Montage Gold (TSX: MAU) — finite-mine entry decision
Our maximum entry price is C$2.90 per share. At the November 24, 2026 regular TSX close of C$12.86, the price rule says Wait. The strongest quantified contrary case combines sustained US$5,600/oz gold, a documented 6% Koné royalty and 10% more life-of-mine ounces: it yields C$13.33 no-downside hurdle above the close, while the joint-downside entry stays C$2.90. Extra ounces require the anticipated new reserve plan; extra capital beyond modeled variable cost is unresolved. The November 24 PM gold fix was US$3,623.50, and the national budget points to 8% royalty above US$2,000. Peralta factual exhibit, p.4, highlighted row Peralta factual exhibit, p.4, highlighted row Peralta factual exhibit, p.3, highlighted row
- Market close (CAD/share)
- C$12.86
- Base fair value (CAD/share)
- C$4.93
Company details
- Maximum entry price (CAD/share)
- C$2.90
Research cutoff: November 24, 2026 (America/Vancouver). Quoted share: TSX common, Canadian dollars. Issuer accounts and mine model: US dollars. No later event enters the as-of decision. Next checkpoint: FY2026 commercial-production disclosure, then the late-Q1 2027 reserve and mine-plan update.
Investment Thesis
Koné poured first gold on September 26, 2026, but the share owns 90% of the mine and delivers part of production to two stream buyers. At the November 24 TSX close of C$12.86, the decision is Wait against C$4.93 fair and C$2.90 entry. The model assumes US$3,600/oz gold, near the US$3,623.50 November 24 PM fix. Peralta factual exhibit, p.2, highlighted row Peralta factual exhibit, p.3, highlighted row Peralta factual exhibit, p.4, highlighted row
Market Mispricing
The close exceeds fair by C$7.93 and maximum entry by C$9.96. Holding base assumptions fixed, a constant gold price of about US$6,185/oz would meet the five-year no-downside hurdle at the close. The executable worksheet solves this by bisection beyond the issuer's disclosed US$3,000–4,000 range; it is an expectation test, not a forecast.
Recent Developments
October processed about 880,000 tonnes of oxide at 0.82 g/t and roughly 95% recovery, producing 23,462 ounces. The hard-rock comminution circuit was still targeted for Q2 2027 and commercial oxide production for Q4 2026. Peralta factual exhibit, p.2, highlighted row Peralta factual exhibit, p.2, highlighted row Peralta factual exhibit, p.2, highlighted row The November 24 close is the last market observation in this edition; subsequent news is outside the decision cutoff.
Earnings Outlook
Three frozen tests: Q4 2026 mine output including October, bear/base/bull 34/60/63 koz, to check against FY2026 results; FY2027 production 124.5/273/286.7 koz, to check against FY2027 operating disclosure; FY2027 parent year-end cash US$55.5m/US$314.1m/US$483.2m, to check against audited cash and funding notes. The bear includes US$285m equity issuance and maintains a US$50m cash buffer. These are Peralta forecasts. Peralta factual exhibit, p.2, highlighted row Peralta factual exhibit, p.3, highlighted row
Valuation Summary
Finite mine fair values are C$1.66 bear, C$4.93 base and C$6.96 bull. Base year-five exit is C$8.6965, with zero common distributions in each of 2027–31. Fair value discounts the exit at 12%; the XIC-linked return hurdle is separate. No value is assigned to Didievi or unreserved satellites.
Recommended Action and Entry Price
Wait. XIC at 7.5% gross, less 3 bp each trade, produces 7.487% annualized after cost. The required stock after-cost CAGR is 9.487%; stock trades cost 5 bp each way. The C$5.5220 base hurdle is floored to C$5.50. The C$2.9164 bear capital-preservation ceiling is floored to C$2.90 and binds. Downside reduces the identically rounded entry by C$2.60; exact hurdle minus final is C$2.6220. This is a research threshold, not an order.
Catalysts
The next near-term measurable event is the Q4 2026 commercial-production decision. The updated reserve and life-of-mine plan was expected in late Q1 2027; hard-rock completion was targeted Q2 2027. A credible upward revision requires documented production, recoveries and an attributable stream-adjusted cash bridge, not only drill intercepts. Peralta factual exhibit, p.2, highlighted row
Primary Risks to Thesis
A strong conditional countercase combines sustained US$5,600 gold, proof of a 6% Koné state royalty and 10% more life-of-mine ounces with no extra capital. It yields C$11.91 fair and C$13.33 no-downside hurdle, above the close; the unchanged joint-downside entry remains C$2.90. The issuer model uses 6%, whereas the national budget points to 8% above US$2,000. A binding exemption and reserve-backed, costed extra ounces would be needed to credit that case. Peralta factual exhibit, p.3, highlighted row
Closing Prices
| Date | Close (CAD) | Entry (CAD) |
|---|---|---|
| 2026-11-19 | 13.65 | |
| 2026-11-20 | 12.28 | |
| 2026-11-23 | 13.81 | |
| 2026-11-24 | 12.86 | 2.90 |
FT TSX MAU historical price, TSX MAU regular closes, CAD, November 19–24, 2026.
