Silvercorp Metals Inc. (TSX:SVM) — November 24, 2026
Our maximum entry price is C$4.60 per share. At the verified November 24 TSX regular close of C$9.42, the rule is Wait. Base fair value is C$7.50 and the five-year exit model yields only 0.28% net annual return at that close, 7.21 percentage points below the modeled XIC return. The strongest credible contrary case is that silver stays near the recent US$61.83/oz realized level rather than reverting toward the mine plan's US$28/oz long-run market price: holding other inputs fixed, sustained silver +US$34/oz raises fair value to C$13.20 and the entry ceiling to C$9.70, a Buy at this close. The evidence favoring the base is the reserve plan's explicitly lower long-run silver deck, while the contrary case remains live until post-restart realized prices and cash prove otherwise. This is a first edition, with no predecessor. All amounts are US$ unless marked CAD; the quoted share, close and entry are CAD. Next review: Ying's December 2026 production update, GC approval, and El Domo's next cost/schedule disclosure. Ying reserve economics · Q2 realized metal prices · TSX close history
- Market close (CAD)
- C$9.42
- Base fair value (CAD)
- C$7.50
Company details
- Maximum entry price (CAD)
- C$4.60
- Five-year exit price (CAD)
- C$9.33
- Net hurdle price (CAD)
- C$6.07
Investment Thesis
Silvercorp owns profitable Chinese silver-led mines, principally Ying, and is financing the El Domo copper-gold build in Ecuador. The thesis is a portfolio of finite cash flows and a funded development option, not a perpetual silver multiple. Ying's 2026 reserve schedule runs to FY2042, but Silvercorp's economic interest is approximately 79%, not 100%. GC is excluded from near-term production until safety approval. El Domo is charged for all US$207.3 million remaining construction capital and its precious-metal stream before the shareholder bridge. Ying reserve cash table · El Domo remaining cost
Market Mispricing
The close exceeds fair value by C$1.92/share; fair value exceeds the maximum entry by C$2.90/share. Those signed steps sum to the C$4.82 gap between C$9.42 and C$4.60. The market can be rational if silver holds near recent realized prices and El Domo delivers on schedule. The base does not capitalize that price indefinitely because the reserve plan uses US$28/oz market silver after FY2028. The model-implied silver price for fair value to equal the close is about US$39.47/oz long term; the price required for the entry rule to reach C$9.42 is about US$60.03/oz, with other assumptions held fixed. The entry threshold is solved from the rounded C$0.05 entry rule, not the fair-value slope; +US$32.031/oz is the first modeled Buy. These are conditional reverse calculations, not consensus. Ying price deck
Recent Developments
Ying's safety works suppressed Q2 FY2027 output; management says the works were substantially completed and operations approved to resume. GC remains suspended pending design approval. On November 3 El Domo's budget rose from US$283.6 million to US$298.2 million and target production moved four months to November 2027. October 16 added an approximately US$112 million three-year loan draw, with US$107 million net proceeds. Q2 operations · loan subsequent event
Earnings Outlook
The first forecast is the remaining FY2027 Ying cash, not the reported six-month CFO. The model uses US$35 million after-tax mine cash for the post-September period against a US$104.82 million full FY2027 reserve-plan number, then US$139.35 million in FY2028. This is a conservative restart judgment. El Domo contributes no production cash before 2028, and GC only a delayed recovery proxy. The next three checkpoints are: FY2027 Ying processed tonnes and silver ounces; GC restart approval plus tonnes; and El Domo remaining spend, stream draws and first production month. Ying plan · GC suspension
Valuation Summary
A finite mine cash model yields C$7.50/share, using 9.0% for China and 9.5% for the Ecuador project, 1.4296 CAD/USD, and 256.93 million economically diluted shares. The model includes projected US$87.75 million remaining stream proceeds as funding and reduces later El Domo cash for streamed metal. It does not add the issuer's US$428 million quoted portfolio indication on top of its US$123.071 million combined investment book balances. The latter are carried at book pending a security-by-security liquidation bridge. balance sheet · Bank of Canada FX
Recommended Action and Entry Price
Wait above C$4.60. A five-year net XIC hurdle of 7.49% annual plus 2.00 points requires C$6.0721 at the forecast C$9.33 exit and dated distributions. The joint downside reduces base fair value by C$1.45; a C$1.45 stress-only deduction from the C$6.05 rounded unstressed ceiling gives C$4.60. The stress joins silver US$6/oz lower, El Domo US$50 million overrun and no GC recovery. This is deliberately more demanding than fair value because a buyer would bear correlated execution and commodity risk. The price rule is evaluated before sizing any trade; no trade is proposed here. cost increase and contingency
Catalysts
