i-80 Gold Corp. — First Equity Research Edition
Our maximum entry price is C$0.00 per share. No positive entry price clears the linked downside capital-preservation rule. At the November 25, 2026 TSX:IAU close of C$1.54, Wait / Needs underwriting. The strongest contrary assumption is sustained US$4,500/oz gold with the announced two-mine ramp; it raises modeled fair value to about C$0.98 but leaves the same downside constraint binding. The US$2,750/oz Granite Creek feasibility case, absent Archimedes reserves and a commissioned Lone Tree plant, supports the more cautious base. Granite Creek study, September 21, 2026 · November 23 Archimedes update · dated TSX closes.
- Market close (CAD)
- C$1.54
- Base fair value (CAD/share)
- C$0.12
Company details
- Base five-year exit (CAD/share)
- C$0.39
- Linked downside exit (CAD/share)
- C$0.00
- Base hurdle ceiling (CAD/share)
- C$0.25
- Downside preservation ceiling (CAD/share)
- C$0.00
- Maximum entry price (CAD/share)
- C$0.00
- Binding ceiling
- joint_downside
- Base five-year gain at close
- -74.7%
- Downside five-year gain at close
- -100.0%
The issuer is i-80 Gold Corp., listed as IAU on Toronto and IAUX on NYSE American. The US-listed IAU is the separate iShares Gold Trust; no gold-trust data enters this report. The filing reports in USD; prices and the decision are CAD. This first edition uses the latest completed TSX close of November 25 and the Bank of Canada daily average of C$1.4219 per US$1 for the same date. The model holds FX constant for both purchase and sale, and values the existing common claim after estimated new financing. Q3 cover, physical p. 1 · Bank of Canada FXUSDCAD, November 25 observation.
Investment Thesis
i-80 owns a potentially valuable Nevada refractory-gold processing network, but shareholder cash depends on finishing a US$430 million plant, meeting two underground mine schedules, and funding a 2031 convertible maturity. The reported US$411.4 million of September cash is financing proceeds, not distributable free cash. No common dividend is assumed through the five-year horizon. Q3 balance, physical p. 6 · Q3 cash flow, physical p. 8 · Q3 Lone Tree discussion, physical p. 36.
Market Mispricing
The C$1.42 close-to-fair gap is primarily a difference in long-run gold price and funding assumptions. Even the US$4,500/oz case in the frozen model is about C$0.98 fair value. The close requires roughly US$5,282/oz over the modeled mine life to clear the 9.487% five-year policy hurdle with otherwise unchanged production and financing. That is a conditional model solution, not street consensus or a forecast. Model and output.
Recent Developments
On November 23, management said production mining had begun at Archimedes; this is earlier stage extraction, not proof of reserves or saleable 2026 ounces. September's Granite Creek technical work established its first 556,500-ounce proven and probable reserve. The 10-Q says production from Archimedes oxide ore originally expected in Q4 is now likely recognized in Q1 2027. Archimedes release, physical p. 1 · Granite study, Table 1 · Q3 outlook, physical p. 30.
Earnings Outlook
Peralta's three frozen tests are: (1) combined attributable gold output in 2028, 125 koz base, 90 koz linked downside, 125 koz upside, versus management's 150–200 koz target; Q4 2028 operations settle it; (2) Lone Tree cash refurbishment through commissioning, US$430m base, US$529.9m downside and US$430m upside, against the engineering budget; quarterly capex and the commissioning notice settle it; (3) cumulative external equity through 2031, US$170.8m base, US$792.1m downside and US$115.9m upside at the modeled issue prices; securities filings and cash balances settle it. These are analyst paths, not issuer guidance. Q3 outlook, physical p. 29 · Lone Tree estimate, physical p. 36 · model inputs.
Valuation Summary
Finite-life discounted mine cash after investment and debt claims, excluding proceeds from hypothetical future share issues, gives C$0.12 per existing share. A base 2031 exit of C$0.39 supports a C$0.2479 unrounded hurdle ceiling. The linked downside has no positive residual common claim after 2031; its preservation ceiling and the maximum entry are zero. Future financing is modeled to test liquidity and 2031 dilution, not counted as project income. Decision worksheet · saved decision.
Recommended Action and Entry Price
Wait; exclude from qualified purchase ranks. The linked downside requires US$792.1m of hypothetical equity through 2031 at US$0.55/share, plus US$173.4m after 2031. Neither is committed, and the 2031 residual mine cash is negative before later new equity. The decision is Needs underwriting until Lone Tree funding and Archimedes reserve economics become independently defensible. A higher share price alone does not resolve this. Q3 liquidity, physical p. 42 · project model.
Catalysts
The next measurable catalysts are 2026 year-end gold output, a Q4 2026 Cove study, 2027 Archimedes feasibility, Lone Tree final permits and commissioning, and 2028 consolidated payable gold sales. Each can revise mine duration, funding and the exit. Q3 outlook and project timetable, physical p. 29 · Archimedes release, physical p. 2.