Company Overview
Montage Gold Corp. trades as MAU on the Toronto Stock Exchange, with Koné in Côte d’Ivoire as its operating asset and Didievi, Wendé and Mauritania exploration assets. Its controlled Koné subsidiaries were 90% owned at September 30, 2026; the state holds the residual 10%. Peralta factual exhibit, p.3, highlighted row Montage Q3 2026 report, note 2, physical p.31.
Products and Services
The present product is doré containing gold; mine cash is driven by payable ounces, realized gold price and the stream purchase-price formulas. The November report recorded no gold sales in Q3, despite 1,284 ounces produced after the September first pour. That distinction matters for reconciling accounting revenue to cash. Peralta factual exhibit, p.4, highlighted row
Business Model
Koné mines ore from Koné and Gbongogo Main and feeds a central plant. Oxide treatment started first; hard-rock comminution remained under construction. The 2024 UFS schedules 3.57m produced ounces over 16 years from two deposits. Later satellites are optional upside until a new reserve mine plan proves their economics. Peralta factual exhibit, p.2, highlighted row Peralta factual exhibit, p.2, highlighted row
Revenue Drivers
The two largest drivers are produced ounces and gold price. Base uses US$3,600/oz, 60 koz for Q4 2026 and 273 koz for 2027 from splitting the UFS first operating year, then the published finite schedule. The US$3,600 price is an explicit common sensitivity, not a company forecast. Peralta factual exhibit, p.2, highlighted row
Cost Structure
The 2026 site-visit model’s US$3,000 and US$4,000 cases retain annual mining, haulage, processing, rehandle, G&A, sustaining and closure costs. We interpolate after-tax unfinanced mine cash, then add statutory royalty and stream economics, remaining construction spending, corporate costs and debt. The 2024 UFS US$998/oz life-of-mine AISC is a dated study measure; it excludes the financing streams and is no substitute for common cash. Montage November 13 site presentation, physical pp.125–126; 2024 Koné UFS, physical pp.362–363.
Operating Levers
2027 profitability depends on whether the hard-rock circuit reaches design, ore grade holds and Gbongogo feed enters the plant. October’s 0.82 g/t head grade and 95% recovery were oxide observations, whereas the UFS first-year blended grade is 1.22 g/t and its recovery about 90%. We do not apply the October recovery to the 16-year plan. Peralta factual exhibit, p.2, highlighted row
Distribution
Gold is sold through standard bullion channels, but payable ounces committed to Wheaton and Zijin earn only their contract purchase payments. At US$3,600 gold the initial Wheaton payment is US$795/oz rather than full spot; the model counts this as foregone revenue, once. Peralta factual exhibit, p.3, highlighted row
Geographic Exposure
Mine operations and most project cash are in Côte d’Ivoire; the public share and reporting currency differ. The model converts US-dollar cash at the November 24 Bank of Canada 1.4296 USD/CAD indicative rate and does not forecast currency gains. Peralta factual exhibit, p.4, highlighted row
Regulatory Environment
The 2025 national fiscal change lifted the over-US$2,000 gold royalty band from 6% to 8%. We could not locate a Koné mining convention exemption in the checked AIF, Q3 report or project update, so 8% is base and 6% is a sensitivity. The 2024 UFS used 6% in its high-price illustration; using it unadjusted understates a plausible current claim. Peralta factual exhibit, p.3, highlighted row Côte d’Ivoire 2025 budget, Article 37.
Industry Structure
A large open-pit gold operation competes for ore quality, power, equipment, workforce and investor capital. Koné’s reserve scale offers long mine life, but common shareholders sit behind government ownership, royalties and gold-stream delivery contracts. The UFS has 4.01 Moz probable reserves; mineral resources beyond reserves are not automatically cash flows. Peralta factual exhibit, p.2, highlighted row
Growth and Cyclicality
At fixed tonnage, gold price governs revenue while mining and processing costs remain sticky. US$4,200 gold plus 5% more ounces lifts fair from C$4.93 to C$6.96; joint gold, volume, cost and funding downside cuts it to C$1.66. These are model sensitivities, not probabilities.
