Skeena Resources (TSX: SKE) — Eskay Creek common equity
Our maximum entry price is C$22.31 per share. The TSX regular-session close on November 24, 2026 was C$35.68, so wait. Our US$3,600 gold/US$50 silver base gives C$24.93 fair value and 4.23% five-year net annual return, below the 9.49% XIC-relative requirement. The strongest contrary case—US$2,700 gold, US$35 silver, one year of delay and C$200 million additional build cost—cuts fair value to C$12.59 and supports the wait; the advanced construction and committed procurement favor the base, while the 2027 production test remains open.
- Market close (CAD)
- 35.68
- Base fair value (CAD)
- 24.93
Company details
- Maximum entry price (CAD)
- 22.31
Issuer: Skeena Resources Limited · Listing: TSX SKE · Currency: CAD · Sector: Materials / gold and silver development · Research cutoff: 2026-11-24 Vancouver · Horizon: 2031-11-24 · Next review: 2027 commissioning update.
| Date | Close (CAD) | Maximum entry (CAD) |
|---|---|---|
| 2026-11-11 | 43.51 | — |
| 2026-11-16 | 40.55 | — |
| 2026-11-18 | 38.74 | — |
| 2026-11-20 | 33.71 | — |
| 2026-11-23 | 37.04 | — |
| 2026-11-24 | 35.68 | 22.31 |
Investment Thesis
Eskay Creek is a permitted, high-grade British Columbia gold and silver build with a finite, unusually front-loaded production plan. The 2023 DFS projects 2.769 million gold ounces and 80.052 million silver ounces over twelve processing years; the old US$1,800 gold case is only a starting schedule, not our valuation. DFS annual parameters, physical pp. 272–273 At the dated close we wait because even US$3,600 gold and US$50 silver do not clear our price rule after current financing claims.
Market Mispricing
The C$35.68 close is C$10.75 above base fair value; fair value is C$2.62 above maximum entry. The worksheet gives C$4,492 gold, with silver held at US$50, to earn the benchmark plus 200 basis points at the close before the execution reserve, or C$4,979 to make our 12% fair value equal the close. These are conditional price-implied paths, not consensus.
Recent Developments
The November 16 MD&A says the project was more than 80% complete on October 31, with 99% of procurement committed, and targets initial production in Q2 2027 and commercial production in Q3 2027. Construction status, Q3 MD&A p. 10 The April US$750 million 8.5% notes fund construction and bought back two-thirds of the stream, but their proceeds are partly restricted. US$750m note uses and coupon, Q3 MD&A p. 15
Earnings Outlook
Pre-production IFRS losses are not a mine earnings run rate. The 2026 nine-month loss was C$191.963 million and operating cash use C$40.605 million. September 2026 interim loss rows September 2026 interim cash-flow rows Our first material modeled 2027 mine cash is contingent on start-up and recovery; the three frozen checkpoints appear in Financial Analysis.
Valuation Summary
At US$3,600 gold, US$50 silver and 0.74 US$/C$, the model produces C$43.94 per diluted share at 2031-11-24, no cash distributions, C$24.93 discounted fair value, and 4.23% net annual return from the C$35.68 close. The benchmark net return is 7.49% and the required return is 9.49% after 3 bp XIC and 5 bp SKE one-way costs. Exact output.
Recommended Action and Entry Price
Wait above C$22.31. The no-stress ceiling is C$24.93, limited by our 12% fair-value discount, then reduced C$2.62 for the calculated one-year delay plus C$200 million build overrun. At the entry, the base five-year net annual return is 14.50%. This ceiling is a price rule, not a prediction that the stock will trade there.
