Gibson Energy Inc. (TSX:GEI) | Contracted infrastructure, volatile cash
Our maximum entry price is C$28.49 per share. At the November 24, 2026 TSX close of C$31.72, the price rule is Wait. The five-year base case to November 24, 2031 returns 8.06% net annually, versus 7.49% for the assumed gross-7.5% XIC benchmark after its trading costs; the required spread is 2.00 percentage points. The strongest contrary case combines a C$40m delayed/underfilled infrastructure contribution, C$20m weaker Marketing, C$20m annual extra growth spending and a 1.5x lower exit multiple: entry falls to C$20.58, still Wait. The base case has support in long-term terminal contracts, but the alternative is credible while the Chauvin expansion is unbuilt. Stock Price History.
- Market close (CAD/share; 2026-11-24)
- 31.72
- Base fair value (CAD/share)
- 29.70
Company details
- Maximum entry price (CAD/share)
- 28.49
- Expected annual return at close
- 8.06%
- Required net annual return (XIC plus 2 pp)
- 9.49%
Cutoff: 2026-11-24 close, CAD common shares; sector: Energy infrastructure; next review: 2026 full-year results and 2027 guidance. XIC closed C$54.34 on the same date; 7.5% is an explicit forward total-return assumption, not a forecast from that one close. GEI price · XIC price · BlackRock XIC fund.
Investment Thesis
Hardisty, Edmonton and U.S. terminals sell connectivity and storage capacity. The Q3 MD&A reports C$177.1m Infrastructure adjusted EBITDA in the quarter, but its Marketing C$34.5m was unusually strong. Contracted cash deserves a different confidence level from opportunistic Marketing. Q3 Infrastructure row, p.6 · Marketing row, p.8
Market Mispricing
The C$31.72 close exceeds base fair value C$29.70 by C$2.02 and entry by C$3.23. The dominant uncertainty is the 11.5x exit multiple on 2031 consolidated EBITDA; a 1.5x reduction cuts fair value to C$25.27.
Recent Developments
Chauvin closed May 1 for C$411.2m; the pipeline expansion was sanctioned in November for H1 2028 completion. The acquisition is already in net debt and forecast EBITDA, while expansion value depends on spending and commissioning. Chauvin closing, p.17 · expansion timing, p.6
Earnings Outlook
Base Infrastructure EBITDA rises from C$710m in 2027 to C$840m in 2031, supported by full-year Chauvin contribution and later commissioned projects. These are analyst forecasts, not company guidance. Marketing is normalized to C$50m annually, well below annualized Q3 C$138m. nine-month Marketing EBITDA, p.8
Valuation Summary
The model exits at C$34.94 per diluted share in 2031 and carries C$11.83 of dated distributions to that date at 9.5%. Financing and 174.7m diluted shares are explicit. The value C$29.70 is the price that meets XIC plus 200 bp, not a twelve-month target.
Recommended Action and Entry Price
Wait at C$31.72. The C$28.49 maximum entry equals the C$29.69 no-stress hurdle price less C$1.20, the rounded effect of C$20m less annual Marketing EBITDA. At entry the base expected annual return is 10.40%; a buyer must still accept the joint downside of C$22.47 at exit, a 21.1% price-only loss before dividends.
