Trekor Metals Limited (TSX: TKO) — Copper production, claims and the entry rule
Our maximum entry price is C$4.30 per share. At the verified November 24, 2026 regular TSX close of C$7.78, our price rule says Wait; base fair value is C$5.43. The strongest credible contrary case is copper sustained at US$5.80/lb across both mines, with Florence's planned ramp and costs: the same model then gives a C$7.91 entry and a Buy at the close. Q3 realized copper was US$6.40/lb, but Gibraltar grades are expected to soften and Florence's wellfield is three months behind its original plan, so we prefer US$5.00/lb for the base long-run deck. Trekor Q3 2026 report, physical p. 43 · Trekor Q3 2026 report, physical p. 8
- Market close
- C$7.78
- Base fair value
- C$5.43
Company details
- Maximum entry price
- C$4.30
Trekor (formerly Taseko Mines) is a Canadian copper producer with Gibraltar in British Columbia and the new Florence in Arizona. This is a November 24, 2026 information and quote cutoff, with a five-year shareholder comparison to November 24, 2031. Review after the Q4 2026 release, expected in early 2027; the exact release date was not announced at cutoff. All report valuation amounts are CAD unless marked US$. Trekor Q3 2026 report, physical p. 56
Investment Thesis
Two producing assets offer copper exposure, but one common share also bears further Florence wellfield investment, Gibraltar stripping, project closure, debt, seller payments and metal streams. The finite-life worksheet values existing Gibraltar and Florence output and a small risk-weighted Yellowhead option. The base is a Wait because the close exceeds fair value by C$2.35 and the maximum entry by C$3.48. Trekor Q3 2026 report, physical p. 52 · Model bridge
Market Mispricing
The market can be rational if it underwrites durable copper around US$5.52/lb for fair value to equal C$7.78; the stricter stressed-entry rule needs about US$5.77/lb with the copper stress kept US$0.25 lower. These are solved conditional prices, not consensus estimates. US$0.25/lb changes management's estimated Gibraltar annual cash flow by roughly C$45m, or C$0.12 per diluted share before discounting, and Florence adds exposure. November 2026 presentation, physical p. 10 · Executable model
Recent Developments
Trekor changed its legal name in June. Q3 Gibraltar output was 33.9m lb, Florence output 7.0m lb, and consolidated sales were 37.4m lb; Gibraltar 2026 guidance rose to 115–120m lb and Florence guidance remained 25–28m lb. Florence produced its first full commercial quarter, but management disclosed that wellfield expansion was about three months behind plan. Trekor Q3 2026 report, physical p. 3) · Trekor Q3 2026 report, physical p. 28
Earnings Outlook
The base assumes Gibraltar 120m lb annually for 18 modeled years and Florence 55m/75m/85m lb in 2027/2028/steady years for a 22-year finite life. Those are Peralta estimates, with the mature Florence level matching issuer design capacity. The three testable forecasts below freeze the decision drivers; a weaker ramp and higher cost reduce the entry to C$2.70. November 2026 presentation, physical p. 11 · Scenario output
Valuation Summary
The worksheet discounts after-tax mine cash at 9%, deducts existing claims once, and divides by 374.132m diluted shares. Base fair value is C$5.43. A US$4.75/lb copper entry stress yields C$4.30; the five-year benchmark plus 200bp ceiling is C$5.44, so the commodity stress binds. The model assumes no distributions and retains post-financing mine cash in the exit balance rather than inventing a dividend. Trekor Q3 2026 report, physical p. 53 · Model output
Recommended Action and Entry Price
Wait at C$7.78. The C$4.30 entry is a limit price, not a forecast that the stock will trade there. Under the base C$8.57 November 24, 2031 exit, the after-cost return from the close is 1.93% annually versus an after-cost XIC benchmark of approximately 7.49%; the 200bp required spread is not met. A purchase at entry would clear the hurdle under the frozen assumptions. Decision worksheet
Catalysts
The first checkpoint is Q4 2026 Florence pounds, producing well count, pregnant leach solution flow and grade, Gibraltar grade/recovery, and 2027 acid terms. Florence reaching 55m lb in 2027 with a cost path toward US$1.55/lb supports the base; 35m lb and higher acid cost support the downside. The next issuer disclosure can settle the near-term direction. Trekor Q3 2026 report, physical p. 8
Primary Risks to Thesis
A prolonged US$5.80/lb copper environment would defeat the Wait decision under this entry rule. Conversely, US$4.50/lb copper and a slower, costlier Florence ramp cut fair value to about C$0.75 in the joint case. The model makes that downside explicit rather than treating the recent US$6.40 realized Q3 price as permanent. Trekor Q3 2026 report, physical p. 43 · Scenarios
Company Overview
