Pan American Silver Corp. (PAAS)
Pan American has a diversified silver and gold operating base and a potentially valuable La Colorada exploration option. At the dated Toronto quote of C$48.20, the 24-month central terminal value is C$54.07 per share. Modeled stock total return is 16.5%, against 14.1% for XIC, or 2.3 percentage points of excess return. Lower silver or gold realizations, mill disruption, higher sustaining capital, lease cash rent and a lower exit multiple can erase the narrow base advantage.
Current Price
CAD 48.20
Street Consensus
CAD 88.69
Company details
Sector
Basic Materials
Industry
Gold
Market Capitalization
$19.9B
Primary Exchange
Toronto
Benchmark
XIC - Canada
Status
Held
Current Price
CAD 48.20
Street Consensus
CAD 88.69
Sector
Basic Materials
Industry
Gold
Market Capitalization
$19.9B
Primary Exchange
Toronto
Benchmark
XIC - Canada
Status
Held
Pan American has a diversified silver and gold operating base and a potentially valuable La Colorada exploration option. At the dated Toronto quote of C$48.20, the 24-month central terminal value is C$54.07 per share. Modeled stock total return is 16.5%, against 14.1% for XIC, or 2.3 percentage points of excess return. Lower silver or gold realizations, mill disruption, higher sustaining capital, lease cash rent and a lower exit multiple can erase the narrow base advantage.
Current Price
CAD 48.20
Street Consensus
CAD 88.69
Sector
Basic Materials
Industry
Gold
Market Capitalization
$19.9B
Primary Exchange
Toronto
Benchmark
XIC - Canada
Status
Held
Key Catalysts
The next operating report should test recovery at Huaron, attributable silver output, realized metal prices and cash costs against the central case. A La Colorada mine plan with production timing, capital spending and reserves could justify adding option value. Each milestone should trigger a fresh model and benchmark comparison.
Earnings Outlook
The central case assumes existing silver production recovers while gold and silver realizations remain below the latest reported levels. Mine costs, sustaining capital, lease rent and taxes constrain cash available to shareholders. The La Colorada discovery contributes no separately booked central production or cash flow until management supplies an economic plan.
Investment Thesis
Pan American has a diversified silver and gold operating base and a potentially valuable La Colorada exploration option. The 24-month central model offers only 2.3 percentage points excess return over XIC, which is too narrow to support an add today.
Valuation Summary
At the dated Toronto quote of C$48.20, the 24-month central terminal value is C$54.07 per share. Modeled stock total return is 16.5%, against 14.1% for XIC, or 2.3 percentage points of excess return. That spread does not compensate clearly for commodity and terminal-multiple uncertainty.
Recommended Action
Hold existing exposure and do not add because the modeled advantage over XIC is too small for the operating and commodity risks. Revisit after the next mine update and a quantified La Colorada plan; add only if cash-flow evidence and a wider downside-tested return gap emerge.
Recent Developments
The latest quarterly report described stronger realized metals but operational pressure at Huaron and adjustments to annual output guidance. Subsequent La Colorada drilling identified new high-grade veins. The release did not quantify mineable reserves, production timing, capital requirements or incremental cash flow for those veins.
Primary Risks To Thesis
Lower silver or gold realizations, mill disruption, higher sustaining capital, lease cash rent and a lower exit multiple can erase the narrow base advantage. Permit, labour and community obligations also affect mine timing. Drill intercepts may fail to convert into economic reserves.
Market Mispricing Rationale
Relative Performance
Historical return vs XIC · 2025-06-01–2026-06-01
A more optimistic view would credit a sustained mine recovery and new La Colorada ounces sooner than the market does. The strongest counterevidence is the absence of a new mine plan or capital budget, together with material sensitivity to metal prices and the exit multiple. The current record does not establish a dependable mispricing.
Independent Terminal Share Values
Independent valuation · 24-month terminal share prices · CAD. As of 2026-11-18. Price changes exclude dividends; total returns appear in the investment case.
Central case
base
Model confidence
low
These are conditional operating and valuation cases. A central case does not establish a probability, street consensus or uniquely observed market expectation.
Assessment Rationale
The dated analyst target is closer to the conditional high operating case than to the central case. A small analyst sample and unknown target horizon make this an informal comparison, not an independent probability estimate.
The dated Toronto quote sits below the modeled central terminal price. That gap alone does not reveal a unique market forecast because commodity prices, costs, timing and the exit multiple can offset each other.
The central case is the working operating reference, not an assigned most-probable state. Its modeled edge over XIC is narrow and sensitive to metal prices and the terminal multiple.
Confidence is low because metal realizations, mine execution, lease cash rent and the terminal multiple can overwhelm the modest modeled spread. No probabilities are attached to the cases.
Case Narratives
Bear Case
Bear: weaker metals and execution
The bear case ends at C$9.74 per share and produces -75.4% stock total return, versus -11.9% for XIC. The resulting excess return is -63.5 percentage points. This is a conditional downside case, not a probability-weighted forecast.
What Must Go Right: Even in the bear case, existing mines must keep enough throughput and liquidity to fund sustaining work. The model assumes management preserves essential capital and the cash floor before discretionary repurchases.
What Must Go Wrong: Lower metal realizations, weaker volumes and a compressed exit multiple must dominate. A slower recovery at Huaron or additional capital requirements would add risk beyond the central drilling announcement.
Base Case
Base: existing mines recover
The base case ends at C$54.07 per share and produces 16.5% stock total return, versus 14.1% for XIC. The resulting excess return is 2.3 percentage points. The spread is too narrow to prove a robust advantage.
What Must Go Right: Current mines must deliver the assumed recovery in attributable silver volumes while cash costs, maintenance capital, lease rent and distributions remain within the reviewed operating plan.
What Must Go Wrong: The base case loses its relative edge if metal prices or the exit multiple fall modestly. New La Colorada veins carry no separate central cash flow without a mine plan and budget.
Bull Case
Bull: stronger metals and execution
The bull case ends at C$89.19 per share and produces 89.2% stock total return, versus 22.9% for XIC. The resulting excess return is 66.3 percentage points. This case requires favorable operating and valuation conditions.
What Must Go Right: Higher payable output, supportive silver and gold realizations, controlled cash costs and an undiminished exit multiple must coincide. Exploration success could add option value if later engineering supports an economic plan.
What Must Go Wrong: A decline in metal prices, mine delays, rising sustaining capital or a lower exit multiple would break the bull result. Drill grades alone do not establish mineable reserves or near-term cash flow.
Scenario Analysis
Independent valuation · 24-month terminal share prices · CAD. As of 2026-11-18. Price changes exclude dividends; total returns appear in the investment case.
Independent Investment Case
24-month investment case · As of 2026-11-18
Entry price CAD 48.20 on 2026-11-18. Financial statements through 2026-09-30.
