Allied Gold Corporation — first full equity research edition
Our maximum entry price is C$25.49 per share. AAUC closed at C$26.18 on the TSX on November 24, 2026, so the price rule is Wait. At US$3,600/oz gold, the finite-mine base fair value is C$30.45 and the no-distribution November 24, 2031 exit is C$44.80; the base net annual return at the close is 11.32%, versus 7.49% for the after-cost XIC benchmark and a 9.49% required return. The strongest credible paired mine stress—Kurmuk output 15% lower throughout the modeled mine life plus US$100m extra 2027 capital—reduces the entry to C$25.49 and reduces 2027 attributable cash to US$40.0m; US$3,000 gold alone reduces entry to C$15.04. The base case has more support than these stresses because Kurmuk poured first gold and the grid connection was energized by November 18, yet commercial production, full power reliability and its first gold sales were still pending. Peralta factual exhibit, first pour · Allied November 18 6-K, Kurmuk status · Q3 MD&A, Production Outlook and Kurmuk
- Market close (2026-11-24)
- 26.18
- Base fair value
- 30.45
Company details
- Maximum entry price
- 25.49
- 2031-11-24 exit value, no distributions
- 44.80
Decision convention. Five exact anniversary years end November 24, 2031. XIC is assumed to earn 7.5% gross annually, reduced by 3 basis points at purchase and sale. AAUC is charged 5 basis points each way. The required stock return is the net XIC rate plus 200 basis points. No dividend, buyback or acquisition benefit is credited. If a dated CAD cash distribution occurs, the public worksheet is designed to carry it to the horizon at 9.5% using actual days/365.25 and integer years on anniversaries; this edition has none. Decision worksheet · frozen inputs · decision output
All US dollar operating figures below are US$ millions unless a table says otherwise. The TSX share and entry are CAD. USD/CAD 1.4296 is the Bank of Canada November 24 observation, held flat in the model; foreign-exchange sensitivity is a material unresolved risk. Bank of Canada daily digest, USD/CAD November 24 The close and XIC close of C$26.18 and C$54.34 are the batch's independently verified regular TSX closes for November 24. Next reviews: 2026 year-end commercial-production confirmation; Q1 2027 Kurmuk ounces, power uptime, capital and cash receipts; 2027 reserve/resource statement.
Investment Thesis
The current common share owns an 80% economic exposure to Sadiola, approximately 89.89% of Bonikro and 85% of Agbaou, and an expected 93% economic exposure to Kurmuk after Ethiopia's conditional 7% interest. It also bears the Kurmuk stream, prepaid gold deliveries, closure obligations and finite reserves. We value only a ten-year mine schedule through 2036, without perpetuity or value for unclassified Tsenge discovery. Q3 MD&A, footnote to Mineral Reserves and Resources and asset descriptions · 2025 AIF, Mineral Properties
Market Mispricing
The close is C$4.27 below our C$30.45 fair value, but C$0.69 above our C$25.49 entry ceiling. Fair value capitalizes the uncertain mine plan; entry also requires the 200-basis-point advantage over net XIC to survive the paired Kurmuk stress. Gold price is the dominant single input: at US$3,000/oz, fair value is C$15.80. The market price by itself does not prove the mine schedule is wrong. Model and scenarios
Recent Developments
The planned Zijin takeover was terminated in July; Zijin instead bought 12.8m new common shares for C$416.64m on August 10. Those shares and their proceeds are already in the September balance sheet and current denominator; no takeover premium or second cash receipt is added. Kurmuk poured first gold in November, while the November 18 update still anticipated December sales and completion of full power infrastructure. Allied August 10 placement release · November 18 6-K
Earnings Outlook
Management guides 615–670koz consolidated 2027 production, including Kurmuk 240–270koz. Our probability-weighted 2027 schedule is 616.8koz, comprising Sadiola 205.0koz, Kurmuk 216.8koz and Côte d'Ivoire 195.0koz. The guided physical schedule is more optimistic than our expected Kurmuk ramp. The base 2027 attributable cash after growth capital, corporate expense and prepaid deliveries is US$169.9m, far below a gold-price-times-AISC shorthand. Peralta factual exhibit, 2027 guidance · Q3 MD&A, Production Outlook · valuation schedule
Valuation Summary
The 2027–36 discounted, attributable mine cash is US$3,193.0m; after net opening cash and separate claims, equity NAV is US$3,180.0m, or C$30.45 across 149.3m economically diluted shares. Accumulated cash through November 2031 plus the then-remaining finite NAV gives C$44.80/share. The return at today's close is 11.32% net of stock trading costs, 3.83 percentage points above net XIC, but the stress-protected purchase price is lower than today's close. Public model · exact outputs
Recommended Action and Entry Price
Wait for C$25.49 or less, subject to unchanged evidence and exchange rate. At the present C$26.18 close the base return clears the hurdle, but the joint ramp/capital stress does not. If the Q1 2027 Kurmuk disclosure demonstrates more than 55koz at sustained grid power with no capex escalation, rerun the probability and entry rather than mechanically placing an order. No trading instruction or portfolio size is implied.