Trekor owns 100% of Gibraltar after acquiring the remaining Cariboo interests in 2023–24. Florence has begun cathode production. Yellowhead is a permitted-development prospect, while New Prosperity is not assigned a stand-alone positive value in the base. The residual non-controlling interest on the balance sheet relates to New Prosperity, not Gibraltar. Trekor Q3 2026 report, physical p. 66 · FY2025 audited report, physical p. 77
Products and Services
Gibraltar sells copper concentrate, copper cathode and molybdenum concentrate; Florence sells copper cathode. Copper dominates the modeled earnings. Q3 Gibraltar reported 30.4m copper pounds sold and Florence 6.9m; molybdenum benefits Gibraltar C1 cost as a byproduct credit. Trekor Q3 2026 report, physical p. 3
Business Model
Revenue depends on metal pounds sold, US-dollar realized price, settlement adjustments and CAD/USD. Gibraltar concentrate also incurs treatment, refining and transport costs; Florence's in-situ leach needs continuing wells and acid. The worksheet uses C1 margins plus explicit capital, overhead, tax, royalty and stream leakage rather than equating C1 margin with distributable cash. Trekor Q3 2026 report, physical p. 35
Revenue Drivers
Q3 revenue was C$342.2m, comprising Gibraltar C$282.2m and Florence about C$60.0m, a full consolidation to the statement total. The 2027 forecast separately sets Gibraltar 120m lb and Florence 55m lb, both at US$5.00/lb copper and C$1.35/US$; it does not scale Q3 revenue by four. Trekor Q3 2026 report, physical p. 34 · Model inputs
Cost Structure
Q3 Gibraltar C1 was US$2.72/lb and Florence C1 US$3.54/lb during ramp. Base long-run C1 estimates of US$2.55 and US$1.55 remain above issuer Florence life-of-mine technical cost of US$1.11/lb, allowing execution and acid inflation. Capital is modeled separately at C$155m Gibraltar and C$105m Florence annually, rather than silently assuming cash cost covers wellfield renewal. Trekor Q3 2026 report, physical p. 27 · November 2026 presentation, physical p. 13
Operating Levers
Gibraltar grade and recovery drive pounds at fixed milling; Florence well count, flow and solution grade drive cathode production. Q3 Gibraltar recovered about 77% at 0.28% head grade and Florence's Q3 average flow was 4,454 gpm with 1.5 g/L solution grade. Those are physical tests of the forecast. Trekor Q3 2026 report, physical p. 3
Distribution
No common dividend was identified in the 2025 annual or Q3 2026 cash-flow statements. Our five-year cash distributions are zero; actual positive cash is assumed to retire finance claims and then accumulate for common shareholders, with no repurchase benefit. Gibraltar concentrate logistics and Florence's Mitsui cathode offtake are commercial distribution channels, not shareholder distributions. Trekor Q3 2026 report, physical p. 54 · Trekor Q3 2026 report, physical p. 68
Geographic Exposure
Gibraltar is in British Columbia; Florence is in Arizona. CAD reporting meets USD copper revenue and cost exposure, so a different exchange rate changes CAD value even if pounds do not. The worksheet fixes C$1.35/US$ as an analyst assumption; it is not presented as an observed November 24 spot quote. FY2025 audited report, physical p. 78
Regulatory Environment
Mine permits, closure bonding, water and wellfield monitoring can delay or raise costs. Yellowhead entered a British Columbia environmental assessment in July 2026, but a completed permit and fully funded mine do not exist at cutoff. We apply a 3.75% composite chance-of-value weight to the issuer’s illustrative C$2.0bn after-tax project NPV, yielding C$75m, and forecast no Yellowhead production. This is an analyst haircut for permitting, funding, timing and commodity risk, not a measured engineering probability. Trekor Q3 2026 report, physical p. 2 · Trekor Q3 2026 report, physical p. 43
Industry Structure
Copper producers sell a globally priced commodity; neither mine can set the LME price. Florence's cathode bypasses some smelting logistics, while Gibraltar concentrate remains exposed to treatment terms. The issuer's Q3 realized US$6.40/lb reflects a strong particular quarter, not an independently validated long-run price. Trekor Q3 2026 report, physical p. 43
Growth and Cyclicality
Copper prices, ore grades and capital cycles interact. A sustained US$0.25/lb price difference changes Gibraltar cash flow by management's estimate of C$45m annually, before the additional Florence effect. Because the modeled mines are finite, growth beyond reserve lives is not capitalized as a perpetuity. November 2026 presentation, physical p. 10
Competitors
Hudbay and Capstone are useful North American copper-exposed operating peers. Their Q3 2026 adjusted EBITDA/revenue ratios are 54.0% (US$413.4m/US$765.9m) and 50.3% (US$358.3m/US$712.0m), respectively, versus Trekor's 48.0% (C$164.2m/C$342.2m). Each numerator and denominator shares its issuer's reporting currency, so the ratio needs no FX conversion; mix and non-GAAP adjustments differ. Hudbay Q3 release · Capstone Q3 release · Trekor Q3 2026 report, physical p. 3
Market Share
The company reported 41m lb Q3 consolidated production. We do not claim a quantified global market share because neither cited filing supplies a consistent global production denominator; market power is treated as zero. Trekor Q3 2026 report, physical p. 3)
