Kinross Gold Corporation — first equity research edition
Our maximum entry price is C$13.69 per share. At the November 20, 2026 TSX close of C$24.81, our price rule says Wait. The largest uncertainty is the long-run USD gold price: sustained US$5,000/oz gold, after the issuer’s indicated royalty cost response, raises the entry to C$27.87 and reverses the price rule to Buy. This is a November 20 market and FX cutoff using issuer disclosures available by November 23; it is not a November 23 closing quote.
- Market close (CAD)
- $24.81
- Base fair value (CAD/share)
- $15.65
Company details
- Maximum entry price (CAD/share)
- $13.69
- Price rule
- Wait
TSX: K; NYSE: KGC is a different USD listing. All mine cash flows are USD and converted once at the Bank of Canada November 20 USD/CAD observation of 1.4325; the November 20 TSX K close of C$24.81 is cross-checked against MarketBeat's dated K history. Our investor horizon is 24 months, the shared XIC base benchmark of 14.1227% total return over 24 months after XIC trading costs, stock entry and exit costs of 5 basis points each, and no dividend credit on top of NAV. The XIC path assumes 5% annual NAV growth net of fund expense and 1.97% annual cash distributions on starting capital, with 3-basis-point XIC costs each way; these are forecast assumptions, not promised returns. The mine discount rate and project weights are separate analyst judgments. Stock Price History shows the frozen final three trading observations.
Investment Thesis
Kinross owns cash-generating gold mines but also two large undeveloped projects. Attributable 2026–27 production guidance of 1.84–1.86 million gold equivalent ounces is lower than the original plan, concentrated at La Coipa and Round Mountain. The base value includes explicit, risk-weighted Great Bear and Lobo-Marte economics; the September 2026 operating update is the operating starting point.
Market Mispricing
At C$24.81, the gap to C$15.65 fair value is −C$9.16, then the XIC return comparison and stock costs lower the entry by C$1.96 to C$13.69; the total close-to-entry gap is −C$11.12. The market can be right if gold stays far above our US$3,500 long-run assumption, projects advance faster, or reserve conversion exceeds the model. The worksheet allows these claims to be tested rather than inferred from a low price alone.
Recent Developments
Q3 2026 attributable production was 424,693 ounces, versus 503,862 a year earlier, and AISC rose to US$1,947/oz from US$1,622/oz. Cash and equivalents at September 30 were US$2,638.4 million with US$739.2 million long-term debt. Q3 MD&A, physical page 3 and interim balance sheet, physical page 1 support the figures.
Earnings Outlook
Our model assumes US$3,500/oz for future sales, near the November 20 observed US$3,538.19 gold close, versus Q3 realized US$4,248 attributable per ounce. It is an analyst scenario, not a consensus forecast; each US$500/oz change shifts the modeled fair value by about C$5.68 per share. Management's September 2026 guidance of 1.84–1.86 million ounces and US$1,850–1,900 AISC does not guarantee a decade-long production or cost path.
Valuation Summary
The 9% nominal USD finite-life NAV discounts operating-mine cash through 2036, discounts Great Bear through 2040 and Lobo-Marte through 2046, then adds cash and investments and deducts debt, closure provisions and noncontrolling interest. The C$15.65 result is sensitive to a reserve-conversion assumption of 4.55 million ounces at existing mines and to project permitting. Detailed output contains each forecast year and the equity bridge.
Recommended Action and Entry Price
Wait at the dated close. The entry ceiling solves for an after-cost Kinross return equal to the common 14.1227% XIC 24-month base path: unchanged fair value in month 24 times 0.9995 for stock exit cost, divided by 1.141227 and 1.0005 stock entry cost, then rounded down to one cent. No interim Kinross dividend is credited. At entry, that simplified after-cost appreciation matches the XIC forecast.
Catalysts
The next quarterly report should show whether La Coipa recovery and Round Mountain grades recover, and whether AISC moves back toward the US$1,850–1,900 guidance. A Chilean environmental decision for Lobo-Marte and a Great Bear permit/feasibility update could materially raise project risk weights. September operating update, La Coipa and Round Mountain paragraphs gives the tests.
Primary Risks to Thesis
A sustained gold price near US$5,000/oz, a material extension of existing mine lives, and fully permitted lower-cost projects would undermine our Wait conclusion. Conversely, gold at US$3,000 with higher sustaining spend brings the joint-downside entry to C$5.23. Both directions are quantified below, rather than assigning discovery value without a mine plan.