Catalysts
Commercial production confirmation and December gold receipts test whether prepaid delivery and stream deductions are modeled on the correct timetable. The first-quarter 2027 report tests management's 55–65koz Kurmuk quarter target; the 2027 reserve update tests whether discovery can extend finite mine life. Sadiola's pre-leach thickener is targeted for Q2 2027 and its 7Mt/y expansion for H1 2029. November 18 6-K · Q3 MD&A, Sadiola and Kurmuk Outlook
Primary Risks to Thesis
Gold at US$3,000, an extended Kurmuk power/ramp delay, and more costly Sadiola expansion each consume the excess return. Mali political and fiscal exposure, cash taxes, VAT collections, option/convert dilution and host-government interests all reduce cash to this share. Mine lives are finite; inferred resources do not yet support cash flow. Q3 MD&A, Risks and Mineral Resources
Company Overview
Allied is a Canadian-listed African gold producer with Sadiola in Mali, Bonikro and Agbaou in Côte d'Ivoire, and newly producing Kurmuk in Ethiopia. Consolidated statements include subsidiaries at 100% and show non-controlling interests separately; our valuation attributes mine cash once. 2025 AIF, Description of Business · Q3 financials, statement of financial position
Products and Services
The product is payable gold, sold at market prices except ounces committed under hedges, prepays and streams. The model explicitly deducts remaining 2027 prepaid deliveries and the economic discount on Kurmuk streamed ounces. The 2026 collars terminate in December and do not suppress modeled 2027–36 prices. Q3 financials, Notes 11 and 16 · Q3 MD&A, Commodity Hedges
Business Model
Ore grade, processed tonnage and recovery determine saleable ounces; realized price less cash mining, royalties, sustaining investment, development spending and taxes determine cash. AISC includes sustaining items but excludes Kurmuk/Sadiola growth capex, cash taxes and financing. The worksheet starts with annual production and AISC as a cost proxy, then separately subtracts growth capital, cash taxes, corporate costs, streams and prepaid ounces. Q3 MD&A, Non-GAAP AISC definition and operational tables
Revenue Drivers
In Q3 2026, consolidated production was 91,195oz and sales 92,532oz; nine-month production was 284,640oz and sales 286,380oz. Gold prices drove revenue to US$358.1m in Q3 and US$1,118.5m in nine months. Future volume is dominated by Kurmuk's first full year and Sadiola's uncertain 2029 expansion. Q3 MD&A, Operating Results Summary · Q3 financials, earnings statement revenue row
Cost Structure
Nine-month AISC was US$2,277/oz sold and Q3 AISC US$2,378/oz; Sadiola's Q3 AISC was US$2,876/oz. We do not project this consolidated measure as a uniform margin. Base 2027 AISC assumptions are US$2,400 Sadiola, US$1,700 Kurmuk and US$2,000 Côte d'Ivoire, with separate operating and development risk. Q3 MD&A, consolidated and Sadiola key performance tables
Operating Levers
The Kurmuk commissioning schedule, Sadiola fresh-ore recovery and Bonikro stripping are the principal levers. Sadiola's planned pre-leach thickener could support 200–230koz before a larger expansion; we include 70% of its incremental expansion ounces and the matching 70% of US$200m assumed capital. This is an analyst probability, not issuer guidance. Q3 MD&A, Sadiola Outlook and Bonikro Stripping
Distribution
Gold is shipped to buyers or delivered in kind under existing contracts. Management intends to consider a 2027 base dividend and an NCIB, but neither was an approved cash entitlement at the cutoff; the shareholder model sets distributions and repurchases to zero. Q3 MD&A, Capital Allocation
Geographic Exposure
Mali supplies Sadiola cash and state ownership; Côte d'Ivoire supplies the CDI complex; Ethiopia supplies Kurmuk and its conditional state interest. Concentration in these jurisdictions can affect permits, power, repatriation and tax timing. The model applies mine-level interests before aggregating and does not subtract NCI book equity again. 2025 AIF, Properties and Risks · Q3 MD&A, reserve ownership footnote
Regulatory Environment
Mine licences, environmental permits, reclamation obligations, royalties and host-government interests govern cash realization. Kurmuk's state economic participation begins after commercial production and specified public commitments; the model assumes it applies, a conservative treatment versus current legal ownership. Q3 MD&A, Mineral Reserve ownership footnote
Industry Structure
Gold miners are price takers in a global metal market. AISC and reinvestment, rather than brand or contract pricing, determine the ability to convert bullion prices into shareholder cash. Reserves and permitting constrain the duration of a mine's output. 2025 AIF, Gold Industry and Mineral Properties
Growth and Cyclicality
AAUC's growth is project-led: management expects 615–670koz in 2027 and about 800koz by 2029. Those are targets, not achieved ounces. Our expected schedule peaks around 755koz in 2029 and declines to 588koz by 2036 as modeled pits deplete; there is no perpetual terminal value. Q3 MD&A, production outlook · finite schedule
Competitors
