TransAlta Corporation — TA, TSX — 24 November 2026

Our maximum entry price is C$13.75 per share. The TSX common share closed at C$18.16 on 24 November 2026, so wait. The base case gives C$16.81 of fair value and a 7.33% five-year annual net return at that close, below the 9.49% XIC-plus-200-basis-point requirement; XIC closed at C$54.34 on the same date. The strongest contrary assumption is a slower Alberta power recovery with delayed Centralia cash flow: C$80 million less 2031 EBITDA plus C$500 million more net debt lowers the rounded no-stress C$16.25 ceiling by C$2.50 to the C$13.75 entry. We prefer the base to that joint stress because TransAlta has 2027 hedges and a contracted Centralia capacity agreement, but do not assign cash value to uncontracted data-centre plans. Q3 outlook and hedges; Centralia capital and timing; TSX:TA close; TSX:XIC close.

Stock Price History

Market close (CAD; TSX:TA, 2026-11-24)
C$18.16
Base fair value (CAD/share)
C$16.81
Company details
Maximum entry price (CAD/share)
C$13.75
2031-11-24 base exit (CAD/diluted share)
C$24.11
Expected annual net return at close
7.33%
XIC net annual benchmark
7.49%
Required return, XIC plus 200 bp
9.49%

Stock Price History

Closing prices

DateClose (CAD)Entry (CAD)
2026-11-1818.33
2026-11-1918.50
2026-11-2017.50
2026-11-2317.95
2026-11-2418.1613.75

The series is unadjusted TSX common-share closes, frozen at the cutoff; it does not include distributions. Price history.

Investment Thesis

TransAlta owns a mix of contracted hydro, wind, solar and gas generation plus Alberta merchant power exposure. The case for one common share requires both an Alberta price recovery and disciplined funding of new gas projects. At the close, our modeled exit and dividends do not clear the XIC hurdle. Fleet and merchant exposure, Q3 MD&A M4.

Market Mispricing

At C$18.16 the market requires roughly C$1.44 billion of 2031 adjusted EBITDA at our 9.5× exit multiple, C$91 million above our C$1.35 billion base, with other inputs fixed. This is a conditional price-implied operating result, not consensus. The gap is consistent with investors giving more credit to Alberta power prices, Centralia or data-centre opportunities than our case does. Model and saved output.

Recent Developments

The October 22 Oklahoma 49% sale for US$305 million and Colorado contracted gas acquisition for US$1 billion, including US$750 million of assumed project debt, were completed before the cutoff. The US$250 million equity purchase component and wind-sale proceeds are separately reflected in the pro-forma net-debt bridge. June's C$350 million common-share issue is already in the September share count. Issuer transaction release; Q3 cash-flow financing row.

Earnings Outlook

Management reaffirmed 2026 adjusted EBITDA of C$950–1,050 million and non-IFRS common FCF of C$350–450 million; nine-month actuals were C$759 million and C$338 million. Our 2031 base EBITDA C$1.35 billion and common FCF C$610 million are analyst forecasts, not guidance. Q3 outlook table M12.

Valuation Summary

A 9.5× 2031 EBITDA exit less C$3.70 billion modeled net debt, C$942 million listed preferred, C$400 million Brookfield exchangeable preferred and C$67 million other minority interests yields C$24.11 per diluted common share. Twenty dated C$0.07 quarterly distributions have C$1.78 future value at 9.5% carry. The entry also absorbs a C$2.50 joint operating/debt stress. Equity bridge.

Recommended Action and Entry Price

Wait at C$18.16. The C$13.75 maximum is rounded down to C$0.25 from the unrounded hurdle less a quantified C$2.50 joint stress, not a target price or prediction of near-term trading. At entry, the base annual net return is in the public worksheet output. Review after full-year 2026 results and the Centralia investment decision.

Catalysts

Full-year 2026 results will test C$950–1,050 million EBITDA and C$1.18–1.51 FCF per share; the early-2027 Centralia final investment decision will reveal the cost and timetable. Alberta 2029 realized merchant economics will test the larger growth case. Q3 outlook M12; Centralia M28.

Primary Risks to Thesis

Lower power prices, project delay and financing strain can coincide. The full bear exit is C$8.28 per share using C$1.05 billion EBITDA, 8×, C$4.30 billion debt and 325 million shares; with the same projected distributions this is a 26.94% total loss at the C$13.75 entry and 44.68% loss at the C$18.16 close. Investor Day's C$100/MWh 2029 Alberta spot assumption is well above 2025's C$44/MWh. Investor Day assumptions; Q3 funding M24–25.