Triple Flag Precious Metals — finite stream value and entry discipline
Our maximum entry price is C$13.87 per share. TFPM closed at C$39.97 on the TSX on November 24, 2026, so our decision is Wait. Base fair value is C$17.21, and the modeled five-year return at the close is -7.98%, versus a 7.49% net XIC benchmark and a 200 basis point hurdle. The strongest contrary case is sustained higher gold and management's full 150–160 thousand calendar-2030 GEO outlook: at our frozen finite delivery path, gold must average US$7,647/oz for today's price to meet the hurdle, or deliveries must reach roughly 288 thousand GEOs in the model year ending November 24, 2030 at US$3,600 gold. The one-month period mismatch does not close that large gap; those requirements are materially above management's outlook and the dated US$3,633 gold observation. The first test is Q4 2026 sales: 21,130–26,130 GEOs complete 2026 guidance; February 2027 guidance and the June 2027 Northparkes mill/E44 studies test the ramp. Q3 operating and guidance rows Northparkes E44 funding and guarantees TSX:TFPM November 24 closing row November 24 gold bulletin, gold row
- Market close (CAD)
- C$39.97
- Base fair value (CAD/share)
- C$17.21
Company details
- Maximum entry price (CAD/share)
- C$13.87
- Five-year exit (CAD/share)
- C$24.22
- Expected annual return at close
- -7.98%
- Net XIC benchmark
- 7.49%
- Return spread
- -15.46 pp
Issuer: Triple Flag Precious Metals Corp. · TSX:TFPM common shares · CAD decision, USD reporting · Metals streams and royalties · Economic and market cutoff November 24, 2026 · Model exit November 24, 2031. Stock Price History
Investment Thesis
The package buys contractual metal deliveries and royalties across operating and development mines. The cash receipts have limited direct mine operating costs, yet depletion, operator funding, metal prices and stream step-downs make the present claim finite. We capitalize only a risk-weighted delivery path through 2051 and deduct E44 funding, debt and dilution. Q3 MD&A, SEC Exhibit 99.1, November 3, 2026, pp. 10–12 Finite model and bridge.
Market Mispricing
The C$39.97 close exceeds our C$17.21 fair value by C$22.76. At our base GEO path, the market-price acceptance test requires US$7,647 gold; at US$3,600 it requires 288k GEOs in 2030. This is a conditional model solution, not street consensus. Sensitivity output.
Recent Developments
Q3 sold 25,030 GEOs, down from 27,037 a year earlier despite revenue rising to US$106.7m from US$93.5m. Ravenswood contributed its first 1,491 GEOs; Northparkes delivered 4,133. The November 13 renewed NCIB authorizes up to 10.284m shares through November 2027 but commits to no repurchase. Q3 2026 issuer release Northparkes E44 funding and guarantees November 13 NCIB renewal, SEC Exhibit 99.1.
Earnings Outlook
We model 108k GEOs in the model year ending November 24, 2027 and 140k in the model year ending November 24, 2030, a 12-month proxy one month earlier than management’s 150–160k calendar-2030 outlook. The gap reflects a 72.7% weighted average on 55k possible development GEOs and is an analyst judgment, not issuer guidance. At the 2030 model-year end, cash after metal purchases, overhead, tax and a US$20m annual replacement reserve is US$345.2m. Q3 operating and guidance rows Project weights Forecast.
Valuation Summary
Finite asset NAV is US$2,706.4m; net parent claims and E44 funding are US$225.7m, yielding C$17.21 per 206.073m economically diluted shares at C$1.4296/US$. This is a cash NAV, not IFRS book value. SEC Q3 statement print, balance-sheet cash row SEC Q3 statement print, common-share row Q3 interim statements, SEC Exhibit 99.2, November 3, 2026, statements pp. 1–3 and notes 4, 9, 12 Bank of Canada daily digest, USD/CAD, November 24, 2026 Bridge.
Recommended Action and Entry Price
The no-stress benchmark-plus-200-bp ceiling is C$16.77. The linked US$3,400 gold / 125k 2030 GEO downside lowers that ceiling by C$2.90 to C$13.87. At the C$39.97 close both base and downside say Wait. No immediate purchase follows from this report. Decision output.
Catalysts
Q4 2026 deliveries and February 2027 five-year guidance test the volume bridge; Northparkes mill expansion and E44 pre-feasibility studies are scheduled by June 2027. The Northparkes E44 payment is scheduled for December 2026. Q3 operating and guidance rows Northparkes E44 funding and guarantees.
Primary Risks to Thesis
Gold/silver prices, Ravenswood delivery thresholds, slower Northparkes ore access, operator insolvency and acquisition spending can impair one-share cash. If the company demonstrates sustainable 155k GEOs at a stronger gold deck without additional common dilution, revise the model rather than mechanically retaining this ceiling. Northparkes E44 funding and guarantees Q3 MD&A, SEC Exhibit 99.1, November 3, 2026, pp. 10–12.
Company Overview
Triple Flag owns streams, royalties and related interests, rather than operating the mines. The 2025 annual report identifies Australia, the Americas and other locations; SEC interim statements consolidate wholly owned subsidiaries, with no disclosed noncontrolling claim to deduct. 2025 annual operating table Q3 interim statements, SEC Exhibit 99.2, November 3, 2026, statements pp. 1–3 and notes 4, 9, 12.