Catalysts
The next check is year-end 2026 construction and electricity commissioning, followed by Q2 2027 initial production and Q3 2027 commercial production. The promised updated NI 43-101 report may alter grade, mine life, capital, recovery or Snip; no value is assigned to an unapproved extension. Construction status, Q3 MD&A p. 10
Primary Risks to Thesis
A sustained metal-price retreat, delayed commissioning, inaccessible restricted funds and the future royalty election can coincide. The joint case at US$2,700 gold, US$35 silver, a one-year delay and C$200 million extra build cost cuts fair value to C$12.59 and the hurdle ceiling to C$14.09. Financing contingency, interim note 1 Royalty election and liability, note 8
Company Overview
Skeena Resources Limited, TSX and NYSE SKE, is developing the 100%-owned Eskay Creek project in Tahltan Territory, British Columbia. It remains a development-stage company, not a producer. Financing contingency, interim note 1
Products and Services
Once commissioned, Eskay will sell payable gold and silver in concentrate. The DFS life-of-mine projection is 2.769 million gold and 80.052 million silver ounces; we do not count resources or Snip as reserves. DFS annual parameters, physical pp. 272–273
Business Model
Cash receipts depend on recovered metal, payability and prices, less concentrate treatment, royalties, the remaining gold stream, mining, processing, tax, sustaining capital and closure. The model starts with DFS after-tax annual cash then applies post-DFS claims in public Python. DFS years 1–6 cash-flow rows, p. 275 Remaining gold-stream terms, note 7
Revenue Drivers
The DFS puts years 1–5 at roughly 450,000 gold-equivalent ounces a year, but this AuEq conversion uses the old metal deck and should not be multiplied by today’s gold price. We scale separate DFS payable gold and silver revenue rows by the two prices and 0.74 US$/C$ conversion; recovered ounces alone would overstate receipts. DFS Year 1 payable gold revenue C$907.57m DFS Year 1 payable silver revenue C$233.86m
Cost Structure
DFS total operating cost is C$53.89 per processed tonne and includes its then-existing 2% NSR. We add 20% to its annual operating-cost rows and 7.25% total on the new net smelter revenue less the 2% royalty already in the DFS cash at its old metal deck. This includes the 2% on the incremental metal revenue. The AIF says 4.0–5.5% across tenures; adding the later 1% NSR and possible 1.5% option gives 6.5–8.0%, so 7.25% total is a midpoint judgment, not revised guidance. DFS annual parameters, physical pp. 272–273 DFS Year 1 royalty C$20.76m on C$1,037.85m NSR Royalty range, AIF p. 8 New 1% NSR, interim note 8 Royalty election and liability, note 8
Operating Levers
First-year gold grade, recovery and throughput dominate the near-term cash slope; the DFS has 83% LOM gold and 91% silver recovery. A 10% recovered-metal miss would likely alter the metal-price uplift proportionately. DFS annual parameters, physical pp. 272–273
Distribution
The project is still under construction and Skeena has not declared a common dividend in the reviewed interim statements. Our five-year cash-distribution schedule is empty; all modeled residual cash benefits the 2031 exit, and the 9.5% carry therefore adds C$0.00. September 2026 interim cash-flow rows
Geographic Exposure
Eskay’s operating site, permits, tax and most capital are Canadian; gold and silver are priced in US dollars. A stronger Canadian dollar lowers converted metal receipts while much of the disclosed cost base is Canadian. DFS annual parameters, physical pp. 272–273
Regulatory Environment
The build is subject to environmental, water and Indigenous consent conditions. The MD&A says required major permits were obtained, but ongoing compliance and the disbursement conditions remain execution risks. Construction status, Q3 MD&A p. 10 Financing contingency, interim note 1
Industry Structure
Gold is price-taking and globally traded; Eskay has no modelled pricing power. Mine-specific ore quality and payable metal recovery determine the margin. DFS annual parameters, physical pp. 272–273
Growth and Cyclicality
The development-to-production transition can create rapid cash growth in 2027–28, but a finite reserve means the model must decline and close rather than perpetuate early output. DFS years 1–6 cash-flow rows, p. 275 DFS later years and closure, p. 277
Competitors
Agnico Eagle is a diversified gold producer with 2026 guidance of 3.3–3.5 million gold ounces; Pan American Silver is a diversified silver and gold producer with revised 2026 gold guidance of 660–680 thousand ounces. Those operating producers provide context, not a direct mine NAV proxy. AEM Q3 release and PAAS Q3 release.