Prospective returns include cash dividends and modeled transaction costs, without dividend reinvestment or investor taxes. XIC uses the same holding period.
Modeled entry/exit costs: PAAS 5/5 basis points; XIC 3/3 basis points.
Bear
Conditional case · no probability assigned
Terminal share price
CAD 9.74
Cash dividends per share
CAD 2.12
PAAS total return
-75.4%
XIC total return
-11.9%
Excess return vs XIC
-63.5 pp
PAAS annualized return
-50.4%
XIC annualized return
-6.1%
Operating and valuation assumptions
EV / EBITDA: 5.50× the final forecast year. Terminal exchange rate: CAD 1.4291 per USD.
Terminal value capitalizes second-year EBITDA after recognized lease cash rent. This is a finite-mine normalized multiple judgment rather than a direct commodity spot multiple; newly discovered La Colorada veins carry no incremental central cash flow.
Balances and annual flows are in USD millions; shares are in millions. All recognized IFRS leases use modeled cash rent. Their liabilities and depreciation are excluded from this valuation’s debt and earnings measures. This is an analytical recast.
Lease cash and accounting basis
Recognized lease liabilities excluded at 2026-09-30: 124.
Historical lease cash estimate from 2026-01-01 to 2026-09-30: principal 42 plus interest 3 = 45. Right-of-use depreciation in that period: 42.
Principal is reported; interest cash is estimated. Interest sensitivity range: 0–6, without assigned probabilities.
The Q3 filing reports 30 million of aggregate interest paid and 42 million of equipment lease payments for nine months, but no separate lease cash interest. Three million is an analytical estimate; zero to six million is a sensitivity range, not issuer guidance.
The forecast silver and gold unit cash costs exclude recognized lease cash rent, which is deducted once after operating profit. Short-term or variable lease amounts are not separately disclosed and remain in cash operating cost estimates.
The base case uses a two million annual cash-tax timing charge beyond a normalized thirty percent tax rate because lease cash deductibility may differ from book treatment. This is an analyst estimate and is challenged independently.
Nine-month equipment lease principal payments of 42 million annualize to 56 million. Add estimated interest to model 60 million of annual rent in each forecast period, allowing renewal of continuing mining equipment capacity rather than assuming runoff to zero.
Terminal EBITDA is after full annual cash rent and excludes the corresponding 124 million lease liability from funded debt. The selected multiple is an analyst normalized assumption on that same cash-rent basis, not a direct provider peer multiple.
Forecast year 1: EBITDA 593.5; common earnings 117.8; reinvestment including acquisitions 550.
Ending funded debt 720; cash 1,183.7; common shares 412.5.
Recognized lease cash charged in operating costs: 60. Separate cash-tax adjustment: 2; a positive amount uses cash. Common earnings use the stated cash-rent basis.
Dividends USD 0.74 per share, converted to CAD 1.06. Executed buybacks 0 million; unused budget 0 million. Repurchases are limited by the modeled cash and leverage requirements.
Operating drivers and units
- gold volume: 0.62
Million attributable gold ounces; midpoint of revised 660 to 680 thousand ounce guidance. The bear case is a conditional analyst assumption, not issuer guidance.
- cash overhead: 210
Annual corporate, royalties and other cash burden beyond site metal unit costs; analyst reconciliation to Q3 operating result. The bear case is a conditional analyst assumption, not issuer guidance.
- silver volume: 23.5
Million attributable silver ounces; low end of 2026 25 to 27 million guidance, no new vein increment. The bear case is a conditional analyst assumption, not issuer guidance.
- gold realization: 3,000
US dollars per gold ounce; analyst forward assumption below Q3 realized 4267, reflecting the observed post-quarter metal-price decline. The exact forecast is not an issuer quote. The bear case is a conditional analyst assumption, not issuer guidance.
- other cash margin: 0
Net zinc, lead and copper margin after their associated cost is conservatively zero; no byproduct credit is counted again in metal unit costs. The bear case is a conditional analyst assumption, not issuer guidance.
- silver realization: 40
US dollars per silver ounce; analyst forward assumption below Q3 realized 63.74, reflecting the observed post-quarter metal-price decline. The exact forecast is not an issuer quote. The bear case is a conditional analyst assumption, not issuer guidance.
- gold unit cash cost: 2,100
US dollars per gold ounce of pre-sustaining-capital cash operating cost; analyst allocation from reported production costs. The bear case is a conditional analyst assumption, not issuer guidance.
- silver unit cash cost: 27
US dollars per silver ounce of pre-byproduct, pre-sustaining-capital cash operating cost; analyst allocation from reported production costs. The bear case is a conditional analyst assumption, not issuer guidance.
Forecast year 2: EBITDA 498; common earnings 56.4; reinvestment including acquisitions 550.
Ending funded debt 440; cash 515.9; common shares 412.6.
Recognized lease cash charged in operating costs: 60. Separate cash-tax adjustment: 2; a positive amount uses cash. Common earnings use the stated cash-rent basis.
Dividends USD 0.74 per share, converted to CAD 1.06. Executed buybacks 0 million; unused budget 0 million. Repurchases are limited by the modeled cash and leverage requirements.
Operating drivers and units
- gold volume: 0.62
Million attributable gold ounces; midpoint of revised 660 to 680 thousand ounce guidance. The bear case is a conditional analyst assumption, not issuer guidance.
- cash overhead: 220
Annual corporate, royalties and other cash burden beyond site metal unit costs; analyst reconciliation to Q3 operating result. The bear case is a conditional analyst assumption, not issuer guidance.
- silver volume: 23.5
Million attributable silver ounces; low end of 2026 25 to 27 million guidance, no new vein increment. The bear case is a conditional analyst assumption, not issuer guidance.
- gold realization: 3,000
US dollars per gold ounce; analyst forward assumption below Q3 realized 4267, reflecting the observed post-quarter metal-price decline. The exact forecast is not an issuer quote. The bear case is a conditional analyst assumption, not issuer guidance.
- other cash margin: 0
Net zinc, lead and copper margin after their associated cost is conservatively zero; no byproduct credit is counted again in metal unit costs. The bear case is a conditional analyst assumption, not issuer guidance.
- silver realization: 40
US dollars per silver ounce; analyst forward assumption below Q3 realized 63.74, reflecting the observed post-quarter metal-price decline. The exact forecast is not an issuer quote. The bear case is a conditional analyst assumption, not issuer guidance.
- gold unit cash cost: 2,200
US dollars per gold ounce of pre-sustaining-capital cash operating cost; analyst allocation from reported production costs. The bear case is a conditional analyst assumption, not issuer guidance.
- silver unit cash cost: 28
US dollars per silver ounce of pre-byproduct, pre-sustaining-capital cash operating cost; analyst allocation from reported production costs. The bear case is a conditional analyst assumption, not issuer guidance.