Company Overview
Kinross is a Canadian-domiciled gold producer with six operating segments across the United States, Brazil, Mauritania and Chile and development projects in Canada and Chile. The 2025 reserve statement records 20.942 million attributable proven and probable gold ounces; this is contained reserve, not all recoverable production. 2025 issuer reserve table, rows Bald Mountain through Total Gold.
Products and Services
Gold doré and silver by-product sales generate almost all metal revenue. Kinross reports gold equivalent ounces using period-specific gold/silver price ratios, so equivalent output is not identical to contained gold reserves. The Q3 2026 release, Consolidated Financial and Operating Highlights footnotes (a)–(f) explains the distinction.
Business Model
Revenue is realized price times sold ounces; ore grade, recovery and throughput determine produced ounces, while royalties, labour, energy, reagents, sustaining capital and growth investment determine cash retained. Management's AISC is non-GAAP and excludes income taxes and major new-project capex. Q3 MD&A physical pages 35–38, AISC reconciliation.
Revenue Drivers
Attributable Q3 sales were 410,245 equivalent ounces at an attributable realized gold price of US$4,248/oz. Nine-month 2026 sales were 1,386,340 ounces. Our forecast separates a US$3,500 long-run gold price from volume; a constant price is a valuation convention, not a claim that spot will stay there. Q3 MD&A physical page 3, financial highlights.
Cost Structure
2026 Q3 AISC of US$1,947/oz includes recurring mine support and sustaining capital, but project construction is excluded. We start 2027 at US$1,900/oz and escalate by US$50/oz annually; this is our estimate and may understate energy or labour shocks. Q3 MD&A physical page 3, AISC row.
Operating Levers
Paracatu and Tasiast supply more than half of Q3 production and are lower-cost than the smaller mines. The concentration offers economies of scale but creates a large sensitivity to their grades and recoveries; a 250 US$/oz AISC increase lowers fair value to C$12.81. Q3 issuer release, mine operating discussion.
Distribution
Kinross sells refined metal into global commodity markets, without meaningful brand pricing power. Realized prices can differ from daily spot and the local CAD share price also moves with USD/CAD. These effects are held separate in the frozen quote and FX observations.
Geographic Exposure
2025 proven and probable ounces were 4.533 million in North America, 12.008 million in South America including undeveloped Lobo-Marte, and 4.401 million at Tasiast in Mauritania. This is reserve location, not current revenue mix. 2025 reserve statement, gold table.
Regulatory Environment
Mining permits, water rights, tailings standards and reclamation obligations shape mine life and project timing. Lobo-Marte's Chilean EIA was accepted for review in Q2 2026 but was still pending at the July update; we probability-weight that project. Lobo-Marte project update, Permitting and capital expenditures.
Industry Structure
Gold miners sell a globally traded product; their competitive position rests on ore quality, reserve depth, jurisdiction and cost to produce an ounce. We test Kinross against two large producers using same-quarter AISC, while recognizing different accounting definitions.
Growth and Cyclicality
Gold price is the main macro driver. A US$500/oz swing from our base changes fair value by about C$5.68 even before altered cut-off grades or exploration economics. Higher gold can enlarge reserves but usually raises royalties and input costs; Kinross's September update, Key Sensitivities estimates a US$5/oz cost increase for each US$100 gold move from royalties.
Competitors
Agnico Eagle and Newmont are the scale comparators. Agnico's Q3 2026 by-product AISC was US$1,648/oz and Newmont's US$1,454/oz, compared with Kinross's US$1,917 by-product gold-ounce measure and US$1,947 equivalent-ounce measure. See the issuer Agnico Q3 AISC reconciliation and Newmont Q3 release.
Market Share
Kinross's 1.84–1.86 million attributable equivalent-ounce 2026 guidance places it among large producers, but our valuation does not assign a market-share premium. The market is deep enough that Kinross cannot set gold prices; the relevant share is of low-cost reserves and funded projects, which the peer cost comparison only partially captures.
Competitive Advantages
Paracatu and Tasiast offer established infrastructure and demonstrated output near a combined 1.1 million ounces annually, while net cash gives room to fund projects. Great Bear's preliminary study points to low-cost Canadian production, but its inferred-resource component prevents us from treating that study as a reserve-backed certainty. September operating update; Great Bear PEA physical page 2, AISC table; PEA inferred-resource footnote 5.
Pricing and Cost Position
At Q3 2026 AISC divided by the US$4,248 realized gold price, Kinross's attributable equivalent-ounce cost ratio was 45.8%. That period benefited from unusually high realized gold; at our US$3,500 assumption and US$1,900 2027 AISC, the modeled cost ratio becomes 54.3% before taxes and new project spending.
