Seabridge Gold — SEA | Investment Research | 2026-11-24
Our maximum entry price is C$13.24 per share. At the November 24, 2026 regular TSX close of C$25.99, we wait; base fair value is C$25.73. A credible contrary case—50% KSM interest, 70% development realization and 2033 production—would raise the stressed entry to C$31.98 and reverse Wait if confirmed in a funded JV; the calculation is in market tests. The current evidence favors a wait because the substantially started designation was quashed November 19 and no JV is signed. Seabridge, Nov. 19 court release original PDF p.6. Quote and economic cutoff: November 24, 2026; next review on loan settlement, EAO ruling or filed JV terms.
- Market close (CAD)
- C$25.99
- Base fair value (CAD/share)
- C$25.73
Company details
- Maximum entry price (CAD/share)
- C$13.24
SEA is a pre-revenue Canadian mine developer. All prices and returns below are CAD per SEA common share; US-dollar mine economics are converted at a frozen C$1.35/US$ assumption. The five-year comparison ends exactly November 24, 2031. Stock Price History
| Date | Close (CAD) | Maximum entry (CAD) |
|---|---|---|
| 2026-11-19 | 25.92 | — |
| 2026-11-20 | 24.80 | — |
| 2026-11-23 | 27.64 | — |
| 2026-11-24 | 25.99 | 13.24 |
The Nov. 24 close is the batch-verified regular TSX CAD observation; preceding daily closes come from TSX:SEA historical prices (unadjusted close, CAD). XIC regular close was C$54.34 on the same date.
Investment Thesis
Seabridge Gold (TSX: SEA; CAD) owns an option on developing the finite 33-year KSM gold-copper mine, not an operating cash stream. The 2022 PFS contains 47.3 million oz gold and 7.32 billion lb copper reserves, while the 2026 M&I resource is inclusive of those reserves; inferred ounces are excluded from our mine cash flows. original PDF p.10 original PDF p.1.
Market Mispricing
At C$25.99, 108.080 million issued shares imply C$2.809 billion equity. The same-share-basis model gives C$25.73 fair value, a C$-0.26 fair-value gap, and C$13.24 entry, a C$-12.75 action gap. The most important unknown is the economically retained JV interest multiplied by the chance that permitted, financed construction starts on time. Market-implied worksheet.
| Price bridge, CAD/share | Amount |
|---|---|
| Market close | C$25.99 |
| Base fair-value change from close | −C$0.26 |
| Base fair value | C$25.73 |
| Entry-policy change from fair value | −C$12.49 |
| Maximum entry | C$13.24 |
Recent Developments
The November 19 court order quashed KSM’s substantially started designation but did not void its environmental assessment certificate. The November 23 support of the Nisga’a and Tahltan Nations strengthens the application, yet the environmental office must decide again. Seabridge, Nov. 19 court release Seabridge, Nov. 23 First Nations support release. The Q3 filing says a preferred partner remains under negotiation; there is no signed JV. original PDF p.6.
Earnings Outlook
Operating revenue is zero pending mine construction. Nine-month 2026 C$117.562 million accounting profit includes C$151.691 million Valor distribution gain and C$31.877 million secured-note remeasurement gain, while operating cash was a C$12.962 million use. These items are not recurring mine cash. original PDF p.3 original PDF p.5.
Valuation Summary
Finite reserve-backed project economics, an explicit 60% realization factor, a 40% retained JV interest, funding dilution and senior claims produce C$45.34 at 2031-11-24. At the close, the modeled net five-year return is 11.75% versus 7.49% for XIC; the 200 bp hurdle is 9.49%. The base spread over net XIC is 4.26 percentage points from unrounded returns. The joint downside reduces the entry by C$15.55. Full bridge.
| Scenario | 2031 exit (CAD/share) | Fair value (CAD/share) | Hurdle price (CAD/share) | Return at close | Hurdle-only decision |
|---|---|---|---|---|---|
| Bear | C$20.85 | C$11.83 | C$13.24 | -4.33% | Wait |
| Base | C$45.34 | C$25.73 | C$28.79 | 11.75% | Buy |
| Bull | C$77.16 | C$43.78 | C$49.00 | 24.29% | Buy |
| Entry rule | CAD per share |
|---|---|
| Hurdle-only ceiling | C$28.79 |
| Joint downside reduction | C$15.55 |
| Maximum entry, rounded | C$13.24 |
Recommended Action and Entry Price
Wait at the November 24, 2026 regular TSX close of C$25.99. The base no-stress hurdle permits C$28.79, but a two-year delay, a 35% retained stake, 45% realization and US$3.5 billion capex uplift jointly reduce the maximum to C$13.24. No SEA cash distribution is modeled. These are pre-trade research thresholds, not a trading instruction. Scenario output.