Competitors
Torex and Centerra illustrate the cash-generation bar for established miners, but Torex is in Mexico with gold, silver and copper equivalents, while Centerra has gold and copper across multiple assets. Neither is a clean mine-stage multiple for pre-commercial Koné. Peralta factual exhibit, p.4, highlighted row
Market Share
The UFS first eight operating years produce 2.406m ounces, a substantial single-mine supply source, yet the company does not report a verified global or Ivorian market-share denominator. We do not translate mine scale into gold pricing power. Peralta factual exhibit, p.2, highlighted row
Competitive Advantages
Current oxide throughput above 90% of nameplate and financing commitments lower, but do not eliminate, construction risk. The early pour is evidence of mechanical progress; the hard-rock circuit and sustained grades remain unproven at the cutoff. Peralta factual exhibit, p.2, highlighted row
Pricing and Cost Position
The UFS identifies 11 Mtpa throughput and an early production profile above 300 koz in its first three years. The November 2026 issuer model still embeds US$885m upfront capital and 6% government royalty; our model updates the latter and includes streams. Comparisons to producer AISC require care because stream revenue losses and country levies differ. Peralta factual exhibit, p.3, highlighted row
Entry Barriers and Substitutes
A 16-year permitted reserve mine, processing plant, haul roads and access to financing are hard to replicate. Gold is fungible, so the mine cannot command a brand premium for doré. The economic edge must appear in realized ounces and margin after all claims.
Supplier and Customer Dynamics
Equipment and power reliability are more important to first-year cash than customer concentration. Wheaton and Zijin are both financing counterparties and buyers of specified production fractions; their contract terms structurally reduce spot-price exposure available to common holders. Peralta factual exhibit, p.3, highlighted row Peralta factual exhibit, p.3, highlighted row
Regulation and Structural Risks
State royalty and 10% government ownership are separate claims. Modelled cash applies the royalty to the full mine and then Montage’s residual 90% only once. A legal convention that confirms 6%, or a changed fiscal regime, would alter per-share value; the worksheet makes that alternative C$5.20 fair. Peralta factual exhibit, p.3, highlighted row Peralta factual exhibit, p.3, highlighted row
Historical Performance
2025 and nine-month 2026 were development periods without regular gold revenue. The annual net loss was US$49.880m in 2025 versus US$49.050m in 2024; the nine-month 2026 loss reached US$87.310m, including significant noncash share awards. Profit ratios from the build phase do not describe steady-state mine margins. Peralta factual exhibit, p.1, highlighted row
Income Statement Analysis
Q3 2026 net loss was US$47.779m, including US$29.638m of share compensation. Removing the noncash charge is useful for cash analysis, but the awards still dilute shareholders and enter the per-share denominator. Peralta factual exhibit, p.1, highlighted row
Balance Sheet Analysis
At September 30, cash was US$106.647m, debt US$214.247m and deferred stream revenue US$755.014m. The stream balance is an accounting liability satisfied through future delivery; the worksheet models the deliveries and therefore does not subtract that liability again. The later cash balance at November 24 was undisclosed. Peralta factual exhibit, p.1, highlighted row Peralta factual exhibit, p.1, highlighted row
Cash Flow Analysis
Nine-month 2026 operating cash use was US$25.169m and investing cash use was US$375.677m, including US$368.286m in mineral property, plant and equipment. Financing supplied US$156.250m stream deposit and US$180.709m loan draws. These historical receipts are already reflected in reported cash/assets and are not added to NAV. Peralta factual exhibit, p.1, highlighted row Peralta factual exhibit, p.1, highlighted row
Earnings Quality
A development-stage IFRS loss is dominated by noncash awards, asset and derivative revaluation and capitalized construction. The owner should assess cash after required spending, royalties, streams and repayments; the reported deferred-revenue accretion cannot be treated as a second cash obligation.
Nonrecurring Items
The April 2026 African Gold acquisition and August Kouroufaba purchase changed asset value, shares and debt; Macquarie’s US$75m loan financed Didievi. We assign no independent value to Didievi while subtracting the full debt, a conservative but explicit judgment. Peralta factual exhibit, p.3, highlighted row
Funding and Cash Conversion
At September 30 management identified US$159.8m remaining hard-rock construction disbursements and US$205.6m liquidity, including an undrawn US$75m Wheaton facility. Those figures are not a November 24 cash bridge; the model spends US$100m in Q4 and US$59.8m in 2027, with no value from undrawn facilities. Peralta factual exhibit, p.3, highlighted row Peralta factual exhibit, p.3, highlighted row
Key Ratios
At the C$12.86 close, basic equity capitalisation is about C$5.24bn (407.619m basic shares times close). The model uses 426.202m economic shares after options treasury adjustment and full PSUs/RSUs/DSUs. At 1.4296 FX, the current basic market cap is roughly US$3.67bn, versus C$4.93 modeled fair per economic share. Peralta factual exhibit, p.1, highlighted row Peralta factual exhibit, p.4, highlighted row
Forward Outlook
FY2027 base checkpoints are 273 koz output, US$263.1m parent cash after capex and debt service, and US$314.1m year-end cash. Bear assumes a hard-rock delay, 15% higher direct cost, US$125m extra capital and US$285m equity funding for 68.5m new shares; FY2027 cash is US$55.5m, above the US$50m buffer. These are forecasts, not guidance.