Entry Barriers and Substitutes
A reserve base, permits, capital and mine-building skills are barriers, but investors can own physical gold or lower-cost miners instead. XIC is the batch-wide comparator for the entry decision; any additional miner-specific return demand would lower the maximum entry and must be stated separately.
Supplier and Customer Dynamics
Kinross's suppliers of diesel, electricity, explosives and skilled labour can absorb part of gold-price upside. Customer concentration is less relevant for bullion; the issuer's September sensitivity states a US$10/barrel oil move changes attributable cost by about US$10/oz. September update, Key Sensitivities.
Regulation and Structural Risks
Mauritania fiscal terms, Brazil tailings and water requirements, and Chile permits can change project cash flows. The annual report's MD&A risk section and 2025 reserve notes, physical pages 38–39 are the source baseline; our country-specific risk weights are analyst judgment.
Historical Performance
Metal sales rose from US$5,148.8 million in 2024 to US$7,051.1 million in 2025, largely in a rising gold market. Nine-month 2026 sales of US$6,420.5 million exceeded nine-month 2025 US$5,028.1 million, but Q3 output fell 16%; this mix warns against extrapolating revenue. 2025 annual statements, physical page 67; Q3 2026 statements, physical page 2.
Income Statement Analysis
Q3 2026 operating earnings were US$821.0 million on US$1,774.7 million sales, versus US$810.1 million on US$1,802.1 million a year earlier. Higher realized price offset lower volume and rising production cost per ounce. The IFRS statement is distinct from the non-GAAP AISC model. Interim statements physical page 2.
Balance Sheet Analysis
Cash of US$2,638.4 million exceeded long-term debt of US$739.2 million by US$1,899.2 million at September 30, 2026. Current and long-term provisions total US$1,037.0 million; we deduct the full amount conservatively, although AISC may overlap some reclamation economics. Reversing the full provision deduction raises fair value about C$1.25 per share. Interim balance sheet physical page 1.
Cash Flow Analysis
Nine-month reported operating cash flow after income taxes was US$2,999.8 million; PP&E cash investment was US$1,133.8 million. Issuer attributable FCF was US$1,845.6 million after excluding minority cash. Working capital and the Q3 capital ramp make a single quarter a poor normalized base. Interim cash flow physical page 4; Q3 MD&A physical page 3.
Earnings Quality
2025 included a US$116.1 million impairment reversal and a US$63.0 million gain on sale of Asante holdings. The forecast starts from ounce margins rather than reported net income, avoiding capitalization of these gains. 2025 annual statements physical pages 67 and 69.
Nonrecurring Items
Great Bear and Lobo-Marte are separate projects rather than recurring mine cash. Their initial capital is modeled on separate schedules; the existing-mine budget is reduced to US$350 million in 2027 from the older undifferentiated US$1,050 million assumption. That change corrects double charging, rather than assuming the projects are free.
Funding and Cash Conversion
2026 year-to-date attributable FCF was US$1,845.6 million. The company repurchased roughly US$810 million by late October and returned over US$950 million including dividends, near 46% of FCF. Cash retention funded the rest; our per-share NAV assumes the remaining cash stays with shareholders, without awarding a second buyback uplift. Q3 issuer release, Return of capital.
Key Ratios
At C$24.81 and 1.178 billion September common shares, equity market capitalization is about C$29.23 billion or US$20.40 billion at the dated FX. Its roughly 8.25× 2025 attributable FCF is a trailing high-gold-price ratio, not a sustainable multiple. Our base NAV implies approximately 1.59× the C$15.65 fair value, which requires higher long-run economics to justify.
Forward Outlook
The forecast begins with 1.85 million attributable ounces in 2027 and then a 2028 increase partly tied to Phase X and Curlew. The modeled existing mines produce 16.90 million ounces through 2036, requiring 4.54 million ounces of conversion beyond current operating reserves after estimated 2026 depletion. The separate Great Bear and Lobo-Marte production is not counted in that existing-mine total.
Model Choice
A finite-life mine NAV is more suitable than a perpetual DCF because reserves deplete. AISC includes sustaining capital; we deduct growth capital and cash taxes separately. We set no perpetuity, terminal multiple or unquantified exploration value. Project cash is risk-weighted to reflect feasibility and permits, and all projections remain Peralta estimates. Kinross reserve table.