Products and Services
Streams entitle the company to buy specified metal at agreed ongoing payments; royalties pay a portion of mine sales or revenue. Northparkes is a 54% gold/80% silver stream outside E44, Cerro Lindo a 25% silver stream after its April step-down, and Ravenswood a tiered gold stream. Northparkes E44 funding and guarantees Cerro Lindo and Buriticá asset rows Q3 MD&A, SEC Exhibit 99.1, November 3, 2026, pp. 10–12.
Business Model
Mine operators finance, build and run the assets; Triple Flag provides upfront capital for streams and receives metal or royalty cash when the operator produces. This reduces direct mine sustaining capex but leaves commodity, counterparty and reserve risk. E44 requires a separate US$84.3m payment in December 2026. Northparkes E44 funding and guarantees.
Revenue Drivers
Q3 revenue was US$70.409m gold, US$32.092m silver and US$4.181m copper/other, totaling US$106.682m. GEO is revenue divided by that quarter’s average gold price, so ounces alone do not pin revenue when the gold/silver ratio changes. Q3 operating and guidance rows Q3 MD&A, SEC Exhibit 99.1, November 3, 2026, pp. 10–12.
Cost Structure
Q3 cost of sales excluding depletion was US$21.736m, including a material noncash prepaid-gold expense; corporate administration was US$4.590m. Nine-month royalty revenue of US$78.333m was 20.5% of US$382.886m total, so the model charges no metal purchase payment to the 20.5% royalty proxy of other GEOs. It uses stream metal terms, US$32m 2027 corporate cost, 15% cash tax and US$20m annual replacement reserve instead of treating reported gross margin as distributable cash. SEC Q3 statement print, disposal-gain row SEC Q3 MD&A print, royalty-revenue total Q3 interim statements, SEC Exhibit 99.2, November 3, 2026, statements pp. 1–3 and notes 4, 9, 12 Q3 MD&A, SEC Exhibit 99.1, November 3, 2026, pp. 10–12 Model inputs.
Operating Levers
Northparkes E48 ramps in 2026–27 and E22 targets initial production by fiscal 2030, with a 10–11 Mtpa mill expansion under study. These are operator milestones; we weight development GEOs at 72.7%, and do not count 100% of an unfunded pathway. Northparkes E44 funding and guarantees.
Distribution
Metal is sold into established bullion markets and royalties are paid by operators; the Q3 release divides sales by gold, silver and other commodities. The economic customer is the mine operator for contractual deliveries and the commodity market for realized price. Q3 operating and guidance rows.
Geographic Exposure
Q3 asset updates span Australia, Peru, Colombia, Mexico, Chile and North America. Northparkes and Ravenswood add Australian concentration while Cerro Lindo, Buriticá and other contracts diversify counterparties, not metal price. Northparkes E44 funding and guarantees Cerro Lindo and Buriticá asset rows.
Regulatory Environment
Permits, mine plans and local operating law sit primarily with counterparties. The November 2026 update names an October environmental application at Ana Paula and operator approvals for Northparkes; failure delays contractual cash even if Triple Flag itself is compliant. Northparkes E44 funding and guarantees Issuer asset update p.6.
Industry Structure
Royalty and stream issuers finance projects in exchange for production-linked rights. Wheaton, a larger peer, reported 231k Q3 GEOs and US$548/GEO cash costs, demonstrating similar contract economics but materially different scale and asset mix. Wheaton Q3 2026 primary release.
Growth and Cyclicality
The contractual share of output can grow with operator investment, but metal prices and project cycles dominate cash. Q3 TFPM GEOs fell 7.4% year over year while revenue rose 14.2%; this is price exposure, not volume proof. Q3 2026 issuer release.
Competitors
Wheaton is a relevant streaming peer; OR Royalties and Franco-Nevada hold different mixes of royalties and streams. We use Wheaton’s disclosed cash cost/ounce only as an operating check because size, metal mix and project-life differences make an unadjusted P/E misleading. Wheaton Q3 2026 primary release.
Market Share
The company reports 239 assets and 33 producing in its 2026 investor materials, but no reliable total addressable market denominator. We do not assign a market-share premium or extrapolate asset count into annual cash. Issuer asset handbook.
Competitive Advantages
Contractual exposure to operator-funded expansions is valuable when the mines produce; Northparkes E22 and Ravenswood are examples. The same contracts cap upside through tiered entitlements and counterparty decisions. Northparkes E44 funding and guarantees Q3 MD&A, SEC Exhibit 99.1, November 3, 2026, pp. 10–12.
Pricing and Cost Position
TFPM Q3 asset margin was 93%, a non-IFRS measure that adds back depletion and noncash prepaid costs. Wheaton’s US$3,466/GEO Q3 cash margin uses a different measure and gold deck, so it supports high operating leverage but cannot be directly ranked as a spread. Q3 2026 issuer release Wheaton Q3 2026 primary release.
Entry Barriers and Substitutes
Large upfront commitments, geological diligence and operator relationships limit entrants. Direct bullion and XIC are liquid substitutes for investors; XIC’s net 7.49% modeled return plus 2.00 pp is our capital-allocation hurdle. Northparkes E44 funding and guarantees TSX:XIC November 24 closing row Return worksheet.