XIC annual price growth -8.0%, after fund expenses; annual cash distributions 1.75% of the initial investment. These are forecasts.
Base
Conditional case · no probability assigned
Terminal share price
CAD 54.07
Cash dividends per share
CAD 2.12
PAAS total return
16.5%
XIC total return
14.1%
Excess return vs XIC
+2.3 pp
PAAS annualized return
7.9%
XIC annualized return
6.8%
Operating and valuation assumptions
EV / EBITDA: 8.00× the final forecast year. Terminal exchange rate: CAD 1.4291 per USD.
Terminal value capitalizes second-year EBITDA after recognized lease cash rent. This is a finite-mine normalized multiple judgment rather than a direct commodity spot multiple; newly discovered La Colorada veins carry no incremental central cash flow.
Balances and annual flows are in USD millions; shares are in millions. All recognized IFRS leases use modeled cash rent. Their liabilities and depreciation are excluded from this valuation’s debt and earnings measures. This is an analytical recast.
Lease cash and accounting basis
Recognized lease liabilities excluded at 2026-09-30: 124.
Historical lease cash estimate from 2026-01-01 to 2026-09-30: principal 42 plus interest 3 = 45. Right-of-use depreciation in that period: 42.
Principal is reported; interest cash is estimated. Interest sensitivity range: 0–6, without assigned probabilities.
The Q3 filing reports 30 million of aggregate interest paid and 42 million of equipment lease payments for nine months, but no separate lease cash interest. Three million is an analytical estimate; zero to six million is a sensitivity range, not issuer guidance.
The forecast silver and gold unit cash costs exclude recognized lease cash rent, which is deducted once after operating profit. Short-term or variable lease amounts are not separately disclosed and remain in cash operating cost estimates.
The base case uses a two million annual cash-tax timing charge beyond a normalized thirty percent tax rate because lease cash deductibility may differ from book treatment. This is an analyst estimate and is challenged independently.
Nine-month equipment lease principal payments of 42 million annualize to 56 million. Add estimated interest to model 60 million of annual rent in each forecast period, allowing renewal of continuing mining equipment capacity rather than assuming runoff to zero.
Terminal EBITDA is after full annual cash rent and excludes the corresponding 124 million lease liability from funded debt. The selected multiple is an analyst normalized assumption on that same cash-rent basis, not a direct provider peer multiple.
Forecast year 1: EBITDA 1,746.9; common earnings 939.2; reinvestment including acquisitions 550.
Ending funded debt 720; cash 1,905.1; common shares 409.6.
Recognized lease cash charged in operating costs: 60. Separate cash-tax adjustment: 2; a positive amount uses cash. Common earnings use the stated cash-rent basis.
Dividends USD 0.74 per share, converted to CAD 1.06. Executed buybacks 100 million; unused budget 0 million. Repurchases are limited by the modeled cash and leverage requirements.
Operating drivers and units
- gold volume: 0.67
Million attributable gold ounces; midpoint of revised 660 to 680 thousand ounce guidance. The base case is a conditional analyst assumption, not issuer guidance.
- cash overhead: 180
Annual corporate, royalties and other cash burden beyond site metal unit costs; analyst reconciliation to Q3 operating result. The base case is a conditional analyst assumption, not issuer guidance.
- silver volume: 25.2
Million attributable silver ounces; low end of 2026 25 to 27 million guidance, no new vein increment. The base case is a conditional analyst assumption, not issuer guidance.
- gold realization: 3,750
US dollars per gold ounce; analyst forward assumption below Q3 realized 4267, reflecting the observed post-quarter metal-price decline. The exact forecast is not an issuer quote. The base case is a conditional analyst assumption, not issuer guidance.
- other cash margin: 0
Net zinc, lead and copper margin after their associated cost is conservatively zero; no byproduct credit is counted again in metal unit costs. The base case is a conditional analyst assumption, not issuer guidance.
- silver realization: 50
US dollars per silver ounce; analyst forward assumption below Q3 realized 63.74, reflecting the observed post-quarter metal-price decline. The exact forecast is not an issuer quote. The base case is a conditional analyst assumption, not issuer guidance.
- gold unit cash cost: 1,800
US dollars per gold ounce of pre-sustaining-capital cash operating cost; analyst allocation from reported production costs. The base case is a conditional analyst assumption, not issuer guidance.
- silver unit cash cost: 23
US dollars per silver ounce of pre-byproduct, pre-sustaining-capital cash operating cost; analyst allocation from reported production costs. The base case is a conditional analyst assumption, not issuer guidance.
Forecast year 2: EBITDA 1,728; common earnings 931.4; reinvestment including acquisitions 550.
Ending funded debt 440; cash 2,014.4; common shares 406.9.
Recognized lease cash charged in operating costs: 60. Separate cash-tax adjustment: 2; a positive amount uses cash. Common earnings use the stated cash-rent basis.
Dividends USD 0.74 per share, converted to CAD 1.06. Executed buybacks 100 million; unused budget 0 million. Repurchases are limited by the modeled cash and leverage requirements.
Operating drivers and units
- gold volume: 0.68
Million attributable gold ounces; midpoint of revised 660 to 680 thousand ounce guidance. The base case is a conditional analyst assumption, not issuer guidance.
- cash overhead: 180
Annual corporate, royalties and other cash burden beyond site metal unit costs; analyst reconciliation to Q3 operating result. The base case is a conditional analyst assumption, not issuer guidance.
- silver volume: 26
Million attributable silver ounces; low end of 2026 25 to 27 million guidance, no new vein increment. The base case is a conditional analyst assumption, not issuer guidance.
- gold realization: 3,750
US dollars per gold ounce; analyst forward assumption below Q3 realized 4267, reflecting the observed post-quarter metal-price decline. The exact forecast is not an issuer quote. The base case is a conditional analyst assumption, not issuer guidance.
- other cash margin: 0
Net zinc, lead and copper margin after their associated cost is conservatively zero; no byproduct credit is counted again in metal unit costs. The base case is a conditional analyst assumption, not issuer guidance.
- silver realization: 50
US dollars per silver ounce; analyst forward assumption below Q3 realized 63.74, reflecting the observed post-quarter metal-price decline. The exact forecast is not an issuer quote. The base case is a conditional analyst assumption, not issuer guidance.
- gold unit cash cost: 1,850
US dollars per gold ounce of pre-sustaining-capital cash operating cost; analyst allocation from reported production costs. The base case is a conditional analyst assumption, not issuer guidance.
- silver unit cash cost: 24
US dollars per silver ounce of pre-byproduct, pre-sustaining-capital cash operating cost; analyst allocation from reported production costs. The base case is a conditional analyst assumption, not issuer guidance.
XIC annual price growth 5.0%, after fund expenses; annual cash distributions 1.98% of the initial investment. These are forecasts.