Growth
Operating-mine volume starts at management's 1.84–1.86 million 2027 guidance and trends down to 1.30 million by 2036. Starting operating reserves after removing Lobo-Marte and estimated 2026 depletion are 12.359 million ounces. The 16.90-million-ounce plan needs 4.54 million ounces of conversion, an analyst assumption that has no mine-by-mine conversion schedule; the groupwide 27.499-million-ounce measured-and-indicated figure includes undeveloped projects and is not a valid existing-mine denominator; zero conversion lowers fair value to C$13.47.
Profitability
The US$3,500/oz base is close to November 20 gold, but US$1,000/oz below 2026 YTD realized prices. Existing-mine AISC rises from US$1,900 in 2027 to US$2,350 by 2036. The historical Q3 AISC of US$1,947 supports the starting range but not the full inflation path. Higher AISC by US$250/oz throughout cuts fair value to C$12.81.
Reinvestment or Required Capital
Existing-mine development capital totals US$2.475 billion in 2027–36, separate from US$1.429 billion Great Bear initial capital and US$1.8 billion Lobo-Marte initial capital. Sustaining spend is already inside AISC and must not be subtracted again. The issuer's 2026 total attributable capital guidance of US$1.5 billion included US$1.05 billion non-sustaining, including named projects; our future schedule is an estimate, not an assertion that management has committed this exact allocation. 2025 results, capital guidance table.
Discount Rate
We use a 9% nominal USD discount rate for all unweighted project and mine cash flows, then apply explicit 50% Great Bear and 60% Lobo-Marte weights for development risk. This is an analyst hurdle, not the issuer's 5% study rate. An 11% discount rate lowers fair value to C$14.16 and entry to C$12.39. The 14.1227% XIC 24-month return is a separate investor comparison, not the mine discount rate.
Terminal Economics
There is no terminal growth or residual sale value. Last explicit existing-mine free cash of US$896.50 million in 2036 is followed by zero in 2037; sustaining spending is embedded in each year's AISC and the provision deduction covers modeled closure liability. This finite-life boundary is conservative if reserves continue to convert, but avoids an unearned perpetuity. Project lives end in 2040 for Great Bear and 2046 for Lobo-Marte.
Bridge to One Common Share
The worksheet's operating NAV, risk-weighted projects, US$2,638.4 million cash, US$91.4 million investments, US$739.2 million debt, US$1,037.0 million provisions and US$127.4 million NCI bridge to common equity. Dividing by 1.185 billion diluted shares and multiplying by 1.4325 CAD/USD yields C$15.65. Dilution above the September outstanding 1.178 billion is a 7-million-share cushion; NCI book value is an imperfect proxy for minority fair value. Interim balance sheet physical page 1.
Price-Implied Expectations
At fixed volumes, costs, risk weights and FX, gold near US$4,306/oz would lift fair value to the C$24.81 close; about US$4,617/oz is needed to make the close an entry under XIC parity after trading costs when costs are fixed. Applying the issuer’s US$5/oz royalty-cost response per US$100/oz rise shifts the entry flip to about US$4,675/oz. These are conditional solutions, not forecasts or consensus. At US$4,000 gold, entry remains C$18.67; at US$5,000 with the royalty response, the entry is C$27.87 and the call reverses. The base US$3,500 is closer to the dated November 20 observation, but the high-price regime is plausible enough to monitor, not dismiss.
Independent Cross-Check
Kinross's July Lobo-Marte update reports a US$3.2 billion NPV at US$3,500 gold using 5% discount and a January 1, 2028 valuation date; our project schedule uses 9%, future capital and a 60% risk weight, so its lower contribution is directionally consistent. Great Bear's 2024 PEA reports US$3.3 billion NPV at US$2,500 and 5%, but includes inferred resources; our 50% weight matters more than its study NPV. Lobo-Marte financial highlights; Great Bear PEA physical page 2, NPV table; PEA inferred-resource footnote 5.
Conclusion and Change from Prior Edition
This is the first edition. The initial working model omitted production from Great Bear and Lobo-Marte while including substantial growth spending, producing a false C$8.90 fair value. The independent review caught it before release; separated project capital and risk-weighted production raise fair value by C$6.75 to C$15.65. A second correction replaced the unsupported 8% plus 4-point hurdle with the batch XIC parity rule, taking the final entry to C$13.69; the original C$7.08 entry combined both earlier defects. The Wait decision survives, but the corrected entry is materially different.
Peer Selection
Agnico Eagle and Newmont supply independent same-period gold-miner cost data. We do not compare equity P/E or EV/FCF across the three because dated share prices, balance-sheet claims and consistent attributable definitions were not collected for those peers. The operating-cost comparison challenges our AISC forecast without pretending to fix an equity multiple.
