NGEx Minerals Ltd. (TSX: NGEX) — November 24, 2026
Our maximum entry price is C$10.24 per share. At the November 24, 2026 TSX regular close of C$16.11, the price rule is Wait. This is a five-year, November 24, 2031 preproduction exit case, not a claim that a mine will produce cash by then. The strongest contrary case is a strategic bid after Lunahuasi resource conversion: at C$17 billion success NAV and a 70% realization probability, the modeled maximum entry rises to C$22.64 and the call flips to Buy. The evidence favors the lower base because Lunahuasi still has no mineral resource estimate, mine plan or development capital estimate. Even the base conditionally assumes 320 million mineable tonnes at 1.3% Cu and 1.7 g/t Au; at 0.9% Cu with other inputs fixed, maximum entry falls to C$7.55. Q3 discussion, physical PDF page 2 · Model and cases.
- Market close (CAD)
- C$16.11
- Base fair value (CAD)
- C$12.80
Company details
- Maximum entry price (CAD)
- C$10.24
As-of boundary. The quote and disclosed facts stop at November 24, 2026. The September 30 statements were released November 5. Valiente closed November 12; NGEX's November 24 share excludes the distributed 0.2 VALX share and Valle Ancho. Forecast amounts and probabilities are Peralta judgments, not company guidance. NGEx completion announcement.
Investment Thesis
Lunahuasi's drill intersections establish an unusually attractive exploration target, while Los Helados supplies a large but nonreserve resource. Value to common holders depends on converting that geology to mineable economics and funding years of work without excessive dilution. Q3 technical discussion, physical page 2 · Los Helados resource, physical page 3.
Market Mispricing
The C$16.11 close exceeds our C$12.80 risked present value by C$3.31 and our C$10.24 entry by C$5.87. The gap hinges most on Lunahuasi's unproven economic scale. Raising its successful project NAV and realization probability to the strategic-bid case reverses the call; the base requires resource definition first. Generated sensitivity.
Recent Developments
Phase 5 plans extend drilling and initiate an exploration adit; the company states resource definition remains an objective, not an accomplished estimate. The November 12 Valiente distribution transferred Valle Ancho and approximately C$16.6 million out of NGEX. Q3 MD&A, physical page 4 · Subsequent event, physical page 36 · completion.
Earnings Outlook
No commercial mine revenue is forecast before the 2031 exit. Our five-year C$700 million exploration, corporate and study budget exceeds post-spin cash and short investments of C$185.4 million. Approximately C$514.6 million new equity at C$12 is required with no credited option proceeds; if the issue price falls, dilution rises. Q3 cash-flow statement, physical page 17 · Funding bridge.
Valuation Summary
The model yields C$22.57 exit per diluted share, C$12.80 present fair value at 12%, and a C$14.33 price ceiling for the required XIC-plus-200-basis-point return. A 20% asset-value stress makes C$10.24 the binding entry. At the close, modeled after-cost stock return is 6.950% against 7.487% for XIC, a negative 0.537-point spread. Output.
Recommended Action and Entry Price
Wait for C$10.24 or less, then require the resource and funding checkpoints below still hold. Under the modeled joint conversion and funding miss, entry falls to C$6.81; loss from the base entry to the C$8.52 stressed fair value is 16.8%, while a deeper project failure can lose much more. This is an entry rule, not a trade instruction. Cases.
Catalysts
Watch Phase 5 infill continuity and first Lunahuasi MRE, adit access plus metallurgical variability, and quarterly treasury plus shares issued. These tests matter because they revise project success probability, spend and dilution rather than merely the commodity narrative. Q3 program, physical page 4.
Primary Risks to Thesis
No Lunahuasi resource, high-altitude access, Argentina policy, royalty burdens and a preproduction funding gap can each lower one-share value. The strongest upside risk to Wait is a credible strategic acquisition with its own development funding. Lunahuasi report · Q3 liabilities, physical page 15.
Company Overview
NGEx is a Canadian-listed explorer with Lunahuasi in San Juan, Argentina and Los Helados in Chile. It reports Canadian dollars under IFRS and has no commercial production. Q3 MD&A, physical page 2.
Products and Services
Its prospective products are copper, gold and silver concentrate or a project interest sold to a developer. No realized product or customer revenue exists at the cutoff. Q3 operations, physical page 2.