Bull
Conditional case · no probability assigned
Terminal share price
CAD 89.19
Cash dividends per share
CAD 2.12
PAAS total return
89.2%
XIC total return
22.9%
Excess return vs XIC
+66.3 pp
PAAS annualized return
37.6%
XIC annualized return
10.9%
Operating and valuation assumptions
EV / EBITDA: 9.00× the final forecast year. Terminal exchange rate: CAD 1.4291 per USD.
Terminal value capitalizes second-year EBITDA after recognized lease cash rent. This is a finite-mine normalized multiple judgment rather than a direct commodity spot multiple; newly discovered La Colorada veins carry no incremental central cash flow.
Balances and annual flows are in USD millions; shares are in millions. All recognized IFRS leases use modeled cash rent. Their liabilities and depreciation are excluded from this valuation’s debt and earnings measures. This is an analytical recast.
Lease cash and accounting basis
Recognized lease liabilities excluded at 2026-09-30: 124.
Historical lease cash estimate from 2026-01-01 to 2026-09-30: principal 42 plus interest 3 = 45. Right-of-use depreciation in that period: 42.
Principal is reported; interest cash is estimated. Interest sensitivity range: 0–6, without assigned probabilities.
The Q3 filing reports 30 million of aggregate interest paid and 42 million of equipment lease payments for nine months, but no separate lease cash interest. Three million is an analytical estimate; zero to six million is a sensitivity range, not issuer guidance.
The forecast silver and gold unit cash costs exclude recognized lease cash rent, which is deducted once after operating profit. Short-term or variable lease amounts are not separately disclosed and remain in cash operating cost estimates.
The base case uses a two million annual cash-tax timing charge beyond a normalized thirty percent tax rate because lease cash deductibility may differ from book treatment. This is an analyst estimate and is challenged independently.
Nine-month equipment lease principal payments of 42 million annualize to 56 million. Add estimated interest to model 60 million of annual rent in each forecast period, allowing renewal of continuing mining equipment capacity rather than assuming runoff to zero.
Terminal EBITDA is after full annual cash rent and excludes the corresponding 124 million lease liability from funded debt. The selected multiple is an analyst normalized assumption on that same cash-rent basis, not a direct provider peer multiple.
Forecast year 1: EBITDA 2,467.5; common earnings 1,450.6; reinvestment including acquisitions 550.
Ending funded debt 720; cash 2,316.5; common shares 406.8.
Recognized lease cash charged in operating costs: 60. Separate cash-tax adjustment: 2; a positive amount uses cash. Common earnings use the stated cash-rent basis.
Dividends USD 0.74 per share, converted to CAD 1.06. Executed buybacks 200 million; unused budget 0 million. Repurchases are limited by the modeled cash and leverage requirements.
Operating drivers and units
- gold volume: 0.69
Million attributable gold ounces; midpoint of revised 660 to 680 thousand ounce guidance. The bull case is a conditional analyst assumption, not issuer guidance.
- cash overhead: 170
Annual corporate, royalties and other cash burden beyond site metal unit costs; analyst reconciliation to Q3 operating result. The bull case is a conditional analyst assumption, not issuer guidance.
- silver volume: 26.5
Million attributable silver ounces; low end of 2026 25 to 27 million guidance, no new vein increment. The bull case is a conditional analyst assumption, not issuer guidance.
- gold realization: 4,200
US dollars per gold ounce; analyst forward assumption below Q3 realized 4267, reflecting the observed post-quarter metal-price decline. The exact forecast is not an issuer quote. The bull case is a conditional analyst assumption, not issuer guidance.
- other cash margin: 0
Net zinc, lead and copper margin after their associated cost is conservatively zero; no byproduct credit is counted again in metal unit costs. The bull case is a conditional analyst assumption, not issuer guidance.
- silver realization: 60
US dollars per silver ounce; analyst forward assumption below Q3 realized 63.74, reflecting the observed post-quarter metal-price decline. The exact forecast is not an issuer quote. The bull case is a conditional analyst assumption, not issuer guidance.
- gold unit cash cost: 1,750
US dollars per gold ounce of pre-sustaining-capital cash operating cost; analyst allocation from reported production costs. The bull case is a conditional analyst assumption, not issuer guidance.
- silver unit cash cost: 22
US dollars per silver ounce of pre-byproduct, pre-sustaining-capital cash operating cost; analyst allocation from reported production costs. The bull case is a conditional analyst assumption, not issuer guidance.
Forecast year 2: EBITDA 2,511; common earnings 1,486.5; reinvestment including acquisitions 550.
Ending funded debt 440; cash 2,883; common shares 401.2.
Recognized lease cash charged in operating costs: 60. Separate cash-tax adjustment: 2; a positive amount uses cash. Common earnings use the stated cash-rent basis.
Dividends USD 0.74 per share, converted to CAD 1.06. Executed buybacks 200 million; unused budget 0 million. Repurchases are limited by the modeled cash and leverage requirements.
Operating drivers and units
- gold volume: 0.7
Million attributable gold ounces; midpoint of revised 660 to 680 thousand ounce guidance. The bull case is a conditional analyst assumption, not issuer guidance.
- cash overhead: 170
Annual corporate, royalties and other cash burden beyond site metal unit costs; analyst reconciliation to Q3 operating result. The bull case is a conditional analyst assumption, not issuer guidance.
- silver volume: 27
Million attributable silver ounces; low end of 2026 25 to 27 million guidance, no new vein increment. The bull case is a conditional analyst assumption, not issuer guidance.
- gold realization: 4,200
US dollars per gold ounce; analyst forward assumption below Q3 realized 4267, reflecting the observed post-quarter metal-price decline. The exact forecast is not an issuer quote. The bull case is a conditional analyst assumption, not issuer guidance.
- other cash margin: 0
Net zinc, lead and copper margin after their associated cost is conservatively zero; no byproduct credit is counted again in metal unit costs. The bull case is a conditional analyst assumption, not issuer guidance.
- silver realization: 60
US dollars per silver ounce; analyst forward assumption below Q3 realized 63.74, reflecting the observed post-quarter metal-price decline. The exact forecast is not an issuer quote. The bull case is a conditional analyst assumption, not issuer guidance.
- gold unit cash cost: 1,750
US dollars per gold ounce of pre-sustaining-capital cash operating cost; analyst allocation from reported production costs. The bull case is a conditional analyst assumption, not issuer guidance.
- silver unit cash cost: 22
US dollars per silver ounce of pre-byproduct, pre-sustaining-capital cash operating cost; analyst allocation from reported production costs. The bull case is a conditional analyst assumption, not issuer guidance.
XIC annual price growth 9.0%, after fund expenses; annual cash distributions 2.10% of the initial investment. These are forecasts.
Variant view
Attributable annual silver output · Second twelve-month forecast period ending November 2028
Comparison reference: 25 million silver ounces
The low end of issuer 2026 guidance is a transparent reference point, not a 2028 street consensus.