Dated Ratio Table
Q3 2026, USD per gold ounce, by-product AISC where available; the last column is AISC divided by Kinross's Q3 realized US$4,248/oz reference price for a consistent commodity denominator, not the peer's own realized price.
| Company and definition | Q3 2026 AISC USD/oz | AISC / US$4,248 gold |
|---|---|---|
| Kinross attributable gold by-product | 1917 | 45.1% |
| Agnico Eagle gold by-product | 1648 | 38.8% |
| Newmont gold by-product | 1454 | 34.2% |
Sources: Kinross Q3 per-ounce table, Agnico Q3 AISC reconciliation, Newmont Q3 headline and AISC reconciliation.
Comparability Adjustments
AISC is non-GAAP and company definitions differ; Kinross's equivalent-ounce AISC is US$1,947, while its gold by-product ratio is US$1,917. Agnico changed components in 2026, and Newmont has a broader copper and silver mix. The table is a cost challenge only, not a claim that Kinross trades at a specified discount or premium.
Implications for Value
Kinross's higher recent cost supports an AISC stress. A US$250/oz sustained increase takes fair value to C$12.81 and entry to C$11.21. The peer gap is not itself a forecast for Kinross because its ore grades, mine plans and growth projects differ.
Bear Case
US$3,000 gold, unchanged ounces and capital yields C$9.97 fair value and C$8.72 entry. This is a multi-year downside price path, not one weak quarter. Sustaining cost, reserve conversion and project permits can compound the loss, as in the joint stress.
Base Case
US$3,500 gold, 16.90 million existing-mine ounces through 2036, 4.55 million converted ounces, a 50% Great Bear weight and 60% Lobo-Marte weight produce C$15.65 fair value. These weights are analyst probabilities applied to full future project cash and capital, not issuer guidance.
Bull Case
US$4,000 gold with otherwise unchanged inputs produces C$21.33 fair value and C$18.67 entry. Sustained US$5,000 gold with US$75/oz extra royalty-linked cost produces C$31.85 fair value and C$27.87 entry, a Buy at the frozen close. The World Gold Council’s January 2026 commentary documents a US$5,000 spot crossing, while spot on November 20 was lower. A spot milestone does not establish a long-run price; the model makes the duration assumption explicit.
Outcomes at Close and Entry
| Assumption | Close | Fair value | Maximum entry | Price rule |
|---|---|---|---|---|
| Base | 24.81 | 15.65 | 13.69 | Wait |
| Bear gold | 24.81 | 9.97 | 8.72 | Wait |
| Bull gold | 24.81 | 21.33 | 18.67 | Wait |
| Gold 5000, royalties +75/oz | 24.81 | 31.85 | 27.87 | Buy |
| No conversion | 24.81 | 13.47 | 11.79 | Wait |
| Great Bear fails | 24.81 | 13.45 | 11.77 | Wait |
| Lobo-Marte fails | 24.81 | 14.56 | 12.74 | Wait |
| Higher sustaining cost | 24.81 | 12.81 | 11.21 | Wait |
| Higher discount rate | 24.81 | 14.16 | 12.39 | Wait |
| Higher cash tax | 24.81 | 14.34 | 12.55 | Wait |
| No separate closure deduction | 24.81 | 16.90 | 14.79 | Wait |
| Joint downside | 24.81 | 5.98 | 5.23 | Wait |
| Growth capex +20% | 24.81 | 14.91 | 13.05 | Wait |
The strongest independently plausible alternative shown is sustained US$5,000 gold with US$75/oz higher cost; it flips Wait to Buy at the frozen close. Joint downside combines US$3,000 gold, US$250/oz extra AISC, 20% higher growth capital and only 2.0 million converted ounces; input inflation can coincide with lower grades, so this is one coupled operating shock. It yields C$5.98 fair value and C$5.23 entry. The next guidance and reserve statement distinguish these cases.
Market-Implied Case
Holding all else fixed, approximately US$4,306/oz gold is needed for fair value to equal the November 20 close and roughly US$4,617/oz to meet the entry hurdle at fixed costs, or roughly US$4,675/oz when the issuer’s royalty response is applied. The latter is the stronger market case because it requires future appreciation and costs to be compensated. Recent Q3 realized US$4,248 and November 20 spot near US$3,538 are below those thresholds; January 2026 spot crossed US$5,000, so the stronger case cannot be excluded.