Primary Risks to Thesis
The plant may cost more or start later, high-grade access may lag, metal prices may normalize, prepay deliveries may consume saleable ounces, and the convertible may require cash repayment. The joint downside models lower realized gold, 28% less output, 25% more growth capital and US$0.55/share financing simultaneously. A reserve-only view would omit much of Archimedes; its 2025 PEA is preliminary. Q3 risks, physical p. 4 · Granite study caution.
Closing Prices
S&P Global Market Intelligence adjusted TSX:IAU closes in CAD, as displayed by Stock Analysis; the frozen rows end before this edition's release. Price history and basis.
| Date | Close (CAD) | Entry (CAD) |
|---|---|---|
| 2026-11-20 | 1.45 | |
| 2026-11-23 | 1.54 | |
| 2026-11-24 | 1.52 | |
| 2026-11-25 | 1.54 | 0.00 |
Company Overview
The four principal wholly owned Nevada properties are Granite Creek, Ruby Hill, Cove and Lone Tree. Granite Creek has an operating underground mine; Ruby Hill includes Archimedes, now in production mining; Lone Tree's autoclave is under refurbishment. The Q3 filing describes all other projects apart from Granite Creek underground as exploration stage under S-K 1300. Q3 Note 1, physical p. 10 · Q3 technical caution, physical p. 29.
Products and Services
Gold sales currently come from Granite Creek sulfide and oxide ore, residual leach material, and third-party processing. The company also produces silver; the silver purchase agreement creates a senior delivery claim. It sells metal, not services. Q3 operational results, physical p. 31 · Q3 debt Note 7, physical p. 12.
Business Model
Mine ore is either toll processed or stockpiled for the planned Lone Tree hub. Owning the autoclave could improve payability but requires capital and operating performance first. The model charges the full plant refurbishment once, rather than adding a plant premium to technical study values. Q3 Lone Tree, physical p. 36 · Granite FS processing strategy.
Revenue Drivers
Saleable ounces equal produced ounces less contractual prepay deliveries; USD revenue equals those ounces times the assumed realized gold price. The reported nine-month 2026 gold ounces sold were 23,668 at US$4,608/oz average realized price. Annual modeled payable sales rise only if both mines and the plant ramp. Q3 sales, physical p. 39 · frozen schedule.
Cost Structure
The Granite study estimates 2028–32 AISC of US$1,915/oz, excluding plant refurbishment allocation; Archimedes's 2025 PEA gives US$1,893/oz. These project averages are starting anchors, not proof of corporate cost. Peralta also charges corporate G&A, exploration, growth mine development, royalties, taxes, financing, closure and the plant. Granite FS Table 1 and endnote 5 · Archimedes PEA, physical p. 1.
Operating Levers
The relevant levers are ore grade, recovery, tonnes mined, toll versus owned processing, prepay ounces, and royalty burden. A 2028 miss in either mine can coincide with cash demands for a nearly complete plant. The joint scenario therefore links volume and capital rather than varying gold price alone. Granite FS Table 1 · Q3 Lone Tree progress, physical p. 36.
Distribution
Gold is sold through metal and ore sale arrangements; the 2026 prepay requires 39,978 gold ounces delivered monthly from January 2028 through June 2030. The model removes those ounces from cash sales but retains their mining cost. Q3 Note 7, physical p. 13.
Geographic Exposure
The operating assets are in Nevada. CAD common-share returns nevertheless depend on USD mine cash and USD/CAD, so the frozen C$1.4219 conversion is an assumption rather than an FX forecast. Both trades use the same rate. Q3 Note 1, physical p. 10 · Bank of Canada observation.
Regulatory Environment
US mine and environmental permits govern development; technical disclosure follows Canadian NI 43-101 and US S-K 1300. The Granite study qualifies as a Canadian feasibility study but a US pre-feasibility study under differing criteria. Lone Tree has existing operational permits, with design and environmental permits progressing. Granite FS opening classification · Q3 Lone Tree permits, physical p. 36.
Industry Structure
Gold mines sell a globally priced commodity. i-80 cannot set the gold price; its potential edge is control of a Nevada autoclave that can process refractory ore. The Granite FS says owned processing after Lone Tree commissioning reduces dependence on third parties. Granite FS processing strategy · Lone Tree description.
Growth and Cyclicality
In 2026, reported realized prices were unusually high relative to i-80's US$2,750 Granite reserve base. The project study itself shows Granite's NPV5 moving from US$118m at US$2,750/oz to US$598m at US$4,500/oz with the same mine plan. These are scenario sensitivities, not probability-weighted outcomes. Granite FS Table 4.
Competitors
Alamos Gold is a profitable, multi-mine gold producer; New Found Gold's Hammerdown illustrates a smaller ramp. Their Q3 margins are comparative operating evidence, while neither owns the same Nevada ore/plant package or financing obligations. Alamos Q3 2026 release, Financial Results · New Found Q3 MD&A, Financial Review.
Market Share
Gold-market share is immaterial to a price-taking miner. The test is whether i-80 earns an adequate margin per payable ounce after building the required infrastructure. Its issuer target of 150–200 koz in 2028 is under 0.1% of global mine supply; the model prudently uses 125 koz, and exact industry share is not a valuation input. Q3 outlook, physical p. 29.