Our forecast: 26 million silver ounces
Base period-two model assumes modest recovery after Huaron work; it contains no quantified November vein increment.
The variant is one million ounces above a flat low-end-guidance extrapolation, conditional on existing-mine recovery. The exploration release lacks a schedule to add its new veins.
Dated catalysts
- Review full-year 2026 silver output and Huaron repair status against the current lower-end guidance.
By 2027-03-31 · silver ounces in millions >= 25
- Review a quantified La Colorada vein mine schedule, reserve conversion and capital plan before adding incremental cash flows.
By 2028-11-17 · incremental approved silver ounces in millions > 0
What would weaken the thesis
- Production below the lower end of 2026 silver guidance would weaken the recovery case.
By 2027-03-31 · silver ounces in millions < 25
- A material rise in recognized lease rent would weaken cash conversion.
By 2027-11-18 · annual recognized lease cash rent in USD millions > 70
Sources and evidence dates
Q3 2026 report pp. 2-3, 12, 31-32, 53-56, 63-67 · 2026-11-04
November 17 daily US dollar rate 1.4291 Canadian dollars · 2026-11-17
October 2026 factsheet pp. 1-2; distribution yield 2.00%, trailing yield 1.98%, MER 0.06% · 2026-10-31
November 17 La Colorada exploration results; no mine plan or cash-flow schedule · 2026-11-17
PAAS.TO regularMarketPrice CAD 48.20 observed 2026-11-18 13:58:57 EST · 2026-11-18
Street Targets
Reference Price
$48.22
Street Mean Target
$88.69
Price-only Change
+83.9%
Street consensus is a comparison. This price-only change excludes dividends and uses the stored reference price.
Street Target Range
Current vs low/median/mean/high target prices
Growth
Modelled EPS Sensitivity and Revision Range
Top: Street estimate level by period (low to high with mean). Bottom: source-provided estimate change metric (%).
Sources: yfinance_parsed_snapshots, valuation.street_targets
The base operating case assumes 25.20 million attributable silver ounces in the first forecast year and 26.00 million in the second. The modest recovery depends on existing mine execution after Huaron downtime. The newly reported La Colorada veins add no quantified central production because the issuer has not provided a mine schedule, capital budget or incremental cash flow.
Profitability
Margin Breakdown
Driver contributions from revenue to net income
Base first-year EBITDA after recognized lease cash rent is 1,746.90 million USD. The case assumes silver realization of 50.00 and gold realization of 3,750.00 USD per troy ounce. These are analyst forecasts below the issuer’s latest reported realized prices, not current realized sales or guaranteed commodity prices.
Reinvestment
The base case budgets 450.00 million USD of annual maintenance capital and 100.00 million USD of growth capital before discretionary repurchases. The new veins receive no separate capital or production schedule. Dividends use the declared quarterly run rate as an assumption; buybacks occur only after the cash reserve and leverage checks.
Discounting
This is a conditional exit-multiple model over 24 months rather than a discounted cash flow with a measured weighted average cost of capital. It compares the modeled stock wealth, including cash dividends and transaction allowances, with declared XIC price-growth and cash-yield cases. Commodity, currency and terminal-multiple risk must be judged separately from the mechanical return comparison.
Terminal Value
The base terminal case applies 8.00x to second-year EBITDA of 1,728.00 million USD after full recognized lease cash rent. It then adjusts for external funded debt, available cash and noncommon claims, and converts the resulting common value at an assumed 1.43 Canadian dollars per US dollar. Finite mine lives and metal-price cycles make the multiple a judgment rather than a perpetual peak-margin entitlement.
Comparables
Peer Percentile Heatmap
Subject percentile rank vs peer set
The PAAS subject multiples now use the current Canadian dollar Toronto market capitalization and reviewed US dollar issuer statements converted at the verified dated Bank of Canada rate. Kinross and Franco-Nevada peer quotes were refetched, but their provider financial ratios are not identical issuer-reviewed bases; royalty and producer economics also differ. The issuer has not supplied a matching EBITDA definition, so the related enterprise multiple is unavailable for PAAS. The modeled exit multiple remains a separate conditional analyst assumption on after-rent EBITDA, and a lower multiple can erase the modest base excess return.
Valuation Conclusion
At the dated quote of C$48.20, the 24-month base case gives a conditional terminal value of C$54.07 per share and 16.5% total stock return including modeled cash dividends. The XIC case gives 14.1%, leaving 2.3 percentage points of excess total return. That narrow modeled spread does not demonstrate a robust advantage after commodity and terminal-value uncertainty. The November La Colorada discoveries have no separately measurable event-only value increment until a mine plan supports one.
Convergence Probability
No probability is assigned to the bear, base or bull cases. They are conditional operating and terminal assumptions, not a probability distribution or a claim that the current market will converge to the base price.
Convergence Probability Rationale
The base result is sensitive to metal realizations and the exit multiple. A separate adverse lease-rent test and lower multiple test reduce the already narrow excess return, while a combined commodity and multiple downside falls below the current quote. Exploration drilling may create option value, but the issuer has not disclosed the production timing, spending or cash flow needed to book it in the central case.
Thesis Specific Risks
The portfolio’s silver exposure depends on execution at Juanicipio and existing silver mines, while La Colorada Skarn and other growth projects require further engineering, capital and approvals. Technical reports and the annual information form warn that resource estimates and economic assumptions can change. A model that capitalizes undeveloped discoveries before a defined mine plan risks overstating value; lower 2026 gold guidance and Huaron downtime also pressure near-term forecasts.
Regulatory And Legal Risks
The company faces environmental, safety, permit, tax, labour and community obligations across several jurisdictions. Escobal remains non-operating during the ILO 169 consultation process in Guatemala. The annual information form identifies tailings, closure, concession and political risks, and the Q3 report describes regulatory work at Jacobina. Delays or restrictions can defer production and raise costs.
Financial And Liquidity Risks
Cash generation is exposed to silver and gold price swings, cost inflation, capital requirements and working-capital movements. Although the Q3 2026 report shows substantial cash and liquidity, available liquidity includes credit capacity and attributable Juanicipio cash rather than only unrestricted consolidated cash. Project commitments, mine remediation and shareholder distributions can reduce future liquidity.
Business And Operational Risks
Mine output can fall when grade, recovery, sequencing, equipment availability or geotechnical conditions differ from plan. The Q3 2026 report cites Huaron grinding-mill foundation downtime and Jacobina seismicity and inspection measures; it also records lower-than-expected Timmins and Shahuindo output. Exploration results may fail to convert into mineable reserves or economically timed production.
Industry And Competitive Risks
Silver and gold are globally priced commodities, so Pan American has limited control over realized prices. The company competes for mineral properties, skilled staff, supplies, capital and technical capability. Energy, labour and reagent inflation may increase mine costs even when commodity prices weaken; USGS silver context also shows that supply and demand are not determined by one producer.