Catalysts
A new substantial-start decision, signed partner terms and the targeted end-2027 feasibility study can change ownership, schedule and cost assumptions. The US$100 million loan was fully drawn by November 2 and is due by December 31, 2026; the secured-note financing puts become exercisable March 24, 2028. original PDF p.25 original PDF p.26.
Primary Risks to Thesis
If the substantial-start reconsideration fails or the 2027 study reprices construction above our US$2.0 billion uplift, the joint bear result is C$20.85 at exit and C$13.24 as a hurdle entry. The strongest credible contrary case is an earlier 50%-retained funded JV with 70% realization; its entry after the same downside reduction is shown in the market test below and can reverse Wait. Seabridge, Nov. 19 court release Sensitivity.
Company Overview
SEA is a Canadian development-stage company; KSM Mining Inc. is a subsidiary and the Toronto shares trade as SEA. Its projects include KSM and Bronson Corridor in BC, Snowstorm in Nevada and 3 Aces in Yukon. original PDF p.6.
Products and Services
There are no current mine products. The PFS proposes gold/copper/silver concentrate, molybdenum concentrate and gold-silver doré from 33 years of ore. Revenue begins only if facilities are built and operating. original PDF p.10
Business Model
Seabridge historically funds exploration and early works through equity, debt and royalty-linked notes, while seeking a major partner to finance and operate KSM. A signed JV would transfer some project economics to that partner. original PDF p.6 original PDF p.5.
Revenue Drivers
PFS average annual production is 1.027 million contained gold oz and 178 million lb copper across 33 years; years 1–7 average 1.413 million gold oz. Our gold sensitivity uses the life-of-mine rate, not the higher early rate. Payability, recovery, metal prices and CAD/USD determine sales. original PDF p.42
Cost Structure
The 2022 PFS has US$6.432 billion initial and US$3.210 billion sustaining capital, both in 2022 dollars, plus operating, offsite, tax and closure costs. Our US$2.0 billion project-cost uplift is an analyst allowance pending the 2027 study, not issuer guidance. original PDF p.46
Operating Levers
Each US$1/oz gold change affects 1.027 million annual contained ounces before our 65% incremental after-tax factor and 5% finite-life discount. The 65% factor is a judgment for tax/recovery/royalty leakage; changing it is a visible input in the worksheet. original PDF p.42.
Distribution
Future concentrate needs truck haulage to Stewart, BC, and shipment to Pacific Rim smelters. That chain and treatment charges are in the PFS economics; we do not add a separate margin premium. original PDF p.10.
Geographic Exposure
KSM is in northwest British Columbia; US-dollar metal sales and Canadian-dollar spending create FX sensitivity. Our C$1.35/US$ is a frozen analyst conversion assumption, distinct from the PFS US$0.77/C$ construction estimate. original PDF p.45
Regulatory Environment
KSM has an environmental assessment certificate, but the substantial-start determination was quashed and requires reconsideration; further full-production permits and certificate amendments remain. This risk is inside the 60% realization and 2034 production assumptions, not treated as settled. Seabridge, Nov. 19 court release original PDF p.13.
Industry Structure
Large-scale mine development competes for engineering capacity, lenders and partners long before metal sales. KSM’s US$6.432 billion 2022 initial capital makes its capital access more binding than a producing miner’s near-term output. original PDF p.46.
Growth and Cyclicality
Gold/copper price cycles affect both resource economics and financing terms. US$3,600 gold is a scenario input, not an observed spot quote or company guidance; a US$1,742 historical PFS deck is the attributable starting point. original PDF p.12.