Model Choice
Use a finite reserve mine NAV with annual mine cash to 2042, not a perpetuity or a multiple of a construction-period earnings loss. The site-visit US$3,000 and US$4,000 project cases are 100% unfinanced and exclude streams; our worksheet interpolates, updates fiscal claims, then allocates 90%, remaining capex, corporate cost, debt and diluted shares. Montage November 13 site presentation, physical pp.125–126.
| Scenario | Gold (US$/oz) | Fair (C$/share) | Five-year hurdle price (C$/share) | Year-five exit (C$/share) |
|---|---|---|---|---|
| Bear | 3,000 | 1.66 | 1.85 | 2.92 |
| Base | 3,600 | 4.93 | 5.52 | 8.70 |
| Bull | 4,200 | 6.96 | 7.79 | 12.26 |
Growth
The 2024 UFS schedule is 333/335/378 koz in years 1–3, then 273/244/236/284/323 koz in years 4–8, and lower tail years. We split 60 koz into Q4 2026 and 273 koz into 2027 from its first 333 koz, avoiding extra ounces from early oxide startup. Future satellites are valued at zero pending a new reserve mine plan. Peralta factual exhibit, p.2, highlighted row Peralta factual exhibit, p.2, highlighted row
Profitability
The issuer's after-tax 100% project rows are interpolated at US$3,600. An incremental two-point state royalty and both streams' spot opportunity cost, net of ongoing purchase payments, then reduce cash. The 2027 issuer project after-tax row is US$661.27m, falling to US$467.91m after those claims. No stream-loss cash tax shield is assumed; a 25% later-year shield would raise fair to C$5.49. Tax basis is unresolved.
Reinvestment or Required Capital
US$885m is the updated full project budget, but most was already spent by September 30. Only the US$159.8m remaining enters the forward model, split US$100m/US$59.8m in 2026/2027. Issuer annual project cash includes sustaining and final closure outflow; bear adds US$125m construction overrun and a US$285m equity raise to preserve a US$50m cash buffer. Peralta factual exhibit, p.3, highlighted row
Discount Rate
Present fair uses a 12% nominal CAD-equivalent equity discount rate, a Peralta judgment for single-mine and country risk. The constant FX conversion makes a fixed-currency discount numerically equivalent. The five-year entry hurdle instead derives from XIC 7.5% gross with 3 bp each trade plus 2 percentage points, and 5 bp stock trade costs. It is not a beta CAPM estimate.
Terminal Economics
No perpetuity is used. The end-2031 common exit contains US$1,393.0m retained cash and discounted 2032–43 finite mine and closure cash, less remaining debt. 2031→2032 output falls from 244 to 236 koz, and parent cash from US$218.0m to US$176.6m. The explicit 2043 final closure outflow is included, as is US$30m annual corporate spending through closure. End-2031 is a 37-day approximation to the November 24 five-year anniversary, discounted for exactly five years. Peralta factual exhibit, p.2, highlighted row
Bridge to One Common Share
The September 30 US$106.647m cash starts the bridge; future 100% mine cash is multiplied by 90% once. Remaining construction spend, corporate expenses, interest and scheduled US$214.247m debt repayment follow. US$700m received stream deposits are excluded because the gold-delivery discount is already in annual cash. Basic 407.619m shares become 426.202m after full PSUs/RSUs/DSUs and treasury-adjusted options using C$3.42 strike and the C$12.86 close. Peralta factual exhibit, p.1, highlighted row Peralta factual exhibit, p.3, highlighted row
| Year | Study/adjusted output (koz) | Issuer project after tax | Extra state royalty | Wheaton stream loss | Zijin stream loss | Attributable parent cash after capex, overhead, interest and debt | Distribution (C$/share) |
|---|---|---|---|---|---|---|---|