Business Model
Pan American operates mines, processes ore into saleable metal products, and reinvests cash generation in sustaining work and selected growth projects. Its portfolio combines wholly owned operations with an equity interest in Juanicipio. Metal prices and mine-level productivity set cash generation, while development spending and shareholder distributions compete for that cash.
Cost Structure
Mining, processing, labour, energy, consumables, maintenance, royalties and site administration drive operating costs. Sustaining capital, exploration and project development require separate cash outlays. In Q3 2026 the company reported higher production costs at most mines and higher royalty costs tied to mining activity; reported all-in sustaining costs are non-GAAP measures that require reconciliation to the financial statements.
Revenue Drivers
Revenue depends on payable metal sold, realized commodity prices and the production mix. The Q3 2026 report attributes year-to-date revenue growth versus 2025 primarily to higher realized gold and silver prices, partly offset by lower gold and silver sales volumes. Juanicipio contributes at Pan American’s attributable ownership share.
Company Overview
Pan American Silver is a Vancouver-based producer of silver and gold across the Americas. Its operating portfolio spans Canada, Mexico, Peru, Brazil, Bolivia, Chile and Argentina. It also owns a 44% interest in the producing Juanicipio mine in Mexico, the non-operating Escobal mine in Guatemala, and exploration and development projects. The operating business is reported in Silver and Gold segments.
Geographic Exposure
Producing mines are located in Canada, Mexico, Peru, Brazil, Bolivia, Chile and Argentina. Mexico includes La Colorada and the Juanicipio joint-venture interest. Guatemala exposure includes Escobal, which remains non-operating. Country-specific permits, taxes, labour conditions and local currency costs affect operating outcomes.
Key Operating Levers
Throughput, grade, recovery, metal mix, mine availability and sustaining capital determine unit economics. The Q3 2026 report expects 2026 silver output at the low end of 25–27 million ounces because of Huaron mill-foundation downtime and a gold-heavier mix at Cerro Moro; gold guidance was revised to 660–680 thousand ounces amid Jacobina operating measures. The November 17 La Colorada drilling disclosed Elena, Denisse and Catalina vein discoveries and further La Chona work, but supplied no new mine schedule or incremental production forecast.
Products And Services
The company mines and sells silver and gold, with zinc, lead and copper recovered from certain operations. Silver exposure includes La Colorada, Huaron, San Vicente, Cerro Moro and its 44% Juanicipio interest; gold operations include Jacobina, El Peñon, Shahuindo, Timmins and Minera Florida. Sales reflect payable metal content rather than a recurring service subscription.
Distribution And Go To Market
The company sells payable metal produced from its mines into commodity markets through commercial arrangements. Silver, gold and base-metal realization follows market prices, payable terms and the mix of products sold; its investor materials do not describe a consumer distribution network or proprietary end-market pricing.
Regulatory And Operating Environment
Mining depends on concessions, permits, environmental compliance, mine safety and community relationships in each jurisdiction. The 2025 annual information form lists tailings, labour, geopolitical and permitting risks. Escobal remains subject to the ILO 169 consultation process in Guatemala; the Q3 2026 report describes ongoing work rather than an operating restart. La Colorada exploration results require further technical and economic work before they can support a mine-plan change.
Industry Description
Pan American participates in mined precious metals, primarily silver and gold, with zinc, lead and copper byproducts at some operations. The USGS silver commodity review describes supply from primary silver mines and as a byproduct of other metal mining. The company’s own portfolio combines silver and gold segments across the Americas.
Competitive Landscape
The relevant comparison set is other producers of silver and gold and developers competing for mineral rights, skilled labour, equipment and capital. Pan American’s November 2026 investor presentation emphasizes its multi-mine footprint and silver exposure. Production quality depends on each asset’s grade, cost, jurisdiction and remaining mine life rather than a branded consumer product.
Market Share And Positioning
Pan American presents itself as a major silver producer with mines across the Americas and a 44% Juanicipio interest. Its position comes from a diversified operating portfolio, mineral inventory and exposure to both silver and gold. A precise global market-share claim is not necessary to assess its position and is not established by the selected source packet.
Supplier And Customer Dynamics
Suppliers provide energy, labour, mining equipment, reagents, explosives and contracted services; availability and prices influence site costs and project schedules. Customers buy payable precious and base metals under commercial terms tied to commodity prices and product specifications. Individual customer bargaining power is less central than metal prices, payable terms and mine performance.
Competitive Advantages And Moat
Existing mines, processing plants, permitted infrastructure, technical teams and mineral inventories are difficult to replicate quickly. The company’s multi-jurisdiction portfolio reduces reliance on any single operating site, while the La Colorada and Juanicipio interests add silver exposure. These are asset and execution advantages; they do not create a contractual monopoly or protect realized metal prices.
Industry Growth And Cyclicality
Mine revenue is cyclical because realized metal prices move with global commodity markets, while ore grade, recovery and production availability vary by asset. New supply requires exploration, technical studies, permits, capital and construction over long periods. Silver demand has both industrial and investment uses in the USGS commodity review, so price and volume can respond to different cycles.
Pricing Power And Cost Position
Pan American generally takes global prices for payable metals rather than setting them. Its economic flexibility therefore comes from grade, recovery, throughput, byproduct recovery, operating discipline and capital allocation. Cash costs and all-in sustaining costs are mine-sensitive and can change with input inflation and metal mix; the selected technical report shows why La Colorada orebody characteristics and mining method matter.
Barriers To Entry And Substitutes
A new mine requires a viable deposit, resource definition, engineering, financing, permits, community engagement and construction. Existing infrastructure and technical knowledge can lower the execution burden for expansion near operating mines. Silver competes with other materials in some industrial uses, while investors can obtain precious-metals exposure through bullion or other securities.
Industry Regulation And Structural Risks
Mining is exposed to concession, environmental, safety, tax and community requirements across jurisdictions. Tailings, water use and closure obligations create long-duration liabilities. The annual information form identifies operational and country risks, while the La Colorada technical report demonstrates the resource, engineering and permitting work needed to turn mineralization into economic output. Escobal’s consultation process illustrates how a permitted asset can remain non-operating.
Balance Sheet Analysis
Balance Sheet Snapshot
Capital structure composition and liquidity ratios
At September 30, 2026, total assets were US$10.176 billion, liabilities US$2.774 billion and equity US$7.402 billion, compared with US$9.742 billion, US$2.741 billion and US$7.001 billion at December 2025. Current assets of US$2.579 billion exceeded current liabilities of US$949 million. The results release also cites US$1.9 billion of cash, equivalents and short-term investments and US$3.4 billion of total available liquidity, a broader non-GAAP measure including credit availability and Juanicipio cash.