Competitive Advantages
Florence's in-situ process targets US$1.11/lb life-of-mine C1 at 85m lb annual capacity in management's study, a potential low-cost advantage. The current US$3.54/lb Q3 C1 means that advantage remains to be proven during ramp. Gibraltar has existing infrastructure and an 18-year indicated mine life, but higher diesel and explosives costs constrain the advantage. November 2026 presentation, physical p. 13 · Trekor Q3 2026 report, physical p. 5
Pricing and Cost Position
The base copper deck is US$5.00/lb, deliberately below Q3's US$6.40/lb realized price and above Florence's technical study US$3.75/lb NPV deck. It is an analyst judgment, not a forward strip. A one-input US$4.50 case reduces fair value to C$3.17 and entry to C$2.04; this is the dominant exposure. November 2026 presentation, physical p. 13 · Worksheet output
Entry Barriers and Substitutes
Copper deposit development needs reserves, approvals, large upfront capital and skilled operations; substitution by other metals is possible in some end uses but not modeled as a separate demand premium. Yellowhead's estimated initial C$2.0bn capital demonstrates why an unfunded project's headline NPV cannot enter common NAV at face value. November 2026 presentation, physical p. 20
Supplier and Customer Dynamics
Gibraltar faces diesel and explosives inflation and concentrate shipment timing; Florence faces acid and drilling productivity. Q3 Gibraltar's concentrate inventory increased by about 3m lb because shipments lagged output. These working-capital and input exposures motivate a downside with lower pounds and higher C1 together. Trekor Q3 2026 report, physical p. 5
Regulation and Structural Risks
BC reclamation and Arizona wellfield rules constrain projects. The Q3 C$161.4m rehabilitation provision is carried as a claim; surety bonds of C$141.7m Gibraltar and US$36.1m Florence secure obligations but are not extra debt in the bridge. Trekor Q3 2026 report, physical p. 52 · Trekor Q3 2026 report, physical p. 43
Historical Performance
Fiscal 2025 revenue was C$672.9m and operating cash C$219.6m, compared with C$608.1m and C$232.6m in 2024. Nine months 2026 revenue rose to C$909.9m and operating cash to C$399.4m versus C$429.1m and C$118.3m a year earlier. The 2026 rise combines stronger copper prices, Gibraltar sales and the Florence start. FY2025 audited report, physical p. 75 · Trekor Q3 2026 report, physical p. 54
Income Statement Analysis
Q3 2026 revenue C$342.2m less C$171.6m production cost and C$44.9m depletion left C$125.8m mining earnings. Net income was only C$33.6m after share pay, derivatives, finance, accretion and tax. Nine-month earnings were C$72.7m; accounting earnings cannot be treated as mine free cash. Trekor Q3 2026 report, physical p. 53
Balance Sheet Analysis
At September 30 cash was C$214.2m, debt and leases C$755.3m, Cariboo consideration C$145.2m, Florence financing liabilities C$270.8m, silver deferred revenue C$93.6m and rehabilitation C$161.4m. We model future Mitsui/Taurus payment leakage, so their C$270.8m carrying liability is not also subtracted. Silver revenue is not forecast, so its deferred obligation is deducted. Trekor Q3 2026 report, physical p. 52 · Trekor Q3 2026 report, physical p. 69
Cash Flow Analysis
Nine-month operating cash C$399.4m less Gibraltar stripping and other capex C$123.1m, Florence capex C$112.2m and other development C$19.1m leaves C$145.0m before C$44.0m option settlements and financing. C$35.4m interest paid and C$22.5m Cariboo payments further reduce common cash; no dividend appears. Trekor Q3 2026 report, physical p. 54
Earnings Quality
Adjusted EBITDA C$164.2m Q3 excludes several noncash and unusual items; Q3 operating cash was C$122.1m, but C$42.4m working-capital outflow and capex consumed most of it. The worksheet starts from mine pounds and costs, not annualized adjusted EBITDA. Trekor Q3 2026 report, physical p. 3 · Trekor Q3 2026 report, physical p. 54
Nonrecurring Items
Nine-month derivative and fair-value losses were C$52.1m, including stream remeasurement, while copper option settlements used C$44.0m in investing cash. We do not assume these 2026 marks repeat each year; existing stream economics enter operating cash explicitly. That choice differs from ignoring the stream. Trekor Q3 2026 report, physical p. 53 · Trekor Q3 2026 report, physical p. 54
Funding and Cash Conversion
The base spends C$260m each steady year on Gibraltar stripping/equipment and Florence wells, plus C$32m corporate cost. These are analyst normalized amounts, informed by nine-month 2026 C$123.1m Gibraltar and C$112.2m Florence cash investment, rather than an issuer commitment. A joint miss requiring slower Florence output while capex stays high yields no positive maximum entry (C$0.00). Trekor Q3 2026 report, physical p. 54 · Frozen inputs
Key Ratios
Q3 adjusted EBITDA/revenue was 48.0%, but nine-month operating cash/revenue was 43.9% and nine-month capital spending across Gibraltar and Florence was about C$235.3m. These measures differ in working capital, tax, finance and project timing; none alone is a distributable-cash margin. Trekor Q3 2026 report, physical p. 3 · Trekor Q3 2026 report, physical p. 54