Competitive Advantages
The Lone Tree autoclave may be scarce capacity: management says i-80 is one of two Nevada owners of such facilities. This is an issuer claim, not independently verified market power. The model assigns no stand-alone monopoly multiple and requires the plant capital and commissioning. Q3 asset description, physical p. 36 · Granite FS milling strategy.
Pricing and Cost Position
i-80's nine-month 2026 cost of sales of US$78.2m against US$109.5m revenue leaves only US$29.7m gross profit before US$88.3m of pre-development spending. Alamos's Q3 cost-of-sales ratio is materially better, though its size and assets differ. AISC comparisons omit site-specific project capital, so the full US$430m Lone Tree cost remains in Peralta's model. Q3 income, physical p. 7 · Granite FS endnote 5.
Entry Barriers and Substitutes
Permits, ore access and autoclave capital are real barriers; other producers' gold remains a perfect demand-side substitute. i-80's scarcity claim matters only if feed grades, recoveries and commissioned throughput deliver the forecast margins. Q3 Lone Tree discussion, physical p. 36.
Supplier and Customer Dynamics
Contractor labour and drill-rig supply delayed work at Granite Creek and Archimedes in 2026. This matters to mine access and the volume path, not consumer demand. The Q3 filing reports Granite contractor turnover and high labour cost. Q3 Granite and outlook, physical p. 32.
Regulation and Structural Risks
Refractory processing needs environmental controls and permits; a plant delay means stockpiling or lower-payability third-party treatment. The FS baseline assumes Lone Tree by late 2027, which the joint downside explicitly challenges. Granite FS project schedule · Q3 permit update, physical p. 36.
Historical Performance
FY2024 revenue was US$50.3m and FY2025 US$95.2m, while net losses widened from US$121.5m to US$198.8m. Nine-month 2026 revenue was US$109.5m but net loss was US$179.5m. These are GAAP consolidated results, not project PEA cash flow. 2025 10-K income, physical p. 135 · 2026 Q3 income, physical p. 7.
Income Statement Analysis
Nine-month 2026 gross profit of US$29.7m did not fund US$88.3m pre-development, US$26.7m G&A and US$13.9m property maintenance. Operating loss was US$99.3m. The model separates early mine margin from continuing corporate and exploration cost. Q3 income, physical p. 7.
Balance Sheet Analysis
September 30 cash rose to US$411.4m from US$63.2m at year-end 2025, but debt rose to US$453.0m and other liabilities to US$333.3m current plus long term. US$63.5m reclamation is a future economic claim. Equity was US$224.6m. The model does not treat cash raised against prepay and royalty as unencumbered surplus. Q3 balance, physical p. 6.
Cash Flow Analysis
Nine-month CFO was negative US$127.2m and PP&E investment US$56.8m: pre-financing cash demand was US$184.0m. Financing provided US$511.3m, including new convertible, royalty and prepay proceeds. This contrast is the central funding bridge. Q3 cash flow, physical p. 8.
Earnings Quality
The US$179.5m nine-month net loss contains fair-value and noncash effects, while the US$127.2m CFO deficit is still economically material. Noncash items in other expense were US$45.0m and noncash interest US$18.9m. Neither converts the business into positive common cash. Q3 cash flow, physical p. 8 · Q3 other expense note, physical p. 42.
Nonrecurring Items
The 2025 income statement included a US$26.2m PP&E write-down; 2026's financing reset created extinguishment and fair-value effects. Peralta forecasts physical mine cash and claim settlement rather than carrying these accounting marks forward. 2025 income, physical p. 135 · Q3 income, physical p. 7.
Funding and Cash Conversion
At 2027's modeled 40 koz, the full plant spending schedule and corporate costs produce a US$153m cash shortfall before a US$25m liquidity floor. The worksheet issues equity to cover deficits rather than allowing negative cash. The US$100m prepay accordion and US$25m contingent royalty tranche are not committed cash in the model. Q3 liquidity, physical p. 42 · forecast.
Key Ratios
At C$1.54 and 868.2m reported November 2 shares, market common capitalization is about C$1.34bn (US$940m at the frozen FX). This is 4.2 times September book equity, a weak ratio for a depleting asset with financing proceeds embedded in cash. A reported 2026 P/E is not meaningful because earnings are negative. Q3 share cover, physical p. 2 · Q3 balance, physical p. 6 · quote.
Forward Outlook
The base's 2028 125 koz is below the issuer's 150–200 koz goal. From the September cash snapshot the model charges Q4 burn, the remaining US$430m plant budget, mine development, royalties, 39,978 prepay ounces, US$287.5m convertible principal and reclamation. The 2028 production, capital and financing checkpoints above can invalidate the forecast. Q3 forecast caution, physical p. 29 · model.