| 2026 | 60.0 | 145.3 | 4.3 | 32.8 | 5.4 | -55.7 | 0.000 |
| 2027 | 273.0 | 661.3 | 19.7 | 149.3 | 24.4 | 263.1 | 0.000 |
| 2028 | 335.0 | 687.6 | 24.1 | 183.2 | 29.9 | 216.8 | 0.000 |
| 2029 | 378.0 | 778.0 | 27.2 | 206.8 | 33.7 | 419.9 | 0.000 |
| 2030 | 273.0 | 474.8 | 19.7 | 153.3 | 24.4 | 224.1 | 0.000 |
| 2031 | 244.0 | 447.6 | 17.6 | 137.0 | 21.8 | 218.0 | 0.000 |
| 2032 | 236.0 | 393.0 | 17.0 | 132.5 | 18.1 | 176.6 | 0.000 |
| 2033 | 284.0 | 553.6 | 20.4 | 151.5 | 10.6 | 308.5 | 0.000 |
| 2034 | 323.0 | 629.0 | 23.3 | 100.5 | 12.1 | 419.1 | 0.000 |
| 2035 | 205.0 | 341.4 | 14.8 | 63.8 | 7.7 | 203.0 | 0.000 |
| 2036 | 135.0 | 174.6 | 9.7 | 42.0 | 5.1 | 78.2 | 0.000 |
| 2037 | 137.0 | 252.0 | 9.9 | 42.6 | 5.1 | 147.2 | 0.000 |
| 2038 | 137.0 | 229.4 | 9.9 | 42.6 | 5.1 | 126.8 | 0.000 |
| 2039 | 137.0 | 259.4 | 9.9 | 42.6 | 5.1 | 153.8 | 0.000 |
| 2040 | 137.0 | 253.4 | 9.9 | 36.5 | 5.1 | 153.9 | 0.000 |
| 2041 | 137.0 | 255.4 | 9.9 | 21.3 | 5.1 | 169.4 | 0.000 |
| 2042 | 135.0 | 250.2 | 9.7 | 21.0 | 5.1 | 165.2 | 0.000 |
| 2043 | 0.0 | -84.6 | 0.0 | 0.0 | 0.0 | -106.1 | 0.000 |
Price-Implied Expectations
At C$12.86, the modeled year-five exit C$8.6965 with zero dividends loses about -7.5% annually after stock costs, against 9.487% required. The worksheet solves roughly US$6,185/oz constant gold for the no-downside hurdle to equal the close, an extrapolation beyond disclosed US$3,000–4,000 cases, about 71% above the November 24 PM fixing. Peralta factual exhibit, p.4, highlighted row
Independent Cross-Check
The issuer's US$3,000 case reports US$3.011bn 100% unfinanced NPV5% with the full historical US$885m upfront budget. It differs from remaining common equity through discount rate, stream deliveries, and the capex already spent. A separate 2027 bridge from 273 koz at US$3,600, royalties and streams yields US$467.9m project cash, then US$263.1m parent cash after 10% state interest, capex, overhead and debt service. Montage November 13 site presentation, physical p.125.
Conclusion and Change from Prior Edition
This first MAU edition has no prior published price to bridge. Fair C$4.93, no-downside hurdle C$5.52, final C$2.90; the bear preservation ceiling binds. Royalty stabilization and the 2027 mine-plan update could change the estimate.
Peer Selection
Torex and Centerra are observable producers in the same commodity but at different mines, jurisdictions and by-product mixes. They are useful cash-conversion checks, not a multiple that can be applied directly to Koné. Torex ticker changed to TXR in its November 2026 release; this table uses issuer identity rather than a stale symbol. Torex Q3 2026 release, release p.1; Centerra Q3 2026 release, Q3 highlights.
Dated Ratio Table
For Q3 ended September 30, 2026, use issuer-reported US-dollar revenue, IFRS operating cash and non-GAAP free cash. Ratio denominators are that quarter’s revenue, with no annualization.
| Issuer / stage (Q3 2026) | Revenue (US$m) | Operating cash / revenue | Free cash / revenue |
|---|---|---|---|
| MAU / oxide start | 0.0 | N/M | N/M |
| Torex / producer | 555.0 | 41.6% | 27.1% |
| Centerra / producer | 500.3 | 28.6% | 3.4% |
Peralta factual exhibit, p.4, highlighted row Peralta factual exhibit, p.4, highlighted row Peralta factual exhibit, p.4, highlighted row
Comparability Adjustments
Torex free cash deducts its capital spending, leases and interest; Centerra’s Q3 growth investment at Thompson Creek and Goldfield depresses its reported free cash. MAU’s zero sales denominator makes a current multiple meaningless. Torex reports gold-equivalent ounces including silver and copper, while MAU’s mine plan is gold ounces. Torex Q3 2026 release, reconciliation Table 8; Centerra Q3 2026 release, Q3 cash flow notes.