Endeavour Mining is a useful West African operating comparator; its nine-month 2026 production was 820koz at US$1,866/oz AISC. B2Gold spans different jurisdictions and guided 2026 AISC of US$2,230–2,410/oz. Both confirm that Allied's nine-month US$2,277/oz AISC is not a universal industry cost, while neither validates Allied's future Kurmuk cost. Endeavour Q3 2026 results, highlights · B2Gold Q3 2026 results, guidance
Market Share
Gold is a fungible global commodity; a company-level market-share percentage would not explain AAUC's price. Scale matters through procurement and corporate cost absorption, so the model holds US$90m annual corporate cash expense despite the planned volume increase. This is an analyst estimate anchored to nine-month 2026 G&A of US$107.0m, which includes noncash and irregular items. Q3 financials, earnings statement G&A row
Competitive Advantages
The adjacent Bonikro and Agbaou plants offer blending and logistics flexibility, and Kurmuk has a long-term power purchase agreement. These can lower cost or improve uptime, but the Q3 Sadiola cost and November Kurmuk power work show execution has not yet been proven. Q3 MD&A, CDI Complex and Kurmuk sections · November 18 6-K
Pricing and Cost Position
At US$3,600 gold, Allied's observed nine-month AISC consumes 63.3% of gross price; Endeavour's consumes 51.8%. This is an operating-cost comparison, not an equity multiple or forecast, because definitions, royalties, mine maturity and development capital differ. The base Kurmuk cost is a judgmental US$1,700/oz in 2027. Q3 MD&A, AISC table · Endeavour Q3 highlights
Entry Barriers and Substitutes
Permitted reserves, mills, power and financing are entry barriers. XIC is the relevant alternative for this investor's hurdle, with the same November 24 start and transaction cost convention. Owning bullion instead would remove operational and dilution risk but also remove mine operating leverage. 2025 AIF, material properties
Supplier and Customer Dynamics
Fuel, power, contractors and consumables can erode the benefit of a higher bullion price. Allied explicitly cited geopolitical pressure on transport, fuel and consumables in Q3; the model raises royalty costs above its US$3,600 deck and tests a higher discount rate, but does not claim full inflation protection. Q3 MD&A, consolidated cost discussion
Regulation and Structural Risks
Mali's state participation, Ethiopia's conditional 7% Kurmuk interest, tax settlements and working-capital recovery can alter cash that reaches the parent. Inferred resources are excluded because the issuer itself warns they lack demonstrated economic viability. Q3 MD&A, Mineral Reserve notes and tax discussion
Historical Performance
Revenue grew from US$730.4m in 2024 to US$1,331.8m in 2025. Nine-month 2026 revenue was US$1,118.5m versus US$904.0m a year earlier, while nine-month production rose from 262.1koz to 284.6koz. Higher gold prices helped, but the nine-month 2026 operating cash was only US$2.2m after cash tax and working-capital demands. FY2025 financials, earnings and cash-flow statements · Q3 financials, earnings and cash-flow statements
Income Statement Analysis
Q3 2026 revenue of US$358.1m less cash cost of sales of US$200.5m and DDA of US$23.0m gave US$134.5m gross profit. Nine-month gross profit was US$474.1m; nine-month G&A US$107.0m and cash/income tax timing prevent treating gross profit as free cash. Revaluation of financial instruments was a US$17.7m nine-month loss and is excluded from mine cash forecasts. Q3 financials, condensed earnings statement, revenue through revaluation rows
Balance Sheet Analysis
At September 30 cash was US$379.1m, receivables US$178.2m current plus US$49.3m non-current, inventories US$323.5m and PP&E US$1,605.5m. Current borrowings US$153.2m represent convertible debt; the modeled 149.3m share denominator includes 6.2m conversion shares, so that fair-value debt is not also subtracted. Lease obligations US$28.4m, deferred/contingent consideration US$73.7m and the US$190.0m closure provision are deducted once. The US$417.2m deferred-revenue balance is not deducted again because future streamed/prepaid ounces are removed from mine cash. Peralta factual exhibit, cash and claims · Q3 financials, balance sheet and Notes 16–21
Cash Flow Analysis
Nine-month 2026 pre-tax/pre-working-capital operating cash was US$411.3m, but US$180.3m cash tax and US$228.8m working-capital use reduced CFO to US$2.2m. Investing used US$363.8m. The US$298.9m equity offering supported liquidity rather than recurring operating cash. The forecast assumes incremental stockpile and VAT build normalizes; failure to recover the US$90.2m current VAT claim is a direct downside to NAV. Peralta factual exhibit, CFO · Q3 financials, cash-flow statement and Note 12 · Q3 MD&A, cash-flow discussion
Earnings Quality
Year-to-date statutory earnings are a weak cash proxy because mark-to-market gains/losses, stream accounting, capitalized stripping and unusually large working-capital movements intervene. The model does not add noncash DDA to AISC cash margin and then deduct the same sustaining investment again. Its cash margin is still an estimate because site-specific cost guidance and taxes will change with operations. Q3 financials, cash flow reconciliation · Q3 MD&A, AISC definition