Ying's resumed throughput could confirm the FY2028 ramp; GC safety design approval could restore a modest mine; El Domo's tailings facility, power line and November 2027 startup could derisk cash. The dividend declared November 4, payable by December 11, is US$0.0125/share; later equal semiannual payments are forecasts, not declarations. dividend notice
Primary Risks to Thesis
A sustained silver price near US$60/oz would make Wait too conservative. The opposite risk is a further El Domo construction delay and cost increase while Chinese mine cash weakens. The stream and conversion terms make simple enterprise-value arithmetic especially misleading. El Domo budget · convertible terms
Stock Price History
Closing prices
| Date | Close (CAD) | Maximum entry (CAD) |
|---|---|---|
| 2026-11-17 | 11.18 | |
| 2026-11-18 | 10.86 | |
| 2026-11-19 | 10.42 | |
| 2026-11-20 | 9.50 | |
| 2026-11-23 | 9.99 | |
| 2026-11-24 | 9.42 | 4.60 |
The six TSX regular-session closes are unadjusted CAD observations from the dated exchange-specific history; they do not represent total returns. TSX:SVM daily history
Company Overview
Silvercorp is a British Columbia issuer with producing mines in China and development projects in Ecuador and the Kyrgyz Republic. It reports in US dollars while this edition values TSX shares in CAD. corporate and listing note
Products and Services
Ying sells silver, gold, lead and zinc concentrates; GC sells silver/lead/zinc concentrates. El Domo is a copper-gold polymetallic development. Economic revenue is payable metal after smelting and refining, not contained reserve ounces times spot prices. Ying metal schedule · El Domo metal schedule
Business Model
Operating cash pays site costs, taxes, sustaining and growth capital, then minorities, project funding and parent claims before anything belongs to the listed share. The reported Q2 US$62.683 million CFO includes a US$43.875 million long-term Wheaton deposit; US$18.808 million is the arithmetic CFO excluding that receipt, before any other normalization. cash flow row
Revenue Drivers
Silver price and Ying ore volume are dominant; the Ying technical report estimates 69.3% of mine revenue from silver. Q2 FY2027 revenue fell to US$72.097 million from US$83.330 million as safety works cut output, despite stronger realized prices. Ying revenue mix · Q2 revenue
Cost Structure
Ying's 2026 reserve model includes mining, milling, shipping, resource tax, site G&A, government fees, sustaining and growth capital. El Domo must add state and Altius royalties, local operating costs, profit sharing, tax, sustaining and closure spending. Parent overhead is modeled separately at US$22 million/year through 2031. Ying cost table · El Domo cash table
Operating Levers
A return from Q2's safety interruption and the No. 3 mill's planned capacity addition drive Ying's modeled US$139.35 million FY2028 cash, while prolonged stoppage would impair it. The mill budget is real investment, already inside the technical cash schedule; the model does not deduct it again. mine plan and capital
Distribution
Concentrates are sold to smelters and priced by reference to the Shanghai silver, lead and zinc markets; payment depends on payable content, refining and treatment terms. A metal-market price cannot simply be applied to gross mined tonnes. metal price risk note
Geographic Exposure
China supplies current mine revenue and cash; Ecuador is the principal construction outlay and future copper-gold cash; Kyrgyz development consumes capital without a positive base NAV here. Country and currency risk are not diversified away by the Canadian listing. corporate note
Regulatory Environment
China safety upgrades affected Ying and keep GC suspended. Ecuador's El Domo construction faces water, tailings and power-line approvals. These are modeled through the FY2027 Ying reduction, GC haircut and El Domo overrun stress, respectively. GC suspension · project update
Industry Structure
SVM is a multi-metal miner, so silver peers are benchmarks for operating quality, not direct substitutes for its geographic and construction risks. Price takers compete on ore grade, recovery, mine cost and access to permits and capital. issuer price risk
Growth and Cyclicality
Ying's reserve schedule supports volume growth to about 1.6 million tonnes/year by FY2029 before depletion. Silver prices can change cash value faster than that production ramp. The model tests US$6/oz downside and a US$34/oz sustained upside rather than extrapolating one quarter. annual ore schedule
Competitors
Pan American Silver and First Majestic are listed silver-led comparisons. Their September 2026 quarters supply operating ratios, while SVM's quarter reflects Ying safety work and GC suspension. Neither peer owns SVM's El Domo stream and staged minority entitlement. PAAS report · AG report
Market Share
A defensible global silver market share cannot be computed from these filings alone because payable and contained ounces differ. The model uses each asset's disclosed reserve schedule and realized prices; market share is not a valuation input. Ying production table
Competitive Advantages
