AbraSilver Resource Corp. (TSX:ABRA) | 24 November 2026

Our maximum entry price is C$9.83 per share. At the verified 24 November 2026 TSX regular close of C$8.70, the rule says Buy for a five-year holding period ending 24 November 2031. The strongest contrary case combines US$35 silver, US$3,350 gold, US$144 million of extra construction capital, a C$6 equity issue and a one-year ramp delay: its C$7.55 unstressed hurdle entry is below the close, so the call would reverse. The base case is favored because the July 2026 feasibility study supports the resource and initial mine design, while the lower US$40 silver deck and explicit financing dilution already cut its headline economics; the financing and first production milestones remain decisive. Mine plan Funding

Stock Price History

Market close (CAD/share; 2026-11-24)
8.70
Base fair value (CAD/share)
11.35
Company details
Maximum entry price (CAD/share)
9.83

Issuer: AbraSilver Resource Corp.; listing TSX:ABRA; quoted currency CAD; sector Materials / silver-gold development. Evidence cutoff and quote close: 24 November 2026. Latest available interim filing: 30 September 2026, authorized 12 November. Present fair value is C$11.35; modeled 2031 equity exit is C$16.68 per economically diluted share. The C$9.83 entry is the C$10.59 five-year benchmark hurdle ceiling less a C$0.76 stress-only reserve, rounded to cents. The 2031 exit is a forecast, not a target-price quotation. Share basis Project NPV

Stock Price History

Closing Prices

DateClose (CAD)Entry (CAD)
2026-11-189.87
2026-11-199.25
2026-11-208.19
2026-11-239.10
2026-11-248.709.83

Source for the regular TSX daily closes, not adjusted for dividends: dated ABRA price history. The user-provided cutoff close was corroborated there. No dividends are declared in this period.

Investment Thesis

One ABRA share owns a diluted claim on the wholly owned Diablillos reserve mine plan, after funding the build and senior claims. The July study gives a 25-year life and US$3.003 billion after-tax NPV at 5% using US$50 silver and US$3,650 gold; those are project economics, not common equity value. Study Metals

Market Mispricing

At C$8.70 and 165.688 million basic shares, market equity is about C$1.442 billion. The market may be discounting financing, metal prices and schedule more than this model. The position is credible only if the US$964.84 million modeled debt/equity package can be obtained without a material stream. Shares Financing

Recent Developments

The feasibility study was filed July 2026; Worley began bridging engineering in August; 13 November board changes preceded financing and a targeted Q2 2027 final investment decision. The company had not disclosed binding project financing terms by the cutoff. Worley award Board update Financing

Earnings Outlook

The company has no operating revenue and lost C$44.391 million in nine months of 2026. Mine earnings do not start until the modeled late-2029 first doré and 2030 ramp. Loss First doré

Valuation Summary

The model uses the study's US$2.223 billion NPV8, adjusts metal prices, finances the build, rolls the residual project NAV to 2031 and divides remaining common equity by 276.75 million diluted shares. C$16.68 is the base exit, C$11.35 its 8% present value and C$9.83 the maximum entry after the benchmark and joint-stress reserve. NPVs Generated valuation

Recommended Action and Entry Price

Buy only at or below C$9.83 on this dated evidence. At the close, modeled stock return after 5 bp on each side is 13.88% annually, versus XIC's 7.49% after 3 bp each side, or 6.39 percentage points. The rule requires 2.00 percentage points; a full joint bear case fails. Return arithmetic

Catalysts

Signed financing and final investment decision in Q2 2027; first doré near November 2029; full-year 2030 realized metal and cost reports are the three milestones that can settle the base case. Schedule

Primary Risks to Thesis

Unfunded construction, an adverse metal deck, incomplete engineering and Argentina execution risk are material. The study's Class 3 cost range extends to +20%; even a delayed year and a smaller cost overrun can remove the entry margin. Cost range Funding