Wesdome Gold Mines Ltd. (TSX: WDO) — finite-reserve equity edition
Our maximum entry price is C$7.65 per share. At the November 24, 2026 TSX regular close of C$23.80, the decision is Wait. The base reserve-only fair value is C$12.06; a joint 15% recovered-ounce miss, US$250/oz extra AISC and 20% more growth capital lowers the five-year entry hurdle to C$7.65. The base case is favored over that stress only if Q4 grade recovery and 2027 production confirm the mine plan. TSX WDO close, 2026-11-24
- Market close
- 23.80
- Base fair value
- 12.06
Company details
- Maximum entry price
- 7.65
- Five-year modeled exit · 2031-11-24
- 7.25
- Expected annual return at close · net
- -7.41%
- XIC net comparator · gross 7.5%, 3bp each side
- 7.49%
- Decision at close
- Wait
This is a five-year decision to November 24, 2031 in Canadian dollars, with XIC as the comparator. Stock Price History
Investment Thesis
The investable claim is a 100%-owned, two-mine Canadian producer with a finite reserve schedule through 2033. Our US$3,600 gold case values only the scheduled reserve ounces; new discovery is upside only after conversion. Eagle River reserve schedule, physical p221 Kiena reserve schedule, physical p56
Market Mispricing
At C$23.80 the market asks for far more reserve cash than this deck supports. With the modeled 2031 payments and remaining mine value, the close implies about US$6,220/oz gold held through the plan to clear XIC plus 200bp, holding costs and ounces fixed. This is conditional, not a consensus forecast. TSX WDO close, 2026-11-24 Model
Recent Developments
Q3 output was 41,287 oz, down 18% year over year, while AISC rose to US$1,789/oz. Management expects Q4 to be the strongest quarter and 2026 production below the 192,500 oz guidance midpoint. Q3 production row, physical p2 Q3 AISC row, physical p2
Earnings Outlook
Our base uses the published 2027–28 production outlook as a reasonableness check, then follows contained reserve schedules and mine-specific recoveries through 2033. No perpetual growth or unproven discovery is capitalized. Forecast
Valuation Summary
Reserve-only fair value is C$12.06 per diluted share; the five-year benchmark hurdle alone permits C$10.30. A joint 15% ounce miss, US$250/oz AISC increase and 20% growth-capex overrun lowers that hurdle to C$7.65, the maximum entry. Bridge Decision
Recommended Action and Entry Price
Wait at C$23.80. The strongest contrary case is that the technical plans understate near-mine conversion and a sustained gold price far above US$3,600 funds much more shareholder cash. At US$4,200, our reserve-only fair rises to the value in the sensitivity table, but the entry rule still tests the five-year spread. Eagle River reserve schedule, physical p221 Sensitivity
Catalysts
First test: Q4 2026 production must reach at least 49,586 oz to meet the 180,000 oz guidance floor. The 2027 result should then reach 185,000 oz with AISC no greater than US$1,750/oz. Q3 production row, physical p2 Q3 MD&A guidance, physical p7
Primary Risks to Thesis
Grade sequencing, rising unit costs, a lower gold deck and mine-life depletion are the principal threats. The shared cash balance provides time, but an undrawn US$250m revolver is borrowing capacity, not common equity value. Q3 interim statements, physical p2 Q3 MD&A guidance, physical p7
Company Overview
Wesdome operates Eagle River near Wawa, Ontario, and Kiena near Val-d’Or, Québec. Both are wholly owned underground gold mines. Eagle River reserve schedule, physical p221 Kiena reserve schedule, physical p56
Products and Services
Gold sold is the core product. Q3 included 41,800 sold ounces versus 41,287 produced ounces; inventory timing can move quarterly revenue independently of mined output. Q3 production row, physical p2
Business Model
Mine revenue is realized gold price times ounces sold, translated to Canadian dollars; Q3 consolidated revenue was C$250.588m. The model uses recovered ounces and a constant US$3,600/C$1.35 deck rather than extrapolating Q3’s US$4,279 realized price. Q3 revenue row, physical p2 Q3 realized-price row, physical p2
Revenue Drivers