Competitors
NOVAGOLD is another preproduction large-mine developer: it reported US$343.4 million cash and term deposits and US$28.1 million Q3 operating cash expenditures at August 31. Its Donlin ownership was 60% with a proposed 100% all-share acquisition, illustrating why gross project NAV must be adjusted for interests and funding. NOVAGOLD, Oct. 8 Q3 release.
Market Share
SEA currently has zero produced-gold market share; its 47.3 million PFS reserve ounces describe a possible mine feed, not sales. The 2026 KSM M&I resource of 95.5 million ounces includes reserves and does not expand the modeled finite mine plan. original PDF p.1 original PDF p.2.
Competitive Advantages
KSM has a 33-year PFS and completed Treaty Creek terminal energization, which may ease a future power connection. This does not eliminate US$6.4 billion-plus construction funding. original PDF p.10 original PDF p.6.
Pricing and Cost Position
The 2022 PFS reports US$275/oz by-product operating costs over the mine life, reflecting copper and other credits; this is a study estimate, not a current AISC quote. Our model values the entire multi-metal PFS and adds only gold-price sensitivity, avoiding an independent copper credit. original PDF p.12.
Entry Barriers and Substitutes
KSM scale, reserves and environmental work are hard to recreate. Investors can instead buy producers with existing cash flows or other developers with less demanding initial capital; a large resource alone confers no profitable production. original PDF p.41.
Supplier and Customer Dynamics
A future concentrate buyer and construction suppliers will affect transport, treatment charges and schedule. The PFS assumes 96% payable copper and 97.8% payable gold in copper concentrate; financing negotiations can transfer project upside to the partner. original PDF p.41.
Regulation and Structural Risks
The November court outcome makes the substantial-start status a live condition even though the environmental certificate remains. This regulatory result drives a two-year delay and lower realization in the joint bear case. Seabridge, Nov. 19 court release Bear calculation.
Historical Performance
Annual IFRS net losses were C$31.247 million in 2024 and C$53.172 million in 2025; nine-month 2026 net income was C$117.562 million due mainly to a one-off Valor gain. Revenue is absent in these statements. original PDF p.8 original PDF p.3.
Income Statement Analysis
2025 corporate and administrative expense was C$22.050 million; nine-month 2026 was C$21.915 million. A C$31.877 million secured-note remeasurement gain in nine-month 2026 is noncash and sensitive to metal assumptions. original PDF p.8 original PDF p.3.
Balance Sheet Analysis
September 30 cash was C$56.289 million, note carrying value C$536.883 million and loan C$69.940 million; another US$50 million loan draw occurred November 2. The worksheet converts the contractual US$411.9 million note puts once and does not also subtract related future royalties. original PDF p.2 original PDF p.25.
Cash Flow Analysis
2025 operating plus investing cash use was C$203.404 million; nine-month 2026 was C$168.217 million, including C$10 million cash distributed with Valor. Financing through equity and the loan filled the gap. original PDF p.10 original PDF p.5.
Earnings Quality
The C$151.691 million Valor gain exceeds nine-month net income; note remeasurement and FX further cloud reported profit. Cash used in operations is the cleaner present funding measure, while development cash is mostly classified in investing. original PDF p.3 original PDF p.5.
Nonrecurring Items
Valor holders at the June 3 spinout received 0.511 Valor share per SEA share; a November 24 SEA buyer does not receive those shares. SEA retained a C$12.022 million gold stream asset, counted once in the claims bridge. original PDF p.8 original PDF p.2.
Funding and Cash Conversion
The US$100 million 7%-interest loan is due December 31, 2026. Share settlement is limited by TSX pricing and a 4.9% lender ownership cap, so the model keeps the full loan as a claim rather than assuming unlimited share conversion. We add 18 million shares to finance roughly C$468 million future SEA-level spend, with further 1.4 million interest shares and 0.8 million awards; this is an analyst funding case, not issued shares. original PDF p.25original PDF p.26.
Key Ratios
At close, market capitalization is C$2.809 billion and contractual notes-plus-loan less post-draw cash approximates C$0.565 billion. The enterprise-style claim is C$3.374 billion; this is not a producing miner EBITDA multiple. Dilution from 108.080 to 128.280 million modeled shares is 18.7%. original PDF p.4 Bridge.
