Northland Power — November 24, 2026

Our maximum entry price is C$23.00 per share. Northland Power Inc. (TSX: NPI), a Canadian power producer, closed at C$23.60 CAD on November 24, 2026; the price rule is Wait. Base fair value is C$26.81. Research cutoff is the regular TSX close on that date; the latest available issuer filing is the September 30, 2026 interim report approved November 12. The next review is the FY2026 release and the first post-completion JV cash disclosure. The strongest contrary case is C$1.95bn 2031 EBITDA at 8.2×, implying C$16.00 entry and Wait; installed turbines and long contracts favor the base, while project cash and funding remain unproved.

View the frozen close series

Market close (CAD/share)
C$23.60
Base fair value (CAD/share)
C$26.81
Company details
Maximum entry price (CAD/share)
C$23.00

View the frozen close series

Investment Thesis

Northland Power Inc. (TSX: NPI) offers a dated completion-to-cash opportunity in offshore wind, but the parent must fund project obligations before investors enjoy the operating step-up. At the TSX NPI unadjusted 24 November 2026 close, CAD 23.60, our C$23.00 entry is C$0.60 below the market. The five-year base exit is C$36.73 with C$4.55 of future-valued modeled distributions, giving an 11.81% annual net shareholder return at the close versus 7.49% net for modeled XIC. The 4.33 percentage-point spread clears the benchmark by more than 200 basis points; the entry still says Wait because a persistent C$1.2 billion project-value miss lowers the hurdle ceiling to C$23.30 before rounding. Model bridge.

Market Mispricing

The close is C$3.21 below base fair value, yet C$0.60 above the stressed maximum entry. The disputed input is how much operating value Hai Long and Baltic can turn into cash after their own borrowings and sponsor obligations. Northland's reported free cash flow adds back growth expenditures, so the dividend and construction equity cannot both be funded from the full headline figure. Q3 2026 report, physical p. 5 Q3 2026 report, physical p. 22

Recent Developments

All 73 Hai Long turbines were installed and generating, but final permits and full commercial operation were still pending; all 76 Baltic turbines were installed with more than 70% generating at the November 12 release. The Jurassic battery project began commercial operations. We do not treat pre-completion production as fully distributable operating cash. Q3 2026 report, physical p. 8 November 12 issuer release

Earnings Outlook

Management's 2026 guidance was C$1.45–1.65 billion adjusted EBITDA and C$1.05–1.25 free cash flow per share. Our 2031 C$2.25 billion proportionate EBITDA assumption requires the two large projects to contribute after construction and modest growth elsewhere; it is an analyst forecast, not guidance. The next decisive disclosures are commercial operation, attributable project cash distributions and remaining sponsor funding. Q3 2026 report, physical p. 30

Valuation Summary

At an 8.8× 2031 exit multiple, C$2.25 billion of consolidated-subsidiary plus parent-share JV EBITDA produces C$19.80 billion proportionate EV. We subtract C$5.704 billion consolidated net financing, C$3.964 billion attributable external JV debt, C$0.382 billion NCI and C$0.145 billion preferred claims. C$9.605 billion common equity divided by 261.502 million diluted shares gives C$36.73 exit. See bridge and the claim caveats in Valuation.

Recommended Action and Entry Price

Wait at C$23.60. The unstressed hurdle permits C$26.21, rounded down to C$26.00. A C$1.2 billion persistent project-value impairment lowers that ceiling to C$23.30; rounding down to C$23.00 sets the actionable entry. If the market reaches that level, recheck new filings and the project cash obligations before using the price rule. The bear EV case gives C$17.34 fair value, a 24.6% mark-to-value loss from C$23.00 before distributions.

Catalysts

Baltic and Hai Long commercial-operation certificates, first recurring cash distributions, project debt draw and paydown reports, and 2027 guidance will test whether installed capacity becomes cash. The earliest forecast checkpoint is Northland's FY2026 filing, expected after year end; compare actual EBITDA with C$1.45–1.65 billion guidance and sponsor funding with the disclosed commitments. Q3 2026 report, physical p. 7

Primary Risks to Thesis

The strongest contrary case combines C$1.95 billion 2031 EBITDA and an 8.2× exit multiple. It produces C$17.34 fair value, C$16.00 entry and Wait at C$23.60. Long-lived underperformance at the two offshore projects, refinance cost or added equity funding could cause that outcome. Full turbine installation and long contracts favor the base, but the first cash-distribution record is more probative than capacity alone. Q3 2026 report, physical p. 45