Business Model
Exploration creates geological information, then resource, engineering, permits and financing can convert that information into saleable project economics. Our exit assumes a funded third-party valuation of the undeveloped assets, not company cash distributions. Q3 strategy, physical page 2.
Revenue Drivers
Future copper, gold and silver output, recovery, payability, prices and mine life would drive revenue. Since Lunahuasi lacks reserves and Los Helados lacks a current feasibility mine plan, the model uses explicit conditional project NAV after tax, royalties and future capital rather than fabricated annual sales. Los Helados technical report.
Cost Structure
Current spending is field exploration and corporate administration. The nine months to September 30 used C$76.158 million of operating cash; capitalized mineral property carrying value is only C$6.508 million and is not economic NAV. Q3 cash flow, physical page 17 · balance sheet, physical page 15.
Operating Levers
Resource tonnage, continuity and metallurgy drive a potential mine's value; access and permitting change when and whether it can be built. The September preliminary metallurgy came from selected composites, so recovery ranges do not establish plant-wide recoveries. Issuer metallurgical release.
Distribution
A mine developer could market concentrate through offtake channels, but no NGEx sales contract or production route is modeled. A project sale before production is the modeled shareholder exit. Q3 description, physical page 2.
Geographic Exposure
Lunahuasi is in Argentina and Los Helados in Chile, across a high-altitude border district. This creates currency, environmental, access and permitting exposures; we apply a 12% equity discount rate and resource probabilities rather than assuming district adjacency creates operating synergies. Q3 MD&A, physical page 2.
Regulatory Environment
NI 43-101 resources are not reserves and do not prove economic extraction. The company has limited access agreements rather than full surface ownership for Los Helados. Argentine mining and Chilean royalties can change after-tax proceeds. Los Helados technical report · Q3 note 8, physical page 22.
Industry Structure
Large copper-gold discoveries compete for scarce development capital, engineering capacity, permits and potential acquirers. Geological endowment alone does not secure those inputs. Los Helados technical report, project risks.
Growth and Cyclicality
Copper and gold price changes alter conditional project NAV, while preproduction NGEX has no current metal-price revenue. Our C$10.000 billion Lunahuasi success NAV and C$3.131 billion Los Helados success NAV are analyst after-capex judgments; they are deliberately tested over wide ranges. Model inputs.
Competitors
The most relevant alternatives are other undeveloped Andean copper-gold projects and the BHP/Lundin Vicuña district, rather than current mine earnings peers. Lundin Mining owns the roughly 31% Los Helados partner interest and holds the adjacent operating Caserones majority interest. Q3 MD&A, physical page 3.
Market Share
NGEx has zero current mine output, so no meaningful copper or gold sales share. Los Helados' 2.08 billion indicated tonnes and 1.08 billion inferred tonnes describe geological inventory, not future market share. Resource table, physical page 3.
Competitive Advantages
Lunahuasi has high-grade drill intersections and district proximity; these increase the potential value of continued work. The strategic-bid case gives that possibility numerical weight but requires resource and engineering confirmation. Q3 program, physical page 4.
Pricing and Cost Position
Without a feasibility mine plan, a cost-quartile claim would be unsupported. The mine worksheet exposes operating costs of US$1.5 billion annually at Lunahuasi and US$1.2 billion at Los Helados, plus US$400 million sustaining for each, then royalty, tax and closure. The Vicuña PEA reports roughly US$2.1 billion annual operating cost for a larger staged complex; this is a scale check, not proof of NGEX costs. Vicuña PEA, physical page 4 · Technical limitations.
Entry Barriers and Substitutes
High-altitude access and large capital needs protect discovered deposits but also delay NGEx's own development. A buyer can allocate capital to other copper-gold projects; the C$16.11 share requires a strong de-risking path to beat a diversified XIC alternative. Q3 access note, physical page 22.
Supplier and Customer Dynamics
Drilling contractors and eventual engineering and construction providers affect the pace and cost of de-risking. NGEx has no current concentrate customers; a strategic buyer is only a modeled exit possibility. Phase 5 plan, physical page 4.
Regulation and Structural Risks
Lunahuasi bears 1% Vicuña, 1% LunR and a 0.5% third-party NSR for the first ten production years plus US$2 million at first production. Los Helados has 1.38% LunR and 0.62% Lundin NSRs, in addition to only 69% NGEx ownership. The worksheet charges Lunahuasi 2.5% NSR for ten years and 2.0% later; Los Helados is 2.0% throughout. Q3 Lunahuasi royalty note, physical page 25 · Los Helados royalty note, physical page 3.