Market Share
Eskay has zero current output. Its modeled 2028 gold of 0.335 million ounces is about 10% of AEM’s 2026 lower-end guidance, but production years and corporate perimeters differ, so this is scale context only. DFS years 1–6 cash-flow rows, p. 275
Competitive Advantages
The high-grade open pit and existing infrastructure can yield strong early margins if DFS grades and recoveries hold; the issuer’s US$687/oz historical AISC is not current all-in common-share economics because it excludes later financing and royalties. November 2026 presentation, historical AISC caveat, p. 4
Pricing and Cost Position
Our 20% cost uplift and post-DFS royalty/stream deductions prevent use of the stale AISC as the model cost. The outcome is still highly metal-price sensitive: US$2,700 gold alone reduces 2031 exit to C$31.57. November 2026 presentation, historical AISC caveat, p. 4
Entry Barriers and Substitutes
Permitted reserves, infrastructure and capital create a long replacement cycle. Investors can nonetheless buy diversified producers or XIC instead of taking a concentrated commissioning risk. Construction status, Q3 MD&A p. 10
Supplier and Customer Dynamics
Concentrate payability, smelter treatment and logistics affect net revenue; the DFS lists C$724.46 million lifetime refining and transport costs. The current offtake mix was not separately verified, so we retain the DFS deductions and stress conversion. DFS lifetime refining and transport C$724.46m
Regulation and Structural Risks
Project compliance, Indigenous relationships and the restricted-note covenants can restrict access to cash before revenue begins. A funding shortfall could force dilution or expensive debt. Financing contingency, interim note 1 US$750m note uses and coupon, Q3 MD&A p. 15
Historical Performance
This is a build, so 2024–26 revenue is nil. 2025 reported net loss was C$182.841 million versus C$151.939 million in 2024; 2026 nine-month loss rose to C$191.963 million from C$111.078 million. 2025 audited loss, p. 7 September 2026 interim loss rows
Income Statement Analysis
The 2026 loss contains C$51.517 million stream mark-to-market, C$27.036 million combined NSR accretion and C$31.918 million share-based payments. Those are not current mine operating margins. September 2026 interim loss rows
Balance Sheet Analysis
At September 30 the balance sheet shows C$71.022 million cash, C$397.825 million restricted cash, C$13.795 million marketable securities, C$1.043 billion note carrying debt, plus stream and royalty fair-value liabilities. We subtract note face principal and model the future stream/royalty cash, avoiding a second subtraction of their accounting marks. September 2026 interim balance-sheet row September restricted cash C$395.287m September note debt C$951.557m non-current Remaining gold-stream terms, note 7 Royalty election and liability, note 8
Cash Flow Analysis
Nine-month 2026 CFO was negative C$40.605 million, mineral-property additions C$321.422 million and stream repurchase C$254.352 million. Funding was from the note and released restricted funds, not operating profit. September 2026 interim cash-flow rows
Earnings Quality
IFRS loss is distorted by non-cash remeasurement of stream and royalty instruments. Cash conversion must be judged after production; our model forecasts project cash rather than capitalizing current earnings. September 2026 interim loss rows September 2026 interim cash-flow rows
Nonrecurring Items
The April 2026 stream buyback of C$254.352 million is a historical investment, not a future cash outflow in our remaining-life model. The remaining 3.52% stream is deducted from future gold revenue. September 2026 interim cash-flow rows Remaining gold-stream terms, note 7
Funding and Cash Conversion