Forward Outlook
Three frozen tests, all Peralta estimates except the cited starting observations:
| Forecast and definition | Base | Downside / upside | Settling disclosure |
|---|---|---|---|
| Florence copper produced, calendar 2027, million lb; Q3 2026 was 7.0m lb | 55 | 35 / 65 | 2027 quarterly operating releases and annual report |
| Gibraltar copper produced, calendar 2027, million lb; 2026 guidance 115–120m lb | 120 | 110 / 130 | Q4 2026 grade/recovery and 2027 production reports |
| Combined Gibraltar + Florence required annual sustaining, stripping and wellfield capital, calendar 2027, C$m; nine months 2026 C$235.3m | 260 | 310 / 230 | 2027 cash-flow statement and project capital notes |
The Florence forecast requires continued well additions and acid supply. These quantities settle the operating thesis more directly than a share-price outcome. Trekor Q3 2026 report, physical p. 3 · Trekor Q3 2026 report, physical p. 54
Model Choice
The public Python worksheet is a finite-life, asset-by-asset mine NAV. Gibraltar production ends after 18 years and Florence after 22, consistent with issuer approximate mine-life claims. No terminal perpetuity or unfunded Yellowhead production is hidden in the model. The 2026 year-end to 2027 forecast bridge is an explicit forward estimate: Gibraltar 115–120m lb guidance becomes 120m lb; Florence 25–28m lb guidance becomes 55m lb with ongoing C$105m annual wellfield capital. November 2026 presentation, physical p. 8 · Trekor Q3 2026 report, physical p. 1
The reported Q3 mining cash proxy connects to the first forecast year as follows. The C$29.48m reset is a combined analyst bridge, not a separately disclosed issuer adjustment; the detailed forecast derives 2027 gross mine margin directly from pounds, copper and C1. The table prevents the 2026 quarter from being silently annualized into a 2027 forecast. Trekor Q3 2026 report, physical p. 53 · Worksheet
| Reported Q3 to first forecast year (CAD m) | Amount |
|---|---|
| Q3 2026 reported revenue less production cost | 170.64 |
| Annualization of that quarterly gross margin | 511.91 |
| 2027 driver-model reset: copper, production, C1 and accounting perimeter | -29.48 |
| Mitsui stream and Taurus royalty | -15.04 |
| Corporate cost | -32.00 |
| Gibraltar and Florence required capital | -260.00 |
| Modeled cash tax | -103.81 |
| 2027 mine free cash | 242.21 |
Growth
Florence scales 55m in 2027, 75m in 2028 and 85m thereafter, never beyond stated 85m design capacity. Gibraltar stays at 120m until its modeled life ends; this is demanding if Connector grades fall. The slower Florence test uses 35m/60m/70m and a higher C1. November 2026 presentation, physical p. 11 · Trekor Q3 2026 report, physical p. 28
Profitability
US$5.00/lb copper at C$1.35/US$ less Gibraltar US$2.55/lb and Florence US$1.55/lb C1 gives mine margins before corporate cost, capital and tax. Florence pays Taurus 2.05% of gross revenue and Mitsui receives 2.67% of physical pounds for 25% of LME until 40m lb of stream deliveries. The model's annual stream and royalty rows make the cash leakage inspectable. Trekor Q3 2026 report, physical p. 68 · Forecast schedule
Reinvestment or Required Capital
Annual C$155m Gibraltar and C$105m Florence capital continue throughout each modeled mine life. This deliberately exceeds C$235.3m nine-month 2026 combined capital on an annual basis, but the exact wellfield maintenance schedule is uncertain. Raising required capital by C$50m for the first five years lowers common value; the downside also tests lower production and higher cost, because those misses can coincide. Trekor Q3 2026 report, physical p. 54
Discount Rate
We use a 9% nominal CAD after-tax NAV discount rate as an analyst risk judgment for mature operations plus Florence ramp uncertainty, not a claimed observed WACC. A 10% alternative holding operating inputs fixed reduces fair value to C$4.88 and entry to C$3.83, still Wait; US$4.50 copper jointly with 10% gives C$2.78 fair and C$1.72 entry. The worksheet inputs expose the rate for reproduction. The mine-life cutoff prevents a terminal-rate assumption from dominating the calculation. Model inputs
Terminal Economics
There is no perpetuity. Last Gibraltar output occurs in 2044 and last Florence output in 2048 in the model; each subsequent year contributes zero from that asset. C$161.4m rehabilitation is deducted once from enterprise to common value. This conservatively keeps the September carrying provision as a present claim, while annual production remains finite and steady capital never disappears before exhaustion. Trekor Q3 2026 report, physical p. 52 · Forecast schedule
The worksheet boundary rows below show full last-year investment followed by the end of each finite asset. Continuing capital into the first zero-production year would be economically wrong; the remaining closure claim is already deducted in the common bridge.