Implications for Value
The peer evidence demonstrates why a price-to-sales or earnings multiple cannot rescue a construction-to-production bridge. MAU must first produce positive, stream-adjusted, attributable cash in 2027. Peer operating cash ratios serve as an ex-post sanity test once it reports meaningful sales.
Bear Case
US$3,000 gold, 15% fewer ounces, 15% higher direct cost and a halved residual 2027 first-year output give 124.5 koz for FY2027. The missed ounces are not recovered later in this finite schedule. A US$125m capex overrun is funded by US$285m equity issuance for 68.5m shares, implying C$5.95/share gross; this also preserves the US$50m cash buffer. Fair is C$1.66, year-five exit C$2.9193.
Base Case
US$3,600 gold, 60 koz Q4 2026 and 273 koz FY2027, US$159.8m remaining construction, no new reserve, zero dividends and no exploration-asset value yield C$4.93 fair and C$8.6965 year-five exit.
Bull Case
US$4,200 gold and 5% more production through the finite schedule, without extra capex, yield C$6.96 fair and C$12.2634 exit. Reserve conversion and capital cost are unproven.
Outcomes at Close and Entry
The public worksheet recomputes each alternative at the same dated close, including the binding rule.
| Assumption | Close | Fair value | Maximum entry | Price rule |
|---|---|---|---|---|
| Base | C$12.86 | C$4.93 | C$2.90 | Wait |
| US$4,200 gold, 5% more ounces | C$12.86 | C$6.96 | C$2.90 | Wait |
| 6% state royalty only | C$12.86 | C$5.20 | C$2.90 | Wait |
| US$5,600 gold and proven 6% royalty | C$12.86 | C$10.42 | C$2.90 | Wait |
| US$5,600 gold, proven 6% royalty, 10% more ounces | C$12.86 | C$11.91 | C$2.90 | Wait |
| 25% stream-loss tax shield after first operating year | C$12.86 | C$5.49 | C$2.90 | Wait |
| Joint ramp, cost and funding downside | C$12.86 | C$1.66 | C$2.90 | Wait |
The base no-downside hurdle is C$5.5220; after flooring it is C$5.50. The bear zero-return ceiling is C$2.9164; the final common entry is C$2.90. The standalone bear return-hurdle price is C$1.85, distinct from that common entry. Conditional US$5,600/6%/10%-more-ounces no-downside hurdle: C$13.33. Constant-gold market-implied base hurdle: US$6,185/oz, extrapolated beyond the issuer's disclosed range.
Market-Implied Case
At C$12.86, the base five-year hurdle requires about US$6,185/oz constant gold under the 8% royalty. A conditional US$5,600/6%/10%-more-ounces case reaches C$13.33 no-downside hurdle, above the close, but remains C$2.90 under the unchanged joint-downside entry rule. The extra output requires a new costed reserve plan; mining and sustaining capital above the worksheet's variable-cost factor is not modeled.
Analyst Assessment
The 2025 national royalty rise and the lack of a published Koné exemption favor 8% for underwriting. The observed 2026 PM gold price near US$3,600 supports the common deck. The bull case is relevant because gold reached substantially higher levels earlier in 2026, but a brief high price does not prove 16 years of it. The first production and cash disclosures after commercial declaration should update the weight of these cases.
Operating Risks
Hard-rock completion Q2 2027 is the key schedule risk. A one-year-equivalent first-year output miss can keep costs and capital high, making the base 273 koz FY2027 forecast unattainable. Under the combined bear, 2027 output is 124.5 koz and end-year cash only US$55.5m after assumed new equity. Peralta factual exhibit, p.2, highlighted row
Financial and Liquidity Risks
At September 30 cash US$106.6m was below debt US$214.2m, with US$159.8m construction still to spend. The undrawn US$75m Wheaton line is contingent funding, not shareholder wealth. A capex overrun or weak 2027 ramp could force dilution; the bear includes 68.5m shares. Peralta factual exhibit, p.3, highlighted row Peralta factual exhibit, p.3, highlighted row
Regulatory and Legal Risks
The national 2025 budget raises the high gold-price royalty to 8%; a documented project-specific stabilized 6% rate would add about C$0.26 fair. Conversely, royalty enforcement, permit changes or environmental remediation could cut cash. We have not obtained a public Koné convention with a contrary rate. Peralta factual exhibit, p.3, highlighted row
Industry and Competitive Risks
Gold price is the dominant variable. The common US$3,600 deck is close to the cutoff fixing, but a US$3,000 sustained path with lower ounces and higher cost cuts fair to C$1.66. Stream buyers retain a fixed fraction of early production, leaving less benefit of a higher spot price for MAU. Peralta factual exhibit, p.3, highlighted row
Thesis-Specific Risks and Reconsideration Triggers