Supplier and Customer Dynamics
Operators supply metal and bear mining capital needs; contract enforcement and mine economics determine actual volumes. The Cerro Lindo entitlement stepped from 65% to 25% in April 2026, proving that a headline asset name does not preserve the old cash right. Q3 MD&A, SEC Exhibit 99.1, November 3, 2026, pp. 10–12.
Regulation and Structural Risks
Foreign permits, water, labor and closure conditions can impair operators; Triple Flag’s legal right remains only as good as mine production and the contract. We assign no separate terminal discovery value beyond the finite delivery path. Northparkes E44 funding and guarantees 2025 AIF risk section.
Historical Performance
2025 revenue US$388.704m, operating cash US$312.832m and 113,237 GEOs followed 2024 revenue US$268.991m, cash US$213.503m and 112,623 GEOs. Nine-month 2026 revenue rose to US$382.886m while 83,870 GEOs were slightly below 84,480 in 2025. 2025 annual operating table Q3 interim statements, SEC Exhibit 99.2, November 3, 2026, statements pp. 1–3 and notes 4, 9, 12.
Income Statement Analysis
Q3 2026 net income US$64.240m compares with US$61.916m a year earlier. Nine-month US$337.469m includes US$81.259m disposal gains and US$37.772m fair-value gains, so reported EPS is an unsafe perpetual earnings base. SEC Q3 statement print, disposal-gain row Q3 interim statements, SEC Exhibit 99.2, November 3, 2026, statements pp. 1–3 and notes 4, 9, 12.
Balance Sheet Analysis
September 30 cash US$20.348m and revolver debt US$185m compare with US$71.284m and no debt at 2025 year-end. The disclosed US$5m October repayment is paired with a US$5m pro forma cash deduction, giving US$180m debt and US$15.348m cash before later undisclosed operating movements; US$84.3m E44 remains a future cash call. Lease obligations total US$1.108m; no NCI is disclosed. SEC Q3 statement print, balance-sheet cash row Q3 interim statements, SEC Exhibit 99.2, November 3, 2026, statements pp. 1–3 and notes 4, 9, 12 Q3 MD&A, SEC Exhibit 99.1, November 3, 2026, pp. 10–12 2025 audited balance sheet.
Cash Flow Analysis
Nine-month operating cash US$316.550m includes a US$13.555m working-capital outflow; pre-working-capital cash was US$330.105m after US$12.248m cash taxes. Mineral interest purchases consumed US$472.592m, so operating cash is not all available for dividends. SEC Q3 statement print, operating-cash row Q3 interim statements, SEC Exhibit 99.2, November 3, 2026, statements pp. 1–3 and notes 4, 9, 12.
Earnings Quality
The Steppe amendment produced a fixed-delivery financial asset and noncash revaluation. We model remaining deliveries as ounces and do not add the US$95.960m Steppe carrying value to NAV. US$81.259m disposition gains are excluded from forecast cash. SEC Q3 statement print, Steppe remaining-ounce row SEC Q3 statement print, disposal-gain row Q3 interim statements, SEC Exhibit 99.2, November 3, 2026, statements pp. 1–3 and notes 4, 9, 12 Q3 MD&A, SEC Exhibit 99.1, November 3, 2026, pp. 10–12.
Nonrecurring Items
2024 included US$148.034m impairment charges; 2025 included US$46.233m fair-value gains and US$6.710m asset disposals. These make trailing IFRS earnings multiples unstable even before 2026 Steppe accounting. 2025 audited income statement.
Funding and Cash Conversion
Nine-month 2026 cash after operating flow and mineral purchases was negative US$156.042m before dividends, buybacks and funding. The company drew US$355m and repaid US$170m of debt, paid US$36.083m dividends and US$41.207m for repurchases. Future investments must be funded by cash or debt; the model deducts E44 and a separate annual replacement budget. SEC Q3 statement print, operating-cash row Q3 interim statements, SEC Exhibit 99.2, November 3, 2026, statements pp. 1–3 and notes 4, 9, 12.
Key Ratios
Q3 operating cash/revenue was 86.2%, versus 2025 full-year 80.5%; both reflect contemporaneous metal prices and portfolio mix. Q3 GEO volume contracted despite higher cash, so these ratios are cross-checks rather than sustainable margins. Q3 2026 issuer release 2025 annual operating table.
Forward Outlook
Three frozen tests: (1) 2026 GEOs: base 105–110k, downside below 100k, upside 110k; Q4 release settles it. (2) 2030 risk-weighted GEOs: base 140k, downside 125k, upside 155k; the February 2027 guidance and annual operating disclosures settle the path. (3) 2027 cash after purchase, overhead, tax and US$20m replacement: base US$257.1m, downside US$240.2m, upside US$297.1m; 2027 statements and acquisitions settle it. Q3 operating and guidance rows Generated paths.
Model Choice
We discount a finite 2027–2051 net cash schedule; each labeled model year runs November 24 to the next November 24, so the first five periods end exactly November 24, 2031. No perpetuity or uncapped exploration option is embedded. Revenues equal modeled GEOs times a flat US$3,600/oz gold equivalent price, with Ravenswood thresholds and Steppe fixed deliveries separately scheduled. The terminal claim at November 24, 2031 is remaining 2032–2051 NAV plus retained cash less claims. Python model Inputs.