| Year and asset boundary | Gibraltar mlb | Florence mlb | Required capex CADm | Free cash CADm |
|---|---|---|---|---|
| 2044 | 120 | 85 | 260.0 | 334.3 |
| 2045 | 0 | 85 | 105.0 | 172.2 |
| 2048 | 0 | 85 | 105.0 | 173.0 |
| 2049 | 0 | 0 | 0.0 | 0.0 |
Bridge to One Common Share
The bridge below is worksheet output. It begins with discounted mine cash, deducts C$755.3m debt/leases, C$145.2m Cariboo seller claims, C$161.4m rehabilitation, C$93.6m unmodeled silver delivery obligation and C$38.6m other financial claims, adds C$214.2m cash and a C$75m Yellowhead option (3.75% × issuer C$2.0bn illustrative project NPV), then divides by 374.132m diluted shares. Florence stream/royalty liabilities are excluded from the balance deduction because modeled delivery cash has already reduced operating flows. Mitsui conversion is a material unexercised option: a 10% Florence interest with US$50m cash in place of the stream could change NAV and requires revaluation when exercised or when the October 2028 window closes. Trekor Q3 2026 report, physical p. 69
| Bridge (CAD m unless noted) | Base |
|---|---|
| Finite mine operating PV | 2,935.16 |
| Cash less debt, leases, Cariboo, rehabilitation and other net claims | -979.80 |
| Probability-weighted Yellowhead option | 75.00 |
| Common equity | 2,030.36 |
| Diluted shares (m) | 374.13 |
| Fair value (CAD/share) | 5.43 |
Price-Implied Expectations
At the C$7.78 close, all else fixed, the NAV needs about US$5.52/lb life-of-mine copper. To make the entry rule Buy at the same close while retaining a US$0.25/lb copper stress has a crossover at about US$5.77/lb sustained copper; a US$5.80/lb case gives C$9.04 fair value, C$7.91 stressed entry and a 12.19% after-cost return at the close. This is a conditional inverse model, not an external forecast. A Q4 Florence output below 7m lb or a 2027 rate below 35m lb would challenge even optimistic ramp assumptions. Market solve in executable worksheet · Trekor Q3 2026 report, physical p. 3
Independent Cross-Check
Management's November presentation gives Florence after-tax NPV8 of US$930m at US$3.75/lb and US$2.1bn at US$6.00/lb. Those project figures use their own forecast, date and 8% rate, and are not common-share prices; our 9% CAD, claim-adjusted value is directionally compatible with strong copper sensitivity. A 10% discount-rate rerun is a separate countercheck, while US$0.25/lb copper is a larger economic sensitivity. November 2026 presentation, physical p. 13 · Model output
Conclusion and Change from Prior Edition
The first Markdown edition set the same economic cutoff and prices; this correction changes source navigation only. The C$7.78 close to C$5.43 fair gap is −C$2.35; the fair-to-entry commodity stress is −C$1.13; together they explain the −C$3.48 close-to-entry gap at report precision. The next revisions should update the Florence ramp, 2027 acid cost, Gibraltar grade and copper deck together with any share issuance or claim changes. Decision output
Peer Selection
Hudbay and Capstone have current copper-producing operations and Q3 2026 releases by cutoff. Their gold/byproduct mix, project maturity and accounting differ from Trekor's two-mine mix; the table is an operating-margin cross-check, not a substitute for finite mine NAV. Hudbay Q3 · Capstone Q3
Dated Ratio Table
| Issuer; Q3 ended 2026-09-30 | Revenue, issuer m | Adjusted EBITDA, issuer m | EBITDA / revenue |
|---|---|---|---|
| Trekor, CAD | 342.2 | 164.2 | 48.0% |
| Hudbay, USD | 765.9 | 413.4 | 54.0% |
| Capstone, USD | 712.0 | 358.3 | 50.3% |
The identical ratio definition is reported adjusted EBITDA divided by reported quarterly revenue in each issuer's currency. Trekor Q3 2026 report, physical p. 3 · Hudbay release · Capstone release
Comparability Adjustments
The ratio cannot compare share value without common copper decks, sustaining capex, mine life, debt and streams. Trekor's strong Q3 copper realization lifted all miners, while Florence remained costly during ramp. We do not infer a peer EV/EBITDA from unverified same-day share prices. Peer releases above · Trekor Q3 2026 report, physical p. 4
Implications for Value
Trekor's 48.0% Q3 adjusted margin is below both selected peers, which tempers any claim of already-realized Florence cost leadership. The ratio remains secondary because Q3 mine prices and timing differ from the long-run deck. The NAV decision therefore stays Wait. Dated ratio table
Bear Case
A joint miss holds copper at US$4.50/lb, Gibraltar 110m lb at US$2.75/lb C1, and Florence 35m/60m/70m lb with US$1.85/lb mature C1, while annual capital stays high. Fair value falls to C$0.75. We pair output and cost misses because slower well development and lower grades do not relieve the need for drilling or stripping. Trekor Q3 2026 report, physical p. 28 · Scenario output
Base Case