The following is Peralta economic cash, not GAAP forecast statements. AISC includes sustaining capital, so growth capex is separate. Revenue less AISC, royalty, G&A, exploration and cash taxes links to operating cash; interest, principal, new equity and growth capex then link to ending unrestricted cash and the diluted share base.
| Base economic cash bridge (USD m except shares) | 2027 | 2028 | 2029 | 2030 | 2031 | 2032 |
|---|---|---|---|---|---|---|
| Gold sales | 140.0 | 381.5 | 521.5 | 584.6 | 612.5 | 612.5 |
| Mine AISC | 76.4 | 238.3 | 314.0 | 332.9 | 332.9 | 332.9 |
| Royalty | 2.1 | 6.6 | 8.7 | 9.2 | 18.4 | 18.4 |
| Corporate G&A | 35.0 | 35.0 | 35.0 | 35.0 | 35.0 | 35.0 |
| Exploration | 55.0 | 25.0 | 20.0 | 20.0 | 20.0 | 20.0 |
| Cash taxes | 0.0 | 19.2 | 36.0 | 46.9 | 51.5 | 51.5 |
| Operating cash | -28.5 | 57.5 | 107.9 | 140.6 | 154.6 | 154.6 |
| Growth capex | 350.0 | 65.0 | 20.0 | 20.0 | 20.0 | 20.0 |
| Interest | 10.8 | 10.8 | 10.8 | 10.8 | 10.8 | 0.0 |
| Principal repayment | 0.0 | 0.0 | 0.0 | 0.0 | 310.1 | 0.0 |
| New equity cash | 152.5 | 18.3 | 0.0 | 0.0 | 0.0 | 0.0 |
| Ending unrestricted cash | 25.0 | 25.0 | 102.1 | 211.9 | 25.7 | 160.4 |
| Ending common shares, m | 1091.6 | 1116.0 | 1116.0 | 1116.0 | 1116.0 | 1116.0 |
Model Choice
This is a finite-life two-mine shareholder cash model through 2037, with zero terminal perpetuity and no value for undeveloped Cove, Mineral Point or Granite Creek open pit. Granite's 2026 reserve and Archimedes's preliminary 2025 study anchor 450 koz and 928 koz remaining modeled recovered output respectively. Granite's 485 koz recovered study total begins in 2026, so Peralta removes roughly 35 koz for 2026 rather than double counting it in 2027 onward. Granite FS reserve and output, Table 1 · Archimedes PEA output, physical p. 15 · schedule.
Growth
Granite rises to 75 koz annually in 2028–32, matching the FS's five-year average. Archimedes rises from 10 koz in 2027 to 100 koz in 2030, near the PEA's post-ramp average of 101.9 koz. Peralta's 2028 pace remains below management's two-mine target; optional discoveries are zero-valued. Granite FS Table 1 · Archimedes PEA metrics, physical p. 2.
Profitability
The base uses US$3,500/oz long-run gold, below Q3 realized US$4,211/oz and September's US$4,608 nine-month average. It applies project AISC to all produced ounces, removes prepaid ounces from revenue and charges the 1.5% royalty through 2030 and 3% thereafter. The 25% cash tax rate is an analyst simplification with no loss-carryforward credit. Q3 sales, physical p. 39 · Q3 royalty, physical p. 42 · worksheet.
Reinvestment or Required Capital
The full US$430m Lone Tree budget is included: US$30.4m nine-month 2026 reported spend, an estimated US$74.6m in Q4, US$290m in 2027 and US$35m in 2028. Additional mine-development growth capital, exploration, G&A and US$63.5m closure are charged separately. The 2027–28 split and post-2026 development costs are Peralta estimates that require settlement by future filings. Q3 Lone Tree spend, physical p. 36 · Q3 plant budget, physical p. 36 · Q3 balance reclamation, physical p. 6.
Discount Rate
A 12% USD nominal discount rate is an analyst risk rate for pre-reserve Archimedes, commissioning and financing risk; it is higher than the technical studies' 5% project presentation. It is not a CAPM estimate. The separate five-year portfolio hurdle follows net XIC 7.4871% plus two percentage points = 9.4871%. At 15% NAV discount, fair value falls to C$0.10 while no positive downside entry qualifies. The linked downside cash test is binding. Granite FS NPV5 definition · policy inputs.
Terminal Economics
At the 2031 boundary the base still has finite Granite and Archimedes ounces for 2032–37. The worksheet discounts those remaining cash flows at 12%, adds 2031 ending cash after the US$287.5m convertible and other debt repayment, then divides by 1,116m diluted common shares. Mine development continues at US$20m annually and closure is paid in 2037; there is no perpetual terminal step-down or value for unproved discoveries. Carrying the final year's US$20m development forward through the finite schedule changes nothing because it is already present.
| Finite mine boundary (USD m) | 2031 | 2032 |
|---|---|---|
| Gold sales | 612.5 | 612.5 |
| Mine AISC | 332.9 | 332.9 |
| Royalty | 18.4 | 18.4 |
| Corporate G&A | 35.0 | 35.0 |
| Exploration | 20.0 | 20.0 |
| Cash tax | 51.5 | 51.5 |
| Operating cash | 154.6 | 154.6 |
| Growth capital | 20.0 | 20.0 |
| Debt principal | 310.1 | 0.0 |
| Interest | 10.8 | 0.0 |
forecast and exit bridge. See the generated terminal and implied-price tables.