Opening modeled liquid/restricted assets of C$482.642 million less C$350 million remaining build leave C$132.642 million before operations, coupons and note repayment. The build estimate is our judgment against the revised US$659 million project estimate and 80% physical progress, not issuer-reported cost to complete; every C$100 million change moves the 2031 exit by C$0.77/share. September 2026 interim balance-sheet row November 2026 presentation, revised US$659m capital, p. 5 Construction status, Q3 MD&A p. 10
Key Ratios
At close, basic market capitalization is about C$4.48 billion using 125.644 million shares; this is 32.1 times September 2026 book equity of C$139.820 million. Neither book multiple nor pre-revenue P/E is a useful project NAV. Outstanding shares, Q3 MD&A p. 34 September 2026 interim balance-sheet row
Forward Outlook
Three frozen, testable Peralta forecasts: (1) 2027 Eskay recovered gold of 0.195 Moz, downside below 0.10, upside above 0.25; settle against the FY2027 production table. (2) 2028 recovered gold of 0.335 Moz, downside below 0.25, upside above 0.40; settle against FY2028 site production. (3) C$350 million remaining construction cash after September 2026, downside over C$550 million, upside below C$300 million; settle against construction capital updates and cash-flow additions through Q3 2027. These are analyst estimates, not issuer guidance. DFS years 1–6 cash-flow rows, p. 275 Construction status, Q3 MD&A p. 10 Model.
Model Choice
The 2023 DFS annual mine cash flow is a finite schedule, not a perpetual DCF. We interpolate six months of first-year output into 2027, retain each subsequent year through closure, and value only cash after November 2031 as a declining mine NAV at 10%. We give Snip and unconverted resources zero. DFS years 1–6 cash-flow rows, p. 275 DFS later years and closure, p. 277
Growth
Under the base, gold is US$3,600/oz and silver US$50/oz for the remaining modeled life, versus DFS US$1,800/23. The model converts each metal separately at 0.74 US$/C$. This long-run deck is analyst judgment; a gold-only US$2,700 case appears in Scenarios. DFS annual parameters, physical pp. 272–273
Profitability
Annual DFS after-tax cash starts with price-specific mine revenue, 2% royalty, costs, taxes and sustaining capital. The worksheet adds metal-price differences, 20% operating-cost uplift, the full 7.25% royalty on updated net smelter revenue less the 2% already in DFS cash, and the 3.52% remaining stream at a 10% cash purchase price, then applies 35% marginal tax. Original annual rows and output are public. DFS Year 1 payable gold revenue C$907.57m DFS Year 1 payable silver revenue C$233.86m DFS Year 1 after-tax cash C$704.02m DFS Year 1 royalty C$20.76m on C$1,037.85m NSR Remaining gold-stream terms, note 7
Reinvestment or Required Capital
We deduct C$350 million of remaining construction capital from C$482.642 million opening cash and securities, plus annual DFS sustaining capital already inside after-tax mine cash. Incremental closure cash of C$27.854 million is reserved against the C$102.984 million September provision and the DFS C$75.13 million final cash rows; this deliberately compares an accounting estimate with nominal outlays and is conservative. September 2026 interim balance-sheet row DFS later years and closure, p. 277
Discount Rate
The 2031 residual mine NAV uses 10% nominal CAD and today’s five-year fair-value discount is 12%, both Peralta judgments reflecting development concentration. The investor hurdle is separately the 7.5% gross XIC assumption net of 3 bp each side plus 200 bp = 9.487% net; SKE is charged 5 bp each side. A 15% residual NAV rate reduces fair value to C$23.57.
Terminal Economics
There is no perpetual terminal value. The post-exit NAV begins with the remaining 2031 stub and then receives interpolated year-5/year-6 mine cash in 2032; later years decline to closure in 2042. Carrying the last strong 2031 production rate indefinitely would be economically invalid. DFS later years and closure, p. 277 The C$27.854 million additional closure cushion is subtracted in 2042.