Historical Performance
NGEx has no revenue. FY2025 operating cash outflow was C$93.490 million versus C$46.169 million in FY2024; the first nine months of 2026 used C$76.158 million versus C$65.651 million in 2025. FY2025 cash flow, physical page 41 · Q3 cash flow, physical page 17.
Income Statement Analysis
The nine-month 2026 net loss was C$80.264 million versus C$85.192 million in 2025; stock compensation was C$11.767 million. An income multiple is not informative for a pre-revenue explorer. Q3 income and cash flow, physical page 17.
Balance Sheet Analysis
September 30 cash C$89.920 million plus short investments C$112.078 million gives spendable treasury C$201.998 million before the C$16.6 million Valiente contribution. C$257.508 million LunR shares are liquid-market investments, not cash; a related C$34.647 million deferred tax is deducted in equity value. Q3 balance sheet, physical page 15 · Q3 subsequent event, physical page 36.
Cash Flow Analysis
Annualizing nine-month operating cash outflow gives about C$101.5 million, before any construction. Our C$110 million annual exploration/corporate case plus C$150 million predevelopment studies over five years is a modest increase, not a funded mine build. Q3 cash flow, physical page 17.
| Reported-to-forecast cash use | C$ million |
|---|---|
| Trailing operating cash outflow, 2025 Q4–2026 Q3 | 103.997 |
| Increment to 2027 exploration/corporate budget | 6.003 |
| 2027 share of five-year predevelopment studies | 30.000 |
| First forecast-year total cash use, 2027 | 140.000 |
Earnings Quality
The LunR C$83.0 million nine-month mark gain was in OCI, not cash from mine operations. The share-based compensation add-back in cash flow does not erase shareholder dilution. Q3 note 4, physical page 16 · options, physical page 27.
Nonrecurring Items
Valiente's completed spin removed Valle Ancho and C$16.6 million contribution after September quarter end. The model deducts the cash once and excludes the 0.2 VALX distribution from a new November 24 NGEX purchase. Q3 subsequent event, physical page 36 · closing announcement.
Funding and Cash Conversion
Five-year C$700 million work spending less C$185.398 million post-spin treasury leaves C$514.602 million to raise. At C$12 this adds 42.884 million shares; counting all 11.191 million September options adds a further potential dilution and produces 270.934 million economically diluted 2031 shares. The November 12 spin exchanged these for replacement NGEX options, but the post-spin strike and expiry schedule was not verified. We credit zero exercise cash while retaining all shares as potential dilution, a conservative modeling choice. Crediting C$103.312 million from the unadjusted September strike schedule would lift fair value to C$13.22 and entry to C$10.58, without changing Wait. A C$9 issue price is tested separately. Funding output · option table, physical page 27 · spin completion.
Key Ratios
At C$16.11, basic market capitalization is C$3.494 billion on 216.859 million issued shares. Post-spin spendable treasury is only about 5.3% of that value; nine-month reported operating cash outflow represents 41% of that treasury. Both ratios warn against treating working capital as mine funding. Share capital · Q3 balances, physical page 15.
Forward Outlook
Three frozen tests: (1) by December 2027, a first Lunahuasi MRE with at least 150 million tonnes in a defined high-grade domain; downside no MRE, upside at least 250 million tonnes; issuer resource release settles it. (2) by December 2028, a study showing initial capital at or below US$5 billion for a staged project and recoveries consistent with scaled metallurgy; downside above US$7 billion or no study, upside below US$4 billion; technical study settles it. (3) by September 2027, cumulative post-September 2026 external equity issuance no more than 20 million shares while treasury remains above C$80 million; downside over 35 million shares or below C$40 million, upside no issuance and above C$140 million; interim filings settle it. All thresholds are analyst checkpoints, not company guidance. Q3 program · Q3 share count.
Model Choice
The public decision worksheet takes successful after-capex NAV from a finite mine cash model, then treats the assets as conditional 2031 sale/development options. No reserve-based annual mine cash flow is invented. Successful asset NAVs are after projected construction capital, operations, tax, closure and royalties; pre-exit exploration and corporate studies are funded separately, then new shares dilute one-share proceeds. Frozen inputs.
Growth
The conditional 20-year mine schedule yields C$10.000 billion Lunahuasi success NAV at 45% realization, C$4.500 billion risked; Los Helados yields C$3.131 billion success NAV at 65%, then 69% attributable, C$1.404 billion risked. These are analyst assumptions with broad uncertainty because no current feasibility economic study or Lunahuasi MRE exists. Resource evidence · Inputs.