Analyst Assessment
Wait survives the US$4,000 gold, AISC, discount-rate and project-failure scenarios, but reverses under sustained US$5,000 gold with royalty-linked cost. The model is still highly assumption-sensitive: the base C$13.69 entry should be revisited after a project feasibility/permit update, the next reserve reconciliation or a sustained gold regime near US$5,000. No portfolio sizing is implied.
Operating Risks
Lower grades, recovery or weather at La Coipa and Round Mountain threaten ounces and unit cost together. The 2026 guidance reset demonstrates this combination. A Q4/2027 production miss below 1.84 million annualized ounces with AISC above US$1,900 would require revisiting the base schedule. September update, asset paragraphs.
Financial and Liquidity Risks
Higher growth capital lowers NAV even with current net cash. At September 30, cash less debt was US$1.899 billion, but US$1.037 billion of provisions and cash taxes compete with dividends and projects. A 20% capex shock lowers fair value to C$14.91. Interim balance sheet.
Regulatory and Legal Risks
Lobo-Marte's Chilean EIA and Great Bear's Canadian permitting govern start dates. Their 60% and 50% valuation weights are judgment, not an actuarial estimate; full Great Bear failure lowers fair to C$13.45, full Lobo-Marte failure to C$14.56. Lobo-Marte update, permitting; Great Bear PEA, risk footnote.
Industry and Competitive Risks
Gold is the largest value driver, and peer AISC shows Kinross recently had a wider cost burden. A sustained US$500/oz increase in gold adds about C$5.68 fair value; a decrease removes the same amount in this linear cash model. Royalties and input inflation could reduce the upside, so the simple fixed-cost sensitivity is optimistic at high gold.
Thesis-Specific Risks and Reconsideration Triggers
The most important challenge to Wait is a credible long-run gold path far above US$3,500 combined with project derisking. Reopen the thesis if the next reserve report shows material net additions, Great Bear reaches a reserve-backed feasibility decision, Lobo-Marte receives key environmental approval, or realized gold remains above US$4,000 for multiple quarters with stable AISC.
Environmental Factors
Tailings, water use and closure liabilities are financially material in Brazil, Mauritania and Chile. We deduct the entire US$1.037 billion provision as a conservative claim, although some reclamation accrual already appears in AISC; this overlap has an approximately C$1.25 fair-value ceiling if fully reversed. Interim balance sheet provisions; 2025 results, sustainability/tailings capital guidance.
Social Factors
Great Bear depends on Indigenous consultation and Canadian permits; Lobo-Marte's water, power and local communities are part of Chilean EIA review. These are schedule and capital risks, not a generic ESG score. A one-year start delay would reduce project PV and extend pre-revenue carrying cost. Lobo-Marte July update, Sustainability by design and Permitting.
Governance Factors
Kinross committed to return 50% of 2026 free cash flow to holders and had repurchased approximately US$810 million by late October. Governance quality depends on whether investment in projects competes responsibly with buybacks at high share prices. The model gives no extra value for the policy itself. Q3 issuer release, Return of capital.
Financially Material Risks and Opportunities
Renewable power at Lobo-Marte could reduce long-run energy cost, but permits and up-front capital dominate current valuation uncertainty. In Great Bear, an inferred-resource PEA has an attractive AISC estimate but cannot be treated as a proven reserve. The risk weights and failure cases make those uncertainties visible in per-share value.
Annual Results
USD millions, fiscal years ended December 31; IFRS. 2025 annual statements physical page 67.
| Item (USDm) | FY2024 | FY2025 |
|---|---|---|
| Metal sales | 5148.8 | 7051.1 |
| Production cost of sales | 2197.1 | 2346.4 |
| Operating earnings | 1540.3 | 3277.6 |
| Net earnings to common | 948.8 | 2390.1 |
Interim Results
Nine months ended September 30, USD millions. Interim statements physical page 2.
| Item (USDm) | 9M 2025 | 9M 2026 |
|---|---|---|
| Metal sales | 5028.1 | 6420.5 |
| Production cost of sales | 1713.7 | 1992.4 |
| Operating earnings | 2155.3 | 3345.5 |
| Net earnings to common | 1483.6 | 2270.4 |
Trailing Results
Trailing September 2026 equals FY2025 less 9M 2025 plus 9M 2026, with identical consolidated perimeter: metal sales US$8,443.5 million and operating earnings US$4,467.8 million. These are reported-line arithmetic, not normalized profit; the 2025 impairment reversal remains within the trailing window. Annual and interim rows provide the inputs.