Forward Outlook
Three frozen forecasts: (1) signed KSM partnership by 2027-12-31 with SEA 40% economic interest (bear 35%, bull 50%), settled by filed JV terms; (2) year-end 2027 FS initial capex at US$8.432 billion including our uplift (bear US$9.932 billion, bull US$7.932 billion), settled by the FS; (3) 2028-12-31 economically diluted shares at 128.280 million (bear 140 million, bull 118 million), settled by issued shares, awards and financing disclosures. These are testable estimates; 2027 timing follows issuer target, while ownership, cost and dilution are analyst judgments. original PDF p.6 original PDF p.46 original PDF p.4.
Model Choice
This is a finite 33-year reserve-based project NAV, translated to a five-year investor exit and discounted to present fair value. A resource-ounce multiple would count inferred, unfunded ounces. The 2022 PFS was US$7.9 billion post-tax NPV5 at US$1,742 gold, before our explicit gold, cost, delay, interest, probability and funding adjustments. original PDF p.12 Model.
Growth
No mine growth is assumed beyond the 33-year PFS; a 39-year later PEA expansion and unquantified discoveries receive no mine cash flows. The 2026 resource update is a price/cost cutoff estimate, not a new reserve plan. original PDF p.12 original PDF p.2.
Profitability
The 2022 PFS includes US$6.432 billion initial and US$3.210 billion sustaining capital with US$23.9 billion lifetime post-tax net cash flow under its old metal deck. We add US$3,600 gold sensitivity using 1.027 million annual oz, a 33-year 5% annuity and 65% post-tax realization, then deduct capex inflation. This is a linear scenario, not a revised engineering study. original PDF p.12 original PDF p.42 Calculation.
Reinvestment or Required Capital
The project economics already deduct 2022 initial and sustaining capital, so only incremental US$2.0 billion inflation/design cost is deducted. The 40% retained interest presumes a partner funds the rest; SEA-level C$468 million 2027–31 capital and overhead is funded through 18 million new shares at the C$25.99 illustration. Do not count those proceeds again as exit cash. original PDF p.46 Funding inputs.
Discount Rate
The PFS NPV5 uses 5% real-world project convention; we retain that only to extend incremental gold cash flows. A separate 10% preproduction discount across 2031-to-start years and 60% realization account for time and failure. Present fair value discounts the modeled 2031 exit at 12% annually. The 9.5% net stock hurdle is instead 7.5% gross XIC, 3bp each side, plus 200bp, with SEA at 5bp each side. These rates serve different questions. Exact inputs and outputs Return test.
Terminal Economics
2031 is an exit checkpoint, not a perpetual mine terminal year. Production starts in 2034 base, 2036 bear, 2033 bull; the same finite 33-year PFS cash stream is discounted to that start. Carrying sustaining investment into a nonexistent perpetuity is inapplicable. If closure or sustaining cost rises beyond the PFS, it belongs in the US$2.0 billion uplift or a revised FS, and would lower entry. original PDF p.46.
Bridge to One Common Share
The contractual note puts total US$411.9 million plus accrued interest; the model assumes interest is paid in 1.4 million shares until 2028 and deducts the US$411.9 million cash/refinancing obligation once. It adds the full US$100 million loan, subtracts estimated C$126.229 million post-draw cash, adds payables, lease and reclamation, and credits receivables, investments and only the retained Valor stream. No NCI is reported for KSM; a 40% eventual interest is modeled through the project numerator. No dividends or buybacks are assumed. The 2022 PFS says its economics include royalties but does not disaggregate the subsequently amended Sprott silver stream. If the old 60% silver royalty was included and the note is cash-redeemed, our valuation conservatively retains that cost as well as the note put: a simple 2022-deck restoration would add about C$0.49 to entry, insufficient to change Wait. This illustration uses 3.0m silver oz/year, US$21.90/oz, 60% gross royalty, the same 65% tax/leakage and finite 5% annuity; it is not a current royalty valuation. original PDF p.48 original PDF p.28 original PDF p.42 original PDF p.26 original PDF p.2 Bridge output.