Catalysts
First test: 2026 full-year results and 2027 guidance, then the disclosed H1 2028 Chauvin expansion service date. Watch Infrastructure EBITDA, capital spent and debt together. Chauvin contract mix, p.6
Primary Risks to Thesis
Marketing margins may revert, projects can run late, and debt can absorb cash left after dividends. The Q3 MD&A's 82% payout excludes growth investment, so it is not free cash after expansion. TTM DCF row, p.24
Company Overview
Gibson is a Canadian-listed North American liquids infrastructure operator. Core terminals are in Hardisty, Edmonton, Ingleside and Wink, with Moose Jaw processing. business overview, p.2
Products and Services
Infrastructure provides storage, transportation, gathering and marine loading. Marketing purchases and sells crude, natural gas liquids and refined products, and supplies Moose Jaw. Marketing description, p.7
Business Model
Infrastructure contracts are predominantly take-or-pay or fee-for-service: presentation states >95% of 2025 Infrastructure revenue. Chauvin's Teine commitment covers only 50% of its volume, so system-wide contract quality should not be imputed to every new barrel. contract structure, p.14 · Chauvin mix, p.6
Revenue Drivers
Q3 Infrastructure revenue was C$200.2m on 213.1m barrels, while Marketing revenue was C$3.60bn on 84.3m barrels. The latter is mostly product value, so gross revenue is a poor valuation numerator. Infrastructure revenue, p.6 · Marketing revenue, p.8
Cost Structure
Infrastructure Q3 operating expenses and other were C$26.1m; Marketing cost of sales and other C$3.56bn. Corporate adjusted EBITDA was negative C$18.7m Q3, modeled as C$78m annual cost. Infrastructure costs, p.6 · Marketing costs, p.8 · corporate adjustment, p.21
Operating Levers
Incremental contracted throughput improves utilization, while Marketing depends on crack spreads, differentials and volatility. This report separately forecasts both. Marketing drivers, p.8
Distribution
Gibson declared C$0.45 per share for Q4 2026 payable January 15, 2027; the model forecasts four C$0.45 payments in 2027 (January 15, April 15, July 15 and October 15), then modest growth on the same quarterly dates. Only January 2027 is declared; later dates and amounts are estimates. Actual future declarations remain board decisions. declared dividend, p.5
Geographic Exposure
Canadian WCSB terminals and U.S. Gulf Coast assets expose operating and reporting cash to CAD/USD and regional crude flows. Q3 MD&A reports CAD/USD 1.40 for the quarter. Q3 FX row, p.7
Regulatory Environment
Pipelines and marine terminals require permits and environmental compliance; the H1 2028 expansion date can move with approvals and execution. The AIF's operating-risk discussion is treated as a scenario risk rather than a fixed penalty. AIF environmental risk, p.40
Industry Structure
Hardisty aggregates WCSB crude for outbound pipelines; Ingleside provides Gulf Coast export access. Connection density matters because customers value route choice. terminal capacity, p.4
Growth and Cyclicality
Canadian production and egress may lift throughput, but road asphalt and wellsite-fluid demand are seasonal; Marketing is materially more cyclical than contracted storage. seasonality, p.7
Competitors
Enbridge, Pembina and Keyera compete for liquids infrastructure capital and customer contracts, though their gas, utility and NGL mixes differ. Enbridge Q3 release · Pembina Q3 release · Keyera Q3 release.
Market Share
The November issuer deck says one in four WCSB barrels pass through Gibson terminals; this is issuer-estimated throughput position, not a proven national fee share. issuer throughput claim, p.5
Competitive Advantages
Existing tankage and inbound/outbound links at Hardisty reduce the need for a new customer to build an entire route. Long-term contracts support visibility, though the Chauvin expansion still needs capital and volume. connection project, p.6
Pricing and Cost Position