Bridge to One Common Share
Start with US$411.4m September cash. Charge Q4 estimated US$149.6m combined other burn and plant spend; forecast yearly post-tax mine cash less growth capital, interest and debt repayment. Issue estimated equity whenever cash would fall below US$25m; the base needs US$170.8m at US$0.75/share, growing the 868.2m reported shares plus 20m award buffer to 1,116.0m. The prepay and royalty proceeds are already in September cash, while future deliveries and royalties leave future cash; subtracting their September accounting liabilities again would double count. Q3 debt note, physical p. 12 · Q3 cover shares, physical p. 2 · public calculations.
Price-Implied Expectations
At C$1.54, a five-year 9.4871% net hurdle needs roughly C$2.425 of sale proceeds per share before the sale fee. Solving the frozen model with other base inputs fixed requires about US$5,282/oz gold to get that 2031 exit, well above both the US$3,500 base and Granite's US$4,500 high sensitivity. A verified 2028 pace above 175 koz with contained capital and funded debt may offer a different path; that is a test, not an assumed valuation.
| Price-implied output | Value |
|---|---|
| Required 2031 exit before sale fee (CAD/share) | 2.425 |
| Solved gold price with base drivers fixed (USD/oz) | 5,282 |
Independent Cross-Check
Granite's company sensitivity is only US$193m NPV5 at US$3,000/oz and US$598m at US$4,500/oz; Archimedes's earlier preliminary NPV5 is US$644m at US$3,000/oz. These project values are not additive corporate equity: their study dates and 5% rates differ, Lone Tree shared capital is excluded in Granite AISC, and 2026 financing and common dilution came later. They support strong gold optionality but cannot justify adding NPV5 and US$411m cash without the plant and senior claims. Granite FS Table 4 and endnote 5 · Archimedes PEA sensitivity, physical p. 5.
Conclusion and Change from Prior Edition
This is the first IAU edition; there is no predecessor value to bridge. The C$1.54 close to C$0.12 fair gap is C$−1.42; fair to zero eligible entry is C$−0.12; total close to entry is C$−1.54. The downside cash test binds. The most decision-changing missing proof is a funded post-commissioning cash plan with tested Archimedes reserves and a financeable downside. decision output.
Peer Selection
Alamos is a mature gold producer with comparable commodity exposure but stronger diversification and funded operations. New Found Gold's Hammerdown is an early production ramp, but its Canadian reporting currency and smaller scale differ. Both ratios below use their original Q3 2026 public filings; they are operating comparisons, not a claimed share-price multiple. Alamos Q3 release · New Found Q3 MD&A.
Dated Ratio Table
Q3 2026 gross margin is (revenue − cost of sales including depreciation where reported) / revenue; amounts are in each issuer's reporting currency and millions. New Found's C$23.010m cost of sales row is used with C$41.6m revenue; different currency does not affect its ratio. The ratios are not substitutes for mine NAV.
| Issuer, Q3 2026 | Revenue m | Cost of sales m | Gross margin |
|---|---|---|---|
| i-80 Gold (USD) | 32.728 | 27.774 | 15.1% |
| Alamos Gold (USD) | 510.4 | 214.2 | 58.0% |
| New Found Gold (CAD) | 41.580 | 23.010 | 44.7% |
i-80 Q3 income, physical p. 7 · Alamos Q3 Financial Results · New Found Q3 MD&A cost of sales.
Comparability Adjustments
New Found's quarter includes its newly commercial Hammerdown mine and Alamos holds several mature mines; neither shares i-80's portfolio-wide royalty and prepaid ounces. i-80's gross margin excludes most exploration and plant development spending below the gross-profit line. Its 15.1% thus overstates cash available to common and is a diagnostic, not a target margin. Q3 income, physical p. 7 · peer source disclosures above.
Implications for Value
The large margin gap makes a near-term P/E or EV/EBITDA peer transfer indefensible. The model instead asks whether grade, recovery and owned processing can turn the current loss and funding demand into cash per diluted share. A mature producer's margin does not value i-80's uncommissioned autoclave. frozen model.
Bear Case
US$2,750/oz gold, 72% of base mine ounces and 125% of growth capital are a linked adverse path: slow access to profitable ore can coexist with plant overruns. The case assumes US$792.1m of new common through 2031 at US$0.55/share to preserve a US$25m operating cash floor; diluted shares then reach 2,328.5m. Another US$173.4m would be needed during 2032–37. That later issuance is uncommitted and cannot be credited to 2031 holders. Cash plus discounted remaining mine cash before later equity is negative US$71.9m at the 2031 exit, leaving zero common value and no positive eligible entry price. Granite FS base gold price · Q3 conditional liquidity, physical p. 42 · scenario output.
Base Case
US$3,500/oz with 2028 output of 125 koz and full plant commissioning produces C$0.12 fair value, C$0.39 2031 exit and US$170.8m estimated new equity. The 2028 volume is below management's target; the lower gold price than nine-month realized is a long-run normalization judgment. Q3 target, physical p. 29 · scenario output.
Bull Case
US$4,500/oz with the base production schedule produces about C$0.98 fair value and C$1.55 exit if equity can be raised at US$1/share. This is still below the current C$1.54 fair-value threshold, even though Granite's official high gold sensitivity is much larger than its base. No upside probability is assigned. Granite FS Table 4 · scenario output.