| Latest reported to modeled common claim, C$m | Amount |
|---|---|
| Sept. 30 2026 mineral-property book asset (not independent NAV) | 1,647.54 |
| Replace book asset with risk-weighted, retained 2031 project value | +4,620.21 |
| Other exploration estimate | +150.00 |
| Contractual senior/current net claim after Nov. 2 financing | −601.30 |
| Modeled 2031 common exit value | 5,816.46 |
| Unexplained arithmetic residual | 0.00 |
| Bridge at 2031-11-24 | Base | Bear | Bull |
|---|---|---|---|
| 2022 PFS post-tax NPV5 (US$bn) | 7.90 | same | same |
| US$3,600 gold increment (US$bn) | 19.85 | 19.85 | 19.85 |
| Capital inflation / design deduction (US$bn) | 2.00 | 3.50 | 1.50 |
| Finite mine NPV after uplift (US$bn) | 25.75 | 24.25 | 26.25 |
| Production start | 2034 | 2036 | 2033 |
| 2031 project value before partner/probability (US$bn) | 19.34 | 15.06 | 21.69 |
| SEA retained interest | 40% | 35% | 50% |
| Development realization | 60% | 45% | 70% |
| Attributable risk-weighted KSM (C$m) | 6,267.75 | 3,201.31 | 10,249.77 |
| Other exploration (C$m) | 150.00 | 75.00 | 250.00 |
| Net senior/current claims (C$m) | (601.30) | (601.30) | (601.30) |
| Common equity exit (C$m) | 5,816.46 | 2,675.02 | 9,898.47 |
| Economic diluted shares (m) | 128.28 | 128.28 | 128.28 |
| 2031 exit per share | C$45.34 | C$20.85 | C$77.16 |
Price-Implied Expectations
At C$25.99, the model requires about the retained-interest × realization product in the worksheet with other assumptions fixed; this is a conditional inverse, not a statistically estimated success probability. The current 40% × 60%=24% product must be compared with the calculated threshold, while the old-deck enterprise-style claim/US$7.9 billion is only a sanity check because decks, claims and dates differ. Market test.
| Acceptance / contrary test | Result |
|---|---|
| Price/enterprise claim at close (C$m; equity plus notes and loan less cash) | 3,373.83 |
| Hurdle-implied retained stake × realization at close (base other assets/claims/dilution fixed) | 21.8% |
| Base assumed retained stake × realization | 24.0% |
| Faster 50% stake / 70% realization, exit | C$74.86 |
| Faster 50% stake / 70% realization, hurdle entry | C$47.53 |
| Faster 50% stake / 70% realization, after same C$15.55 stress | C$31.98 |
| Bear joint delay/stake/probability/capex hurdle | C$13.24 |
| Benchmark net annualized | 7.487% |
| Required stock net annualized | 9.487% |
| Stock base net annualized at close | 11.751% |
| Illustrative 2022 silver-royalty restoration if PFS includes redeemed 60% stream (US$bn project NPV) | 0.410 |
| Potential increase in base/stressed entry from that restoration (CAD/share) | C$0.49 |
Independent Cross-Check
At the close 108.080 million shares imply C$2.809 billion equity. Adding US$411.9 million note puts and US$100 million loan at C$1.35/US$ and deducting C$126.229 million post-draw cash yields C$3.374 billion enterprise-style financing claim. That is about US$2.499 billion, or 31.6% of the old US$7.9 billion PFS NAV; it is no formal probability because a 2026 high-gold deck, capex, partner share and interest differ. original PDF p.4 original PDF p.12.
Conclusion and Change from Prior Edition
First SEA edition; there is no prior fair-value or entry bridge. C$25.73 fair value is a point-in-time estimate, while C$13.24 entry is an action threshold that survives the joint downside and the common five-year XIC hurdle. A signed favorable JV would require a new edition, not a silent change to this one. Decision worksheet.
Peer Selection
NOVAGOLD is selected because Donlin is also preproduction and needs a partner/financing solution. It is not a direct KSM gold-copper comp: the reported cash is US dollars, Donlin is Alaska gold and NG ownership was in transaction. NOVAGOLD, Oct. 8 Q3 release.
