09 | 28.22 |
| 2025-12-10 | 28.58 |
| 2025-12-11 | 28.71 |
| 2025-12-12 | 28.12 |
| 2025-12-15 | 28.08 |
| 2025-12-16 | 28.19 |
| 2025-12-17 | 29.38 |
| 2025-12-18 | 28.75 |
| 2025-12-19 | 29.13 |
| 2025-12-22 | 29.04 |
| 2025-12-23 | 29.14 |
| 2025-12-24 | 29.25 |
| 2025-12-29 | 29.11 |
| 2025-12-30 | 28.57 |
| 2025-12-31 | 28.52 |
| 2026-01-02 | 29.24 |
| 2026-01-05 | 29.26 |
| 2026-01-06 | 29.74 |
| 2026-01-07 | 29.62 |
| 2026-01-08 | 29.69 |
| 2026-01-09 | 30.02 |
| 2026-01-12 | 30.34 |
| 2026-01-13 | 30.44 |
| 2026-01-14 | 29.30 |
| 2026-01-15 | 29.49 |
| 2026-01-16 | 29.90 |
| 2026-01-19 | 29.90 |
| 2026-01-20 | 29.94 |
| 2026-01-21 | 29.59 |
| 2026-01-22 | 30.24 |
| 2026-01-23 | 29.64 |
| 2026-01-26 | 30.25 |
| 2026-01-27 | 30.45 |
| 2026-01-28 | 30.48 |
| 2026-01-29 | 30.66 |
| 2026-01-30 | 30.16 |
| 2026-02-02 | 30.67 |
| 2026-02-03 | 31.38 |
| 2026-02-04 | 30.88 |
| 2026-02-05 | 30.06 |
| 2026-02-06 | 31.42 |
| 2026-02-09 | 31.79 |
| 2026-02-10 | 31.50 |
| 2026-02-11 | 31.18 |
| 2026-02-12 | 29.84 |
| 2026-02-13 | 30.32 |
| 2026-02-17 | 30.73 |
| 2026-02-18 | 31.27 |
| 2026-02-19 | 31.32 |
| 2026-02-20 | 32.25 |
| 2026-02-23 | 31.35 |
| 2026-02-24 | 31.49 |
| 2026-02-25 | 32.09 |
| 2026-02-26 | 32.12 |
| 2026-02-27 | 31.82 |
| 2026-03-02 | 33.08 |
| 2026-03-03 | 32.44 |
| 2026-03-04 | 32.23 |
| 2026-03-05 | 31.79 |
| 2026-03-06 | 31.66 |
| 2026-03-09 | 31.48 |
| 2026-03-10 | 31.93 |
| 2026-03-11 | 32.14 |
| 2026-03-12 | 32.84 |
| 2026-03-13 | 34.08 |
| 2026-03-16 | 35.56 |
| 2026-03-17 | 36.23 |
| 2026-03-18 | 35.70 |
| 2026-03-19 | 34.81 |
| 2026-03-20 | 35.14 |
| 2026-03-23 | 35.62 |
| 2026-03-24 | 36.07 |
| 2026-03-25 | 37.94 |
| 2026-03-26 | 38.97 |
| 2026-03-27 | 39.44 |
| 2026-03-30 | 39.15 |
| 2026-03-31 | 39.84 |
| 2026-04-01 | 40.85 |
| 2026-04-02 | 41.22 |
| 2026-04-06 | 41.65 |
| 2026-04-07 | 41.55 |
| 2026-04-08 | 43.66 |
| 2026-04-09 | 45.76 |
| 2026-04-10 | 47.28 |
| 2026-04-13 | 47.56 |
| 2026-04-14 | 48.12 |
| 2026-04-15 | 45.09 |
| 2026-04-16 | 44.47 |
| 2026-04-17 | 44.00 |
| 2026-04-20 | 45.30 |
| 2026-04-21 | 45.75 |
| 2026-04-22 | 46.05 |
| 2026-04-23 | 46.60 |
| 2026-04-24 | 47.22 |
| 2026-04-27 | 48.16 |
| 2026-04-28 | 49.05 |
| 2026-04-29 | 49.30 |
| 2026-04-30 | 50.09 |
| 2026-05-01 | 51.63 |
| 2026-05-04 | 54.53 |
| 2026-05-05 | 55.10 |
| 2026-05-06 | 55.90 |
| 2026-05-07 | 53.43 |
| 2026-05-08 | 53.50 |
| 2026-05-11 | 52.47 |
| 2026-05-12 | 50.65 |
| 2026-05-13 | 49.85 |
| 2026-05-14 | 51.09 |
| 2026-05-15 | 58.35 |
| 2026-05-19 | 58.68 |
| 2026-05-20 | 57.60 |
| 2026-05-21 | 57.80 |
| 2026-05-22 | 58.62 |
| 2026-05-25 | 58.80 |
| 2026-05-26 | 60.19 |
| 2026-05-27 | 58.05 |
| 2026-05-28 | 58.35 |
| 2026-05-29 | 57.79 |
| 2026-06-01 | 57.21 |
| 2026-06-02 | 61.55 |