The operating engine is stope development, grade, mill recovery, and plant utilization. Q3 Eagle River grade 10.1 g/t and Kiena 8.2 g/t show that ore mix can overwhelm throughput in a quarter. Q3 production row, physical p2
Cost Structure
Q3 cash cost was US$1,287/oz sold and AISC US$1,789/oz. AISC includes sustaining capital and corporate allocations; growth capital is modeled separately. Q3 AISC row, physical p2 Q3 MD&A guidance, physical p7
Operating Levers
New Kiena Deep stopes and Presqu’île ramp-up are near-term levers. Two higher-grade Kiena stopes moved from Q3 to Q4, so the next quarter tests timing rather than just annual geology. Q3 stope delay, physical p1
Distribution
Output is sold into the gold market rather than a contracted end-customer channel. The business therefore has direct bullion price exposure; Q3 realized price was US$4,279/oz. Q3 realized-price row, physical p2
Geographic Exposure
The mines are in Ontario and Québec. Gold is priced in US dollars while payroll, development and most reported costs are in Canadian dollars; the worksheet freezes C$1.35/US$1. Eagle River reserve schedule, physical p221 Kiena reserve schedule, physical p56
Regulatory Environment
Underground mining, closure and water/tailings works require provincial approvals. Kiena’s Presqu’île development adds execution and permitting dependence; the model does not credit unapproved expansions. Kiena reserve schedule, physical p56
Industry Structure
Wesdome competes for ore development, skilled labour, equipment and investor capital against larger Canadian gold operators. The comparison with Agnico Eagle below is operational, not a peer NAV transplant. Agnico Eagle Q3 2026 results
Growth and Cyclicality
Gold revenue moves with the commodity cycle. Under the worksheet, each US$400/oz change affects finite-life NAV materially even if the ore plan holds; the reserve plan is short enough that late-period price assumptions matter. Sensitivity
Competitors
Agnico produced 814,012 payable ounces in Q3, about twenty times Wesdome’s 41,287 oz, illustrating scale and diversification difference. Agnico Eagle Q3 2026 results Q3 production row, physical p2
Market Share
There is no useful claim that Wesdome has a stable share of the world gold market. Its relevant scarce asset is accessible high-grade Canadian reserves; recoverable reserve ounces are bounded in the two technical reports. Eagle River reserve schedule, physical p221 Kiena reserve schedule, physical p56
Competitive Advantages
The reserve plans extend both mines to 2033, but Wesdome’s Q3 grade shortfall shows that access to multiple mining fronts is economically important. Eagle River reserve schedule, physical p221 Q3 production row, physical p2
Pricing and Cost Position
Q3 AISC of US$1,789/oz exceeds Agnico’s US$1,648/oz. At a shared US$3,600 deck, that difference is about 3.9 percentage points of revenue before tax, with differing mine mixes. Agnico Eagle Q3 2026 results Q3 AISC row, physical p2
Entry Barriers and Substitutes
Existing shafts, mills and permits reduce the need for greenfield construction, but reserve replacement still requires drilling, development and tailings investment. Unconverted resources receive zero base-case value. Eagle River reserve schedule, physical p221 Kiena reserve schedule, physical p56
Supplier and Customer Dynamics
Equipment and labour shortages constrain stope sequencing. Kiena cited workforce planning gaps in Q3; that specific bottleneck is a measurable test of management’s claimed Q4 recovery. Q3 stope delay, physical p1
Regulation and Structural Risks
Gold is globally traded, while mine permits and closure obligations are local. The reserve plans use US$1,800 gold to establish economic reserves, half the analyst valuation deck; that difference is disclosed rather than hidden. Kiena reserve schedule, physical p56
Historical Performance
2025 revenue rose to C$914.325m from C$558.184m in 2024; net income rose to C$349.495m from C$135.471m. The price cycle contributed and these are not through-cycle mine margins. 2025 audited statements, physical p8
Income Statement Analysis
Q3 2026 revenue was C$250.588m and operating income C$136.178m; nine-month revenue C$817.145m and operating income C$453.620m. Q3 interim statements, physical p2
Balance Sheet Analysis