Dated Ratio Table
| Developer / observation | Cash or term deposits | Quarterly operating + project cash use | Cash coverage (quarters) | Source |
|---|---|---|---|---|
| SEA, Sept. 30 2026, C$m | 56.289 | 94.971 (Q3 operating + investing) | 0.59 | original PDF p.2 original PDF p.5 |
| NG, Aug. 31 2026, US$m | 343.4 | 28.1 (Q3 operational expenditure) | 12.22 | NOVAGOLD, Oct. 8 Q3 release |
This is a liquidity ratio, not a trading multiple. SEA’s additional November loan draw would lift its numerator to about C$126.2 million but adds an equal senior claim due December 2026. Both denominators are issuer-specific and this table must not be read as a like-for-like EV/oz valuation.
Comparability Adjustments
NG’s US$343.4 million includes term deposits; SEA cash excludes C$14.809 million market securities and its Q3 investing includes KSM construction. NG’s Donlin ownership was 60% at its August quarter and subject to a proposed 100% acquisition. Currency cancels within each coverage ratio; balance dates and expenditure definitions do not. NOVAGOLD, Oct. 8 Q3 release original PDF p.2.
Implications for Value
SEA’s short cash runway and immediate December loan maturity warrant a funding/dilution charge and a low entry even when long-life PFS NPV is large. NG cannot calibrate a KSM retained-interest multiple without matching project plans, liabilities and partner terms. Funding assumptions.
Bear Case
Together: 35% retained project, 45% realization, US$3.5 billion cost uplift and 2036 production. The later start and greater capital need can coincide if the SSD review or FS drags on. At the close, C$20.85 2031 exit gives -4.33% net annualized. Seabridge, Nov. 19 court release Scenario output.
Base Case
40% retained interest, 60% realization, US$2.0 billion uplift, 2034 production, US$3,600 gold, C$1.35/US$. These are analyst assumptions with no signed JV or 2027 FS. Exit C$45.34; fair C$25.73. original PDF p.6 Frozen inputs.
Bull Case
50% retained interest, 70% realization, US$1.5 billion uplift and 2033 production. C$77.16 exit and C$43.78 fair value rely on a favorable early funded JV and preserved permits. Scenario output.
Outcomes at Close and Entry
The joint downside hurdle entry is C$13.24, so we set the maximum at C$13.24; at C$25.99 the action is Wait despite base hurdle-only Buy. At C$13.24, the bear exit clears the same 9.49% required net return by construction, while base provides more upside. Stock and XIC costs are applied to both purchase and sale; payments are empty. Decision output.
| Assumption | Close | Fair value | Maximum entry | Price rule |
|---|---|---|---|---|
| Base | C$25.99 | C$25.73 | C$13.24 | Wait |
| Faster funded JV: 50% stake, 70% realization, 2033 start, same stress reduction | C$25.99 | C$42.48 | C$31.98 | Buy |
| US$3,000 gold, same stress reduction | C$25.99 | C$18.83 | C$5.52 | Wait |
| 12.5% preproduction discount, same stress reduction | C$25.99 | C$23.92 | C$11.22 | Wait |
Market-Implied Case
At the close, the inverse model solves for the retained interest × development-realization product required to justify C$25.99 after fixed claims, dilution and other assets. A 50% retained, 70% realization faster-JV case can clear the stressed entry rule and reverse Wait; its numeric result appears in the test table. This assumption is credible but uncontracted. original PDF p.6 Acceptance test.
Analyst Assessment
We favor Wait because the November court order left the substantial-start question unsettled and no partner term sheet or current FS fixes SEA’s retained economics. A signed JV with at least 50% retained stake, committed capital and viable 2027 cost would be a decision-changing observation. Seabridge, Nov. 19 court release original PDF p.6.
Operating Risks
High-altitude construction, geotechnical work and mill recovery can stretch start and capex. The bear delays start two years and adds US$1.5 billion beyond base uplift. Reconsider on the filed FS cost and schedule. original PDF p.6.
Financial and Liquidity Risks
Loan maturity December 31, 2026, March 24, 2028 secured-note puts and share settlement constraints can force dilutive or costly refinancing. Reconsider after the 2026 loan repayment filing and any 2028 put election. original PDF p.25 original PDF p.26.
Regulatory and Legal Risks
The SSD was quashed, although the certificate was not; a failed reconsideration threatens schedule and perhaps certificate expiry. Our 45% bear realization is an analyst risk parameter, not a legal probability. Check the EAO determination. Seabridge, Nov. 19 court release.
