Las Vegas Sands Corp. (NYSE: LVS) — November 24 Equity Research Edition, Revision 4

Our maximum entry price is US$33.03 per share. At the November 24, 2026 NYSE regular-session close of US$39.61, Wait. Peralta's base fair value is US$42.37, US$2.76 above the close; the five-year linked downside capital-preservation ceiling is US$6.58 below it and binds entry. The strongest credible contrary assumption is that a nine-times Marina Bay Sands exit multiple is too harsh even if Macao and project economics disappoint: 10.48 times would raise the entry ceiling to about US$39.63 and flip the US$39.61 call to Buy, whereas Q3 2026 property EBITDA fell 20.6% at Marina Bay Sands and the expansion still needs about US$4.9 billion to reach its US$8.0 billion project estimate. This is a judgment-sensitive Wait, not a prediction of a near-term price decline. The next test is the Q4 2026 operating release and the updated construction schedule. Information cutoff: November 24, 2026; five-year exit: December 31, 2031. Q3 10-Q, p. 10 project estimate · Q3 deck, p. 4 MBS decline · November 24 unadjusted NYSE close · Model decision

Stock Price History

Market close (USD/share)
39.61
Base fair value (USD/share)
42.37
Company details
Maximum entry price (USD/share)
33.03

Stock Price History

Closing prices

DateClose (USD)Entry price (USD)
2026-09-3037.81
2026-11-2439.6133.03

Source: NYSE:LVS daily unadjusted closes, accessed November 25, 2026. The November 24 close is corroborated by Yahoo Finance historical data. The chart is price-only, before dividends or FX.

Investment Thesis

One LVS share owns the wholly owned Singapore Marina Bay Sands business and 75.56% of Sands China, which operates Macao resorts, after corporate costs, investment commitments, debt and distributions to Sands China minorities. The five-year case values Singapore and Macao separately, deducts attributable net debt and does not treat consolidated Macao cash as wholly owned. Q3 10-Q, p. 3 balance sheet · Q3 10-Q, p. 17 ownership · Model

Market Mispricing

The base fair value exceeds the close by US$2.76, but the downside ceiling is US$6.58 below it. At US$39.61, the model's base terminal proceeds produce 11.44% annualized in frozen CAD, 3.95 percentage points above the 7.49% net XIC assumption; downside produces a 16.60% five-year nominal loss. An investor who believes the downside sale multiple cannot fall to nine times would disagree with Wait. The observable test is completed expansion cost and opening date, followed by post-opening cash earnings. Five-year proceeds

Recent Developments

The quarter ended September 30 produced US$3.216 billion revenue, down 3.5% year over year, and US$1.119 billion adjusted property EBITDA, down 16.7%. LVS spent US$950 million repurchasing 20.97 million shares in Q3 and reported 627 million shares outstanding; repurchases cannot be extrapolated through the construction cycle without funding. It purchased additional Sands China shares, bringing ownership to 75.56%. Q3 deck, pp. 4–5 quarterly results and capital return · Q3 10-Q, p. 4 revenue

Earnings Outlook

Peralta forecasts 2027 Marina Bay Sands EBITDA of US$2.90 billion, Macao EBITDA of US$2.25 billion and US$416 million of attributable cash before the US$903 million LVS dividend. These are estimates against the September 2026 trailing property EBITDA of US$2.873 billion in Singapore and US$2.200 billion in Macao; the annual construction spend produces a temporary dividend funding gap. No new MBS expansion contribution is assumed before its planned January 2031 opening. Q3 deck, p. 19 trailing EBITDA and net debt · Q3 10-Q, p. 10 opening estimate · Forecast

Valuation Summary

The five-year exit is US$59.44 per share in the base case and US$27.68 in the joint downside. Base fair value discounts modeled per-share dividends and the exit at 10%; the separate portfolio entry rule requires the base terminal proceeds to clear net XIC plus two percentage points and the downside to preserve nominal capital. The base price ceiling is US$43.275 unrounded; downside is US$33.033 unrounded, then the binding price is floored once to US$33.03. Full price bridge

Recommended Action and Entry Price

Wait for US$33.03 or lower, subject to fresh evidence and USD/CAD. At that entry the downside proceeds just preserve nominal CAD capital after 5 basis points on purchase and sale, while at the current close they lose 16.60%. Since the ceiling is driven by exit multiples and an expansion build, the rule should be rerun after the next company disclosure before an order. Decision worksheet · Output

Catalysts

The 2026 Q4 release can test whether Singapore's premium-gaming weakness persists and Macao recovers. The next project update can test the roughly US$4.9 billion unspent expansion estimate and the need for Singapore approval to extend the contractual July 2029 deadline. The first 2031 operating disclosure would settle the modeled MBS expansion ramp. Q3 deck, p. 4 Singapore result · Q3 10-Q, p. 10 construction

Primary Risks to Thesis

A longer high-end gaming slowdown, mandatory Macao concession spending, construction overrun, floating-rate interest and restrictions on subsidiary distributions can combine. The September balance sheet had US$15.444 billion carrying debt and US$2.858 billion unrestricted cash. The risk case cuts Singapore and Macao EBITDA together, adds construction cost and interest, reduces dividends and uses lower exit multiples. Q3 10-Q, pp. 3, 8–10 · Risk model