Bridge to One Common Share
| 2031 common exit bridge (C$ millions) | Base |
|---|---|
| Mine cash through 2031 after sustaining capital and tax | 4,292.14 |
| Residual finite mine NAV, late 2031–2042 | 2,764.46 |
| Opening cash and securities less remaining build | 132.64 |
| Senior note face principal | -1,036.76 |
| Five annual coupons | -440.62 |
| 2031 common exit equity | 5,711.85 |
| Diluted shares (millions) | 130.00 |
| 2031 exit (CAD/share) | 43.94 |
| Fair today, 12% five-year discount (CAD/share) | 24.93 |
| Hurdle ceiling, 9.49% net requirement (CAD/share) | 27.90 |
| No-stress ceiling, lesser of fair and hurdle (CAD/share) | 24.93 |
| Delay plus C$200m reserve, hurdle difference (CAD/share) | -2.62 |
| Maximum entry (CAD/share) | 22.31 |
| Calendar year | Mine cash (C$M) | Gold (Moz, interpolated) | Silver (Moz, interpolated) |
|---|---|---|---|
| 2027 | 640.34 | 0.195 | 3.960 |
| 2028 | 1,036.72 | 0.335 | 7.745 |
| 2029 | 867.50 | 0.295 | 8.840 |
| 2030 | 897.70 | 0.300 | 9.500 |
| 2031 | 948.64 | 0.300 | 10.920 |
| 2032 | 933.73 | 0.310 | 9.710 |
| 2033 | 620.24 | 0.240 | 5.325 |
| 2034 | 612.01 | 0.210 | 6.985 |
| 2035 | 637.34 | 0.205 | 8.000 |
| 2036 | 380.91 | 0.135 | 4.320 |
| 2037 | 228.69 | 0.095 | 1.915 |
| 2038 | 139.53 | 0.070 | 1.230 |
| 2039 | 69.56 | 0.030 | 0.530 |
| 2040 | 4.89 | 0.000 | 0.000 |
| 2041 | -37.56 | 0.000 | 0.000 |
| 2042 | -58.59 | 0.000 | 0.000 |
The 130 million diluted shares include 125.644 million current shares plus 4.356 million net allowance for awards and other equity dilution. The election is modeled as the 1.5% royalty path rather than 2.9 million shares, so the dilution allowance does not also add that full alternative. Outstanding shares, Q3 MD&A p. 34 Royalty election and liability, note 8 No book stream or NSR liability is subtracted again because cash deliveries and royalties are in the mine flow.
Price-Implied Expectations
At C$35.68 and the stated cost/horizon, the base exit of C$43.94 earns 4.23% net, a -3.26 percentage-point spread to XIC and -5.26 points below the required return. With silver at US$50, gold must average about US$4,492 for the close to clear the bare hurdle, or US$4,979 to equal our risk-discounted fair value. A 2028 recovered-gold result below 0.25 Moz would weaken that path. Exact solve.
Independent Cross-Check
The DFS reports 2.769 million gold ounces, 80.052 million silver ounces and C$2.993 billion LOM after-tax cash at the old deck, before subsequent claims. DFS annual parameters, physical pp. 272–273 Our base 2031 accumulated cash and residual NAV total C$7,056.6 million before current debt, opening cash and financing coupons. That uplift is driven by a doubled gold deck; it is not attributed to new ounces or Snip. The peer scale ratios below are a reasonableness check only.
Conclusion and Change from Prior Edition
This successor corrects the royalty bridge in the 2026-11-24-01 edition: the DFS 2% royalty must apply to the metal-price uplift as well as the 5.25% post-DFS increment. The wait decision remains. DFS Year 1 royalty C$20.76m on C$1,037.85m NSR
Peer Selection
AEM and PAAS trade in CAD on the TSX and publish attributable 2026 gold guidance. Their producing portfolios and capital structures differ sharply from SKE, so the ratio below measures scale paid for rather than mine value.