Ying's long reserve schedule, existing infrastructure and high silver exposure distinguish it from an unbuilt mine. El Domo has an updated feasibility model and funding stream, but the funder's metal entitlement limits common-share upside. Ying life · El Domo financing
Pricing and Cost Position
Q2 FY2027 Ying cash cost was US$96.76 per tonne processed, higher than US$82.89 a year earlier, while volume was lower. A per-ounce byproduct-credit AISC comparison is distorted by lead/zinc price and mix. The valuation therefore changes explicit silver receipts and mine cash instead of imposing a peer AISC multiple. Ying cost
Entry Barriers and Substitutes
Resources require licenses, processing plants, capital and years of development; ore grades and recoveries cannot be replicated by a trading competitor. Investors can substitute diversified silver miners, but SVM's China/Ecuador exposure and stream differ. The peer ratios below are an operating cross-check, not the value conclusion. Ying reserve report
Supplier and Customer Dynamics
El Domo's unit-cost construction contractor and pending equipment delivery create execution dependence, while smelters' payable-metal terms affect realized price. The November budget separately identifies US$8.3 million diesel-related package increases. project budget
Regulation and Structural Risks
Mining safety and tailings approvals can make an otherwise positive reserve NAV unavailable for years. The El Domo power line delay may lengthen diesel generator use and raise operating costs, beyond capital overrun. El Domo power
Historical Performance
Fiscal 2026 revenue was US$438.135 million versus US$298.895 million in FY2025, but net income attributable to common was a US$9.944 million loss, largely distorted by the noncash convertible derivative loss. For the six months to September 2026, revenue was US$210.762 million; Q2 alone was US$72.097 million. annual income · interim income
Income Statement Analysis
The Q2 mine-operation margin was 55.3% (US$39.883 million/US$72.097 million), but it is consolidated before minority allocation and before parent costs. The six-month attributable earnings of US$64.690 million include gain and transaction effects; that amount is not the mine cash forecast. Q2 income rows
Balance Sheet Analysis
At September 30 cash was US$383.451 million; investments and associates were carried at US$63.889 million and US$59.182 million. Accounts payable and accrued liabilities were US$101.938 million, conversion note liability US$121.048 million book, Wheaton deposit liability US$90.423 million, rehabilitation US$9.908 million, and noncontrolling book equity US$196.028 million. These are accounting balances, not all additive deductions: working capital is embedded in mine FCF, the stream is modeled in metal delivery, minorities are taken at asset cash flow, and conversion is modeled in shares. statement of financial position
Cash Flow Analysis
FY2026 CFO US$310.568 million includes a US$43.875 million stream deposit, and cash spent on equipment and mine exploration/development was US$129.253 million before the US$91.696 million Chaarat acquisition. In Q2 FY2027 CFO US$62.683 million included another US$43.875 million deposit; equipment plus development cash was US$58.029 million. Mine capital spending and stream financing must stay separate in a normalized cash bridge. annual cash · interim cash
Earnings Quality
A reported cash-flow headline overstates recurring operations when it includes a stream advance. The Q2 arithmetic US$62.683 million less US$43.875 million is US$18.808 million, with working-capital movements and taxes still embedded. Noncash derivative revaluation also obscured FY2026 earnings. The model starts with reserve cash schedules and a current-quarter reset rather than annualizing either headline. Q2 CFO · annual derivative loss
Nonrecurring Items
The FY2026 US$178.544 million convertible derivative loss and Q2 FY2027 investment/dilution items are excluded from operating mine cash. The March 2026 bond amendment moved conversion into equity classification; it did not extinguish US$150 million principal or the 4.75% coupon. FY2026 annual report · bond terms
Funding and Cash Conversion
The US$207.3 million El Domo remainder can be met by the US$383.451 million September cash, US$107 million net October loan and the unreceived US$87.75 million of Wheaton installments, before other mine and development uses; this is gross liquidity, not free equity. US$50 million is reserved for Chaarat/Condor unfunded discretionary spend and parent cash costs are separately forecast. A US$50 million El Domo overrun lowers fair value by C$0.25/share; delayed output would cut it further. remaining project cost · loan net proceeds
Key Ratios
Q2 mine margin was 55.3%; Q2 unadjusted CFO/revenue was 86.9%, but CFO excluding the US$43.875 million deposit was 26.1% of revenue. The 60.8-point gap is financing classification, not superior mine economics. FY2026 dividend cash US$5.482 million was only 1.8% of reported CFO, which itself included the deposit and does not indicate a durable payout ratio. Q2 income and cash · annual dividend cash
Forward Outlook