September cash was C$379.934m versus C$353.865m at 2025 year-end. C$8.788m leases and C$33.273m decommissioning provisions are distinct; the model subtracts lease debt and includes future closure cash once. Q3 interim statements, physical p2
Cash Flow Analysis
Nine-month 2026 CFO was C$351.650m, versus C$299.155m a year earlier. Mining-property additions were C$134.346m, before C$177.037m buyback cash and C$4.398m dividends. Q3 interim cash flow, physical p5
Earnings Quality
Adjusted EBITDA and AISC are issuer non-IFRS measures. Q3 AISC reflects cost and sustaining spending, while IFRS operating income contains depreciation; neither is shareholder free cash by itself. Q3 production row, physical p2 Q3 interim statements, physical p2
Nonrecurring Items
The Angus Gold acquisition was an asset purchase in 2025, with EY identifying its C$49.3m consideration as a key audit matter. The base case does not add an unquantified Angus discovery option. Auditor report, physical p4
Funding and Cash Conversion
Q3 free cash flow was C$51.548m under the issuer definition after capex and leases. It differs from operating cash of C$102.347m because underground development and equipment are required. Q3 production row, physical p2 FCF reconciliation, p23
Key Ratios
Nine-month 2026 CFO/revenue was 43.0%, but gold prices and working capital affect that historical ratio. The reserve model uses ounces, AISC, growth capital and tax directly. Q3 interim statements, physical p2 Forecast
Forward Outlook
Three frozen tests: (1) Q4 2026 produced ounces: base 60,000, downside below 49,586, upside above 62,086; Q4 production release settles it. (2) FY2027 ounces: base 196,000, downside below 185,000, upside above 220,000; 2027 annual release settles it. (3) FY2027 growth capital: base C$80m, downside over C$96m, upside under C$64m; 2027 cash-flow/MD&A capital table settles it. Q3 production row, physical p2 Eagle River reserve schedule, physical p221 Kiena reserve schedule, physical p56
Model Choice
A finite mine-life cash NAV is preferable to a perpetuity. Eagle River and Kiena reserve schedules end in 2033. The producing-issuer Kiena report does not disclose an issuer NPV, so this is Peralta’s calculation. Eagle River reserve schedule, physical p221 Kiena economic disclosure, physical p64
Growth
The Q4 2026 stub is 60k recovered oz; 2027–33 output follows mine-specific contained ounces times 95.7% Eagle and 98.4% Kiena recovery. No new reserves enter the base. Eagle River reserve schedule, physical p221 Kiena reserve schedule, physical p56
Profitability
Gold is US$3,600/oz; the model uses C$1.35/US$1. Q3 realized US$4,279 is observable but too high to treat as a guaranteed eight-year deck. Q3 realized-price row, physical p2 Frozen input
AISC rises from US$1,700/oz to US$1,850 by 2033 as Eagle reserve grade trends down. The US$250 sensitivity shows the price cost of a credible persistent miss. Eagle River reserve schedule, physical p221 Sensitivity
Reinvestment or Required Capital
Growth capital is C$187m from the cutoff through 2033, in addition to AISC, which already includes sustaining spending. This approximates the technical life-of-mine growth totals after nine-month 2026 growth additions. Eagle River reserve schedule, physical p221 Kiena capital, physical p552
Discount Rate
An 8% nominal CAD discount rate is an explicit analyst judgment for reserve risk. Raising it to 10% reduces late cash more than near cash; the public worksheet permits that one-line test. There is no terminal perpetuity after 2033. Frozen input
Terminal Economics
The last producing year is 2033. We charge C$37.703m closure cash in that year and zero cash after it; carrying sustaining investment into a nonexistent terminal year is inappropriate. The closure liability is therefore not subtracted again from equity NAV. Q3 obligations, p28
Bridge to One Common Share
The asset cash PV plus C$379.934m September cash less C$8.788m leases is divided by 145.2m diluted shares. This share estimate exceeds 143.747m issued on November 4 and recognizes awards/options; undrawn credit and marketable securities are not added. Q3 interim statements, physical p2 Share count, p28
| Bridge | C$M | C$/diluted share |
|---|---|---|