Industry and Competitive Risks
Metal price reversals, cost inflation and financing competition could reduce project surplus. The PFS used US$1,742 gold and 2022-dollar capex; US$3,600 is not an issuer forecast. Re-run gold and cost inputs after the FS. original PDF p.12 original PDF p.46.
Thesis-Specific Risks and Reconsideration Triggers
Trigger 1: JV terms below 40% retained or requiring SEA to fund construction; trigger 2: FS initial cost above US$9.932 billion; trigger 3: no renewed SSD, or 2028 notes not refinanced on feasible terms. Each would lower exit/entry relative to our base and requires a fresh model. original PDF p.6 Seabridge, Nov. 19 court release Inputs.
Environmental Factors
The PFS includes tailings, water-treatment, reclamation and closure costs; 2022 estimates may understate current construction/mitigation. Sept. 30 reclamation provision totaled C$4.836 million and deposits C$22.040 million, which do not substitute for final mine closure capital. original PDF p.46 original PDF p.2.
Social Factors
Nisga’a and Tahltan support is documented November 23, but the court required renewed consultation with Tsetsaut Skii km Lax Ha. These are different Indigenous groups and support does not predetermine the EAO outcome. Seabridge, Nov. 23 First Nations support release Seabridge, Nov. 19 court release.
Governance Factors
2025 AIF lists 10 directors, four women and one Indigenous Canadian as of its report, while management and board must negotiate a value-preserving JV and manage continuing equity issuance. KPMG flagged note-liability valuation as a critical audit matter because metal, discount and probability assumptions are sensitive. original PDF p.102 original PDF p.4.
Financially Material Risks and Opportunities
Treaty Creek power connection and supportive partners can improve feasibility, whereas permit and construction failures would defer all common cash. Our realization factor and capex/delay scenarios carry these ESG-linked economics; no separate “ESG premium” is added. original PDF p.6Seabridge, Nov. 19 court release.
Annual Results
| C$m, fiscal year Dec. 31 | 2024 | 2025 |
|---|---|---|
| Revenue | 0 | 0 |
| Corporate/admin expense | (21.181) | (22.050) |
| Secured-note remeasurement | +36.916 | (86.610) |
| Net loss | (31.247) | (53.172) |
original PDF p.8. No operating mine revenue; expense and fair-value rows are not gross margin.
Interim Results
| C$m, nine months to Sept. 30 | 2025 | 2026 |
|---|---|---|
| Revenue | 0 | 0 |
| Valor distribution gain | 0 | +151.691 |
| Corporate/admin | (13.980) | (21.915) |
| Secured-note remeasurement | (23.871) | +31.877 |
| Net income/(loss) | (9.390) | +117.562 |
Trailing Results
Twelve months to Sept. 2026 derived as FY2025 + 9M2026 − 9M2025: net income C$73.780 million; corporate/admin C$29.985 million expense. The TTM “profit” contains Valor’s C$151.691 million distribution gain and is unsuitable as a P/E denominator. original PDF p.8original PDF p.3.
Material Adjustments
Exclude the Valor gain and note remeasurement from recurring earnings; keep all required capital and financing in the shareholder bridge. No taxable mine profit is recognized until construction, so a current earnings multiple is not our method. original PDF p.3 original PDF p.4.
Annual Positions
| C$m, Dec. 31 | 2024 | 2025 |
|---|---|---|
| Cash | 49.815 | 117.528 |
| Mineral property/equipment | 1,251.424 | 1,347.672 |
| Secured notes | 562.552 | 598.517 |
| Equity book value | 843.018 | 1,124.971 |
original PDF p.7. Capitalized mineral property cost is not independent NAV.
Interim Positions
| C$m, Sept. 30 2026 | Amount |
|---|---|
| Cash | 56.289 |
| Mineral interests/property/equipment | 1,647.540 |
| Secured notes | 536.883 |
| Loan payable (first US$50m) | 69.940 |
| Accounts payable/accruals | 67.613 |
| Valor stream | 12.022 |
| Total shareholder equity | 1,131.732 |
original PDF p.2. The second loan draw is a subsequent event.