Three frozen, testable forecasts: (1) Ying FY2028 silver output 8.04 million ounces base, 6.0 downside, 8.6 upside; compare the FY2028 production release against the same Ying mine perimeter. (2) Ying FY2028 after-tax pre-minority mine free cash US$139.35 million base, US$85 million downside, US$190 million upside; test against mine cash/capital disclosures and reconcile any changed silver deck. (3) El Domo total future construction spend from September 2026 US$207.3 million base, US$257.3 million downside, US$187.3 million upside, paired with first production by November 2027 base, May 2028 downside, August 2027 upside; compare each quarterly budget and commissioning disclosure. GC approved restart by end-2027 is an additional binary checkpoint. Ying plan · El Domo budget
Model Choice
The public Python worksheet reads frozen inputs and emits exact JSON, decision tables and valuation tables. Mine cash is finite: Ying FY2027-42, GC delayed through 2034, El Domo 2027-38. No perpetual terminal multiple or unquantified Condor/Chaarat resource value is added. Ying cash source · El Domo project table
Growth
Ying's FY2027 source cash US$104.82 million is reduced to US$35 million remaining after the September balance date because the plan predates the safety suspension. FY2028 source US$139.35 million is then used. GC recovers only from 2028 at US$12.5 million/year pre-minority, lower than the technical report's US$101.4 million 8% NAV when discounted from the revised restart date. El Domo's source production begins H2 2027; this edition removes 2027 operating cash and begins the 2028 source stream after the November 2027 targeted startup. GC technical NAV · El Domo timing
Profitability
Ying source FCF already deducts operating costs, tax, sustaining and growth capital. The silver sensitivity adds after-tax, attributable proceeds at 96% realization and 25% marginal tax. El Domo's technical FCF is reduced by US$42 million in 2028-29, then tapering, as an analyst estimate of streamed margin. An illustrative full year at 27,000 payable gold oz, 529,000 payable silver oz, US$3,390 gold and US$42 silver gives US$51.2 million gross value foregone: 50% × gold plus 75% × silver, each at the 82% unpaid share during deposit reduction. A roughly 18% effective tax shield brings this to US$42 million. The assumed volumes, tax shield and annual delivery phase are estimates; the metal-by-metal schedule and milestone timing are not disclosed in a way that verifies the exact annual deduction. A US$9 million/year larger loss for 2028-29 would lower fair by about C$0.08/share. El Domo technical cash schedule · stream delivery and payment terms
Reinvestment or Required Capital
Ying's technical FCF embeds future sustaining and growth capital; the FY2028 rows include US$32.40 million sustaining and US$35.03 million growth capital. El Domo's US$207.3 million remaining budget replaces the technical report's stale initial capital schedule; 2028 onward FCF embeds sustaining/closure. Its US$87.75 million undrawn Wheaton stream is added as one funding receipt, with later metal cash reduced. The US$50 million Chaarat/Condor provision has no corresponding positive project NAV. Ying capex rows · El Domo cost
Discount Rate
A one-point increase in both mine discount rates lowers fair value to C$7.21 and keeps the price rule at Wait; this isolates discount uncertainty from the silver sensitivity. The 9% Ying and GC nominal US-dollar rates exceed the Ying report's 5% illustrative rate to compensate for reserve execution, China safety approvals and single-asset concentration. El Domo is 9.5% versus its technical 8% rate for construction, weather and Ecuador risk. These are analyst hurdle rates, not measured WACC; 5% to 9% on Ying's source schedule alone materially lowers value. The separate 10% China/10.5% El Domo run is in the generated sensitivity and decision tables; lower rates could support a higher entry but cannot be assumed without evidence. Ying NPV5 · El Domo NPV8
Terminal Economics
No perpetuity is used. Mine cash after the November 24, 2031 exit, including December 2031 flows, is discounted back to that exact date; remaining finite years run to FY2042 for Ying and 2038 for El Domo. The base assumes El Domo's 95% qualifying-capital recovery entitlement through 2032 and 75% from 2033, although the contract ties the change to actual recovery rather than a date. The recovery account has not been independently reconstructed, so the public worksheet also bounds the case at 75% from first production: fair C$7.09 and entry C$4.25, still Wait. The 2031–32 table shows source cash with sustaining and closure where present. Ying finite cash · El Domo finite cash · El Domo ownership terms
| Boundary | Last explicit cash (US$M) | First following cash (US$M) | Included costs |
|---|---|---|---|
| El Domo: 2031 → 2032 | 58.5 | 78.8 | sustaining/closure in source mine FCF |
| Ying: 2031 → 2032 | 88.1 | 82.9 | sustaining/closure in source mine FCF |
Bridge to One Common Share
| Component | US$M PV |
|---|---|
| Ying | 605.3 |
| Gc | 56.6 |
| Domo | 363.5 |
| Overhead | -175.4 |
| Loan | -98.4 |
| Bond Coupon | -17.9 |