Dated Ratio Table
| Issuer and period | TSX close, 2026-11-24 (C$) | Equity value (C$bn) | Gold output (Moz) | Equity value / annual gold oz (C$/oz) |
|---|---|---|---|---|
| SKE, modeled 2028 | 35.68 | 4.48 | 0.335 | 13,370 |
| AEM, 2026 guidance low end | 223.35 | 112.91 | 3.30 | 34,215 |
| PAAS, 2026 guidance midpoint | 44.40 | 18.31 | 0.670 | 27,328 |
SKE close/share count: price history, Outstanding shares, Q3 MD&A p. 34. AEM close and shares: issuer quote, AEM Q3 guidance. PAAS close/equity quote and 2026 guidance: quote, issuer Q3 release. SKE ounces are Peralta’s 2028 interpolation of DFS years 1–6 cash-flow rows, p. 275. The equity-value ratios exclude debt and silver ounces.
Comparability Adjustments
AEM and PAAS are current diversified producers; SKE is a single mine under construction. The denominator years differ because SKE has no 2026 mine output. PAAS has much more silver exposure. The ratios omit debt and by-product value, so do not use them to set SKE entry.
Implications for Value
SKE’s lower equity value per annual future gold ounce is consistent with build and finite-life discounts, but does not by itself prove mispricing. The detailed asset cash, senior claims and closure bridge govern the decision.
Bear Case
US$2,700 gold, US$35 silver, one-year start delay and C$200 million additional build spending yield C$22.19 2031 exit, C$12.59 fair and C$14.09 bare hurdle entry. At today’s C$35.68 close, the modeled annualized result is -9.08%. This links price and execution stress rather than treating them as independent.
Base Case
US$3,600 gold/US$50 silver and on-time second-quarter 2027 initial output give C$43.94 exit and C$24.93 fair. The construction reserve makes the maximum entry C$22.31. Construction status, Q3 MD&A p. 10
Bull Case
US$4,400 gold and US$60 silver at the same recovered-ounce schedule give C$59.05 exit and C$33.51 fair; this is metal upside, not an assumed reserve extension.
Outcomes at Close and Entry
| Assumption | Close | Fair value | Maximum entry | Price rule |
|---|---|---|---|---|
| Base | 35.68 | 24.93 | 22.31 | Wait |
| Gold US$2,700 | 35.68 | 17.91 | 17.91 | Wait |
| Exit NAV rate 15% | 35.68 | 23.57 | 23.57 | Wait |
| One-year delay | 35.68 | 23.46 | 23.46 | Wait |
| C$200m extra build | 35.68 | 24.06 | 24.06 | Wait |
| Delay and C$200m | 35.68 | 22.59 | 22.59 | Wait |
| Joint downside | 35.68 | 12.59 | 12.59 | Wait |
| Upside | 35.68 | 33.51 | 33.51 | Wait |
Base entry is lesser of fair and cost-adjusted hurdle less the joint execution reserve. Other rows show their own no-extra-reserve ceilings; all displayed actions are evaluated at C$35.68. Generated scenario output.
Market-Implied Case
At fixed US$50 silver, no delay and the base costs, gold around US$4,492 lets the C$35.68 price meet the return hurdle before execution reserve. That exceeds our US$3,600 base by US$892. The closest forecast falsifier is 2028 recovered gold below 0.25 Moz.