| PV of Q4 2026–2033 finite mine cash | 1,379.68 | 9.50 |
| September 30 cash | 379.93 | 2.62 |
| Lease claim | -8.79 | -0.06 |
| Reserve-only common NAV / fair | 1,750.83 | 12.06 |
| 2031 retained cash after forecast dividends | 716.06 | 4.93 |
| 2031 PV of 2032–33 cash | 336.79 | 2.32 |
| 2031 exit per share | 1,052.85 | 7.25 |
Price-Implied Expectations
Holding ounces and costs fixed, the five-year hurdle at C$23.80 needs roughly US$6,220/oz gold, much higher than the base US$3,600. That is a conditional market-implied gap; price could instead reflect reserve conversion, lower costs, or a lower return hurdle. Model
Independent Cross-Check
The published reserve totals are an independent quantity cross-check: Eagle 647k recovered oz and Kiena about 700k; the model uses actual 2026 depletion then remaining schedule. It does not value inferred ounces. Eagle River reserve schedule, physical p221 Kiena reserve schedule, physical p56
Conclusion and Change from Prior Edition
This is a first edition without a predecessor. Close-to-fair is C$−11.74/share and fair-to-entry C$−4.41/share, summing to entry less close C$−16.15. The latter reflects the five-year XIC hurdle and joint operating stress. Bridge
Peer Selection
Agnico Eagle is a Canadian gold producer with the same US dollar gold revenue driver but much greater scale. The comparison is to Q3 2026 operating cost per payable/sold ounce, not to interchangeable mine lives. Agnico Eagle Q3 2026 results Q3 production row, physical p2
Dated Ratio Table
Q3 2026 AISC divided by the common US$3,600 analyst deck: Wesdome 49.69% (US$1,789/oz), Agnico Eagle 45.78% (US$1,648/oz). A lower ratio leaves more pretax revenue per ounce. Q3 AISC row, physical p2 Agnico Eagle Q3 2026 results
| Issuer / Q3 2026 | AISC US$/oz | AISC / US$3,600 gold | Output koz |
|---|---|---|---|
| Wesdome | 1,789 | 49.69% | 41.287 |
| Agnico Eagle | 1,648 | 45.78% | 814.012 |
Comparability Adjustments
Wesdome reports AISC per ounce sold; Agnico uses payable production and a larger multi-mine portfolio. The ratio is a cash-margin cross-check, not a market P/NAV multiple or entry anchor. Q3 production row, physical p2 Agnico Eagle Q3 2026 results
Implications for Value
The 3.91-point cost gap supports stress testing Wesdome above management guidance, but each mine’s finite reserves and capital determine NAV. Copying Agnico’s equity multiple would omit depletion and 2026 grade evidence. Eagle River reserve schedule, physical p221 Q3 production row, physical p2
Bear Case
Bear combines 15% fewer recoverable ounces, US$250/oz higher AISC and 20% more growth capital; the linked misses can arise from delayed stopes and lower grade. Closure remains funded. Sensitivity
Base Case
Base uses US$3,600 gold, published reserve schedules, stated recoveries, AISC escalation and 35% tax. All forecast distributions are conditional; only the December 2026 dividend is declared. Frozen input
Bull Case
Bull holds reserves fixed and uses US$4,200 gold. It does not assume discoveries become reserves for free. Sensitivity
Outcomes at Close and Entry
Prices below are CAD per diluted share. The base maximum entry is the joint downside hurdle; alternative rows show their stand-alone hurdle without a second stress overlay.
| Assumption | Close | Fair value | Maximum entry | Price rule |
|---|---|---|---|---|
| Base | 23.80 | 12.06 | 7.65 | Wait |
| Gold US$3,200 | 23.80 | 9.79 | 8.23 | Wait |
| AISC +US$250 | 23.80 | 10.64 | 9.01 | Wait |
| Joint grade/cost/capex stress | 23.80 | 9.15 | 7.65 | Wait |
| Gold US$4,200 | 23.80 | 15.46 | 13.39 | Wait |
At the base close the unrounded net annual return is −7.405%, versus 7.487% net XIC, a −14.892 percentage-point spread; the required stock return is 9.487%. At the C$7.65 maximum entry, the base net return is 16.19%; the joint-stress return is 9.49%. Model
Market-Implied Case
The market price can be made to meet the return hurdle at about US$6,220 gold under the same reserve plan. This is a solved conditional deck, not an observed forward curve. Model
Analyst Assessment
The joint operating stress is credible because Q3 showed both lower grade and elevated cost. We retain the lower maximum entry until Q4 and 2027 disclosures show the mine schedule is recoverable. Q3 production row, physical p2