Material Adjustments
We do not feed trailing IFRS earnings directly into NAV. We move from 2026 guidance of 1.84–1.86 million ounces and US$1,850–1,900 AISC to a 2027 mine-level assumption of 1.85 million and US$1,900, then separate tax and development. The bridge is exact in the worksheet; differences from reported FCF reflect gold price, project timing, working capital and accounting definition.
Annual Positions
USD millions at December 31. 2025 annual report physical page 66.
| Item (USDm) | 2024-12-31 | 2025-12-31 |
|---|---|---|
| Cash | 611.5 | 1742.3 |
| Long-term debt | 1235.5 | 738.2 |
| Total assets | 10865.6 | 12411.1 |
| Common equity | 6861.6 | 8576.0 |
Interim Positions
USD millions; 2025 comparator repeated for the interim balance sheet. Q3 statements physical page 1.
| Item (USDm) | 2025-12-31 | 2026-09-30 |
|---|---|---|
| Cash | 1742.3 | 2638.4 |
| Long-term debt | 738.2 | 739.2 |
| Current plus long-term provisions | 1050.8 | 1037.0 |
| Noncontrolling interest | 118.1 | 127.4 |
Capital and Claims Reconciliation
Cash less long-term debt was US$1,899.2 million. For common NAV we add US$91.4 million of investments and deduct US$1,037.0 million provisions and US$127.4 million NCI book value. The latter is a proxy and may differ from asset-level fair value. Diluted share count is 1.185 billion versus 1.178 billion outstanding in September. Q3 balance sheet physical page 1.
Annual Flows
USD millions, years ended December 31. 2025 annual report physical page 69.
| Item (USDm) | FY2024 | FY2025 |
|---|---|---|
| Operating cash after tax | 2446.4 | 3760.5 |
| PP&E additions | 1075.5 | 1194.2 |
| Common dividends | 147.5 | 152.1 |
| Common buybacks | 0.0 | 600.3 |
Interim Flows
Nine months ended September 30, USD millions. Q3 statements physical page 4.
| Item (USDm) | 9M 2025 | 9M 2026 |
|---|---|---|
| Operating cash after tax | 2623.6 | 2999.8 |
| PP&E additions | 826.0 | 1133.8 |
| Common dividends | 110.0 | 142.8 |
| Common buybacks | 335.2 | 690.2 |
Trailing Flows
Trailing September 2026 reported cash after tax equals US$4,136.7 million; PP&E additions equal US$1,502.0 million, so a simple consolidated post-PP&E measure is US$2,634.7 million. That is not attributable free cash and includes the high-price period. Annual cash-flow rows; interim rows.
Reconciliation to Common Shareholders
Nine-month 2026 consolidated operating cash after tax of US$2,999.8 million less US$1,133.8 million PP&E additions gives US$1,866.0 million. The issuer's attributable FCF of US$1,845.6 million is US$20.4 million lower after its minority-interest adjustments. Dividends plus buybacks paid were US$833.0 million, leaving US$1,012.6 million of attributable FCF for net cash accumulation, other financing and liquidity; this residual is not counted again as an incremental NAV asset beyond September cash. The price decision assumes 100% of positive unspent cash eventually benefits holders through value retention, versus a 50% shareholder-benefit sensitivity that would reduce any return-based case; neither changes this asset NAV mechanically because cash retained still belongs to equity. Q3 cash-flow statement; issuer attributable FCF reconciliation.
Primary Sources and Locators
The local originals are 2025 audited annual report, 2025 year-end reserve and guidance release, Q3 2026 interim financial statements, Q3 MD&A and 2026 circular. The September 2026 guidance reset, Lobo-Marte July update, and Great Bear PEA, page-2 financial highlights are issuer originals; the first two updates are linked externally with section and table names, and the PEA is included locally. The local reserve PDF page 35 is image-based; its rectangle must be checked in the public reader.
Frozen Inputs and Assumptions
Public inputs freeze price, FX, gold, operating reserves, conversion, production, AISC, development spending, project schedules, tax, discount, claims, shares and entry rule. USD financial claims refer to September 30, 2026 and TSX/FX/gold observations to November 20, 2026. The 9% discount, 30% simplified cash tax, 50% Great Bear weight, 60% Lobo-Marte weight and 4.55-million-ounce conversion are explicit analyst judgments. The 14.1227% XIC path and costs are the established batch comparator. The simplified tax applies to post-AISC margin, not taxable income; actual capex timing, tax pools and jurisdictional rates could move NAV materially.