Growth
Base model-year 2027–31 GEOs are 108/118/128/140/145k; each model year ends November 24, a one-month timing difference from issuer calendar guidance. The 2030 base is below management’s 150–160k, because we risk-weight 55k potential development GEOs to 40k expected; these project weights are Peralta judgment. Northparkes E44 costs US$84.3m, while Gunnison’s unexercised expansion would cost US$65m and may be bought down; neither is a free full-probability option. Q3 operating and guidance rows Northparkes E44 funding and guarantees Gunnison Q3 2026 commitments note.
| 2030 model-year development source | Unrisked GEO (k) | Probability | Weighted GEO (k) | Direct TFPM funding (US$m) |
|---|---|---|---|---|
| Northparkes E22/E44 and mill | 22.0 | 80% | 17.6 | 84.3 |
| Kone royalty ramp | 8.0 | 85% | 6.8 | 0.0 |
| Hope Bay development | 10.0 | 50% | 5.0 | 0.0 |
| Gunnison/Johnson Camp | 5.0 | 60% | 3.0 | 0.0 |
| Other signed development rights | 10.0 | 76% | 7.6 | 0.0 |
| Total | 55.0 | 72.7% weighted average | 40.0 | 84.3 |
Probabilities and volumes are Peralta judgments, not operator forecasts. Changing one probability moves the 2027–31 GEO path by a ramped share of its change in weighted 2030 GEOs. The Gunnison case excludes exercise of the US$65m expansion option and allows for the disclosed royalty buydown. Other operator-funded projects carry no additional TFPM direct commitment in this model.
Profitability
At US$3,600 gold, the model charges 10% cash metal cost on the stream portion of non-Steppe other GEOs, with 20.5% treated as royalty volume and no purchase charge. Ravenswood pays 10% until 194,200 cumulative deliveries then 20%; overhead starts US$32m in 2027, with 15% cash tax. These are forecasts calibrated against reported cash, not a restatement of IFRS depletion. SEC Q3 MD&A print, Ravenswood 194,200-ounce threshold SEC Q3 MD&A print, royalty-revenue total Q3 MD&A, SEC Exhibit 99.1, November 3, 2026, pp. 10–12 Q3 interim statements, SEC Exhibit 99.2, November 3, 2026, statements pp. 1–3 and notes 4, 9, 12 Cash schedule.
Reinvestment or Required Capital
E44 US$84.3m is deducted once as a pending December 2026 commitment. A US$20m annual portfolio replacement reserve is deducted from 2027 onward but receives no separate future GEO credit; mine-level sustaining capex is the operators’ burden. The reserve makes the long-life tail less generous. Northparkes E44 funding and guarantees Input file.
Discount Rate
We use a nominal USD 9.5% asset cash discount and separately compare a 7.49% net five-year XIC return plus 2.00 percentage points. This is an analyst required return, not a measured TFPM WACC. At 10.5% cash discount, fair value falls from C$17.21 to C$15.96 and the hurdle ceiling from C$16.77 to C$16.18; the decision remains Wait. Executable inputs Sensitivity output.
Terminal Economics
There is no perpetuity: 2051 is the last cash year, after 2031 other GEOs decline 2.5% annually through 2041 then 5%; Ravenswood’s 5.5% stream declines to 3.75% after 194.2k cumulative ounces and 2.5% after 253k. The 2031 exit includes only remaining scheduled cash and accumulated residual after dividends, without interest on that residual. Cash replacement remains US$20m from 2031 into 2032. Holding other GEOs flat through 2051 raises fair value to C$19.85; even this asset-life test does not warrant the close. SEC Q3 MD&A print, Ravenswood 194,200-ounce threshold Q3 MD&A, SEC Exhibit 99.1, November 3, 2026, pp. 10–12 Finite rows.
| Model year ending November 24 | Total GEO (k) | Revenue (US$m) | Cash metal (US$m) | Overhead (US$m) | Cash tax (US$m) | Replacement (US$m) | Cash after required investment (US$m) |
|---|---|---|---|---|---|---|---|
| 2031 | 145.0 | 522.0 | 41.9 | 34.6 | 66.8 | 20.0 | 358.7 |
| 2032 | 141.8 | 510.6 | 41.0 | 35.3 | 65.1 | 20.0 | 349.1 |
The replacement reserve remains US$20m at the forecast boundary. Holding other GEOs flat after 2031 instead of declining would raise finite fair value from C$17.21 to C$19.85 and the hurdle ceiling from C$16.77 to C$19.41; this is a deliberately optimistic asset-life check, not the base case.
Bridge to One Common Share
Pro forma cash US$15.348m (September US$20.348m less October US$5m debt paydown) and investments US$24.323m offset US$180m disclosed post-October debt, US$1.108m leases and US$84.3m E44 funding. We include 205.685460m November 3 common shares plus 0.387921m incremental options: 206.073381m. No assumed buybacks, preferred shares or NCI. The Steppe financial asset is already represented by fixed deliveries, so it is not added again. SEC Q3 statement print, balance-sheet cash row SEC Q3 statement print, common-share row SEC Q3 MD&A print, outstanding option row SEC Q3 statement print, Steppe remaining-ounce row Q3 interim statements, SEC Exhibit 99.2, November 3, 2026, statements pp. 1–3 and notes 4, 9, 12 November 13 NCIB renewal, SEC Exhibit 99.1 2025 AIF capital and voting rights Generated bridge.