Raise the base only when Q4 2026 commercial status and 2027 mine output/attributable cash are reported, and when the late-Q1 2027 reserve plan converts satellites into a scheduled, costed source. Cut the case if hard-rock completion slips beyond Q2 2027, if disclosed remaining construction disbursement rises materially above US$159.8m before completion, or if annualized 2027 gold output is below 200 koz without a clear recovery plan. Peralta factual exhibit, p.2, highlighted row
Environmental Factors
The UFS includes US$61.6m of life-of-mine closure cost in its finite cash schedule, and the Koné North pit affects a portion of the Toudian Forest Reserve. Tailings, water and rehabilitation spending can exceed a 2024 study estimate, so closure stays in the terminal years and is not discarded. Peralta factual exhibit, p.5, highlighted row Peralta factual exhibit, p.5, highlighted row
Social Factors
Gbongogo Main development affects Dolourogoukaha village and requires resettlement. The November update reported over 2,800 staff and contractors and 15.2m construction hours at a 0.07 lost-time injury frequency. These are scale and safety observations, not proof of lifetime community consent. Peralta factual exhibit, p.5, highlighted row Peralta factual exhibit, p.5, highlighted row
Governance Factors
Nemesia, controlled by trusts settled by the late Adolf Lundin, held 71.317m shares, or 17.69%, in the 2026 circular. Concentrated influence can align long-term financing but may also shape transactions and capital allocation. The model gives no credit for sponsor support. Peralta factual exhibit, p.4, highlighted row
Financially Material Risks and Opportunities
Environmental remediation, royalty terms and the 10% state interest directly reduce common cash; permits and community relationships protect the 16-year schedule. The next observable evidence is actual cost and royalty disclosure in the first commercial-production financial statement. ESG claims are valued only where they affect modeled cash or probability, not as an unsupported premium. Peralta factual exhibit, p.3, highlighted row
Annual Results
Issuer-reported US$m for December 31 fiscal years, with 2024 restated. The development stage had no operating gold revenue.
| Annual statement (US$m) | FY2024 restated | FY2025 |
|---|---|---|
| Exploration and project investigation expense | 31.938 | 14.646 |
| Administration expense | 10.833 | 12.111 |
| Share compensation | 6.996 | 6.654 |
| Net loss | 49.050 | 49.880 |
Peralta factual exhibit, p.1, highlighted row Montage 2025 annual report, consolidated statements of loss, physical p.49.
Interim Results
The comparable periods are nine months ended September 30, US$m.
| Interim statement (US$m) | 9M2025 | 9M2026 |
|---|---|---|
| Exploration expense | 10.374 | 15.301 |
| Administration expense | 8.819 | 13.007 |
| Share compensation | 5.400 | 44.310 |
| Net loss | 43.611 | 87.310 |
Peralta factual exhibit, p.1, highlighted row Montage Q3 2026 report, condensed statements of loss, physical p.26.
Trailing Results
Twelve months ended September 30, 2026 are derived as FY2025 plus 9M2026 less 9M2025, US$m.
| Trailing statement (US$m) | Calculation | TTM Sep 2026 |
|---|---|---|
| Net loss | 49.880 + 87.310 - 43.611 | 93.579 |
| Administration | 12.111 + 13.007 - 8.819 | 16.299 |
The TTM is a build-period accounting measure, not a normalized earnings base. Montage 2025 annual report, p.49; Montage Q3 2026 report, p.26.
Material Adjustments
The 2026 share compensation charge is noncash but economically dilutive. Model cash removes that accounting expense from the cash bridge while the 10.923m PSUs and options enter the denominator. The stream deferred-revenue balance is not deducted on top of cash settlement through future ounces. Peralta factual exhibit, p.1, highlighted row Peralta factual exhibit, p.1, highlighted row
Annual Positions
At year-end the stream financing enlarged the balance sheet before mine production. US$m.
| Statement position | Dec 2024 restated | Dec 2025 |
|---|---|---|
| Cash | 115.318 | 191.776 |
| Total assets | 256.720 | 732.472 |
| Deferred stream revenue | 84.870 | 569.809 |
| Equity attributable to MAU | 143.047 | 116.848 |
Peralta factual exhibit, p.1, highlighted row Montage 2025 annual report, physical p.48.
Interim Positions
US$m at September 30, 2026 versus December 31, 2025.
| Statement position | Dec 2025 | Sep 2026 |
|---|---|---|
| Cash | 191.776 | 106.647 |
| Total assets | 732.472 | 1,442.824 |
| Debt and loans | 3.692 | 214.247 |
| Deferred stream revenue | 569.809 | 755.014 |
Peralta factual exhibit, p.1, highlighted row Montage Q3 2026 report, financial position, physical p.25.