Worksheets and Saved Outputs
Run PYTHONDONTWRITEBYTECODE=1 PYTHONPATH=. /Users/johnperalta/johnperalta4vanilla/.venv/bin/python support/valuation.py from this edition root with Python 3.12.13 and standard library only. The script reads relative frozen inputs and writes the linked Markdown and exact JSON. Its cases are independent recalculations, and changing one input flows through all cases. No writer credentials are used.
| Worksheet | Output |
|---|---|
| Finite-life mine NAV and entry | Decision and sensitivities · Year schedule and equity bridge |
| Year | Attributable Moz | Gold USD/oz | AISC USD/oz | Pretax margin USDm | Cash tax USDm | Development USDm | FCF USDm | PV USDm |
|---|---|---|---|---|---|---|---|---|
| 2027 | 1.850 | 3,500.00 | 1,900.00 | 2,960.00 | 888.00 | 350.00 | 1,722.00 | 1,579.82 |
| 2028 | 1.950 | 3,500.00 | 1,950.00 | 3,022.50 | 906.75 | 350.00 | 1,765.75 | 1,486.20 |
| 2029 | 1.900 | 3,500.00 | 2,000.00 | 2,850.00 | 855.00 | 300.00 | 1,695.00 | 1,308.85 |
| 2030 | 1.800 | 3,500.00 | 2,050.00 | 2,610.00 | 783.00 | 275.00 | 1,552.00 | 1,099.48 |
| 2031 | 1.750 | 3,500.00 | 2,100.00 | 2,450.00 | 735.00 | 250.00 | 1,465.00 | 952.15 |
| 2032 | 1.700 | 3,500.00 | 2,150.00 | 2,295.00 | 688.50 | 225.00 | 1,381.50 | 823.74 |
| 2033 | 1.650 | 3,500.00 | 2,200.00 | 2,145.00 | 643.50 | 200.00 | 1,301.50 | 711.97 |
| 2034 | 1.550 | 3,500.00 | 2,250.00 | 1,937.50 | 581.25 | 200.00 | 1,156.25 | 580.28 |
| 2035 | 1.450 | 3,500.00 | 2,300.00 | 1,740.00 | 522.00 | 175.00 | 1,043.00 | 480.23 |
| 2036 | 1.300 | 3,500.00 | 2,350.00 | 1,495.00 | 448.50 | 150.00 | 896.50 | 378.69 |
| Equity bridge | USDm |
|---|---|
| operating mine nav usdm | 9,401.40 |
| great bear risk adjusted nav usdm | 1,819.68 |
| lobo marte risk adjusted nav usdm | 898.77 |
| cash usdm | 2,638.40 |
| nonoperating investments usdm | 91.40 |
| debt usdm | -739.20 |
| closure provisions usdm | -1,037.00 |
| noncontrolling interest usdm | -127.40 |
| Common equity | 12,946.05 |
| Diluted shares (m) | 1,185.00 |
| USD/CAD | 1.4325 |
| Fair value (CAD/share) | 15.65 |
| Maximum entry (CAD/share) | 13.69 |
| 2025 mine group | Reserve gold Moz | Attributable 2025 production GEO Moz | Static reserve / production years |
|---|---|---|---|
| Tasiast | 4.401 | 0.503 | 8.7 |
| Paracatu | 4.839 | 0.601 | 8.0 |
| United States incl Manh Choh (attributable) | 4.533 | 0.676 | 6.7 |
| La Coipa | 0.436 | 0.232 | 1.9 |
| Operating total (excluding Lobo-Marte) | 14.209 | 2.012 | 7.1 |
| Finite-life boundary | 2036 last explicit year | 2037 first terminal year |
|---|---|---|
| Operating ounces (Moz) | 1.300 | 0.000 |
| After-tax ounce margin (USDm) | 1,046.50 | 0.00 |
| Development capital (USDm) | 150.00 | 0.00 |
| Free cash (USDm) | 896.50 | 0.00 |
Changes from the Preceding Edition
First edition without a predecessor. The private first-pass C$8.90 fair value and C$7.08 entry are not a publication baseline; the independent review found that project capex was charged without giving Great Bear or Lobo-Marte a production schedule. The reviewed model corrects that before this first edition. Future editions should bridge source changes, model changes and rounding separately.
Closing Prices
Frozen unadjusted TSX K regular-session closes in CAD; these are neither dividend-adjusted total returns nor an intraday quote. Finabase daily K.TO history, November 18–20, 2026.
| Date | Close (CAD) | Entry (CAD) |
|---|---|---|
| 2026-11-18 | 27.15 | |
| 2026-11-19 | 26.24 | |
| 2026-11-20 | 24.81 | 13.69 |