Outcomes at Close and Entry
The policy uses the lower unrounded ceiling, then floors once to a cent. The linked downside ceiling is zero, so no positive price qualifies. Every displayed action compares the C$1.54 close to that zero ceiling; the name is excluded from qualified ranks because the downside cannot preserve common capital. The high-gold case does not relax the same joint-downside preservation test.
| Assumption | Close | Fair value | Maximum entry | Price rule |
|---|---|---|---|---|
| Base | C$1.54 | C$0.12 | C$0.00 | Wait |
| High gold US$4,500/oz | C$1.54 | C$0.98 | C$0.00 | Wait |
| AISC 15% higher | C$1.54 | C$0.00 | C$0.00 | Wait |
| NAV rate 15% | C$1.54 | C$0.10 | C$0.00 | Wait |
| Joint downside US$2,750/oz and 72% output | C$1.54 | C$0.00 | C$0.00 | Wait |
Market-Implied Case
At the close the base five-year exit needs C$2.425/share to clear the XIC plus 2-point hurdle. Holding production, capex and financing assumptions fixed, US$5,282/oz gold is the implied long-run deck. That exceeds the US$4,500 technical sensitivity; it can also be met by more ounces or valuable optional projects, which the present base excludes. worksheet · Granite FS sensitivity.
Analyst Assessment
The base favors US$3,500 because it allows materially higher gold than the technical reserve base while withholding credit for unproved projects. The credible contrary case is US$4,500 gold with on-time commissioning; it narrows the gap but does not reverse the Wait call. A 15% increase in both mine AISC assumptions eliminates the modeled current common NAV, independently illustrating operating leverage. A future signed construction funding plan and reserve-backed Archimedes feasibility can change both survival and valuation. Granite FS sensitivity · Q3 planned Archimedes study, physical p. 34.
Operating Risks
Grade and recoveries can differ from the Granite 7.87 g/t, 87% study average; the Archimedes PEA uses a different, still preliminary 7.0 g/t and 90% recovery. A 2028 combined output below 90 koz would be worse than the joint model and require a new liquidity test. Granite FS Table 1 · Archimedes PEA metrics, physical p. 2.
Financial and Liquidity Risks
US$287.5m convertible principal matures in April 2031; US$150m gold prepay requires 39,978 oz delivery, and Franco-Nevada's 1.5% royalty doubles to 3% in 2031. These claims affect cash differently and are modeled once each. The US$100m accordion requires lender approval, not automatic liquidity. Q3 debt Note 7, physical p. 12 · Q3 royalty, physical p. 42.
Regulatory and Legal Risks
Lone Tree's environmental and design permits remain a commissioning condition. Any material delay into 2028 would postpone the expected processing advantage while the mine and debt cash obligations persist. Public notice of approval and actual first commercial throughput are separate checkpoints. Q3 plant permits, physical p. 36.
Industry and Competitive Risks
Gold price sets cash margin across both mines. The Granite FS shows more than a fivefold NPV difference between US$2,750 and US$4,500 gold; sustained high spot cannot be safely treated as a guaranteed long-run contract price. Labour competition has already affected Granite movement. Granite FS Table 4 · Q3 Granite operating discussion, physical p. 32.
Thesis-Specific Risks and Reconsideration Triggers
Reconsider after the first signed Lone Tree full-cost-to-complete disclosure, the Archimedes feasibility/reserve publication and a funded five-year bridge that specifies all debt, prepay ounces and dilution. For the 2028 checkpoint, production above 150 koz with plant spend at or below US$430m is evidence for the upside; below 90 koz or spend above US$529.9m supports the downside. Q3 production target, physical p. 29 · model ranges.
Downside at the current price
At US$2,750 gold, 72% output and 25% more growth capital, the 2031 residual common claim is zero before trading costs, with zero dividends and no other distribution proceeds. Cash plus discounted 2032–37 mine cash, excluding uncommitted future equity proceeds, is negative US$71.9m at the modeled 2031 exit. The base sale is C$0.39046/share with zero dividends. At the C$1.54 close, five-year nominal gain/loss is −74.7% base and −100% downside. The net-XIC-plus-2-point base ceiling is C$0.24793; the zero-return downside ceiling is zero and binds. No positive entry is eligible. US$792.1m of assumed common financing through 2031 and a further US$173.4m through 2037 lack a commitment. A funded plant completion plan and reserve-backed Archimedes economics are required to reconsider. Scenarios · policy worksheet · exact output · Q3 conditional liquidity, physical p. 42.
Environmental Factors
Lone Tree's autoclave modernization is partly to meet current environmental standards; water treatment at Granite Creek is a separate growth capital item. September reclamation liabilities totaled US$63.5m, modeled as an eventual cash claim. Permit, water-treatment and closure disclosures can change the capital path. Q3 plant and water discussion, physical p. 36 · Q3 balance, physical p. 6.
Social Factors
Competition for skilled Nevada underground labour caused contractor turnover and slower material movement at Granite Creek. The model's 28% linked production miss is a stress rather than a claim about likely employee performance. Quarterly advancement rates and contractor staffing are the observable test. Q3 Granite discussion, physical p. 32.