Profitability
The conditional schedule derives revenue from annual tonnes, head grade, recovery, copper at US$4.60/lb, gold at US$3,600/oz and silver at US$40/oz. It then subtracts operating cost, NSR, sustaining capital and tax. Gold US$3,600 is a scenario cross-check, not a verified spot price; Lunahuasi tonnage and grades are analyst hypotheses, not an MRE. The Vicuña PEA used US$4.60 copper and US$3,300 gold, providing an adjacent-district price comparison. Vicuña peer study, physical page 3 · Mine schedule.
Reinvestment or Required Capital
C$700 million pre-exit spending funds exploration, studies and corporate operation only. The separate conditional finite-mine worksheet charges US$5.0 billion Lunahuasi and US$7.1 billion Los Helados initial capital in 2032–35, then annual operating cost, sustaining capital, tax, NSR and closure. Its successful project NAVs are net of future mine development capex; the buyer, not NGEX before the 2031 exit, is assumed to fund construction. This is a crucial assumption: if NGEX instead builds, project debt/equity and coupons must be modeled before a sale. No such debt is assumed today. Q3 cash flow · Model.
Discount Rate
A 12% nominal CAD cost of equity discounts the five-year risked exit. It is an analyst required-return judgment for early-stage geographic, technical and financing risk; 15% lowers fair to C$11.22 and entry to C$8.98. The separate entry hurdle is XIC's 7.5% gross, 3 basis points each side, plus 200 basis points net. Decision output.
Terminal Economics
There is no perpetuity: the terminal event is a November 24, 2031 asset realization. Neither project has modeled production by exit; mine-level success NAVs represent the value to a funded developer after its later construction, closure and royalty obligations. C$700 million NGEX work spending to exit is not omitted or double counted. A carry-forward of the final year's C$110 million exploration burden for another five years would require another C$550 million and roughly 45.8 million extra shares at C$12 if there were no asset sale, cutting the C$22.57 exit to approximately C$19.30. Model.
Bridge to One Common Share
The worksheet bridge starts with C$5.904 billion risked project value, adds C$222.861 million LunR value after related deferred tax, subtracts C$13.173 million contractual claims, and divides C$6.114 billion by 270.934 million diluted shares for C$22.57. Funding proceeds equal budget shortfall and are spent; they do not appear again as exit cash. September 30 cash and LunR are on different liquidity bases. Generated bridge · claims, physical page 10.
Price-Implied Expectations
At C$16.11, the 9.487% net annual benchmark-plus-200-basis-point hurdle requires roughly C$25.37 per diluted exit share after stock costs, or C$6.874 billion on 270.934 million shares. Holding Los Helados, LunR, claims and funding fixed, Lunahuasi risked value must rise by about C$0.760 billion to C$5.260 billion: 52.6% realization of the C$10 billion success NAV, versus our 45%. A verified MRE and capital study supporting that probability would challenge Wait. Output and formulas.
| Price bridge | C$ per share |
|---|---|
| November 24, 2026 close | C$16.11 |
| Close to fair, signed | -C$3.31 |
| Fair to entry, signed stress | -C$2.56 |
| Maximum entry | C$10.24 |
Independent Cross-Check
The C$3.494 billion basic market capitalization exceeds the C$423.693 million September book equity by over eightfold; accounting carrying value is not mineral economic value, but it confirms the close is mostly optionality. A strategic bid could rationalize that optionality; the 2031 implied value and dilution are the stronger test. Q3 balance sheet, physical page 15 · market close.
Conclusion and Change from Prior Edition
This same-cutoff presentation correction leaves the economic model and decision unchanged. With base net return below XIC, the C$10.24 entry offers both the 200-basis-point hurdle and a 20% risked-value stress. The biggest model uncertainty is the conditional Lunahuasi NAV and realization probability, which are judgments without a resource study. Cases.
Peer Selection
Lundin Mining/BHP's Vicuña PEA is the closest disclosed district development comparator: it has resource and an engineering plan but no operating mine at cutoff. We compare initial capital per annual nameplate tonne and after-tax project NPV. The NGEX rows remain Peralta conditional models, not equivalent issuer studies. Vicuña PEA, physical page 4.