Nonrecurring Items
The terminated Zijin sale is not an asset realization. The separate August share placement is completed and reflected in cash and shares. The September US$25m gold advance for 5,978oz was settled October 21 and receives no second model deduction. Changes in the convertible fair value are not cash claims above the contractual redemption amount. Q3 financials, Note 16 subsequent events and Note 17 · Q3 MD&A, financing instruments
Funding and Cash Conversion
The model uses US$100m Q4 2026 cash use after September, including an estimated US$43.6m for the first three months of prepaid delivery, then US$169.9m attributable cash in 2027 after US$130.7m of prepaid gold's foregone spot receipts. It carries residual cash with the company and assumes no buyback, dividend or further financing. In the joint stress, 2027 modeled cash remains positive at US$40.0m; gross cash also covers near-term capital despite the negative net-cash-and-claims valuation bridge. If VAT, tax or capex outflows repeat at the 2026 rate, this liquidity conclusion must be rechecked. Q3 financials, cash and deferred revenue · model
Key Ratios
Nine-month 2026 CFO/revenue was 0.2%; 2025 CFO/revenue was 38.6%, inflated by stream proceeds and a more favorable working-capital period. September cash to recorded borrowings was 2.47×, but conversion, lease, prepay and closure obligations make that a poor standalone safety measure. The observed nine-month AISC/US$3,600 deck is 63.3%. FY2025 financials, cash flow · Q3 financials, cash flow and balance sheet
Forward Outlook
Three frozen tests, all Peralta estimates except the disclosed comparison target: (1) 2027 total produced gold, 616.8koz base, 584koz joint-ramp downside, 643koz management midpoint upside reference; settled by FY2027 operations. (2) 2027 Kurmuk production, 216.8koz probability-weighted base, 184.2koz joint downside, 255koz guidance midpoint; settled by FY2027 mine table, with Q1 2027 55–65koz as the first checkpoint. (3) 2027 attributable cash after growth capital, corporate expense and prepaid ounces, US$169.9m base versus US$40.0m joint downside and US$362.8m upside at US$4,200 gold; settled by FY2027 CFO, capital spending, stream/prepay ounces and NCI disclosures. The third figure is a model diagnostic, not management guidance. Q3 MD&A, outlook · model output
Model Choice
A ten-year finite, attributable mine cash NAV is more appropriate than an AISC multiple or perpetuity. Annual ounces through 2036 cannot exceed disclosed group reserves in aggregate, and no value is assigned beyond the explicit schedule or to unproved Tsenge mineralization. The model discounts mine cash at 10% and holds the November 24 USD/CAD rate flat. This rate is an analyst required return for gold-price, geopolitical, development and foreign-exchange uncertainty; at 12% fair value falls to C$27.85. 2025 AIF, reserves and resource caveat · model output
Growth
Sadiola starts at 205koz in 2027 plus a 70%-weighted 2029 expansion increment of 100koz; Kurmuk starts at 255koz physical plan with 85% ramp weighting in 2027 and 90% thereafter; CDI starts at 195koz. Sadiola's 70% probability applies to both incremental ounces and expansion capital. Kurmuk's capex is not probability discounted because committed start-up spending can occur even if ramp misses. Through 2036 the schedule declines; no terminal growth is credited. Q3 MD&A, Sadiola/Kurmuk/CDI plans · frozen inputs
Profitability
Gold is fixed at US$3,600/oz in the base, with US$3,000 and US$4,200 alternatives. AISC varies by mine and year; 28% of positive site cash margin is charged as an estimated cash tax. Above US$3,600, a further 5% of the gold-price increase is allocated to price-linked royalty costs. Kurmuk's stream removes 6.7% of gold value while returning 15% spot cash, a 5.695% net gross-price drag until 220koz are delivered; a 4.8% rate applies thereafter. At the modeled outputs the threshold is not reached by 2036, so the lower rate adds no value. Peralta factual exhibit, stream terms · Q3 MD&A, streaming agreement and asset AISC · model
Reinvestment or Required Capital
Sadiola expansion requires a modeled US$200m across 2027–28 at 70% probability, paired with its probability-weighted output from 2029. Kurmuk uses US$100m 2027 completion and US$20m 2028; CDI US$90m through 2029. These are analyst cash allowances where the issuer does not provide a fully binding detailed project schedule. Sustaining investment is included in the AISC proxy, while incremental growth capital is deducted separately. Q3 MD&A, capital guidance and Sadiola expansion · model inputs
Discount Rate
The 10% USD nominal NAV discount rate is a judgment, not a measured market WACC. It compensates for a diversified miner's project, country and commodity exposure after probability adjustments. An independent 12% rerun lowers fair value by C$2.60 to C$27.85, while the horizon entry changes only to C$27.89 because retained cash dominates the 2031 wealth calculation. The entry constraint remains the joint operating stress. sensitivity output