Governance Factors
The board approved Lone Tree refurbishment in Q1 2026. Common holders face financing and convertible dilution decisions. At the September share count, options, awards and warrants exist in addition to the 2031 convertible; the 20m award buffer is an estimate, not a fully verified treasury-stock calculation. Future proxy and securities filings should replace it. Q3 Note 9, physical p. 18 · Q3 Lone Tree authorization, physical p. 36.
Financially Material Risks and Opportunities
The economic opportunity is cleaner refractory recovery at the owned hub; the financially material ESG exposure is plant compliance, water management and closure cash. Peralta gives no unsourced ESG premium. If permits or remediation add US$100m of net cash cost, the current-share value falls materially and the downside financing becomes still less plausible. Q3 project discussion, physical p. 36 · reclamation note, physical p. 6.
Annual Results
US$ millions, fiscal years ending December 31; expenses shown as positive costs except net loss. The 2025 10-K gives both years on the same US GAAP basis. 2025 10-K income, physical p. 135.
| Annual US$m | FY2024 | FY2025 |
|---|---|---|
| Revenue | 50.335 | 95.193 |
| Cost of sales plus DDA | 66.058 | 83.687 |
| Gross profit (loss) | -15.723 | 11.506 |
| Pre-development and exploration | 38.430 | 66.071 |
| General and administrative | 20.773 | 29.370 |
| Operating loss | -89.087 | -124.379 |
| Net loss | -121.533 | -198.847 |
Interim Results
US$ millions; both columns are nine months ended September 30, not full years. Revenue and losses reflect the financed pre-commissioning business. Q3 10-Q income, physical p. 7.
| Nine months US$m | 2025 | 2026 |
|---|---|---|
| Revenue | 73.903 | 109.466 |
| Cost of sales plus DDA | 67.081 | 79.815 |
| Gross profit | 6.822 | 29.651 |
| Pre-development and exploration | 38.652 | 88.317 |
| General and administrative | 19.853 | 26.727 |
| Operating loss | -62.293 | -99.295 |
| Net loss | -113.287 | -179.478 |
Trailing Results
Trailing September 2026 equals FY2025 plus nine-month 2026 less nine-month 2025: revenue US$130.756m, operating loss US$161.381m and net loss US$265.038m. These derived values are accounting observations, not the 2027 cash forecast. annual source · interim source.
Material Adjustments
The 2025 US$26.246m PP&E write-down and 2026 financing marks are not extrapolated. The 2027 model instead takes 40 koz mine output at US$3,500/oz, subtracts US$76.4m mine AISC, US$2.1m royalty, US$35m corporate G&A and US$55m exploration, yielding operating cash of about negative US$28.5m before US$350m growth capital and US$10.8m interest. A US$149.6m Q4 2026 burn/plant estimate bridges the September cash snapshot to that forecast. annual write-down · 2026 guidance · forecast output.
Annual Positions
US$ millions at December 31. The sharp rise in shares between 2024 and 2025 came with equity funding; book equity did not rise proportionately because of losses. 2025 10-K balance, physical p. 134.
| Year-end US$m | 2024 | 2025 |
|---|---|---|
| Unrestricted cash | 19.001 | 63.240 |
| Restricted cash | 40.289 | 42.023 |
| Total assets | 655.629 | 703.420 |
| Total debt | 191.397 | 174.717 |
| Total liabilities | 314.965 | 356.647 |
| Common equity | 340.664 | 346.773 |
| Shares outstanding m | 409.787 | 827.230 |
Interim Positions
US$ millions; Q3 2026 financing improved near-term liquidity but increased claims. Unrestricted cash is distinct from US$21.206m restricted reclamation cash. Q3 balance, physical p. 6.
| Position US$m | Dec. 2025 | Sep. 2026 |
|---|---|---|
| Unrestricted cash | 63.240 | 411.355 |
| Restricted cash | 42.023 | 21.206 |
| Total assets | 703.420 | 1155.702 |
| Total debt | 174.717 | 453.040 |
| Reclamation liability | 60.511 | 63.519 |
| Other liabilities | 66.827 | 333.254 |
| Common equity | 346.773 | 224.591 |
| Shares outstanding m | 827.230 | 867.528 |
Capital and Claims Reconciliation
US$453.040m September debt comprises US$275.697m carrying value of the convertible, US$154.775m gold prepay, US$20.078m silver purchase and US$2.490m other. The model uses contractual US$287.5m convertible principal at 2031 and a US$22.568m other claim, but handles prepay through 39,978 future ounces. It handles the US$250m royalty through future revenue leakage, not as a second cash debt. Reclamation US$63.519m is paid at the finite end. Thus financial-statement liabilities, cash obligations and project revenue concessions are not simply added. Q3 Notes 7–8, physical p. 12 · model.