Model years end on November 24, so the first five rows span November 24, 2026 through November 24, 2031 exactly. Every row funds four quarterly dividends from December through September.
| Model year ending Nov 24 | Other GEO (k) | Ravenswood GEO (k) | Total GEO (k) | Sales (US$m) | Cash metal (US$m) | Overhead (US$m) | Tax (US$m) | Replenishment (US$m) | Cash (US$m) |
|---|---|---|---|---|---|---|---|---|---|
| 2027 | 96.0 | 12.0 | 108.0 | 388.8 | 30.8 | 32.0 | 48.9 | 20.0 | 257.1 |
| 2028 | 103.0 | 15.0 | 118.0 | 424.8 | 33.9 | 32.6 | 53.7 | 20.0 | 284.5 |
| 2029 | 110.0 | 18.0 | 128.0 | 460.8 | 37.0 | 33.3 | 58.6 | 20.0 | 311.9 |
| 2030 | 122.0 | 18.0 | 140.0 | 504.0 | 40.4 | 34.0 | 64.4 | 20.0 | 345.2 |
| 2031 | 127.0 | 18.0 | 145.0 | 522.0 | 41.9 | 34.6 | 66.8 | 20.0 | 358.7 |
| 2032 | 123.8 | 18.0 | 141.8 | 510.6 | 41.0 | 35.3 | 65.1 | 20.0 | 349.1 |
| 2033 | 120.7 | 18.0 | 138.7 | 499.4 | 40.1 | 36.0 | 63.5 | 20.0 | 339.8 |
| 2034 | 117.7 | 18.0 | 135.7 | 488.6 | 39.2 | 36.8 | 61.9 | 20.0 | 330.7 |
| 2035 | 114.8 | 18.0 | 132.8 | 478.0 | 38.4 | 37.5 | 60.3 | 20.0 | 321.8 |
| 2036 | 111.9 | 18.0 | 129.9 | 467.6 | 37.8 | 38.2 | 58.7 | 20.0 | 312.9 |
| Bridge | US$m except CAD/share |
|---|---|
| PV 2027–2051 finite cash | 2706.4 |
| Net debt, lease, E44 less cash/investments | (225.7) |
| Equity NAV | 2480.7 |
| Diluted shares (m) | 206.073 |
| CAD/USD | 1.4296 |
| Fair value (CAD/share) | C$17.21 |
| Exit 2031 (CAD/share) | C$24.22 |
| Dated dividends FV 2031 (CAD/share) | C$2.18 |
| Hurdle ceiling (CAD/share) | C$16.77 |
| Joint stress reduction (CAD/share) | C$2.90 |
| Maximum entry (CAD/share) | C$13.87 |
Price-Implied Expectations
At the C$39.97 close and the same dated distributions, costs, FX and finite life, the five-year hurdle requires US$7,647/oz flat gold with our GEO path. Holding gold at US$3,600 requires 288k 2030 GEOs on a ramped path, far above the issuer’s 150–160k outlook. A materially higher sustained metal deck is the more credible contrary mechanism; it remains a commodity speculation rather than disclosed output. Solved sensitivity Q3 operating and guidance rows.
Independent Cross-Check
2025 cash of US$312.832m at the then-gold deck and 113.237k GEOs provides a cash anchor; the base 2027 cash forecast of US$257.1m at US$3,600 and 108k GEOs is of similar order. The IFRS carrying value of US$2.293bn mineral interests at September 2026 is not fair value and excludes/values prepaid rights differently; it is only a reasonableness check. 2025 audited cash flow Q3 interim statements, SEC Exhibit 99.2, November 3, 2026, statements pp. 1–3 and notes 4, 9, 12.
Conclusion and Change from Prior Edition
This is a correction to the first TFPM authored edition, 2026-11-24-01. We find C$17.21 fair and C$13.87 maximum entry versus C$39.97 close, a Wait. Edition 2026-11-24-02 changes the displayed joint-stress reduction from C$2.89 to C$2.90, the difference between the same-rounded C$16.77 no-stress ceiling and C$13.87 entry. The underlying unrounded stress effect is C$2.893; the model economics and decision are unchanged. Decision table.
Peer Selection
Wheaton provides a primary streaming operating comparison; TFPM’s own 2025 and Q3 filings provide the denominator anchor. We do not infer a target from an unrelated miner P/E or an unverified same-day peer equity price. Wheaton Q3 2026 primary release Q3 2026 issuer release.
Dated Ratio Table
| Issuer / reported period | GEOs sold | Revenue (US$m) | Operating cash (US$m) | OCF / revenue | OCF / GEO sold (US$) |
|---|---|---|---|---|---|
| TFPM Q3 2026 | 25,030 | 106.682 | 91.971 | 86.2% | 3,674 |
| TFPM FY2025 | 113,237 | 388.704 | 312.832 | 80.5% | 2,763 |
| Wheaton Q3 2026 | 192,270 | 771.734 | 644.856 | 83.6% | 3,354 |
| Q3 2026 issuer release 2025 annual operating table Wheaton Q3 2026 primary release, Q3 operating review, GEOs sold and operating-cash-flow rows. |
Comparability Adjustments
The table uses USD operating cash/revenue and operating cash/GEO sold for each issuer; acquisition payments remain outside operating cash for both. Wheaton sold 192,270 GEOs but produced 230,965 in Q3, so the production denominator must not be substituted. Working capital, stream payment terms, period gold prices, silver mix and finite asset lives differ. Therefore no direct valuation multiple is fitted. Wheaton Q3 2026 primary release Q3 MD&A, SEC Exhibit 99.1, November 3, 2026, pp. 10–12.