Terminal Economics
There is no perpetuity. In 2031 the schedule still models 752koz, US$662.9m attributable cash and five further years of declining mine output. In 2036 it models 588koz and US$414.0m cash, then zero incremental reserves and zero terminal sale proceeds. The US$190.0m closure provision is deducted in the opening common-equity bridge once; the future cash schedule does not deduct it again. This is a conservative zero-value end for unmodeled resources, although an underestimated post-2036 closure bill would still lower value. Q3 financials, closure provision · finite output
Bridge to One Common Share
The last reported nine-month CFO was US$2.2m. From its disclosed US$411.3m before tax/working capital, subtract US$180.3m tax and US$228.8m working-capital use to reconcile to US$2.2m. These 2026 movements are not used as a 2027 run rate; the first modeled 2027 attributable cash is US$169.9m, after US$130.7m prepaid gold, US$90m corporate cost and explicit development spending. The unexplained cash residual is zero by construction but the future normalization of VAT/stockpiles is unverified. Q3 financials, cash-flow statement · model
| Common equity bridge | US$m |
|---|---|
| Sep 30 cash | 379.1 |
| Estimated Q4 2026 net cash use | (100.0) |
| Lease obligations | (28.4) |
| Deferred/contingent consideration | (73.7) |
| Closure provision | (190.0) |
| Net opening cash and claims | (13.0) |
| PV of finite 2027–36 attributable cash | 3,193.0 |
| Equity NAV | 3,180.0 |
| CAD/share at 1.4296, 149.3m diluted shares | 30.45 |
The 149.3m denominator combines 140.5m basic, 2.2m options, 0.4m units and 6.2m convertible shares disclosed in the November share table. Conversion is assumed, so US$153.2m fair-value convertible borrowing is not subtracted as a claim. The gross cash already includes the August Zijin placement. Mine cash is attributed at 80% Sadiola, 87% blended CDI and 93% Kurmuk; NCI book equity is not deducted again. Peralta factual exhibit, diluted shares · Q3 MD&A, Capitalization table and ownership footnote · Q3 financials, Notes 16–21
Price-Implied Expectations
The base fair value exceeds the C$26.18 close by C$4.27; the entry ceiling is C$4.96 below fair value, yielding a net C$0.69 wait gap. At unchanged output, cost and 10% NAV discount, the five-year no-distribution hurdle at the market close requires approximately US$3,499/oz gold, 2.8% below our US$3,600 deck. This is a conditional market-implied gold equivalent, not consensus or a forecast of spot. A persistent price below US$3,499 with unchanged volume would invalidate the base's excess-return case; a 15% Kurmuk volume loss plus US$100m capex already takes the entry below today's close. model · decision output
Independent Cross-Check
At US$3,600, base NAV is approximately 1.16× the observed close. The US$3,000 deck cuts value by C$14.65/share and the entry by C$10.45, exposing greater gold leverage than the 12% discount-rate test. Endeavour's lower observed AISC demonstrates that some peers convert bullion into mine margin better, but its geography, mine portfolio and capital obligations prevent transplanting its ratio into AAUC. Endeavour Q3 results · sensitivity output
Conclusion and Change from Prior Edition
This is a same-cutoff editorial correction to AAUC's first Markdown publication; no operating inputs or economic outputs changed. The key decision is Wait at C$26.18, despite C$30.45 base fair value, because C$25.49 is the maximum stress-protected entry. The largest open valuation issue is the path from commissioned Kurmuk gold to stable, fully financed deliveries under its stream and prepaid contracts.
Peer Selection
Endeavour offers a West African producing peer; B2Gold offers a geographically mixed gold operator with a Mali mine. These are operating-cost comparators, not direct NAV substitutes. Their released Q3 2026 data and Allied's Q3 data were available by the November 24 cutoff. Endeavour Q3 release · B2Gold Q3 release
Dated Ratio Table
| Issuer and observation | Production | AISC, US$/oz | AISC / US$3,600 deck | Source |
|---|---|---|---|---|
| Allied, 9m ended 2026-09-30 | 284.6koz | 2,277 | 63.3% | Q3 MD&A, Operating Results Summary |
| Endeavour, 9m ended 2026-09-30 | 820koz | 1,866 | 51.8% | Q3 highlights |
| B2Gold, 2026 guidance | N/A here | 2,230–2,410 | 61.9–66.9% | Q3 revised guidance |
Comparability Adjustments
The ratio denominator is the same hypothetical US$3,600 gold deck, not each issuer's realized sales price; it is therefore a normalized cost burden, not historical gross margin. B2Gold is forward guidance while the other rows are nine-month actuals. AISC definitions differ and exclude expansionary projects and tax, so the table cannot be used as a free-cash-flow multiple.
Implications for Value
Endeavour's 51.8% cost burden versus Allied's 63.3% observed burden argues against assuming immediate cost convergence. Our Kurmuk 2027 US$1,700/oz cost is less than Allied's historical aggregate; if it fails, the stress ceiling is the relevant price. No peer market multiple is imported into the finite mine NAV.