Operating Risks
A 15% lower recovered-ounce path cuts the finite-life cash pool and can be paired with higher cost from fixed underground spending. Q4 production below 49,586 oz would be an early warning. Q3 production row, physical p2 Sensitivity
Financial and Liquidity Risks
Cash of C$379.934m buffers capex; the undrawn US$250m facility is not equity cash. A growth-capex overrun consumes common cash even without new debt. Q3 interim statements, physical p2 Q3 MD&A guidance, physical p7
Regulatory and Legal Risks
Closure costs and environmental approvals are real claims. We use C$37.703m future closure cash and revisit it if revised mine plans or bonding estimates rise. Q3 obligations, p28
Industry and Competitive Risks
The commodity price dominates miner equity value. A US$3,200 deck cuts NAV; gold price, FX and royalties can interact, so the single-variable case understates a broader downturn. Sensitivity
Thesis-Specific Risks and Reconsideration Triggers
Reconsider if Q4 2026 misses 49,586 oz, FY2027 output is below 185,000 oz with AISC above US$1,750, or new reserve statements fail to replace 2026 depletion. The forecast table makes those tests falsifiable. Q3 production row, physical p2 Q3 MD&A guidance, physical p7
Environmental Factors
Water and tailings management are required underground-mine costs. Eagle’s technical report schedules tailings growth spending and closure; the model includes growth and future closure cash rather than a free terminal exit. Eagle capital, p288
Social Factors
Kiena cited Q3 workforce gaps that delayed higher-grade stopes. Sustained hiring or retention problems directly affect the 2027 ounce forecast. Q3 stope delay, physical p1
Governance Factors
The board declared a quarterly C$0.0306 dividend in November 2026 while buybacks reduced issued shares. The model freezes 145.2m diluted shares; future repurchases are not assumed to create value without a price test. Q3 MD&A dividend, p26 Q3 interim statements, physical p2
Financially Material Risks and Opportunities
Closure and labour execution are financially material ESG issues because they change capital needs and recoverable ounces. A higher closure estimate reduces residual value; a slower stope schedule lowers near-term shareholder cash. Eagle River reserve schedule, physical p221 Q3 production row, physical p2
Annual Results
Audited CAD millions, years ended December 31. Revenue and net income are source rows, not model forecasts. 2025 audited statements, physical p8
| CAD millions | 2025 | 2024 |
|---|---|---|
| Revenue | 914.325 | 558.184 |
| Operating income | 510.863 | 205.241 |
| Net income | 349.495 | 135.471 |
Interim Results
Unaudited CAD millions, quarters/nine months ended September 30. Q3 interim statements, physical p2
| CAD millions | Q3 2026 | Q3 2025 | YTD 2026 | YTD 2025 |
|---|---|---|---|---|
| Revenue | 250.588 | 230.284 | 817.145 | 626.450 |
| Operating income | 136.178 | 128.149 | 453.620 | 341.739 |
| Net income | 89.723 | 86.923 | 302.560 | 232.092 |
Trailing Results
Trailing twelve-month revenue through September 2026 is C$1,105.020m = FY2025 C$914.325m + YTD2026 C$817.145m − YTD2025 C$626.450m. It mixes gold-price regimes and is not forecast as a perpetuity. 2025 audited statements, physical p8 Q3 interim statements, physical p2
Material Adjustments
2025 Angus acquisition and changing depreciation reduce clean comparability. The base cash model starts from mine ounces and cash costs instead of adjusting IFRS net income into a permanent margin. 2025 audited statements, physical p8 Kiena reserve schedule, physical p56
Annual Positions
Audited CAD millions at December 31. 2025 audited statements, physical p8
| CAD millions | 2025 | 2024 |
|---|---|---|
| Cash | 353.865 | 123.097 |
| Total assets | 1,146.986 | 746.654 |
| Total liabilities | 210.014 | 175.836 |
Interim Positions
Unaudited CAD millions. September 2026 cash is the common-equity bridge starting point. Q3 interim statements, physical p2
| CAD millions | 2026-09-30 | 2025-12-31 |
|---|---|---|
| Cash | 379.934 | 353.865 |
| Lease liabilities | 8.788 | 3.397 |
| Decommissioning provision | 33.273 | 32.693 |
Capital and Claims Reconciliation