| Cash + October net loan proceeds + book investments | 613.5 |
| Common equity before dilution | 1347.2 |
| Economic diluted shares (M) | 256.93 |
| CAD/USD | 1.4296 |
| Base fair value (CAD/share) | 7.50 |
The treasury line is US$383.451 million cash plus US$107 million October loan net proceeds plus US$123.071 million book investments/associates. Loan interest and US$112 million principal are in the loan PV line. The base convertible path issues 32.41 million shares (US$150 million/US$4.628) plus 3.30 million estimated incremental award shares on top of 221.215 million basic shares; 256.93 million approximates the reported 256.916 million six-month diluted weighted count. Coupon cash is deducted until 2029. If share value is below the US$4.628 strike, the worksheet uses cash repayment of US$150 million and excludes conversion shares; the joint stress takes this branch, giving C$6.04/share and a C$1.45 stress deduction. This decision uses modeled per-share value as a proxy for holder behavior at maturity, a limitation if the future traded price diverges. The base alternative repayment branch is C$7.84/share after awards; these paths are mutually exclusive. US$101.938 million payables are operating working capital in source cash flows; rehabilitation and closure are in mine FCF. balance and note · conversion
Price-Implied Expectations
The C$9.42 close requires C$1.92/share more fair value than the base. Holding capital, ownership, FX and other metals fixed, that is a sustained +US$11.47/oz silver realization path, equivalent to approximately US$39.47/oz market silver against the long-run US$28/oz Ying plan. To meet the net XIC+2% entry test at C$9.42, silver needs roughly +US$32.03/oz, or US$60.03/oz sustained. Both are within recent observed realized pricing but would need to survive the FY2028 and later years, not just the next quarter. Ying deck · Q2 realized price table
Independent Cross-Check
The Ying technical report's US$1,030 million 5% post-tax NPV is a gross mine number; applying 79% ownership gives US$814 million before moving to a 9% rate or resetting FY2027. This edition's US$605 million Ying PV is directionally lower for both reasons. GC's technical US$101.4 million 8% NAV is reduced to US$56.6 million PV for suspended output. El Domo's US$573 million 8% technical NAV is not SVM equity: it assumes old capital/timing, unstreamed payable metal, 100% equity funding and no corporate finance; the adjusted project PV is US$363.5 million including future stream funding and staged attribution. Ying NPV · GC NPV · El Domo assumptions
Conclusion and Change from Prior Edition
First edition without a predecessor. The fair-to-entry C$2.90 gap comprises a C$1.43 net-return hurdle gap (C$7.50 less C$6.07, rounded), C$0.02 hurdle rounding, and the C$1.45 joint-stress deduction. The close-to-entry bridge is C$9.42 → C$7.50 (minus C$1.92) → C$4.60 (minus C$2.90). Exact unrounded prices and returns are in the public JSON. There is no inherited target or prior call to relabel.
Peer Selection
Pan American Silver (PAAS) and First Majestic (AG) are observable silver producers with September 2026 quarters. Their business mix and capital allocation differ; SVM has a larger Chinese silver mine contribution and a funded Ecuador build. The peer comparison tests operating margins rather than replacing the mine NAV. PAAS Q3 · AG Q3
Dated Ratio Table
| Issuer; quarter ended Sep. 30, 2026 | Revenue (US$M) | Mine operating earnings (US$M) | Mine margin = earnings/revenue | First source row |
|---|---|---|---|---|
| SVM; fiscal Q2 | 72.097 | 39.883 | 55.3% | Interim income |
| PAAS; calendar Q3 | 1,006 | 373 | 37.1% | Q3 report |
| AG; calendar Q3 | 394.1 | 170.1 | 43.2% | Q3 MD&A |
PAAS revenue is the US$1,006 million consolidated IFRS amount, not its US$1,137 million attributable non-GAAP revenue. AG's values are US$M. The ratios use the same nominal US-dollar quarter and mine income over revenue, but mine-level income includes different depreciation/royalty and joint-venture scopes. PAAS revenue row · AG revenue and income
Comparability Adjustments
SVM's 55.3% consolidated mine margin is not 55.3% attributable free cash: minorities, parent G&A, tax, capital, the stream and El Domo funding follow. PAAS's Juanicipio interests and AG's 70% Los Gatos interest make their reported consolidated/attributable measures differ as well. This table is a quality check; applying a peer EV multiple to SVM's unadjusted CFO would double-count financing. SVM minorities · PAAS attributable definition
Implications for Value
SVM's higher Q2 mine margin does not invalidate the Wait call because its quarter was smaller and the common-share bridge must fund El Domo, service debt and dilute upon conversion. The ratio also does not prove the silver deck: realized prices were exceptionally high across peers. A sustained high-price period could raise Ying's NAV enough to reverse Wait; that scenario is shown explicitly. SVM Q2 operations
Bear Case