Bear Case
At US$3,000/oz with unchanged physical schedule, fair value is C$15.80 and entry C$15.04. This is a price-cycle stress, not a claim that the current spot has fallen. It shows that gold volatility can erase a C$26.18 purchase's return even with otherwise successful operations. model output
Base Case
US$3,600 gold, conditional ramp/expansion probabilities, explicit prepaid deliveries and zero dividends yield C$30.45 fair value, C$44.80 five-year exit and C$28.45 hurdle-only ceiling. The required joint Kurmuk protection reduces the actionable ceiling by C$2.96 to C$25.49. model output
Bull Case
US$4,200 gold with unchanged volumes and a 5% incremental royalty drag produces C$44.34 fair value and C$41.16 entry. This is a sensitivity, not a credible basis to pay above the market without an observable gold-price and cost change. model output
Outcomes at Close and Entry
| Assumption | Close | Fair value | Maximum entry | Price rule |
|---|---|---|---|---|
| Base | 26.18 | 30.45 | 25.49 | Wait |
| Gold US$3,000 | 26.18 | 15.80 | 15.04 | Wait |
| Gold US$4,200 | 26.18 | 44.34 | 41.16 | Buy |
| Kurmuk 15% lower + US$100m capex | 26.18 | 27.02 | 25.49 | Wait |
| 12% discount | 26.18 | 27.85 | 27.89 | Buy |
The table's base row uses the actionable maximum entry of C$25.49, constrained by the joint-stress hurdle; the no-stress hurdle-only ceiling is C$28.45. That paired stress could coincide if delayed reliable power reduces 2027–36 deliverable ounces while start-up repairs and remaining works increase 2027 capital. The joint assumption is deliberately persistent for output, making it stronger than a one-quarter delay. November's first pour supports the base, while power-stabilizer work and December sales remain unproven. November 18 6-K · model
Market-Implied Case
Solving the model at the close for the 9.49% net hurdle gives US$3,499/oz gold, with all mine volumes, costs, taxes, FX, shares and zero distributions fixed. At the same US$100m capex overrun, Kurmuk production must be at least 89.31% of the base expected schedule for the market close to clear the hurdle. This is a measurable operating/price pair, not evidence that either number is management guidance. model
Analyst Assessment
The C$30.45 fair value is plausible but more fragile than its C$4.27 discount suggests. The original independent challenge identified prepaid ounces, the stream, conditional Ethiopian ownership and convertible share treatment; they are explicitly in the model. The close fails the joint downside ceiling by C$0.69. The first decisive test is Kurmuk Q1 2027 output and full-power availability, followed by fiscal 2027 capex and cash realization. Q3 financials, Notes 16–18 · November 18 update
Operating Risks
Kurmuk underproduction and Sadiola high AISC reduce mine cash; a 15% Kurmuk shortfall with US$100m additional capital reduces the no-stress hurdle ceiling of C$28.45 to the actionable C$25.49, leaving Wait at the close. Q1 2027 Kurmuk ounces, grid uptime and capital commitments are the measurable trigger. Q3 MD&A, Kurmuk and Sadiola · stress output
Financial and Liquidity Risks
The 2026 nine-month CFO was US$2.2m after taxes and working capital despite high gold prices. A US$90.2m current VAT receivable and gold delivery obligations can keep cash tied up; recurring working-capital use would lower NAV dollar for dollar before tax effects. The convertible assumption avoids double counting debt but may be too dilutive or too favorable if the share price remains below its conversion strike and redemption is required. Q3 financials, Note 12, Note 16, Note 17 and cash-flow statement
Regulatory and Legal Risks
Mali, Côte d'Ivoire and Ethiopia host rules affect ownership, royalties, taxes, environmental remediation and capital mobility. We deduct recorded closure provision and state participation; new fiscal settlements or a change in Kurmuk's 7% state interest would require a rerun. 2025 AIF, Risk Factors · Q3 MD&A, ownership footnote
Industry and Competitive Risks
At US$3,000 gold the entry falls to C$15.04; no amount of operational execution in the unchanged model restores the US$3,600 case. A stronger US dollar against CAD would raise the CAD NAV; the inverse would lower it. The flat 1.4296 FX assumption does not hedge either outcome. gold sensitivity · Bank of Canada November 24 USD/CAD
Thesis-Specific Risks and Reconsideration Triggers
The 2027 Kurmuk mine table should show at least 240koz physical production to vindicate management's low guidance; our expected value is 216.8koz. A result below 184koz, or final capital more than US$100m above our allowance, calls for the joint stress or worse. The 2027 mineral reserve/resource statement must establish economic reserves before additional Tsenge ounces get value. Q3 MD&A, guidance and exploration
Environmental Factors
The September balance sheet records US$190.0m reclamation and closure provision; the MD&A shows about US$238.6m undiscounted future reclamation cash. We subtract the recorded present liability once and set zero residual mine value after 2036. A larger engineering requirement or earlier closure would reduce value. The issuer reported no significant Q3 environmental incident, which does not eliminate long-tail costs. Q3 financials, closure provision · Q3 MD&A, contractual obligations and sustainability
Social Factors
The Q3 total-recordable-injury rate rose to 2.91 from 1.21 for FY2025, with incidents at Kurmuk contributing. Additional safety controls can raise costs or slow the ramp; this supports retaining a ramp probability below 100%. Q3 MD&A, Sustainability, Health and Safety Highlights
Governance Factors
The halted Zijin takeover and completed strategic placement create a large owner with participation/top-up rights. Zijin disclosed 9.2% after the placement. Helikon's November 12 Schedule 13G/A disclosed 20.94m shares, 15.02% of a September 30 denominator; this is a dated beneficial-ownership statement and can differ from the later basic count. Funding decisions and promised shareholder returns require scrutiny because project spending and dilutive securities compete with dividends. Zijin placement release · Helikon 13G/A, Item 4 and cover
Financially Material Risks and Opportunities
Safe, reliable Kurmuk operations and Sadiola energy efficiency can improve mine cash; power interruptions and remediation add both lost ounces and capital. Our paired stress assigns a C$2.96/share reduction to the entry ceiling. No separate ESG premium or penalty is layered onto that already-stressed cash schedule. November 18 6-K · stress output