Implications for Value
TFPM’s reported Q3 OCF/GEO supports high cash conversion but does not establish cash generation at US$3,600 gold or prove growth to 155k GEOs. Our finite NAV and market-implied tests carry the decision. Model output.
Bear Case
Joint bear: US$3,400 gold and 125k 2030/130k 2031 GEOs. Fair value is C$14.18 and hurdle ceiling C$13.87. Lower metal prices and delayed ore access can coincide; this joint case defines the entry margin of C$2.90. Scenario output.
Base Case
US$3,600 gold and 140k/145k GEOs in 2030/31 yield C$17.21 fair and C$16.77 unstressed hurdle ceiling. E44 is funded, Ravenswood steps down in later years and no automatic repurchase increases per-share value. Scenario output.
Bull Case
US$4,000 gold and 155k/160k 2030/31 GEOs give C$21.95 fair and C$21.24 hurdle ceiling. This is closer to issuer volumes but still requires commodity and development execution. Q3 operating and guidance rows Scenario output.
Outcomes at Close and Entry
At C$39.97 the base expected annual net return is -7.98%, a -15.46 percentage point spread over net XIC. At C$13.87 the stress is sized to the 9.49% required return. The bear fair value is above entry, limiting modeled mark-to-NAV loss there, but a deeper price/volume break can still cause loss. Decision Scenarios.
| Assumption | Close | Fair value | Maximum entry | Price rule |
|---|---|---|---|---|
| Base | C$39.97 | C$17.21 | C$13.87 | Wait |
| Joint bear | C$39.97 | C$14.18 | C$13.87 | Wait |
| Bull | C$39.97 | C$21.95 | C$21.24 | Wait |
Market-Implied Case
The conditional price-implied cases are US$7,647 gold or 288k 2030 GEOs at US$3,600. Neither is issuer guidance. The observable rejection test is 2027 five-year guidance that fails to reach at least 155k 2030 GEOs together with spot gold below US$4,000; that evidence would weaken the optimistic cash route. Q3 operating and guidance rows Root solve.
Analyst Assessment
The strongest credible contrary view is a durable gold price above US$4,000 plus management’s 155k 2030 GEO midpoint. Yet even that modeled bull has a C$21.24 hurdle ceiling, below the close; the numerical decision remains Wait. The model’s long-dated depletion assumption is the main uncertainty, and additional reserve life could raise value. Scenario output Q3 operating and guidance rows.
Operating Risks
Northparkes E22 and the mill study can slip; the Q3 Northparkes 4,133 GEOs versus 10,617 a year earlier shows near-term volatility. Revisit after the June 2027 studies and first E48/E22 delivery evidence. Northparkes E44 funding and guarantees Q3 MD&A, SEC Exhibit 99.1, November 3, 2026, pp. 10–12.
Financial and Liquidity Risks
The US$84.3m E44 payment follows the US$185m September debt balance; the disclosed US$5m October paydown does not remove the funding need. New debt or equity issuance would reduce common per-share value beyond the modeled bridge. Q3 interim statements, SEC Exhibit 99.2, November 3, 2026, statements pp. 1–3 and notes 4, 9, 12 Q3 MD&A, SEC Exhibit 99.1, November 3, 2026, pp. 10–12.
Regulatory and Legal Risks
Operator permits and local enforcement affect deliveries. Ana Paula filed an underground permit in October 2026; Buriticá reports illegal-miner disruption. Revisit if permits are denied or production guidance falls. Cerro Lindo and Buriticá asset rows Issuer asset update p.6.
Industry and Competitive Risks
Spot metals and capital scarcity affect both immediate sales and the price of new streams. A sustained US$3,400 gold deck with delayed 2030 volumes lowers our hurdle ceiling to C$13.87. Joint stress.
Thesis-Specific Risks and Reconsideration Triggers
Cerro Lindo’s 65%-to-25% April silver step-down and Ravenswood’s later lower entitlement illustrate contract cliffs. Gunnison may reduce TFPM’s gross revenue royalty from 3% to 2% and terminate an expansion option that otherwise requires US$65m; the probability-weighted development case includes that uncertainty and gives the expansion option no value. Track 2027 GEO guidance, Q4 2026 sales, Ravenswood cumulative deliveries and E44 funding. A calendar-2030 forecast materially above 155k supported by operator plans could lift the ceiling; the model must be rerun. Q3 MD&A, SEC Exhibit 99.1, November 3, 2026, pp. 10–12 Northparkes E44 funding and guarantees Gunnison Q3 2026 commitments note.
Environmental Factors
TFPM’s direct footprint is smaller than a mine operator’s, but mine permits, tailings and water practices influence contractual production and asset life. We model no ESG premium and apply finite lives to prevent indefinite credit for undeveloped rights. 2025 AIF risk disclosures.
Social Factors
Buriticá’s illegal mining and community tensions can affect throughput and cash entitlement. We assign the associated timing risk to development/volume weights rather than a separate arbitrary ESG haircut. Cerro Lindo and Buriticá asset rows.