Lease liabilities of C$8.788m are deducted from cash in NAV. C$33.273m accounting closure provision is not separately deducted because C$37.703m modeled closure cash appears in 2033. Marketable securities C$38.223m are excluded pending a realizable-value review. Q3 interim statements, physical p2
Annual Flows
Audited CAD millions for years ended December 31. 2025 audited statements, physical p8 Annual cash flow, p10
| CAD millions | 2025 | 2024 |
|---|---|---|
| Operating cash | 456.766 | 240.972 |
| Mining additions | (177.960) | (119.472) |
| Ending cash | 353.865 | 123.097 |
Interim Flows
Unaudited CAD millions, Q3 and nine months to September 30. Q3 interim cash flow, physical p5
| CAD millions | Q3 2026 | Q3 2025 | YTD 2026 | YTD 2025 |
|---|---|---|---|---|
| Operating cash | 102.347 | 118.168 | 351.650 | 299.155 |
| Mining additions | (52.884) | (39.142) | (134.346) | (119.364) |
| Share repurchases cash | (46.360) | 0 | (177.037) | (0.026) |
Trailing Flows
Trailing CFO is C$509.261m = FY2025 C$456.766m + YTD2026 C$351.650m − YTD2025 C$299.155m. This historical high-gold-price cash flow is a cross-check only. 2025 audited statements, physical p8 Q3 interim cash flow, physical p5
Reconciliation to Common Shareholders
YTD CFO C$351.650m less sustaining/growth mining additions and lease payments produced issuer free cash of C$219.126m. Of this, cash dividends were C$4.398m and repurchases C$177.037m; residual roughly C$37.691m before other investment/financing movements. Forecast shareholder cash is 80% of positive annual free cash, with 20% retained and included in 2031 exit once. Q3 interim cash flow, physical p5 FCF reconciliation, p23
| Cash date | CAD/share | Value at 2031-11-24, 9.5% |
|---|---|---|
| 2026-12-29 | 0.03 | 0.05 |
| 2027-11-24 | 1.51 | 2.18 |
| 2028-11-24 | 1.59 | 2.08 |
| 2029-11-24 | 1.53 | 1.84 |
| 2030-11-24 | 1.39 | 1.52 |
| 2031-11-24 | 1.29 | 1.29 |
Primary Sources and Locators
Primary rows: Q3 2026 issuer release p2 (ounces, cost, realized price), interim FS pp2–5 (cash, earnings, shares, cash flow), Q3 MD&A pp7,26,28 (guidance, declared dividend, obligations), Eagle technical pp221,288 (reserve schedule, growth capex), Kiena technical pp56,552 (reserve schedule, capital). 2025 audited FS pp7–10 anchors annual tables. Original PDFs are in this edition; issuer and mirror URLs are listed below. Q3 production row, physical p2 Q3 AISC row, physical p2 Q3 interim statements, physical p2 Eagle River reserve schedule, physical p221 Kiena reserve schedule, physical p56
Frozen Inputs and Assumptions
The public frozen input fixes close C$23.80, XIC close C$54.34 on November 24, gold US$3,600, FX C$1.35, 35% tax, 8% discount and 145.2m shares. XIC gross return of 7.5%, 3bp each side, stock 5bp each side and 9.5% distribution carry are investor assumptions, not observed security returns. TSX WDO close, 2026-11-24 TSX XIC close, 2026-11-24 BlackRock XIC holdings, 2026-11-24
Worksheets and Saved Outputs
The worksheet uses Python 3.12.13 and only its standard library. From this folder run PYTHONDONTWRITEBYTECODE=1 PYTHONPATH=. /Users/johnperalta/johnperalta4vanilla/.venv/bin/python support/valuation.py; it rewrites the linked public outputs. The five-year pricing interval is exactly 2026-11-24 to 2031-11-24; dated payments use actual/365.25 except matching anniversaries.
| Worksheet | Output |
|---|---|
| Finite-life NAV and decision | Decision · Forecast · Bridge · Sensitivity · Dated payments |
The source URLs: Q3 release; Eagle technical; Kiena technical; Q3 interim statements; Q3 MD&A; 2025 audited statements.
Changes from the Preceding Edition
This is the first edition without a predecessor. The close, model and decision are frozen as of November 24, 2026. Later filings, gold prices and buybacks require a new dated edition rather than silently revising this one.
Closing Prices
| Date | Close (CAD) | Maximum entry (CAD) |
|---|---|---|
| 2026-11-20 | 23.06 | |
| 2026-11-23 | 24.66 | |
| 2026-11-24 | 23.80 | 7.65 |
The November 24 XIC close was C$54.34 on the same TSX session; these two quoted price observations have no forecast role beyond the dated comparison. TSX WDO close, 2026-11-24 TSX XIC close, 2026-11-24