Capital and Claims Reconciliation
At the September 30 starting point: cash +US$106.647m; debt −US$214.247m; stream deposits US$700m already received and represented through future delivered gold; remaining construction US$159.8m is paid in the forecast; government 10% interest is applied to project cash; 426.202m economic shares divide the residual. No November 24 balance sheet was reported. Peralta factual exhibit, p.1, highlighted row Peralta factual exhibit, p.3, highlighted row
Annual Flows
US$m, year ended December 31.
| Annual cash flow | FY2024 | FY2025 |
|---|---|---|
| Operating | (33.135) | (37.903) |
| Investing | (83.580) | (351.043) |
| Stream deposits | 75.000 | 468.750 |
| Ending cash | 115.318 | 191.776 |
Peralta factual exhibit, p.1, highlighted row Montage 2025 annual report, cash flow statement, physical p.50.
Interim Flows
US$m, nine months ended September 30.
| Interim cash flow | 9M2025 | 9M2026 |
|---|---|---|
| Operating | (26.795) | (25.169) |
| Investing | (237.183) | (375.677) |
| Financing | 307.692 | 318.029 |
| Ending cash | 159.013 | 106.647 |
Peralta factual exhibit, p.1, highlighted row Montage Q3 2026 report, cash flow statement, physical p.27.
Trailing Flows
Trailing 12 months to September 30 are FY2025 plus 9M2026 less 9M2025.
| Trailing cash flow (US$m) | TTM Sep 2026 |
|---|---|
| Operating | (36.277) |
| Investing | (489.537) |
| Financing | 475.343 |
These construction-period flows cannot be annualized into a producing-mine forecast. Montage 2025 annual report, p.50; Montage Q3 2026 report, p.27.
Reconciliation to Common Shareholders
September 30 cash was US$106.647m. Q4 2026 modeled parent cash after US$100m construction, US$30m corporate spending and US$18.211m interest is US$-55.657m, leaving US$50.990m. In 2027, 90% of US$467.913m project cash is US$421.122m; less US$59.8m construction, US$30m corporate, US$18.211m interest and US$50m principal leaves US$263.111m, with US$314.101m ending cash. No 2027–31 common payout is assumed. Bear raises US$285m for 68.5m shares to cover its US$125m overrun and maintain liquidity. Peralta factual exhibit, p.1, highlighted row Peralta factual exhibit, p.3, highlighted row
Primary Sources and Locators
Public factual rows link to original Peralta exhibits with visible numeric highlights. Original issuer PDFs are retained owner-only; publisher originals and locators are: Montage Q3 2026 report pp.5, 12–16, 25–27, 38–43, 46–47; Montage 2025 annual report pp.48–50; Montage November 11 activities pp.1–2, 9–10; Montage November 13 site presentation pp.125–126; 2024 Koné UFS pp.357–363; Montage 2025 AIF p.36; Côte d’Ivoire 2025 budget Article 37 physical p.77; 2026 management circular p.11. Market inputs: FT TSX MAU historical price November 24 MAU close; Bank of Canada daily digest November 24 USD/CAD; London gold fixing history November 24 PM fixing. Independent peer sources: Torex Q3 2026 release Q3 highlights and cash tables; Centerra Q3 2026 release Q3 highlights and cash tables. Their copyright and redistribution permissions were not established, so the folder keeps originals private and publishes only our attributed factual extraction.
Frozen Inputs and Assumptions
The public input packet records every annual UFS production and issuer US$3,000/US$4,000 after-tax row, claims, FX, share basis and five-year return convention. Gold price is held constant in US dollars; no new satellite reserve, Didievi value, inflation or currency reversion is assumed. A 25% marginal tax allowance on incremental later-year royalty and operating changes, but no assumed stream-loss tax shield, 12% NAV discount, 8.5% debt interest, US$30m parent annual spending through closure and no dividend are judgments. The 2026/2027 capital timing and debt paydown are likewise forecasts, not disclosed schedules. Stream fractions apply to payable gold in the contracts; using study produced ounces as a payable proxy overstates lifetime deliveries by about 0.08% (3.570m versus 3.567m study ounces).
Worksheets and Saved Outputs
The public Python worksheet reads only frozen public JSON and saves an exact JSON result plus two Markdown tables. The source appendix is a Peralta factual reconstruction.
| Worksheet | Output |
|---|---|
| Finite mine and decision worksheet | Decision tables · Annual valuation |
Public model inputs · Exact outputs.
Changes from the Preceding Edition
First edition without a predecessor. No prior Peralta MAU entry or fair value exists to revise; historical UFS project NPV is not a comparable common-equity predecessor.