The numeric rows below locate to the SEC filing's consolidated statements of earnings, page 4 for Q3 and its audited annual earnings statement for FY2025. Q3 statement, p. 4
Annual Results
| US$m unless stated | FY2024 | FY2025 | Source |
|---|---|---|---|
| Revenue | 730.4 | 1,331.8 | audited earnings, Revenue |
| Cost of sales excluding DDA | (462.5) | (753.5) | audited earnings, Cost of sales |
| DDA | (47.6) | (71.7) | audited earnings, DDA |
| Gross profit | 220.2 | 506.5 | audited earnings, Gross profit |
| Net income | (119.6) | 3.3 | audited earnings, Net earnings |
Interim Results
| US$m | 9m 2025 | 9m 2026 | Q3 2026 | Source |
|---|---|---|---|---|
| Revenue | 904.0 | 1,118.5 | 358.1 | Q3 earnings, Revenue |
| Cost of sales excluding DDA | (547.7) | (583.6) | (200.5) | Q3 earnings, Cost of sales |
| DDA | (57.3) | (60.8) | (23.0) | Q3 earnings, DDA |
| Gross profit | 299.0 | 474.1 | 134.5 | Q3 earnings, Gross profit |
| G&A | (75.2) | (107.0) | (21.4) | Q3 earnings, G&A |
Trailing Results
Trailing twelve-month revenue to September 30, 2026 is US$1,546.3m = FY2025 US$1,331.8m less 9m 2025 US$904.0m plus 9m 2026 US$1,118.5m. Trailing gross profit is US$681.6m by the same rule. These IFRS perimeter measures include the old operating portfolio and only start-up Kurmuk contribution, so they are a bridge, not a direct 2027 forecast. FY2025 audited earnings · Q3 interim earnings
Material Adjustments
The worksheet excludes financial-instrument remeasurement from mine cash, attributes subsidiary cash to common ownership and treats prepaid deliveries as foregone future spot receipts. No extra-week or discontinued-business adjustment is required because both periods are calendar years. There is no unexplained arithmetical residual in the reported-to-forecast bridge; economic uncertainty is in working-capital normalization and the mine cost assumptions. Q3 financials, earnings and cash-flow statements
Annual Positions
| US$m at December 31 | 2024 | 2025 | Source |
|---|---|---|---|
| Cash | 225.0 | 479.8 | audited financial position, Cash |
| Inventories, current + non-current | 207.3 | 210.2 | audited financial position, Inventories |
| Mineral PP&E | 795.6 | 1,240.6 | audited financial position, Mineral property |
| Borrowings | 96.4 | 154.3 | audited financial position, Borrowings |
Interim Positions
| US$m at September 30, 2026 | Amount | Source |
|---|---|---|
| Cash | 379.1 | interim position, Cash |
| Inventories, current + non-current | 323.5 | interim position, Inventories |
| Mineral PP&E | 1,605.5 | interim position, Mineral property |
| Borrowings, convertible | 153.2 | interim position, Borrowings |
| Lease liabilities | 28.4 | interim position and Note 18 |
| Deferred/contingent consideration | 73.7 | interim position, current + non-current |
| Closure provision | 190.0 | interim position, reclamation |
| Deferred revenue, current + non-current | 417.2 | interim position, Deferred revenue |
Capital and Claims Reconciliation
The share bridge uses conversion: 149.3m diluted shares and no US$153.2m convertible debt deduction. The lease, deferred consideration and closure liabilities total US$292.1m and are deducted from cash once; future mine cash excludes lease principal and closure cash to avoid duplicate accounting. Deferred revenue is economically serviced through the modeled stream and 2027 prepaid ounces, so it is not a further US$417.2m subtraction. NCI is reflected in production cash attribution, not by subtracting US$101.6m book NCI. Tax payable and operating working capital remain a sensitivity because a mine-level model cannot precisely time their settlement. Q3 financials, balance sheet and Notes 16–21 · Q3 MD&A, capitalization
The interim rows locate to the SEC filing's consolidated statements of cash flows, page 7, and annual rows to the audited annual cash-flow statement. Q3 statement, p. 7
Annual Flows
| US$m | FY2024 | FY2025 | Source |
|---|---|---|---|
| Operating before tax and working capital | 321.3 | 637.0 | audited cash flow, operating reconciliation |
| Income tax paid | (35.7) | (33.3) | audited cash flow, tax |
| CFO | 110.8 | 514.0 | audited cash flow, CFO |
| Investing | (193.4) | (432.1) | audited cash flow, Investing |
Interim Flows
| US$m | 9m 2025 | 9m 2026 | Q3 2026 | Source |
|---|---|---|---|---|
| Before tax/working capital | 409.9 | 411.3 | 115.6 | interim cash flow, subtotal |
| Tax paid | (33.3) | (180.3) | (40.1) | interim cash flow, tax |
| CFO | 325.9 | 2.2 | 12.3 | interim cash flow, CFO |
| Investing | (335.8) | (363.8) | (95.6) | interim cash flow, Investing |
Trailing Flows
Trailing CFO through September 2026 is US$190.3m = 2025 US$514.0m less first-nine-month 2025 US$325.9m plus first-nine-month 2026 US$2.2m. Trailing investing use is US$460.1m by the same method. The resulting negative US$269.8m simple CFO-less-investing measure shows why the model must explicitly fund growth and why accounting gross profit cannot be paid out. FY2025 audited cash flow · Q3 interim cash flow
Reconciliation to Common Shareholders
The model converts annual ounces to price less AISC, subtracts stream economics, cash tax, site growth capital, corporate expense and remaining 2027 prepaid spot receipts, then multiplies by mine-level common ownership. 2027 US$169.9m is retained as cash, not distributed; 2028 US$490.7m and later positive residuals are likewise retained without a buyback premium. The other use of cash is the separate Q4 2026 US$100m allowance. No refinancing proceeds or shareholder dividends enter the return. If management pays dividends, the same cash must leave the terminal balance and be carried under the dated-distribution convention, not counted twice. model output · Q3 MD&A, proposed capital allocation
Primary Sources and Locators
The HTML source files in this package are original SEC EDGAR bytes, retained for public audit. The separate Peralta factual exhibit PDF reconstructs selected numeric rows and opens with claim-specific in-reader highlights; its source lines identify the corresponding SEC originals. The first citations above name the original filing section, statement, note or row; the external EDGAR version is also linked below. Where SEC HTML has no stable row anchor, the named row and exact quoted number are the locator. The original SEC HTML files do not support the PDF reader highlight; each factual-exhibit highlight must therefore be checked against the named EDGAR row, not mistaken for an original PDF highlight.