Annual Flows
US$ millions for fiscal years ended December 31. Positive financing in 2025 was principally share funding, while operating cash remained negative. 2025 10-K cash flow, physical p. 136.
| Annual cash US$m | FY2024 | FY2025 |
|---|---|---|
| CFO | -82.501 | -83.591 |
| PP&E investment | -2.018 | -9.623 |
| CFO less PP&E | -84.519 | -93.214 |
| Financing cash | 82.667 | 139.035 |
| End cash plus restricted cash | 59.290 | 105.263 |
Interim Flows
US$ millions for nine months ended September 30. There was no cash common dividend in either period. The 2026 cash build was financed, not internally generated. Q3 cash flow, physical p. 8.
| Nine-month cash US$m | 2025 | 2026 |
|---|---|---|
| CFO | -49.282 | -127.206 |
| PP&E investment | -4.702 | -56.787 |
| CFO less PP&E | -53.984 | -183.993 |
| Financing cash | 139.130 | 511.332 |
| End cash plus restricted cash | 144.555 | 432.561 |
Trailing Flows
Trailing September 2026 CFO is negative US$161.515m and PP&E investment US$61.708m by FY2025 + nine-month 2026 − nine-month 2025. The combined US$223.223m pre-financing drain is a warning against using the US$411m cash balance as free cash. annual cash flow · interim cash flow.
Reconciliation to Common Shareholders
For 2027 base, forecast operating cash is negative US$28.5m; US$350m plant and mine growth capital and US$10.8m note interest make pre-financing common cash negative US$389.3m. Beginning cash covers part; new equity fills the US$152.5m cash-floor gap, with a smaller 2028 issuance. There are no distributions to existing common and no buyback. Later surplus first funds the 2031 maturity, then stays in cash for the finite mine exit. The downside issues far more equity. At a common 50% fraction of positive residual cash accruing to existing holders, no payout occurs before the modeled financing and debt service; therefore a ranking versus another issuer cannot be inferred from this standalone edition. Q3 financing cash · generated forecast.
Primary Sources and Locators
The original issuer 2025 Form 10-K supplies pp. 134–136 statements and property context; Q3 2026 Form 10-Q supplies pp. 6–8 statements, Notes 7–9 and the pp. 26–39 development, funding and outlook discussion. The November 23 Archimedes issuer release establishes the new mining milestone. The Granite Creek feasibility release filed with the SEC supplies Table 1 reserves, Table 4 gold sensitivity and endnote 5 plant-capital exclusion. The 2026 issuer proxy supplies physical p. 11 ownership. The Kaufman 13G/A supersedes one proxy holding. Alamos and New Found support peer margin rows. The TSX close history is an S&P Global Market Intelligence derived series; Bank of Canada FXUSDCAD supplies the dated daily-average rate.
Decision-critical source ledger: 2028 Granite 75 koz and AISC US$1,915/oz → Granite Table 1 → schedule.granite_koz and granite_aisc_usd_oz; Archimedes 101.9 koz and US$1,893/oz → 2025 PEA project metrics → schedule.archimedes_koz and archimedes_aisc_usd_oz; US$430m plant → Q3 p. 39 → plant_total; US$287.5m note and 39,978 prepay ounces → Q3 Note 7 → convertible_principal and prepay_delivery_koz; royalty rates → Q3 financing discussion → royalty_rate; share basis → Q3 cover → shares_m; CAD conversion → Bank of Canada observation. All extensions beyond source figures are analyst estimates and identified in the frozen input file.
Frozen Inputs and Assumptions
Public input file records the November 25 TSX close and FX, September cash/debt and reported shares, the mine depletion schedule, cash tax and discount rate. Gold US$3,500 base/US$2,750 downside/US$4,500 upside, 12% NAV discount, US$25m minimum cash and issuance prices are judgmental. The 2026 Q4 burn, development schedule, 20m awards buffer and possible issue prices have no signed financing plan; they are the principal evidence limit. Treat all NAV and five-year price results as conditional until these settle.
Worksheets and Saved Outputs
Run from this edition root with PYTHONDONTWRITEBYTECODE=1 PYTHONPATH=. /Users/johnperalta/johnperalta4vanilla/.venv/bin/python support/valuation.py under Python 3.12.13. The worksheet imports only the standard library and reads the linked public JSON. It excludes future equity proceeds from mine NAV and discounts post-2031 cash before any later hypothetical equity; the 2031 exit uses shares issued by 2031. It writes the following public outputs deterministically. It forecasts produced and payable ounces, revenue, costs, royalty, tax, cash investment, financing and share dilution, then calculates NAV, a finite 2031 exit, the two five-year ceilings and the rounded maximum. All USD forecast amounts are millions; reported statement tables above use USD millions. The CAD decision uses one frozen FX rate and 5 bp stock fees each way.
| Worksheet | Output |
|---|---|
| Finite mine cash and entry rule | Decision · Forecast and case bridge · Linked cash bridge · Terminal and implied price · Exact unrounded JSON |
Changes from the Preceding Edition
This is a first edition without a predecessor. No prior published IAU valuation or edition exists to revise. The first forecast checkpoint is the FY2026 gold output and Q4 2026 / FY2027 Lone Tree spend disclosure; the larger 2028 volume and 2031 refinancing observations remain pending. The zero entry ceiling means there is no qualifying positive purchase price under the current linked downside.