Governance Factors
The principal shareholder owned or controlled 133.816m shares, about 65%, as of March 25, 2026 and has board nomination rights. One common share has one vote; concentrated influence can affect capital allocation and minority outcomes. 2025 AIF principal shareholder disclosure 2025 AIF capital and voting rights.
Financially Material Risks and Opportunities
Operator-funded expansions can grow royalties with little direct TFPM capex, while poor diligence can permanently impair upfront stream payments. We require positive per-share economics for future deals; the US$20m annual replacement reserve has no bonus NAV until an identifiable acquisition is underwritten. Northparkes E44 funding and guarantees Model inputs.
Annual Results
| US$m, FY ended December 31 | 2024 | 2025 |
|---|---|---|
| Revenue | 268.991 | 388.704 |
| Gross profit | 155.210 | 262.918 |
| General administration | 21.755 | 30.452 |
| Net income | (23.084) | 240.005 |
| Diluted EPS, US$ | (0.11) | 1.18 |
| 2025 audited income statement. |
Interim Results
| US$m, period ended September 30 | Q3 2025 | Q3 2026 | 9M 2025 | 9M 2026 |
|---|---|---|---|---|
| Revenue | 93.456 | 106.682 | 269.788 | 382.886 |
| Gross profit | 64.059 | 66.314 | 176.329 | 260.446 |
| G&A | 7.894 | 4.590 | 21.651 | 14.702 |
| Net income | 61.916 | 64.240 | 163.173 | 337.469 |
| SEC Q3 statement print, disposal-gain row Q3 interim statements, SEC Exhibit 99.2, November 3, 2026, statements pp. 1–3 and notes 4, 9, 12, consolidated income statement p.2, rows shown. |
Trailing Results
FY2025 less 9M2025 plus 9M2026 gives trailing revenue US$501.802m and net income US$414.301m. The latter includes US$81.259m 2026 disposal gains and US$37.772m fair-value gains; it is not forecastable earnings. 2025 audited income statement Q3 interim statements, SEC Exhibit 99.2, November 3, 2026, statements pp. 1–3 and notes 4, 9, 12.
Material Adjustments
The model replaces IFRS earnings with GEO-linked cash; it excludes one-time gains, adds no second value for Steppe’s US$95.960m financial asset and charges ongoing metal payments, corporate costs, tax and future replacement capital. Q3 interim statements, SEC Exhibit 99.2, November 3, 2026, statements pp. 1–3 and notes 4, 9, 12 Forecast bridge.
Annual Positions
| US$m at December 31 | 2024 | 2025 |
|---|---|---|
| Cash | 36.245 | 71.284 |
| Mineral interests | 1,646.634 | 1,894.470 |
| Total assets | 1,769.979 | 2,113.478 |
| Debt | 0 | 0 |
| Equity | 1,735.720 | 2,045.217 |
| 2025 audited balance sheet. |
Interim Positions
| US$m at September 30, 2026 | Amount |
|---|---|
| Cash | 20.348 |
| Investments | 24.323 |
| Mineral interests | 2,293.259 |
| Debt | 185.000 |
| Lease obligation, current + non-current | 1.108 |
| Equity | 2,308.961 |
| SEC Q3 statement print, balance-sheet cash row Q3 interim statements, SEC Exhibit 99.2, November 3, 2026, statements pp. 1–3 and notes 4, 9, 12, consolidated balance sheet p.1, exact rows. |
Capital and Claims Reconciliation
Start US$185m September debt and US$20.348m cash; apply the disclosed US$5m October repayment to both, giving pro forma US$180m debt and US$15.348m cash. Add US$1.108m leases and US$84.3m December E44 funding; offset US$24.323m investments. Net claim is US$225.737m. Actual November cash movements beyond this repayment are undisclosed. SEC Q3 statement print, balance-sheet cash row Q3 interim statements, SEC Exhibit 99.2, November 3, 2026, statements pp. 1–3 and notes 4, 9, 12 Q3 MD&A, SEC Exhibit 99.1, November 3, 2026, pp. 10–12 Bridge.
Annual Flows
| US$m, FY ended December 31 | 2024 | 2025 |
|---|---|---|
| Operating cash | 213.503 | 312.832 |
| Mineral interest purchases | 57.489 | 218.619 |
| Investing cash flow | (81.960) | (217.971) |
| Dividends paid | 43.279 | 45.845 |
| NCIB repurchases | 8.917 | 9.013 |
| 2025 audited cash flow. |
Interim Flows
| US$m, nine months to September 30 | 2025 | 2026 |
|---|---|---|
| Operating cash before working capital | 229.191 | 330.105 |
| Working capital change | (5.856) | (13.555) |
| Operating cash | 223.335 | 316.550 |
| Mineral interest purchases | 218.419 | 472.592 |
| Dividends | 33.968 | 36.083 |
| Repurchases | 8.018 | 41.207 |
| SEC Q3 statement print, operating-cash row Q3 interim statements, SEC Exhibit 99.2, November 3, 2026, statements pp. 1–3 and notes 4, 9, 12, cash flow statement p.3. |
Trailing Flows
FY2025 minus 9M2025 plus 9M2026 is US$406.047m trailing operating cash. Trailing mineral interest purchase cash is US$472.792m, far above that operating cash because Ravenswood was acquired; a simple OCF yield omits expansion spending. 2025 audited cash flow Q3 interim statements, SEC Exhibit 99.2, November 3, 2026, statements pp. 1–3 and notes 4, 9, 12.