Copper US$5.00/lb, Gibraltar 120m lb, Florence 55m/75m/85m lb, and the balance-sheet bridge yield C$5.43 fair value. A US$0.25 copper stress sets the C$4.30 entry. The expected five-year after-cost close return is 1.93%, below the 9.49% required annual return. Frozen model · Decision output
Bull Case
US$5.50/lb copper, Florence 65m/85m lb and US$1.35/lb mature C1 give C$8.25 fair value, yet the C$7.11 stress-based maximum entry still says Wait at C$7.78. Sustaining US$5.80/lb with the same base operating path is the explicit alternative that flips the action, at C$7.91 entry. Scenario output · Trekor Q3 2026 report, physical p. 43
Outcomes at Close and Entry
| Assumption | Close | Fair value | Maximum entry | Price rule |
|---|---|---|---|---|
| Base | C$7.78 | C$5.43 | C$4.30 | Wait |
| Copper US$4.50 | C$7.78 | C$3.17 | C$2.04 | Wait |
| 10% CAD discount | C$7.78 | C$4.88 | C$3.83 | Wait |
| Copper US$4.50 + 10% | C$7.78 | C$2.78 | C$1.72 | Wait |
| Florence slower/costlier | C$7.78 | C$3.74 | C$2.70 | Wait |
| Joint downside | C$7.78 | C$0.75 | C$0.00 | Wait |
| Bull | C$7.78 | C$8.25 | C$7.11 | Wait |
| Copper US$5.80 (contrary) | C$7.78 | C$9.04 | C$7.91 | Buy |
The 2026-11-24 C$7.78 close exceeds every tabulated maximum entry except the explicit US$5.80/lb contrary case. At the C$4.30 base entry, a bear fair value of C$0.75 implies about 83% price loss before costs, a meaningful capital-loss risk even for a disciplined buyer. The upside path is observable in copper prices and Florence pounds rather than a generic valuation multiple. Scenario worksheet
Market-Implied Case
US$5.52/lb long-run copper closes the fair-value gap, while US$5.77/lb clears the stressed maximum-entry rule. Q3's US$6.40 realized price demonstrates a recent high-price quarter but does not establish two decades of that price. The market case is falsified if Florence fails to move beyond 35m lb in 2027 while C1 remains above US$1.85/lb and Gibraltar stays near 110m lb. Trekor Q3 2026 report, physical p. 43 · Inverse solve
Analyst Assessment
Our US$5.00 copper deck and cautious ramp are judgmental; neither is management guidance for mine life. The alternative US$5.80 copper deck reverses the Wait decision, so this is a price-deck disagreement more than an arithmetic certainty. Q4 Florence operational data and independent copper forward expectations should decide whether to revise the deck; until then the C$3.48 gap to entry protects against overpaying. Frozen assumptions
Operating Risks
Gibraltar grade/recovery and Florence wellfield flow directly affect modeled pounds. A 2027 Florence output at 35m rather than 55m lb, with higher C1, drives the isolated Florence entry from C$4.30 to C$2.70. Reassess on each quarterly operating release. Trekor Q3 2026 report, physical p. 4 · Scenario output
Financial and Liquidity Risks
C$755.3m debt/leases and C$145.2m Cariboo seller consideration compete with common equity. Financing cost and repayment consume cash before buybacks; the five-year worksheet tracks interest on the shrinking debt balance and assumes no common distributions. A prolonged joint downside may need new funding and dilution beyond the frozen 374.132m denominator; the C$0.75 case is therefore optimistic if equity must be raised cheaply. Trekor Q3 2026 report, physical p. 52 · Trekor Q3 2026 report, physical p. 54
Regulatory and Legal Risks
Florence's in-situ leaching and Yellowhead's environmental assessment can face permitting and water scrutiny. Closure provisions may rise; an additional C$50m provision would reduce fair value roughly C$0.13 per diluted share before any behavioral change. New Prosperity is carried at no separate positive modeled value. Trekor Q3 2026 report, physical p. 2 · Trekor Q3 2026 report, physical p. 52
Industry and Competitive Risks
A commodity producer has no price-setting protection. US$4.50/lb copper alone reduces base fair value by about C$2.26/share and leaves Wait intact; stronger copper can reverse the call. Treatment and refining terms, diesel, explosives and acid also change cash conversion. Trekor Q3 2026 report, physical p. 26 · Scenarios
Thesis-Specific Risks and Reconsideration Triggers
Revisit the Wait call if a credible multiyear copper deck approaches US$5.77/lb, or if Florence shows a verified path above 55m lb in 2027 at falling C1 and without extra capital. Revisit the C$4.30 ceiling downward if Q4 wells/flow disappoint, if Gibraltar grades fall faster, or if new financing expands diluted shares. The copper and ramp tests should be changed one at a time and jointly in the worksheet. Trekor Q3 2026 report, physical p. 8
Environmental Factors
Gibraltar and Florence carry legal reclamation obligations measured at C$161.4m at September 30. The bridge deducts this amount and does not assume surety bonds extinguish the obligation. Florence's in-situ process also requires wellfield monitoring; an unexpected remediation cost would lower common value dollar for dollar before tax effects. Trekor Q3 2026 report, physical p. 52 · Trekor Q3 2026 report, physical p. 43