The issuer targets 5–7x build multiples for new projects. The model's 11.5x exit multiple assumes mature contracted assets retain a premium after build; this is an analyst judgment requiring a peer check. build target, p.28
Entry Barriers and Substitutes
Permits, land, existing connections and customer contracts impede new tank construction; competing pipelines, storage and rail remain substitutes. Contract renewals are the point when substitution can become a pricing risk. AIF competition, p.20
Supplier and Customer Dynamics
Producers and pipeline counterparties determine volumes and credit quality. The presentation says >85% of 2025 Infrastructure revenue is under long-term contracts with investment-grade counterparties, yet the acquired Chauvin system's contracted-volume mix is narrower. counterparty mix, p.14
Regulation and Structural Risks
Project permits and environmental duties can postpone cash returns while debt accrues. The joint scenario carries C$20m extra annual growth spend and lower EBITDA through exit, making the cost of a protracted miss visible. capital definition, p.17
Historical Performance
2025 adjusted EBITDA was C$580.7m; September 2026 TTM was C$645.5m, including only five months of Chauvin. Annualized Q3 consolidated EBITDA of C$771.6m is an unreliable starting level because Marketing was strong. 2025 EBITDA, p.3 · TTM EBITDA, p.25
Income Statement Analysis
Nine-month 2026 revenue C$11.28bn and net income C$158.6m compare with C$8.38bn and C$156.3m in 2025. Gross product revenue growth did not translate one-for-one to common earnings. nine-month revenue, p.3 · nine-month net income, p.3
Balance Sheet Analysis
September debt C$2,932.0m, leases C$106.5m and cash C$92.8m imply C$2,945.7m net senior/lease claims to common, C$450m above management's reported net debt because it excludes hybrids. total capitalization debt bridge, p.12 · management definition, p.25
Cash Flow Analysis
TTM operating cash C$523.1m reconciles to DCF C$369.1m after replacement, interest, leases and current tax. Growth capital and acquisition spending are outside DCF; nine-month 2026 growth/acquisition/equity spend was C$439.0m. TTM operating cash, p.24 · growth/acquisition, p.3
Earnings Quality
Nine-month adjusted EBITDA adds back C$8.1m restructuring and C$6.2m Chauvin integration costs. The forecast does not separately capitalize those add-backs; repeated costs would lower DCF. restructuring, p.23 · integration, p.23
Nonrecurring Items
The C$411.2m completed acquisition is in 2026 investing cash and the balance sheet; it is not forecast as another 2027 purchase. Expansion investment remains prospective. acquisition cash flow, p.6
Funding and Cash Conversion
2026 issued 8.16m shares in the bought deal, financing Chauvin; the nine-month cash statement shows C$206.2m net issuance cash. The model holds a 174.7m diluted basis and gives no speculative repurchase credit. share issuance, p.19 · issuance cash, p.6
Key Ratios
Gibson reports 3.9x net debt/TTM EBITDA and 82% TTM dividend payout; these are non-GAAP ratios. The common-share claim ratio including hybrids is 2,945.7/645.5 = 4.56x, before any environmental provision. reported leverage, p.25 · payout, p.24
Forward Outlook
Forecast checkpoints: (1) FY2027 Infrastructure adjusted EBITDA C$710m, downside C$670m, upside C$750m, settled by FY2027 segment reconciliation; (2) Chauvin expansion in service by H1 2028 with effective capacity ~45 mbbl/d versus ~30 acquired, downside ≤30 and upside ≥45, settled by project/volume disclosures; (3) FY2027 DCF C$386m and dividends C$315m with ending net common claims C$3,005m, downside DCF ≤C$340m, upside ≥C$420m, settled by FY2027 DCF, share count and debt notes. Chauvin capacity, p.6
Model Choice
A five-year shareholder-wealth model links operating EBITDA to DCF, dividends, residual financing and an EV/EBITDA exit. It avoids treating reported DCF as fully distributable after growth capital. The full formula and dated payments are in public inputs and worksheet.