Dated Ratio Table
| Project and evidence date | Initial capex (US$bn) | Annual nameplate (Mtpa) | Initial capex / annual tonne (US$/tpa) | After-tax NPV (US$bn) |
|---|---|---|---|---|
| Vicuña district, 2026-02-16 PEA | 7.10 stage 1 | 64 stage 1 | 111 | 9.50 at 8%, all stages |
| NGEX Lunahuasi, 2026-11-24 Peralta conditional | 5.00 | 16 | 313 | 7.32 at 8%, one mine |
| NGEX Los Helados, 2026-11-24 Peralta conditional | 7.10 | 70 | 101 | 2.30 at 8%, one mine |
The Vicuña NPV covers later stages as well as stage 1 and cannot be divided by the stage 1 capital ratio; its PEA uses US$4.60 copper, US$3,300 gold and US$40 silver. NGEX uses US$4.60 copper, US$3,600 gold, US$40 silver and an assumed C$1.36/US$. Gold at US$3,600 is an analyst deck, not a disclosed spot price. Vicuña peer PEA, physical page 4 · NGEX mine output.
Comparability Adjustments
Vicuña has a PEA, 50/50 BHP–Lundin backing and a larger staged complex; NGEX has no Lunahuasi resource or engineering study. Los Helados' modeled NPV is before NGEX's 69% ownership and its 2% NSR is charged in cash flow. The ratios expose capital intensity, not a transferable valuation multiple. Vicuña study, physical page 2 · NGEX royalty disclosures, physical page 3.
Implications for Value
The comparable's US$7.1 billion initial capex and US$9.5 billion after-tax NPV show why a large resource does not become equity value without infrastructure funding and operating proof. If NGEX's eventual studies reveal weaker grades, higher capital or delayed construction, the conditional cash model and entry must fall. Vicuña PEA, physical page 4.
Bear Case
A 0.9% conditional copper grade lowers fair to C$9.44 and entry to C$7.55. Separately, a 25% Lunahuasi realization probability reduces fair to C$8.62 and entry to C$6.89. A joint conversion delay plus C$150 million annual spending and C$9 issuance produces C$8.52 fair and C$6.81 entry. The risks can coincide because additional drilling and slow resource definition consume cash while making equity cheaper. Cases.
Base Case
45% Lunahuasi success and 65% Los Helados success, C$110 million annual work spending, C$150 million studies, C$12 issuance and a 12% discount rate produce C$22.57 diluted exit, C$12.80 fair and C$10.24 entry. Model.
Bull Case
A C$17 billion Lunahuasi successful NAV with 70% realization gives C$28.30 fair and C$22.64 entry, flipping the price rule to Buy. This needs economic resource conversion or a credible funded strategic bid; drill intercepts alone do not settle it. Case output.
Outcomes at Close and Entry
| Assumption | Close | Fair value | Maximum entry | Price rule |
|---|---|---|---|---|
| Base | C$16.11 | C$12.80 | C$10.24 | Wait |
| Lunahuasi 0.9% Cu | C$16.11 | C$9.44 | C$7.55 | Wait |
| Lunahuasi conversion miss | C$16.11 | C$8.62 | C$6.89 | Wait |
| Joint delay and funding | C$16.11 | C$8.52 | C$6.81 | Wait |
| Strategic bid upside | C$16.11 | C$28.30 | C$22.64 | Buy |
| Higher cost of equity | C$16.11 | C$11.22 | C$8.98 | Wait |
Market-Implied Case
With no dividends, the close needs C$25.37 exit per diluted share to deliver XIC plus two net percentage points. This requires either Lunahuasi realization near 52.6% at the base success NAV, a higher funded bid, or better economics elsewhere. The next first MRE and study can refute or strengthen that case. Model.
Analyst Assessment
The base Wait survives the 0.9% copper-grade one-driver shock, a higher cost of equity and joint operating-funding stress. Cutting conditional Lunahuasi copper grade from 1.3% to 0.9% with all else fixed lowers success NAV from C$10.000 billion to C$6.429 billion and entry from C$10.24 to C$7.55. The strategic case can reverse it, but its scale is not established by a reserve, feasibility study or takeout offer at cutoff. Lunahuasi technical report · Cases.
Operating Risks
Drill continuity, metallurgical recovery and high-altitude logistics can reduce recoverable inventory or delay study milestones. A first MRE below the 150 Mt base checkpoint would trigger a probability reset. Q3 program.