Joint stress: long-run silver US$6/oz lower, El Domo construction cost US$50 million above the November budget, and GC has no recovery. Fair value falls to C$6.04, down 35.8% from the close. The same linked silver and funding pressure could occur if mine sales weaken while Ecuador spending continues. This is a lasting silver reduction, not a one-quarter shock. El Domo remaining cost · GC suspension
Base Case
Ying restarts to the FY2028 reserve path, GC has delayed US$12.5 million/year site cash, and El Domo starts late 2027 with US$207.3 million capital still to spend and the precious-metal stream deducted. Fair is C$7.50 and modeled 2031 exit C$9.33; at the C$9.42 close, forecast distributions barely lift annual wealth return above zero after trading cost. Ying source FCF · project update
Bull Case
A sustained US$20/oz lift in silver over the base adds about C$3.35/share of fair value, to C$10.85, without new resource or a stronger copper/gold deck. The stricter strongest-contrary case at +US$34/oz gives C$13.20 fair and C$9.70 entry. The bull case is testable against FY2028 realized prices and attributable Ying cash; recent Q2 prices alone are not proof of persistence. Ying metal schedule · Q2 realized price
| Case | Fair CAD/share | Exit CAD/share | Change at C$9.42 |
|---|---|---|---|
| Stress | 6.04 | 7.30 | -35.8% |
| Base | 7.50 | 9.33 | -20.4% |
| Bull: sustained silver +US$20/oz | 10.85 | 14.06 | +15.2% |
| Change, one at a time | Fair CAD/share | Delta CAD/share |
|---|---|---|
| Silver -US$6/oz | 6.69 | -0.80 |
| El Domo overrun +US$50M | 7.24 | -0.25 |
| GC no recovery | 7.18 | -0.32 |
| Mine discount rates +1 point | 7.21 | -0.28 |
| El Domo 75% from first production | 7.09 | -0.40 |
| Joint stress | 6.04 | -1.45 |
Outcomes at Close and Entry
| Assumption | Close | Fair value | Maximum entry | Price rule |
|---|---|---|---|---|
| Base | 9.42 | 7.50 | 4.60 | Wait |
| GC stays closed | 9.42 | 7.18 | 4.35 | Wait |
| Mine discount rates +1 point | 9.42 | 7.21 | 4.55 | Wait |
| Silver +US$34/oz sustained | 9.42 | 13.20 | 9.70 | Buy |
| El Domo 75% from first production | 9.42 | 7.09 | 4.25 | Wait |
The base Wait remains Wait if GC never restarts. At an actual C$4.60 entry, the joint-stress fair C$6.04 is above cost, but a price-mark loss could still occur if markets discount longer delays or lower metals. The table's entry is recalculated from each case's exit with the same C$1.45 stress allowance and C$0.05 rounding. The strongest contrary case flips the current price rule.
Market-Implied Case
The close implies long-run market silver near US$39.47/oz just to match intrinsic value, and about US$60.03/oz for a 2-point net outperformance entry. No extra project discovery value or equity-portfolio mark is required in this one-variable solve. If FY2028 Ying output is below 6 million ounces, the silver threshold rises; output and realized price must be assessed jointly. Ying long-run price and volume
Analyst Assessment
Wait is defensible only while the long-run silver deck remains conservative and the project stream haircut is approximately right. Sustained silver above US$60.03/oz with Ying output near 8 million ounces would invalidate the entry ceiling; a renewed El Domo budget above US$348 million or a startup beyond May 2028 would strengthen Wait. The highest-value next experiment is a security-level and metal-delivery reconciliation of El Domo's stream economics, followed by a revised attributable mine cash bridge.
Operating Risks
Ying safety remediation and GC's suspended production can keep throughput below the technical mine schedules; a FY2028 Ying miss below 6 million silver ounces is the downside checkpoint. The source report's production path is a reserve projection, not a guarantee. Ying schedule · GC suspension
Financial and Liquidity Risks
A US$50 million El Domo overrun costs C$0.25/share before any delay; US$112 million principal on the October loan matures after three years, and the US$150 million bond has a 4.75% coupon until conversion or repayment. Funding still appears feasible with September cash and remaining stream installments, but the project can crowd out other spending. loan · bond
Regulatory and Legal Risks
GC's suspension depends on design approval and safety work; El Domo's tailings and power infrastructure depend on regulators and contractors. The low US$14.3 million remaining contingency is a smaller buffer than the earlier US$17 million figure. GC · contingency
Industry and Competitive Risks
Silver, gold, copper, lead and zinc prices and payable terms can move together with FX and energy costs. El Domo's diesel adjustment already added US$8.3 million to contract packages. A weaker silver price raises the chance that debt and construction obligations are met from treasury rather than fresh mine cash. commodity risk · diesel increase
Thesis-Specific Risks and Reconsideration Triggers
Reconsider Wait if sustained silver pricing and production jointly support the US$60.03/oz implied hurdle or a security-level equity mark adds at least C$1.92/share of verified net value. Reconsider the base fair value downward if El Domo exceeds US$348 million total budget, first production slips beyond May 2028, or GC remains suspended beyond 2027. These are model triggers, not predictions.