| 2026-06-03 | 62.69 |
| 2026-06-04 | 64.16 |
| 2026-06-05 | 60.40 |
| 2026-06-08 | 59.98 |
| 2026-06-09 | 59.25 |
| 2026-06-10 | 58.52 |
| 2026-06-11 | 59.58 |
| 2026-06-12 | 58.08 |
| 2026-06-15 | 60.95 |
| 2026-06-16 | 61.03 |
| 2026-06-17 | 59.87 |
| 2026-06-18 | 61.18 |
| 2026-06-19 | 62.44 |
| 2026-06-22 | 62.37 |
| 2026-06-23 | 60.91 |
| 2026-06-24 | 61.78 |
| 2026-06-25 | 61.86 |
| 2026-06-26 | 62.47 |
| 2026-06-29 | 63.37 |
| 2026-06-30 | 64.73 |
| 2026-07-02 | 62.55 |
| 2026-07-03 | 64.51 |
| 2026-07-06 | 64.85 |
| 2026-07-07 | 66.75 |
| 2026-07-08 | 67.12 |
| 2026-07-09 | 67.39 |
| 2026-07-10 | 67.64 |
| 2026-07-13 | 68.29 |
| 2026-07-14 | 68.08 |
| 2026-07-15 | 77.18 |
| 2026-07-16 | 76.18 |
| 2026-07-17 | 76.55 |
| 2026-07-20 | 75.09 |
| 2026-07-21 | 77.08 |
| 2026-07-22 | 71.91 |
| 2026-07-23 | 70.81 |
| 2026-07-24 | 70.77 |
| 2026-07-27 | 70.82 |
| 2026-07-28 | 67.43 |
| 2026-07-29 | 63.86 |
| 2026-07-30 | 65.16 |
| 2026-07-31 | 66.87 |
| 2026-08-04 | 70.22 |
| 2026-08-05 | 70.08 |
| 2026-08-06 | 68.27 |
| 2026-08-07 | 67.44 |
| 2026-08-10 | 64.37 |
| 2026-08-11 | 65.66 |
| 2026-08-12 | 64.50 |
| 2026-08-13 | 71.88 |
| 2026-08-14 | 73.14 |
| 2026-08-17 | 74.46 |
| 2026-08-18 | 71.41 |
| 2026-08-19 | 70.07 |
| 2026-08-20 | 69.83 |
| 2026-08-21 | 69.00 |
| 2026-08-24 | 68.57 |
| 2026-08-25 | 65.87 |
| 2026-08-26 | 67.35 |
| 2026-08-27 | 70.41 |
| 2026-08-28 | 66.74 |
| 2026-08-31 | 67.70 |
| 2026-09-01 | 64.69 |
| 2026-09-02 | 66.48 |
| 2026-09-03 | 68.04 |
| 2026-09-04 | 70.24 |
| 2026-09-08 | 73.28 |
| 2026-09-09 | 69.90 |
| 2026-09-10 | 72.57 |
| 2026-09-11 | 71.96 |
| 2026-09-14 | 72.61 |
| 2026-09-15 | 73.34 |
| 2026-09-16 | 75.50 |
| 2026-09-17 | 77.92 |
| 2026-09-18 | 77.87 |
| 2026-09-21 | 81.46 |
| 2026-09-22 | 83.15 |
| 2026-09-23 | 81.78 |
| 2026-09-24 | 79.81 |
| 2026-09-25 | 79.20 |
| 2026-09-28 | 78.46 |
| 2026-09-29 | 80.50 |
| 2026-09-30 | 82.03 |
| 2026-10-01 | 83.89 |
| 2026-10-02 | 85.41 |
| 2026-10-05 | 83.46 |
| 2026-10-06 | 83.21 |
| 2026-10-07 | 82.17 |
| 2026-10-08 | 80.39 |
| 2026-10-09 | 80.51 |
| 2026-10-13 | 82.79 |
| 2026-10-14 | 80.48 |
| 2026-10-15 | 77.17 |
| 2026-10-16 | 77.11 |
| 2026-10-19 | 76.39 |
| 2026-10-20 | 73.60 |
| 2026-10-21 | 73.78 |
| 2026-10-22 | 68.46 |
| 2026-10-23 | 69.10 |
| 2026-10-26 | 71.79 |
| 2026-10-27 | 73.04 |
| 2026-10-28 | 75.33 |
| 2026-10-29 | 76.15 |
| 2026-10-30 | 68.01 |
| 2026-11-02 | 70.30 |
| 2026-11-03 | 74.56 |
| 2026-11-04 | 72.17 |
| 2026-11-05 | 69.78 |
| 2026-11-06 | 68.28 |
| 2026-11-09 | 72.90 |
| 2026-11-10 | 72.80 |
| 2026-11-11 | 76.89 |
| 2026-11-12 | 76.65 |
| 2026-11-13 | 76.69 |
| 2026-11-16 | 75.18 |
| 2026-11-17 | 71.13 |
| 2026-11-18 | 73.05 |
| 2026-11-19 | 71.42 |
| 2026-11-20 | 69.45 |