Wesdome Gold Mines Ltd. (TSX: WDO) — finite-reserve equity edition

Our maximum entry price is C$7.65 per share. At the November 24, 2026 TSX regular close of C$23.80, the decision is Wait. The base reserve-only fair value is C$12.06; a joint 15% recovered-ounce miss, US$250/oz extra AISC and 20% more growth capital lowers the five-year entry hurdle to C$7.65. The base case is favored over that stress only if Q4 grade recovery and 2027 production confirm the mine plan. TSX WDO close, 2026-11-24

Stock Price History

Market close
23.80
Base fair value
12.06
Company details
Maximum entry price
7.65
Five-year modeled exit · 2031-11-24
7.25
Expected annual return at close · net
-7.41%
XIC net comparator · gross 7.5%, 3bp each side
7.49%
Decision at close
Wait

This is a five-year decision to November 24, 2031 in Canadian dollars, with XIC as the comparator. Stock Price History

Investment Thesis

The investable claim is a 100%-owned, two-mine Canadian producer with a finite reserve schedule through 2033. Our US$3,600 gold case values only the scheduled reserve ounces; new discovery is upside only after conversion. Eagle River reserve schedule, physical p221 Kiena reserve schedule, physical p56

Market Mispricing

At C$23.80 the market asks for far more reserve cash than this deck supports. With the modeled 2031 payments and remaining mine value, the close implies about US$6,220/oz gold held through the plan to clear XIC plus 200bp, holding costs and ounces fixed. This is conditional, not a consensus forecast. TSX WDO close, 2026-11-24 Model

Recent Developments

Q3 output was 41,287 oz, down 18% year over year, while AISC rose to US$1,789/oz. Management expects Q4 to be the strongest quarter and 2026 production below the 192,500 oz guidance midpoint. Q3 production row, physical p2 Q3 AISC row, physical p2

Earnings Outlook

Our base uses the published 2027–28 production outlook as a reasonableness check, then follows contained reserve schedules and mine-specific recoveries through 2033. No perpetual growth or unproven discovery is capitalized. Forecast

Valuation Summary

Reserve-only fair value is C$12.06 per diluted share; the five-year benchmark hurdle alone permits C$10.30. A joint 15% ounce miss, US$250/oz AISC increase and 20% growth-capex overrun lowers that hurdle to C$7.65, the maximum entry. Bridge Decision

Recommended Action and Entry Price

Wait at C$23.80. The strongest contrary case is that the technical plans understate near-mine conversion and a sustained gold price far above US$3,600 funds much more shareholder cash. At US$4,200, our reserve-only fair rises to the value in the sensitivity table, but the entry rule still tests the five-year spread. Eagle River reserve schedule, physical p221 Sensitivity

Catalysts

First test: Q4 2026 production must reach at least 49,586 oz to meet the 180,000 oz guidance floor. The 2027 result should then reach 185,000 oz with AISC no greater than US$1,750/oz. Q3 production row, physical p2 Q3 MD&A guidance, physical p7

Primary Risks to Thesis

Grade sequencing, rising unit costs, a lower gold deck and mine-life depletion are the principal threats. The shared cash balance provides time, but an undrawn US$250m revolver is borrowing capacity, not common equity value. Q3 interim statements, physical p2 Q3 MD&A guidance, physical p7