Social Factors
The Yellowhead environmental review and Indigenous/community engagement can affect timing and capital. The issuer reports a remaining C$2m Teẑtan Biny contribution commitment; we include that within conservative other claims/corporate spend rather than assign development production. Trekor Q3 2026 report, physical p. 43
Governance Factors
The June 2026 circular describes share-unit and option arrangements and a majority-vote director policy. Q3 diluted weighted-average shares of 374.132m exceed 366.763m common outstanding; using basic shares would overstate per-share value. We retain the diluted denominator and review any new issuance. 2026 AGM circular, physical p. 57 · Trekor Q3 2026 report, physical p. 53
Financially Material Risks and Opportunities
Florence's potential low C1 cost is economically valuable only if its wellfield output and acid inputs support it; Gibraltar closure and Yellowhead approvals are offsetting capital claims. These factors are modeled through production, cost, capex, finite life and rehabilitation rather than an arbitrary ESG score. November 2026 presentation, physical p. 13 · Trekor Q3 2026 report, physical p. 52
Annual Results
| CAD m, year ended Dec 31 | FY2024 | FY2025 |
|---|---|---|
| Revenue | 608.1 | 672.9 |
| Production costs | (417.1) | (422.2) |
| Depletion and amortization | (73.9) | (102.7) |
| Mining earnings | 124.8 | 152.0 |
| Net loss | (13.4) | (30.1) |
The annual figures are IFRS consolidated, not a constant copper-price series. FY2025 audited report, physical p. 75
Interim Results
| CAD m, three/nine months ended Sep 30 | Q3 2025 | Q3 2026 | 9M 2025 | 9M 2026 |
|---|---|---|---|---|
| Revenue | 173.9 | 342.2 | 429.1 | 909.9 |
| Production costs | (106.8) | (171.6) | (302.5) | (470.7) |
| Mining earnings | 39.2 | 125.8 | 55.1 | 324.9 |
| Net income | (27.8) | 33.6 | (34.5) | 72.7 |
Trekor Q3 2026 report, physical p. 53
Trailing Results
Trailing twelve-month revenue through September 2026 is C$1,153.6m = FY2025 C$672.9m + 9M2026 C$909.9m − 9M2025 C$429.1m. Trailing net income is C$68.1m = −30.1 + 72.7 − (−34.5). This is a reported perimeter bridge, not normalized mine cash. FY2025 audited report, physical p. 75 · Trekor Q3 2026 report, physical p. 53
Material Adjustments
Derivative marks and accretion separate reported net income from operating cash; Q3 US$6.40/lb realized price also exceeds the base US$5.00 deck. The model therefore rebuilds pounds and costs instead of extrapolating the trailing income statement. Trekor Q3 2026 report, physical p. 53 · Trekor Q3 2026 report, physical p. 43
Annual Positions
| CAD m at Dec 31 | 2024 | 2025 |
|---|---|---|
| Cash | 172.7 | 188.0 |
| Total assets | 2,195.0 | 2,472.5 |
| Current debt | 32.9 | 35.7 |
| Long-term debt | 764.4 | 711.3 |
| Equity | 503.2 | 778.7 |
FY2025 audited report, physical p. 74
Interim Positions
| CAD m at Sep 30 2026 | Amount |
|---|---|
| Cash | 214.2 |
| Debt including equipment/leases, current + noncurrent | 755.3 |
| Cariboo consideration, current + noncurrent | 145.2 |
| Florence stream/royalty liability, current + noncurrent | 270.8 |
| Gibraltar silver deferred revenue | 93.6 |
| Environmental rehabilitation | 161.4 |
| Total equity | 892.9 |
Trekor Q3 2026 report, physical p. 52
Capital and Claims Reconciliation
The enterprise-to-common deduction starts with debt C$755.3m + Cariboo C$145.2m + closure C$161.4m + silver C$93.6m + other financial claims C$38.6m − cash C$214.2m = approximately C$979.7m. Florence's C$270.8m accounting financing balance is reconciled to modeled Mitsui and Taurus production leakage, not separately subtracted. The nearly zero reported NCI belongs to New Prosperity; Gibraltar is 100% owned. Trekor Q3 2026 report, physical p. 52 · Trekor Q3 2026 report, physical p. 69
Annual Flows
| CAD m, year ended Dec 31 | FY2024 | FY2025 |
|---|---|---|
| Operating cash | 232.6 | 219.6 |
| Gibraltar stripping + equipment | (83.1) | (149.9) |
| Florence development | (231.0) | (269.5) |
| Other project development | (4.2) | (8.9) |
| Interest paid | (70.3) | (73.4) |
| Net share issuance proceeds | 37.3 | 258.6 |
The 2025 cash funding gap was covered in part by share issuance, a material dilution warning. FY2025 audited report, physical p. 76
Interim Flows
| CAD m, nine months ended Sep 30 | 2025 | 2026 |
|---|---|---|
| Operating cash | 118.3 | 399.4 |
| Gibraltar stripping + equipment | (120.5) | (123.1) |
| Florence capital | (217.5) | (112.2) |
| Other development | (6.2) | (19.1) |
| Copper option settlements | (1.5) | (44.0) |
| Interest paid | (40.1) | (35.4) |
| Cariboo consideration paid | (16.6) | (22.5) |