Capital and Claims Reconciliation
As of Nov. 2, estimate cash at C$126.229 million after the second US$50 million draw and loan at US$100 million. Convert the 2028 US$411.9 million note puts at C$1.35/US$; deduct claims once and credit only existing cash, receivables, securities and stream. The notes may instead become royalties if put financing succeeds; that alternative is not stacked on the cash-settlement case. original PDF p.25original PDF p.26.
Annual Flows
| C$m, year to Dec. 31 | 2024 | 2025 |
|---|---|---|
| Operating cash | (14.220) | (15.459) |
| Investing cash | (121.236) | (187.945) |
| Financing cash | +101.265 | +272.189 |
| Ending cash | 49.815 | 117.528 |
Interim Flows
| C$m, nine months to Sept. 30 | 2025 | 2026 |
|---|---|---|
| Operating cash | (7.353) | (12.962) |
| Investing cash | (143.089) | (155.255) |
| Financing cash | +204.314 | +105.347 |
| Ending cash | 103.104 | 56.289 |
Trailing Flows
TTM to Sept. 2026 = FY2025 + 9M2026 − 9M2025: operating cash C$21.068 million use; investing cash C$200.111 million use; total C$221.179 million use. The spinout’s C$10 million cash distribution is in investing. original PDF p.10original PDF p.5.
Reconciliation to Common Shareholders
Nine-month 2026 operating plus investing cash use of C$168.217 million minus C$35.767 million net equity issuance and C$69.940 million loan proceeds led to cash depletion, adjusted for other financing and FX. No dividends or repurchases were paid; existing holders received historical Valor shares only on the June 3 record transaction. The 18 million modeled future financing shares are assumed to cover about C$468 million corporate/early works and thus add no second cash asset. Any shortfall beyond that would dilute or reduce value further. original PDF p.5original PDF p.8.
Primary Sources and Locators
Core originals: 2026 Q3 financial statements (physical PDF pp.2–5, 8–10, notes 9–11); 2026 Q3 MD&A (pp.6, 10–12, 25–30); 2025 audited statements (pp.3–4 audit opinion, 7–10 statements); 2025 AIF (pp.41–48 PFS and pp.102–103 governance); July 2026 reserves/resources (pp.1–2). The originals come from issuer financial reports and archive. The Nov. 19 and 23 issuer releases and Oct. 8 NG release are publisher links because HTML originals are not repackaged here. The Nov. 24 SEA/XIC closes were independently provided and checked in the batch price snapshot, with no exchange transaction tape in this public edition. Seabridge, Nov. 19 court release Seabridge, Nov. 23 First Nations support release NOVAGOLD, Oct. 8 Q3 release.
Frozen Inputs and Assumptions
All hard-coded economics, dates, currencies, share basis, probabilities, financing and costs are in public model.json. Reported anchors: 2022 PFS NPV US$7.9bn, gold US$1,742, annual 1.027m oz and 33-year life (original PDF p.12original PDF p.42); September shares, cash, claims (original PDF p.2original PDF p.4); Nov. 2 draw and March 2028 put (original PDF p.25original PDF p.26). Analyst inputs are US$3,600 gold, 65% incremental after-tax factor, 40% stake, 60% realization, 2034 start, US$2bn uplift, C$1.35/US$, 18m financing shares and 12% fair-value discount. The batch-verified TSX CAD SEA close was C$25.99 and XIC C$54.34 on Nov. 24, 2026; no post-cutoff inputs enter the call.
Worksheets and Saved Outputs
Run from edition root with Python 3.12.13 and standard library: PYTHONDONTWRITEBYTECODE=1 PYTHONPATH=. /Users/johnperalta/johnperalta4vanilla/.venv/bin/python support/valuation.py. The script reads only public relative inputs and writes the saved tables and exact JSON. Formulae: 33-year 5% annuity for incremental post-tax gold, minus cost uplift, 10% discount to start, times retained share and success, CAD conversion, minus claims, divided by 128.280m shares; 2031 sale cost, 2026 purchase cost and five-year XIC comparison set the hurdle. See outputs below.
| Worksheet | Output |
|---|---|
| Finite mine and entry | Decision · Equity bridge · Market tests |
Changes from the Preceding Edition