Reconciliation to Common Shareholders
Nine-month 2026 operating cash US$316.550m less US$472.592m mineral purchases left a US$156.042m shortfall; dividends US$36.083m and repurchases US$41.207m increased the funding need to US$233.332m before other investing/financing items. Debt net issuance US$185m and opening cash financed much of it. In the forecast, annual cash after metal purchases, overhead, tax and US$20m replacement first services claims; US$0.24/share annual dividends are modeled, with residual retained for 2031 exit and no assumed buybacks. Q3 interim statements, SEC Exhibit 99.2, November 3, 2026, statements pp. 1–3 and notes 4, 9, 12 Model cash and exit.
Primary Sources and Locators
Annual originals: 2025 annual operating table; 2025 audited income statement; 2025 audited balance sheet; 2025 audited cash flow; 2025 AIF principal shareholder disclosure. Interim originals: Q3 2026 issuer release, Q3 operating and guidance rows, Northparkes E44 funding and guarantees, Cerro Lindo and Buriticá asset rows; complete SEC MD&A Q3 MD&A, SEC Exhibit 99.1, November 3, 2026, pp. 10–12 and interim statements Q3 interim statements, SEC Exhibit 99.2, November 3, 2026, statements pp. 1–3 and notes 4, 9, 12; printed SEC rows SEC Q3 statement print, balance-sheet cash row, SEC Q3 statement print, disposal-gain row, SEC Q3 statement print, operating-cash row, SEC Q3 statement print, common-share row, SEC Q3 statement print, Steppe remaining-ounce row, SEC Q3 MD&A print, royalty-revenue total, SEC Q3 MD&A print, Ravenswood 194,200-ounce threshold, SEC Q3 MD&A print, outstanding option row. The SEC HTML originals are retained owner-only. Public PDF prints of those exact SEC exhibits supply pinpoint numeric highlights with print pagination; the linked original SEC filing remains the authoritative document. The issuer release and annual PDFs are original public PDFs. Market/FX: TSX:TFPM November 24 closing row, TSX:XIC November 24 closing row, Bank of Canada daily digest, USD/CAD, November 24, 2026. Peer: Wheaton Q3 2026 primary release. SEC exhibits identify exact statement/note locations beside key tables.
Frozen Inputs and Assumptions
The public frozen JSON distinguishes reported (close, FX, 205.685m shares, cash, debt, leases, investments and E44), derived (0.388m incremental options and modeled net claims) and analyst estimates (gold, GEO path, cash tax, overhead, discount, replacement reserve, finite depletion and exit). The Q3 2026 statement notes and November NCIB notice govern the share and claims dates. A 25-year aggregate path is a simplifying valuation proxy, not an asset-by-asset reserve audit; this could materially understate or overstate value.
Worksheets and Saved Outputs
| Worksheet | Output |
|---|---|
| Finite NAV and entry calculation | Decision · Forecast and bridge · Project weights · Terminal test · Scenarios · Sensitivity and market price root |
Run from this edition folder with PYTHONDONTWRITEBYTECODE=1 PYTHONPATH=. /Users/johnperalta/johnperalta4vanilla/.venv/bin/python support/valuation.py on Python 3.12.13; the public script uses only the Python standard library and relative frozen inputs. Its JSON output is machine-readable. Valuation uses nominal USD cash and converts the result at C$1.4296/US$. Each model-year cash period ends on November 24; years 2027–31 span exactly five years and each funds the four quarterly payments December through September. The five-year shareholder test ends exactly November 24, 2031: quarterly US$0.06 payments are converted to CAD at frozen FX and carried to exit at 9.5% actual/365.25, with anniversary convention when relevant. Stock costs are 5 bp on entry and exit; XIC costs 3 bp on entry and exit; 7.5% gross XIC return less those costs becomes 7.487% annual, then a 200 bp hurdle is added. The model uses the same quote date and 206.073m diluted shares throughout.
Changes from the Preceding Edition
Edition 2026-11-24-02 corrects the displayed joint-stress reduction from C$2.89 to C$2.90 so it equals the difference of the same-rounded C$16.77 no-stress ceiling and C$13.87 entry. The first edition remains immutable. The unrounded stress effect is C$2.893; fair value, entry, model cash flows, source evidence and Wait decision are unchanged. At first intake, no published TFPM head or issuer-specific underwriting registration was found. The second analyst challenged volume extrapolation, Ravenswood tier terms, Cerro Lindo step-down, Steppe double counting, E44 funding, debt timing and dilution before the first draft; each is expressly treated in the model. The next review is after Q4 2026 GEO sales and February 2027 guidance.
| Revision driver | Fair value | Maximum entry |
|---|---|---|
| Prior | C$17.21 | C$13.87 |
| Displayed stress-reduction convention | C$0.00 | C$0.00 |
| Rounding | C$0.00 | C$0.00 |
| Current | C$17.21 | C$13.87 |
Closing Prices
| Date | Close (CAD) | Entry (CAD) |
|---|---|---|
| 2026-11-18 | 41.27 | |
| 2026-11-19 | 39.82 | |
| 2026-11-20 | 38.47 | |
| 2026-11-23 | 40.63 | |
| 2026-11-24 | 39.97 | C$13.87 |
TSX:TFPM November 24 closing row. This short dated chart uses TSX regular-session CAD closes, unadjusted; it is context, not a return series.