Analyst Assessment
The largest single disputed assumption is sustained gold: lowering it to US$2,700 while keeping US$50 silver cuts no-stress entry from C$24.93 to C$17.91. The stronger joint case supports waiting even more. The base is favored because the project is advanced and procurement mostly committed, but the price does not compensate for the unresolved revenue and start-up risks. Construction status, Q3 MD&A p. 10
Operating Risks
A lower grade, recovery, throughput or early commissioning fault cuts the early high-grade cash years most sharply. Reconsider if FY2028 recovered gold is below 0.25 Moz; rerun the exact ounce schedule and mine cash. DFS years 1–6 cash-flow rows, p. 275
Financial and Liquidity Risks
Construction cash can be trapped in restricted accounts or insufficient. The interim note says new financing would be needed in those cases. An extra C$200 million build cost alone lowers 2031 exit by C$1.54/share; a one-year delay and overrun lower the bare hurdle ceiling C$2.62/share. Financing contingency, interim note 1
Regulatory and Legal Risks
Permit compliance and Tahltan relations remain material despite completed major permitting; a stop can defer cash and affect note covenants. Quantify a one-year delay in Scenarios. Construction status, Q3 MD&A p. 10
Industry and Competitive Risks
Gold and silver are volatile and the company has no pricing power. US$2,700 gold with US$50 silver lowers fair value to C$17.91/share. DFS annual parameters, physical pp. 272–273
Thesis-Specific Risks and Reconsideration Triggers
The new technical report and the royalty option may revise reserves, future cash claims or dilution. Recalculate when the 2027 report and royalty election are disclosed; until then assign no Snip reserve extension and treat the 1.5% royalty election in cash; a cash-versus-share election sensitivity remains to be revisited. Royalty election and liability, note 8
Environmental Factors
The site must manage potentially acid-generating material, water treatment and closure. Our model retains DFS closure and adds C$27.854 million against the September 2026 provision; physical tailings and water execution can cost more. Construction status, Q3 MD&A p. 10 September 2026 interim balance-sheet row
Social Factors
Eskay is on Tahltan Territory. Consent and local relationships are operational dependencies, especially for any changed footprint or schedule. The current permit status does not remove ongoing obligations. Construction status, Q3 MD&A p. 10
Governance Factors
Directors and officers held or controlled 2.724 million shares, 2.2% of common, in the March 2026 AIF. Awards create dilution; our 130 million share basis exceeds the 125.644 million current count. Directors and officers ownership, AIF p. 39 Outstanding shares, Q3 MD&A p. 34
Financially Material Risks and Opportunities
The revised construction estimate and a high-interest secured note subordinate the common claim. Spending controls and successful ramp-up could release value; a delayed start can impair both liquidity and equity. November 2026 presentation, revised US$659m capital, p. 5 US$750m note uses and coupon, Q3 MD&A p. 15
Annual Results
| C$ million, year ended Dec. 31 | FY2024 | FY2025 |
|---|---|---|
| Revenue | 0.00 | 0.00 |
| General and administration | 28.58 | 49.93 |
| Net loss | (151.94) | (182.84) |
Interim Results
| C$ million, nine months ended Sept. 30 | 9M2025 | 9M2026 |
|---|---|---|
| Revenue | 0.00 | 0.00 |
| General and administration | 34.86 | 64.38 |
| Net loss | (111.08) | (191.96) |
September 2026 interim loss rows
Trailing Results
TTM to September 2026 net loss is C$263.73 million: FY2025 C$182.84 million plus 9M2026 C$191.96 million less 9M2025 C$111.08 million. No sales or production earnings are yet available. 2025 audited loss, p. 7 September 2026 interim loss rows
Material Adjustments
The derivative and royalty remeasurements are excluded from the mine cash forecast; the share awards are handled in diluted shares. We do not call the pre-production accounting loss a normalized operating margin. September 2026 interim loss rows
Annual Positions
| C$ million, Dec. 31 | FY2024 | FY2025 |