Trekor Q3 2026 report, physical p. 54
Trailing Flows
Trailing operating cash through September 2026 is C$500.6m = FY2025 C$219.6m + 9M2026 C$399.4m − 9M2025 C$118.3m. Trailing Gibraltar/Florence capital is about C$316.6m = FY2025 C$419.4m + 9M2026 C$235.2m − 9M2025 C$338.0m. Trailing operating cash less those two mine capital lines is approximately C$184.0m before corporate development, hedge settlements and finance. FY2025 audited report, physical p. 76 · Trekor Q3 2026 report, physical p. 54
Reconciliation to Common Shareholders
For nine months 2026, C$399.4m operating cash − C$123.1m Gibraltar capex − C$112.2m Florence capex − C$19.1m other development − C$44.0m option settlements = C$101.0m before interest and claim repayments. Subtract C$35.4m interest, C$22.5m Cariboo, C$30.3m equipment/lease repayments and C$2.5m Florence financing repayment: residual is about C$10.3m, with no dividend or buyback. This reconciliation prevents treating operating cash as owner cash. In the forecast, positive residual reduces debt and then remains as cash; no repurchase shrinks the diluted denominator, and deficits increase net finance need. Trekor Q3 2026 report, physical p. 54 · Worksheet
Primary Sources and Locators
- Trekor Q3 2026 financial statements and MD&A, issued 2026-11-04: physical pp. 1–5 operating highlights; 26–28 mine operating conditions; 34–36 segment revenue/cost; 52–54 IFRS statements; 66–70 Cariboo, Mitsui/Taurus and silver obligations; 71–72 share awards. Original issuer PDF.
- Taseko/Trekor FY2025 audited financial statements and MD&A, issued 2026-02-18: physical pp. 74–76 annual statements and cash; 71–72 auditor discussion of Florence stream. Original issuer PDF.
- November 2026 corporate presentation: physical pp. 10, 8, 11–13, 20 and 36–38 for price sensitivity, mine lives, Florence economics, Yellowhead capital and Gibraltar reserves. It is issuer projection, not independent evidence. Original issuer PDF.
- May 2026 circular: principal holders, governance and share units. Original issuer PDF.
- Wellington 13G, filed 2026-11-16, Item 4, Hudbay Q3 release, and Capstone Q3 release.
Frozen Inputs and Assumptions
Public model inputs distinguish the verified TKO C$7.78 close and XIC C$54.34 close from analyst judgments: US$5.00/lb long-run copper, C$1.35/US$, 9% CAD discount, 30% effective cash tax, mine lives, annual mine capital and C$75m Yellowhead option. Reported debt, cash, seller claims, closure and share basis map to the Q3 filing rows above. The model uses 7.5% gross XIC growth less 3bp on buy and sale; TKO costs are 5bp on buy and sale. The horizon is exactly 2026-11-24 to 2031-11-24 with 200bp excess annual return required. No dated cash distributions are forecast; if future distributions occur, their 9.5% carry to the same date should be added on actual/365.25, using integer years on anniversaries. Model input file
Worksheets and Saved Outputs
| Worksheet | Output |
|---|---|
| Finite mine NAV and decision | Opening decision, cash bridge, annual forecast, reported-to-forecast bridge, terminal boundary, scenario matrix, revision bridge, exact JSON |
Run from the edition root with PYTHONDONTWRITEBYTECODE=1 PYTHONPATH=. /Users/johnperalta/johnperalta4vanilla/.venv/bin/python support/valuation.py under Python 3.12.13; the worksheet uses only the Python standard library, frozen public JSON and relative paths. The JSON retains unrounded values. The earnings, cash and balance tables above reproduce filing rows, while the worksheet is an analyst estimate. Neither a source citation nor a checksum proves the forecast. The principal limits are uncertain long-run copper, Florence ramp and acid cost, closure timing, seller payment timing, Mitsui conversion, and future capital/dilution.
Changes from the Preceding Edition
This same-cutoff correction follows the first TKO Markdown edition. It retargets PDF citation highlights to numeric rows and corrects physical-page labels. The C$5.43 fair value and C$4.30 entry are unchanged; no new economic evidence or quote was added. The generated revision bridge below preserves that arithmetic.
| Revision driver | Fair value | Maximum entry |
|---|---|---|
| Prior | C$5.43 | C$4.30 |
| Citation locator correction | C$0.00 | C$0.00 |
| Rounding | C$0.00 | C$0.00 |
| Current | C$5.43 | C$4.30 |
| Date | Close (CAD) | Maximum entry (CAD) |
|---|---|---|
| 2026-11-18 | 7.98 | — |
| 2026-11-19 | 8.04 | — |
| 2026-11-20 | 7.66 | — |
| 2026-11-23 | 8.24 | — |
| 2026-11-24 | 7.78 | 4.30 |
Stock Price History shows the five regular TSX closes before and including the cutoff from Stock Analysis, TKO daily history. The November 24 C$7.78 close is also independently verified by the batch quote. XIC's same-date verified close was C$54.34, used for date alignment, while the five-year benchmark is the specified 7.5% gross annual return assumption.