Forward Financial Outlook
The Q3 report maintains 2026 silver production guidance of 25–27 million ounces, now expected at the low end because of Huaron downtime and Cerro Moro metal mix. Gold production guidance was revised to 660–680 thousand ounces, with Gold Segment AISC guidance increased to US$2,000–US$2,150 per ounce. These operating assumptions constrain near-term volume and cost forecasts; future realized metal prices, mine recovery and capital spending remain uncertain.
Income Statement Analysis
Income Statement Levels
Revenue (USD) and profitability margins (% of revenue)
The Q3 2026 statements report US$1.006 billion of revenue versus US$855 million a year earlier, US$373 million of mine operating earnings versus US$313 million, and US$357 million of net earnings versus US$169 million. Nine-month revenue was US$3.284 billion versus US$2.440 billion and net earnings were US$1.118 billion versus US$528 million. Higher realized metal prices outweighed lower sales volumes in the year-to-date comparison.
Cashflow Statement Analysis
Cash Flow Composition
Operating, investing, and financing cash flow by period
Q3 2026 net cash from operating activities was US$377 million versus US$313 million a year earlier. Investing used US$111 million and financing used US$325 million, leaving US$1.510 billion of cash and equivalents at quarter end. Over nine months, operating activities provided US$1.202 billion, investing used US$133 million and financing used US$778 million. The quarterly cash-flow statement is consolidated and should not be equated with the issuer’s attributable free-cash-flow measure.
Historical Performance Summary
The 2025 annual statements report US$3.619 billion of revenue and US$980 million of net earnings, up from US$2.819 billion and US$113 million in 2024. Operating cash flow rose to US$1.333 billion from US$724 million. The 2026 nine-month results extend the stronger revenue and earnings trend, although commodity prices, asset mix and production volumes differ across the periods.
Key Financial Ratios And Metrics
The Q3 2026 mine operating earnings margin was about 37% of revenue, versus about 37% in Q3 2025; the nine-month margin was about 44% versus 34% a year earlier, calculated from reported revenue and mine operating earnings. The current ratio was approximately 2.72 at September 2026. Q3 attributable silver and gold production were 6.07 million ounces and 167.9 thousand ounces. Silver Segment AISC was US$11.21 per silver ounce and Gold Segment AISC US$2,281 per gold ounce, both non-GAAP and net of relevant credits.
Balance Sheet And Cashflow Analysis
Current assets covered current liabilities by about 2.7 times at September 2026, compared with about 2.7 times at December 2025, using the issuer statements. Cash and equivalents rose from US$1.215 billion at December 2025 to US$1.510 billion at September 2026 despite US$778 million of nine-month financing outflows. Available liquidity includes an undrawn revolver and attributable Juanicipio cash, so it is not wholly balance-sheet cash.
Non Recurring Items And Trend Extrapolation
Q3 fair-value gains and the Larder sale gain should not be annualized as mine earnings. Juanicipio ownership and the recent asset mix change make straight-line comparisons with earlier years imperfect. Huaron mill work and Jacobina seismicity and inspection measures may affect near-term output, while November 17 La Colorada exploration results contain no new cash-flow schedule. A forward model should separate recurring operating drivers from one-time gains, working-capital movements and undeveloped discoveries.
Earnings Quality And Accounting Considerations
Q3 reported net earnings of US$357 million exceeded adjusted earnings of US$287 million. The issuer identifies unrealized fair-value gains on financial instruments, largely its New Pacific Metals interest, and a gain on the Larder property sale among the main adjustments. Non-GAAP adjusted earnings, attributable cash flow and AISC use definitions and reconciliations separate from IFRS statement lines; Juanicipio’s 44% contribution also requires care when comparing attributable and consolidated amounts.
Growth
| Peer Set | EPS Growth | Company Name | Revenue Growth |
|---|---|---|---|
| K | 2.1% | Kinross Gold Corporation | -1.5% |
| FNV | 37.6% | Franco-Nevada Corporation | 13.4% |
| 91.1% | Subject (PAAS) | 17.7% |
Valuation
| P/B | P/E | P/S | Peer Set | EV/EBITDA | EV/Revenue | Market Cap | Forward P/E | Company Name | Enterprise Value |
|---|---|---|---|---|---|---|---|---|---|
| 2.27 | 7.37 | 3.76 | K | 6.01x | 3.79x | $31.8bn | 7.41 | Kinross Gold Corporation | $32.0bn |
| 5.29 | 29.76 | 27.62 | FNV | 31.03x | 28.30x | $65.3bn | 27.93 | Franco-Nevada Corporation | $66.9bn |
| 1.88 | 8.86 | 3.12 | 2.94x | $19.9bn | Subject (PAAS) | $18.7bn |
Profitability
| ROA | ROE | Peer Set | Net Margin | Company Name | Gross Margin | Operating Margin |
|---|---|---|---|---|---|---|
| 20.6% | 35.3% | K | 37.6% | Kinross Gold Corporation | 68.6% | 51.0% |
| 13.5% | 20.1% | FNV | 67.0% | Franco-Nevada Corporation | 92.5% | 77.8% |
| 35.2% | Subject (PAAS) | 44.9% | 46.6% |
Annual
| All numbers in thousands except per-share amounts; TTM through 2026-09-30; TTM EPS approximate (USD) | TTM | Dec 2025 | Dec 2024 | Dec 2023 | Dec 2022 |
|---|---|---|---|---|---|
| Total Revenue | 4,463,000 | 3,619,000 | 2,819,000 | 2,316,100 | 1,494,700 |
| Cost of Revenue | 2,457,000 | 2,214,000 | 2,270,000 | 2,019,300 | 1,446,300 |
| Gross Profit | 2,006,000 | 1,405,000 | 549,000 | 296,800 | 48,400 |
| Operating Expenses | -72,000 | 172,000 | 18,000 | 258,700 | 310,700 |
| Operating Income | 2,078,000 | 1,233,000 | 531,000 | 38,100 | -262,300 |
| Finance and Other Costs | -50,000 | -5,000 | 99,000 | 96,900 | 38,700 |
| Pretax Income | 2,128,000 | 1,238,000 | 432,000 | -58,800 | -301,000 |
| Income Tax Expense | 558,000 | 258,000 | 319,000 | 46,100 | 39,100 |
| Net Income | 1,570,000 | 980,000 | 113,000 | -104,900 | -340,100 |
| Basic EPS | 3.80 | 2.56 | 0.31 | -0.32 | -1.62 |
Quarterly
| All numbers in thousands except per-share amounts (USD) | 3 Months Ended 2026-09-30 | 3 Months Ended 2025-09-30 | 9 Months Ended 2026-09-30 | 9 Months Ended 2025-09-30 |