Environmental Factors
Heavy rainfall and tailings/water-management redesign at El Domo caused the four-month target delay and higher budget; the updated release identifies the TSF, channels and noncontact water controls. The model tests US$50 million capital overrun and zero 2027 production. El Domo update
Social Factors
China safety rules halted operations and depressed Q2 Ying production; management says the Ying works were approved to resume, but GC remains closed. Employee and community safety thus translates directly into throughput risk rather than a generic ESG score. Q2 safety impact · GC closure
Governance Factors
The June 2026 AIF says directors and officers together controlled 8.594 million shares, about 3.9% of common shares on June 26; the reported denominator later rose to 221.215 million by September 30. This is influence but not outright control. Capital allocation deserves scrutiny because Kyrgyz/Condor spending has no positive NAV in this base. AIF ownership · interim share count
Financially Material Risks and Opportunities
El Domo's water, tailings and power build can determine the project's cash start and financing needs. The only quantified ESG-linked model lever here is the cost/startup stress; no carbon-credit or reputation value is inserted. A new permit or independent completion certificate would reduce the uncertainty, while a further contingency cut without a lower total cost would not. power line update
Annual Results
| FY ended March 31 (US$M) | 2025 | 2026 | Original |
|---|---|---|---|
| Revenue | 298.895 | 438.135 | Audited p8 |
| Mine operating income | 123.551 | 253.708 | Audited p8 |
| Net income attributable to common | 58.190 | -9.944 | Audited p8 |
The FY2026 negative common result includes noncash derivative remeasurement; it should not be read as negative mine cash. The annual period is April-March and is not calendar 2026.
Interim Results
| Period ended Sep. 30 (US$M) | Q2 FY2026 | Q2 FY2027 | Six months FY2027 | Original |
|---|---|---|---|---|
| Revenue | 83.330 | 72.097 | 210.762 | IAS 34 p2 |
| Mine operating income | 40.858 | 39.883 | 124.636 | IAS 34 p2 |
| Net income attributable to common | -11.516 | 5.315 | 64.690 | IAS 34 p2 |
Trailing Results
Using FY2026 less the prior-year six months plus the current six months gives trailing revenue US$484.233 million (438.135−164.664+210.762), trailing mine income US$301.663 million (253.708−76.681+124.636), and trailing common net income US$48.136 million (−9.944−6.610+64.690). The last measure remains distorted by nonoperating items. FY26 audited p8 · interim comparative p2
Material Adjustments
For valuation, the bridge is from September assets and claims into future mine cash: start US$383.451 million cash, add October loan net US$107 million, add investment book US$123.071 million, deduct the loan's principal/interest and bond coupons, and divide the converted-equity path by 256.93 million shares. FY2027 Ying is cut to US$35 million remaining; the technical source's FY2027 full-year cash is not annualized after the safety event. cash assets · Ying source
Annual Positions
| March 31 (US$M) | 2025 | 2026 | Original |
|---|---|---|---|
| Cash | 363.978 | 421.989 | Audited p10 |
| Other investments + associates | 63.293 | 108.884 | Audited p10 |
| Total liabilities | 305.553 | 358.558 | Audited p10 |
Interim Positions
| September 30, 2026 (US$M) | Amount | Treatment | Original |
|---|---|---|---|
| Cash | 383.451 | Treasury | IAS 34 p4 |
| Investments + associates | 123.071 | Book asset | IAS 34 p4 |
| Convertible book liability | 121.048 | Conversion shares + coupons | IAS 34 p4 |
| Wheaton contract liability | 90.423 | Future metal delivery | IAS 34 p4 |
| Noncontrolling book equity | 196.028 | Asset-level minority rates | IAS 34 p4 |
Capital and Claims Reconciliation
Cash is not wholly distributable: El Domo remaining capital is US$207.3 million, an October net loan adds US$107 million but creates US$112 million principal, and the stream's future US$87.75 million is tied to future gold/silver deliveries. The base branch recognizes 32.41 million conversion shares; the stressed repayment branch instead deducts US$150 million principal and uses fewer shares. No lease adjustment is material (about US$1.0 million at September), while site closure is in asset cash schedules. loan · bond conversion
Annual Flows
| FY ended March 31 (US$M) | 2025 | 2026 | Original |
|---|---|---|---|
| CFO reported | 138.631 | 310.568 | Audited p11 |
| Wheaton stream cash in CFO | 0 | 43.875 | Audited p11 |
| Equipment + development cash outflow | 79.803 | 129.253 | Audited p11 |