Financial and Liquidity Risks
C$185.4 million post-spin treasury covers less than two years of the modeled C$110 million annual work pace. C$514.6 million new equity is a model requirement; lower issuance prices increase dilution. The company has C$13.173 million contractual obligations and C$34.647 million LunR-related deferred tax. Q3 contractual table, physical page 10 · balance sheet, physical page 15.
Regulatory and Legal Risks
Neither project owns an economic exemption from local permit, tax or access rules. The Argentine adit and Chilean access need sustained approvals; surface rights and royalty commitments constrain a buyer's value. Q3 access and royalty disclosures, physical page 3.
Industry and Competitive Risks
A falling copper-gold deck or competing district project can lower a strategic buyer's price. Our sale-option model deliberately assumes a bidder pays for post-capex economics; without such a market, the terminal realization could be far lower. Technical report risk discussion.
Thesis-Specific Risks and Reconsideration Triggers
Reconsider Wait if a compliant MRE establishes significant continuous high-grade inventory, a staged study constrains capital at or below US$5 billion, and funding arrives without excessive share issuance. Reconsider the base downward if the joint stress emerges. Frozen checkpoints · Q3 Phase 5 plan.
Environmental Factors
High-altitude development needs water, access and closure planning. The issuer says Lunahuasi exploration water intensity fell from 2.5 to 1.78 m³ per drilled metre in 2025 after recycling changes, while water extraction rose with activity; exploration use cannot proxy a future mine. The conditional cash schedule charges US$500 million and US$700 million closure for Lunahuasi and Los Helados, respectively, as analyst estimates. Sustainability water table, physical page 22 · Mine schedule.
Social Factors
Surface access agreements and local engagement affect the schedule. The issuer reports 73% local hiring in San Juan and La Rioja in 2025 and a greater than 50% reduction in minor first-aid incidents between Phase 2 and Phase 3, but these self-reported exploration measures do not settle construction social license. Los Helados has limited access rather than owned surface rights; a material access delay belongs in the joint downside. 2025 sustainability highlights, physical page 6 · Q3 access note, physical page 22.
Governance Factors
Nemesia, linked to a Lundin family trust, held 33.97% of May 2026 votes; Lundin Mining is Los Helados' 31% partner. Strategic transactions require attention to minority-holder economics; we do not assume a transaction premium without a funded offer. The 10% option reserve can dilute common holders. May 2026 circular, physical page 6 · options, physical page 27.
Financially Material Risks and Opportunities
Better staged mine design could raise success NAV, while environmental conditions or royalties could reduce it. The report's conditional values must be reset when an engineering study quantifies these effects; current geology does not settle them. Lunahuasi technical report.
Annual Results
| CAD million, year ended December 31 | 2025 | 2024 |
|---|---|---|
| Exploration and project investigation expense | 100.00 | 63.75 |
| Net loss | (123.34) | (63.60) |
These are reported IFRS figures, not production margin. FY2025 statements, physical page 40.
Interim Results
| CAD million, nine months ended September 30 | 2026 | 2025 |
|---|---|---|
| Net loss | (80.264) | (85.192) |
| Share-based compensation | 11.767 | 19.607 |
The 2026 loss includes exploration expensed as incurred. Q3 statements, physical page 17.
Trailing Results
The latest four quarters are 2025 Q4 plus 2026 Q1–Q3. The Q3 MD&A quarterly table reports net losses of C$38.144, C$44.144, C$19.977 and C$16.141 million, respectively: C$118.406 million trailing net loss. This is not distributable cash. Q3 MD&A, physical page 5.
Material Adjustments
No sales or earnings normalization creates positive distributable income. Stock compensation is noncash in operating cash flow but dilutive in equity; LunR marks are OCI and kept separate from project operating economics. Q3 financial notes, physical page 17.
Annual Positions
| CAD million, December 31 | 2025 | 2024 |
|---|---|---|
| Cash and cash equivalents | 192.536 | 153.368 |
| Total assets | 456.611 | 208.563 |
The 2025 total includes the LunR equity stake, which is not spendable cash at face value. FY2025 position, physical page 39.
Interim Positions
| CAD million, September 30 2026 vs December 31 2025 | 2026 | 2025 |
|---|---|---|
| Cash plus short investments | 201.998 | 273.271 |
| LunR shares at market | 257.508 | 174.480 |
| Total liabilities | 47.820 | 16.970 |
The post-spin C$16.6 million contribution is deducted from September 2026 liquidity in the model. Q3 balance sheet, physical page 15.