|---|---|---|---|---|
| Total Revenue | 1,006,000 | 855,000 | 3,284,000 | 2,440,000 |
| Cost of Revenue | 633,000 | 542,000 | 1,846,000 | 1,603,000 |
| Gross Profit | 373,000 | 313,000 | 1,438,000 | 837,000 |
| Operating Expenses | -54,000 | 63,000 | -129,000 | 115,000 |
| Operating Income | 427,000 | 250,000 | 1,567,000 | 722,000 |
| Finance and Other Costs | -35,000 | 1,000 | -20,000 | 25,000 |
| Pretax Income | 462,000 | 249,000 | 1,587,000 | 697,000 |
| Income Tax Expense | 105,000 | 80,000 | 469,000 | 169,000 |
| Net Income | 357,000 | 169,000 | 1,118,000 | 528,000 |
| Basic EPS | 0.86 | 0.45 | 2.67 | 1.43 |
Annual
| All numbers in thousands except per-share amounts (USD) | Dec 2025 | Dec 2024 | Dec 2023 | Dec 2022 |
|---|---|---|---|---|
| Current Assets | 2,196,000 | 1,720,000 | 1,390,000 | 804,400 |
| Non-current Assets | 7,546,000 | 5,483,000 | 5,823,100 | 2,444,100 |
| Total Assets | 9,742,000 | 7,203,000 | 7,213,100 | 3,248,500 |
| Current Liabilities | 817,000 | 687,000 | 624,200 | 380,800 |
| Non-current Liabilities | 1,924,000 | 1,799,000 | 1,816,400 | 666,100 |
| Total Liabilities | 2,741,000 | 2,486,000 | 2,440,600 | 1,046,900 |
| Stockholders Equity | 7,001,000 | 4,717,000 | 4,772,500 | 2,201,600 |
Quarterly
| All numbers in thousands except per-share amounts (USD) | As At 2026-09-30 | As At 2025-12-31 |
|---|---|---|
| Current Assets | 2,579,000 | 2,196,000 |
| Non-current Assets | 7,597,000 | 7,546,000 |
| Total Assets | 10,176,000 | 9,742,000 |
| Current Liabilities | 949,000 | 817,000 |
| Non-current Liabilities | 1,825,000 | 1,924,000 |
| Total Liabilities | 2,774,000 | 2,741,000 |
| Stockholders Equity | 7,402,000 | 7,001,000 |
| Cash And Cash Equivalents | 1,510,000 | 1,215,000 |
| Total Debt | 720,000 | 714,000 |
Annual
| All numbers in thousands except per-share amounts; TTM through 2026-09-30 (USD) | TTM | Dec 2025 | Dec 2024 | Dec 2023 | Dec 2022 |
|---|---|---|---|---|---|
| Operating Cash Flow | 1,751,000 | 1,333,000 | 724,000 | 450,200 | 31,800 |
| Investing Cash Flow | -277,000 | -706,000 | -33,000 | 397,900 | -255,400 |
| Financing Cash Flow | -840,000 | -278,000 | -225,000 | -551,800 | 53,000 |
| Effect Of Exchange Rate Changes | 6,000 | 3,000 | -3,000 | -3,700 | -6,000 |
| Change In Cash | 640,000 | 352,000 | 463,000 | 292,600 | -176,600 |
| Beginning Cash Position | 870,000 | 863,000 | 400,000 | 107,000 | 283,600 |
| End Cash Position | 1,510,000 | 1,215,000 | 863,000 | 399,600 | 107,000 |
Quarterly
| All numbers in thousands except per-share amounts (USD) | 3 Months Ended 2026-09-30 | 3 Months Ended 2025-09-30 | 9 Months Ended 2026-09-30 | 9 Months Ended 2025-09-30 |
|---|---|---|---|---|
| Operating Cash Flow | 377,000 | 313,000 | 1,202,000 | 784,000 |
| Investing Cash Flow | -111,000 | -456,000 | -133,000 | -562,000 |
| Financing Cash Flow | -325,000 | -67,000 | -778,000 | -216,000 |
| Effect Of Exchange Rate Changes | 3,000 | -1,000 | 4,000 | 1,000 |
| Change In Cash | -56,000 | -211,000 | 295,000 | 7,000 |
| Beginning Cash Position | 1,566,000 | 1,081,000 | 1,215,000 | 863,000 |
| End Cash Position | 1,510,000 | 870,000 | 1,510,000 | 870,000 |
Social Factors
Worker and contractor safety, local employment and community relationships are central to mine continuity. The 2025 annual report discloses two fatalities, at Shahuindo and Jacobina, and describes corrective actions and a three-year safety program. The sustainability report covers community and Indigenous relationships, human rights and workforce practices. Escobal’s non-operating status underscores the importance of consultation and local acceptance.
Governance Factors
The 2026 management information circular and annual information form describe board oversight, executive compensation and governance policies. Oversight of mine safety, tailings, capital allocation and disclosure matters because projects span multiple jurisdictions and technical estimates are uncertain. Governance evaluation should compare stated policies with operating outcomes and disclosed incidents, rather than infer effectiveness from policy existence alone.
Environmental Factors
Mining and processing use water and energy and create tailings, waste rock and closure obligations. Pan American’s 2025 sustainability report describes programs for water stewardship, biodiversity, energy and greenhouse-gas emissions, tailings management and rehabilitation. The annual information form identifies environmental incidents and compliance costs as material operating risks across the portfolio.
Esg Risks And Opportunities
Tailings or water incidents, safety failures, permit delays and weak community relationships could impose remediation costs or interrupt output. The disclosed 2025 fatalities show that safety risk is realized, not merely hypothetical. Better water management, safer operations and transparent engagement can support continuity and permit confidence, but the selected sources do not quantify a distinct valuation premium from these programs.
2026 Management Information Circular PDF panamericansilver.com
Bank of Canada USD to CAD daily exchange rate November 17 2026 Web page www.bankofcanada.ca
November 2026 Investor Presentation PDF panamericansilver.com
PAAS Q3 2026 Earnings Results Release Web page panamericansilver.com
PAAS Q3 2026 Interim Financial Statements and MD&A PDF panamericansilver.com
| Worksheet | Output |
|---|---|
| Reproduce archived values | Recorded values |
- 2023 Annual Report
- 2024 Annual Report
- 2025 Annual Information Form
- 2025 Annual Report
- 2025 Sustainability Report
- 2026 Management Information Circular
- Bank of Canada USD to CAD daily exchange rate November 17 2026
- BlackRock XIC October 2026 factsheet
- Download Latest Technical Report
- November 2026 Investor Presentation
- PAAS Q3 2026 Earnings Results Release
- PAAS Q3 2026 Interim Financial Statements and MD&A
- Pan American Silver Reports High Grade Exploration Results and New Vein Discoveries at La Colorada
- Q1 2026 Conference Call Slides
- Q1 2026 Financial Report
- Q3 2026 Conference Call Slides
- Reserves & Resources
The price-history chart preserves the series returned by the original reader on November 20, 2026. The report carries its original publication date.