| Original, date | Locator used for decision | Public original |
|---|---|---|
| Q3 2026 interim financial statements, Nov 4 | Financial position cash/claims; cash-flow CFO/tax/working capital; Notes 12, 16–21 | SEC original · package copy |
| Q3 2026 MD&A, Nov 4 | Production Outlook, asset KPI tables, Capitalization, streaming, AISC definition, ownership footnote | SEC original · package copy |
| FY2025 audited financial statements, Apr 1 | 2025/2024 earnings, financial position and cash-flow rows | SEC original · package copy |
| FY2025 AIF, Apr 1 | properties, mineral estimates and material risks | SEC original · package copy |
| Kurmuk update, Nov 18 | grid stabilization, first sale and commercial-production timeline | SEC original · package copy |
| Peralta factual excerpt, Nov 25 | selected EDGAR numeric rows, pages 1–4; reconstruction beside originals | highlighted exhibit |
| Bank of Canada, Nov 24 | Daily digest, USD/CAD = 1.4296 | daily digest |
Frozen Inputs and Assumptions
Frozen public JSON distinguishes observed close, FX, September claims and diluted denominator from analyst judgments on gold, tax, cash use, project probabilities, AISC and capital. Most important: 149.3m economically diluted shares; US$3,600 gold; 10% USD NAV discount rate; 80% Sadiola, 87% blended CDI, 93% Kurmuk attribution; 36.315koz prepaid 2027 deliveries; Kurmuk 6.7% stream at 15% spot cash; US$100m Q4 2026 cash use. The CDI blended 87% is an approximation to separately disclosed 89.89% Bonikro and 85% Agbaou because forecast sub-mine ounces are not available. A two-percentage-point CDI ownership error moves the NAV by less than C$0.5/share at the frozen schedule. Peralta factual exhibit, ownership and stream · Q3 MD&A, ownership, streaming and production
Worksheets and Saved Outputs
Run from this edition folder using Python 3.12.13: PYTHONDONTWRITEBYTECODE=1 PYTHONPATH=. /Users/johnperalta/johnperalta4vanilla/.venv/bin/python support/valuation.py. It uses only the standard library and public frozen inputs; it regenerates the linked Markdown and exact JSON. The 2027–36 cash schedule is finite. The November 2031 exit is accumulated modeled cash through 2031 plus discounted 2032–36 cash at the 2031 date, with no paid distributions; stock buy/sell costs are applied to the annual return and entry hurdle. Distributions, if later modeled, require the dated cash carry described at the opening and a corresponding reduction in terminal company cash. A clean reader can open the code and saved output together.
Changes from the Preceding Edition
This edition corrects an inconsistent Buy/Wait phrase and three rounded comparison descriptions from the first November 24 publication. The sources, model inputs, fair value, entry and decision are unchanged.
| Revision driver | Fair value | Maximum entry |
|---|---|---|
| Prior | 30.45 | 25.49 |
| Editorial corrections | +0.00 | +0.00 |
| Rounding | +0.00 | +0.00 |
| Current | 30.45 | 25.49 |
Predecessor immutable edition retains the original text for audit.
The regular TSX CAD cutoff close is verified at C$26.18. Two preceding TSX closes provide chart context: C$25.62 on November 20 and C$26.76 on November 23. XIC's same-date regular close was C$54.34; its future path is an assumed 7.5% gross annual return, not inferred from this short quote chart. TSX AAUC historical observations Stock Price History
Closing Prices
| Date | Close (CAD) | Entry price (CAD) |
|---|---|---|
| 2026-11-20 | 25.62 | 25.49 |
| 2026-11-23 | 26.76 | 25.49 |
| 2026-11-24 | 26.18 | 25.49 |