Capital and Claims Reconciliation
C$47.820 million total reported liabilities includes C$34.647 million deferred tax, C$9.484 million payables, C$3.263 million exploration-partner payable and C$0.426 million accrual. The model deducts LunR tax from the LunR stake and separately deducts C$13.173 million other contractual claims once. No funded debt or coupon is disclosed in that table. Q3 position, physical page 15 · contractual table, physical page 10.
Annual Flows
| CAD million, year ended December 31 | 2025 | 2024 |
|---|---|---|
| Operating cash flow | (93.490) | (46.169) |
| Net financing cash flow | 173.135 | 173.633 |
Equity finance has funded exploration rather than mine construction. FY2025 cash flow, physical page 41.
Interim Flows
| CAD million, nine months ended September 30 | 2026 | 2025 |
|---|---|---|
| Operating cash flow | (76.158) | (65.651) |
| Option exercise proceeds | 2.018 | 1.503 |
Short-investment purchases and redemptions are treasury transfers, not operations. Q3 cash flow, physical page 17.
Trailing Flows
FY2025 operating cash outflow C$93.490 million less the first nine months of 2025 C$65.651 million plus the first nine months of 2026 C$76.158 million equals C$103.997 million trailing outflow. The model's C$110 million annual work spend is close to this cash pace, with additional C$150 million studies over five years. FY2025 cash flow · Q3 cash flow.
Reconciliation to Common Shareholders
No dividend or buyback is modeled through 2031. C$700 million total work and studies consume C$185.398 million post-spin treasury and C$514.602 million new issue proceeds. The model credits no option cash despite counting all September options in diluted shares. Residual pre-exit cash is zero; financing fills the full shortfall. The C$6.114 billion exit common equity is a conditional project/LunR realization net of claims, not cumulative operating cash. Funding bridge.
Primary Sources and Locators
The source index records publisher URLs, dates and physical pages. The May 2026 management circular provides record-date voting ownership. The 2025 sustainability summary provides exploration-stage water, safety and community measures. The Q3 2026 issuer report supplies physical pages 2–9 for operating and contractual disclosure and pages 15–17, 21, 24, 27 and 37 for statements and notes. The FY2025 issuer report supplies physical pages 32 and 35–36. The Lunahuasi and Los Helados 2025 NI 43-101 reports bound resource status. Original publisher pages are NGEx financial reports, technical reports, Valiente completion and TSX quote history. Some physical page locators and text highlights still require signed-out reader validation.
Frozen Inputs and Assumptions
Inputs freeze the November 24 TSX C$16.11 regular close and XIC C$54.34, September 30 financials, November 12 spin, and analyst project/funding cases. The NGEX chart starts after the spin and uses unadjusted CAD close observations from the quoted historical series. Stock Price History.
Closing Prices
| Date | Close (CAD) | Maximum entry (CAD) |
|---|---|---|
| 2026-11-16 | 19.84 | |
| 2026-11-17 | 18.12 | |
| 2026-11-18 | 17.09 | |
| 2026-11-19 | 16.51 | |
| 2026-11-20 | 15.90 | |
| 2026-11-23 | 16.64 | |
| 2026-11-24 | 16.11 | 10.24 |
Worksheets and Saved Outputs
| Worksheet | Output |
|---|---|
| Preproduction exit model | Decision and funding bridge |
| Conditional mine cash model | Annual mine cash schedules |
From the edition folder, run the public scripts mine_cash.py and model.py in that order with Python 3.12.13. The standard library suffices. The second script emits exact JSON and the Markdown decision table. All inputs are local public files; no credential is used. All September options are counted in diluted shares with zero exercise cash credit; no dividends are modeled. Model uncertainty is substantially larger than the two-decimal output precision.
Changes from the Preceding Edition
Edition 03 shortens the public run instructions for phone readability. Edition 02 corrected the chart's maximum-entry label from C$10.58 to C$10.24. Fair C$12.80, entry C$10.24 and Wait at C$16.11 are unchanged from edition 02. Next economic review follows the first Phase 5 resource or funding disclosure after this cutoff.
| Revision driver | Fair value | Maximum entry |
|---|---|---|
| Prior | C$12.80 | C$10.24 |
| Phone instruction correction | C$0.00 | C$0.00 |
| Rounding | C$0.00 | C$0.00 |
| Current | C$12.80 | C$10.24 |