| Dividends to common | 4.948 | 5.482 | Audited p11 |
Interim Flows
| Q2 ended Sep. 30 (US$M) | 2025 | 2026 | Original |
|---|---|---|---|
| CFO reported | 39.180 | 62.683 | IAS 34 p5 |
| Wheaton stream cash in CFO | 0 | 43.875 | IAS 34 p5 |
| Equipment + development cash outflow | 27.811 | 58.029 | IAS 34 p5 |
Trailing Flows
Trailing CFO is US$347.473 million (310.568−87.461+124.366); trailing CFO excluding the two US$43.875 million stream receipts is US$259.723 million. This is still consolidated, includes working-capital changes, and precedes investing outflows and minorities. It is a cross-check, not a normalized common-share cash yield. annual cash · interim cash
Reconciliation to Common Shareholders
The modeled 2027 project uses US$207.3 million remaining El Domo capital with US$87.75 million subsequent stream funding, US$107 million October loan cash and US$112 million loan repayment in 2029; parent overhead and other development spending also use cash. Common dividends are US$0.0125 every half year in the forecast, or about US$3.17 million per payment at 256.93 million diluted shares; forecast distributions are deducted once from accumulated 2031 cash and then reinvested in investor wealth at 9.5%. Residual cash stays in the 2031 exit value; no buybacks are assumed. If cash turns negative before El Domo starts, the model would require new debt or dilution and the fair value would be overstated. El Domo budget · October loan
| Calendar year | Opening liquid cash US$M | Net operating/project/financing flow US$M | Common dividends US$M | Closing liquid cash US$M |
|---|---|---|---|---|
| 2026 | 490.5 | +0.0 | -3.2 | 487.2 |
| 2027 | 487.2 | -176.1 | -6.4 | 304.8 |
| 2028 | 304.8 | +200.5 | -6.4 | 498.8 |
| 2029 | 498.8 | +81.6 | -6.4 | 574.0 |
| 2030 | 574.0 | +177.6 | -6.4 | 745.1 |
| 2031 | 745.1 | +137.0 | -3.2 | 878.9 |
The minimum modeled liquid cash is US$304.8 million at December 2027 after the El Domo budget, future stream installments, loan coupon, parent costs, other development provision and common dividends. Investments of US$123.071 million are excluded from this liquidity schedule. The schedule is calendar-year liquidity, while the exit value discounts post-November 24, 2031 cash as residual. It assumes the four-condition Wheaton installments arrive; a missed draw would lower the 2027 minimum dollar for dollar until replaced with financing. The US$112 million loan principal is paid in 2029, and no new bond principal is paid on the conversion branch.
Primary Sources and Locators
The public originals include September 2026 IAS 34 statements and MD&A, FY2026 audited statements and AIF, June 2026 Ying/GC/El Domo technical reports, November 3 El Domo budget release, and September 2026 PAAS/AG peer filings. PDF links use physical page numbers and numeric row text selectors; the issuer and peer publisher links are listed in source index. The first edition has no predecessor. interim statements · project budget
Frozen Inputs and Assumptions
The frozen input JSON separates reported numbers, technical schedules and analyst judgments. As-of FX 1.4296 CAD/USD comes from Bank of Canada; future FX is held flat. The base does not assume a silver or gold hedge; observed realized prices are market-linked, not fixed contracted hedge cash. US$80 WTI is irrelevant to the mine NAV except through the already updated diesel cost; US$3,600 gold is a cross-check on El Domo's streamed margin rather than a second unstreamed gold value. Bank of Canada rate · El Domo fuel change
Worksheets and Saved Outputs
| Worksheet | Output |
|---|---|
| Valuation and return worksheet | Decision and price rule, Mine NAV and sensitivities, Exact result JSON |
The worksheet uses only the Python standard library and public inputs. Run PYTHONDONTWRITEBYTECODE=1 PYTHONPATH=. /Users/johnperalta/johnperalta4vanilla/.venv/bin/python support/valuation.py from the portable folder on this Mac; any Python 3.12 interpreter works for readers elsewhere. Its outputs are saved byte-for-byte in the edition and the tables above are pasted from them. Five-year horizon is November 24, 2031. XIC gross 7.5% annual becomes 7.49% net after 3bp per side; stock cost is 5bp per side. Dividends are dated and carried at 9.5% using actual/365.25 days, with integer anniversaries if any. declared dividend
Changes from the Preceding Edition
First edition without a predecessor. No earlier SVM entry or call is being revised. This edition freezes the November 24, 2026 close, evidence cutoff and asset cash model; later results must be judged against the three forecast checkpoints without rewriting this record.