|---|---|---|
| Cash | 96.94 | 121.89 |
| Total assets | 274.39 | 770.19 |
| Stream liability | 63.89 | 421.90 |
| Equity | 90.61 | 159.12 |
2025 audited balance sheet, p. 6
Interim Positions
| C$ million | Dec. 2025 | Sept. 2026 |
|---|---|---|
| Cash | 121.89 | 71.02 |
| Restricted cash | 0.00 | 397.83 |
| Marketable securities | 29.67 | 13.80 |
| Note carrying debt | 0.00 | 1,042.80 |
| Common equity | 159.12 | 139.82 |
September 2026 interim balance-sheet row
Capital and Claims Reconciliation
The model begins with C$482.642 million cash, restricted cash and securities, subtracts C$350 million future construction, and at exit subtracts C$1,036.761 million note face. Carrying debt is C$1,042.799 million; the C$6.038 million carrying-to-face difference reflects accounting marks and is not a separate principal claim. Stream and NSR accounting liabilities are represented by future deliveries and royalty cash, avoiding double count. September 2026 interim balance-sheet row Remaining gold-stream terms, note 7 Royalty election and liability, note 8
Annual Flows
| C$ million, year ended Dec. 31 | FY2024 | FY2025 |
|---|---|---|
| CFO | (127.90) | (57.29) |
| Mineral-property additions | (2.21) | (294.41) |
| Net financing inflow | 156.77 | 415.58 |
Interim Flows
| C$ million, nine months ended Sept. 30 | 9M2025 | 9M2026 |
|---|---|---|
| CFO | (56.51) | (40.61) |
| Mineral-property additions | (185.44) | (321.42) |
| Stream repurchase | 0.00 | (254.35) |
| Restricted cash released | 0.00 | 304.70 |
September 2026 interim cash-flow rows
Trailing Flows
TTM September 2026 CFO is negative C$41.39 million and mineral-property additions C$430.40 million: FY2025 plus 9M2026 less 9M2025. The revised capital program, not historical CFO, drives cash demand. 2025 audited cash flows, p. 9 September 2026 interim cash-flow rows
Reconciliation to Common Shareholders
There are no modeled dividends or buybacks through November 2031. Gross project cash before senior debt through 2031 is C$4,292.1 million; five coupons consume C$440.6 million, and C$1,036.8 million principal is repaid. The residual is retained for common holders and included once in the exit, with C$0.00 distribution carry. If cash is diverted to growth beyond the modeled mine, a new funded return case is required. US$750m note uses and coupon, Q3 MD&A p. 15
Primary Sources and Locators
Issuer originals: 2023 Eskay technical report pp. 272–277 for mine economics; September 2026 interim statements pp. 2–5, 14, 16–17 for assets, debt, cash and royalties; September 2026 MD&A pp. 10, 15, 34 for progress, financing and share count; 2025 audited statements pp. 6–9; 2025 AIF p. 39 for insider ownership; November 2026 presentation pp. 4–5 for old-AISC caveat and revised capital. Public publisher index: Skeena investor filings. Market: TSX SKE close history; XIC issuer product and price history; same-day XIC close C$54.34 also appears in dated price history.
Frozen Inputs and Assumptions
The public JSON freezes metals, exchange, cash/debt/shares, royalties, coupon, construction, annual DFS rows, 7.5% XIC gross return, 3 bp and 5 bp one-way costs, 200 bp net spread, and 9.5% distribution carry. The 2026-11-24 SKE close is C$35.68 and XIC close C$54.34. The XIC forecast is an assumption rather than a prediction of its 2031 trading price. See quote observations.
Worksheets and Saved Outputs
| Worksheet | Output |
|---|---|
| Finite mine and decision | Generated decision |
| Finite mine and decision | Cash and equity bridge |
| Finite mine and decision | Scenarios |
Exact machine results. Run python support/valuation.py with Python 3.12 from an edition checkout. The public worksheet uses only its public JSON, and its Markdown outputs are generated bytes.
Changes from the Preceding Edition
The prior 2026-11-24-01 edition had fair value C$25.38 and maximum entry C$22.73. The corrected royalty bridge lowers both while preserving the wait decision. DFS Year 1 royalty C$20.76m on C$1,037.85m NSR
| Revision driver | Fair value | Maximum entry |
|---|---|---|
| Prior | 25.38 | 22.73 |
| DFS 2% on metal uplift | -0.45 | -0.42 |
| Rounding | 0.00 | 0.00 |
| Current | 24.93 | 22.31 |