| Year | Infrastructure EBITDA | Marketing EBITDA | Corporate costs | Consolidated EBITDA | DCF after interest, tax, maintenance and leases | Dividends | Growth capex | Residual after growth | Ending net claims |
|---|---|---|---|---|---|---|---|---|---|
| 2027 | 710.00 | 50.00 | 78.00 | 682.00 | 386.00 | 314.46 | 130.00 | -58.46 | 3,004.15 |
| 2028 | 742.00 | 50.00 | 78.00 | 714.00 | 408.00 | 321.45 | 140.00 | -53.45 | 3,057.59 |
| 2029 | 776.00 | 50.00 | 78.00 | 748.00 | 433.00 | 328.44 | 140.00 | -35.44 | 3,093.03 |
| 2030 | 808.00 | 50.00 | 78.00 | 780.00 | 457.00 | 335.42 | 120.00 | 1.58 | 3,091.45 |
| 2031 | 840.00 | 50.00 | 78.00 | 812.00 | 484.00 | 342.41 | 100.00 | 41.59 | 3,049.87 |
Growth
2027 Infrastructure C$710m starts above Q3-2026 TTM C$663.0m because Chauvin contributes a full year; by 2031 C$840m requires C$130m–140m early annual growth spend plus utilization. The C$47m first-year step is an analyst estimate; if no increment materializes, fair value falls. TTM Infrastructure EBITDA, p.25
Profitability
Marketing is C$50m every forecast year, versus C$52.4m in nine months of 2026 and C$14.5m in the comparable period. Annualizing Q3 C$34.5m would embed unusual crack spreads. Corporate cost C$78m is slightly above Q3 annualized C$74.8m. nine-month Marketing row, p.8
Reinvestment or Required Capital
Replacement capex rises C$58m to C$66m and is deducted before DCF; growth capex C$130m to C$100m is deducted from retained DCF, with deficits increasing debt. The 2031 terminal year still spends C$100m on growth, so the exit multiple does not assume a free investment holiday. TTM replacement, p.24
Discount Rate
Investor comparison uses XIC 7.5% gross annually, 3 bp each way, plus a 200 bp required stock spread; effective hurdle is 9.49%. Stock trading costs are 5 bp each way. This is a stated opportunity-cost hurdle, not a CAPM estimate. A 1.5x exit multiple reduction is tested separately because exit pricing dominates duration risk.
Terminal Economics
2031 EBITDA C$812m, DCF C$484m, C$342m dividends and C$100m growth spend leave C$42m for net debt reduction; year 2032 is not explicitly capitalized. An 11.5x exit EV implies continued reinvestment and no liquidation of terminals. At 10.0x, fair value is C$25.27.
Bridge to One Common Share
| Common-share exit bridge (2031, C$m unless stated) | Base |
|---|---|
| Consolidated EBITDA | 812.00 |
| Exit EV at 11.5x | 9,338.00 |
| Less ending net debt and leases, including C$450m hybrids | (3,049.87) |
| Less environmental provision | (184.94) |
| Common equity exit value | 6,103.20 |
| Diluted shares (millions) | 174.70 |
| Exit price (CAD/share) | 34.94 |
| Future value of dated distributions (CAD/share) | 11.83 |
| No-stress entry at benchmark plus 2 pp | 29.69 |
| Entry stress deduction | (1.20) |
| Maximum entry | 28.49 |
The opening C$29.70 fair value rounds down to C$29.69 before a C$1.20 quantified Marketing reserve, yielding C$28.49 entry. C$31.72 close to fair is −C$2.02; rounding −C$0.01 and stress −C$1.20 sum to −C$3.23 from close to entry. The lease liability remains in net claims while replacement leasing continues; no double-counted lease asset sale is assumed.
Price-Implied Expectations
Holding C$812m 2031 EBITDA, dated distributions, debt, provision and dilution fixed, the C$31.72 close needs approximately a 12.18x exit multiple to meet the 9.487% hurdle. A stronger 2031 EBITDA path could alternatively support the quote, but it must be funded and contracted. At the cutoff, C$31.72 × 174.7m diluted shares plus C$2,945.7m net claims and C$184.9m provision is about 13.44x the C$645.5m reported TTM EBITDA; the base 2031 11.5x assumes compression from that spot ratio. These are conditional model solves, not street consensus. A 2031 EBITDA below C$812m or exit multiple below 11.5x invalidates the stronger price case.
Independent Cross-Check
Q3 2026 DCF C$119.7m annualized is C$478.6m but includes unusual Marketing; TTM C$369.1m is a safer anchor. Forecast 2027 DCF C$386m is C$17m above TTM after full-year Chauvin and higher interest/tax. Q3 DCF, p.3 · TTM DCF, p.24
Conclusion and Change from Prior Edition
This is GEI's first Markdown edition, with no published predecessor. The main pressure is a multiple and growth path that do not clear the C$31.72 close; a lower quote or stronger contracted EBITDA could change the call.
Peer Selection
Enbridge, Pembina and Keyera are Canadian listed midstream comparators. Mix differs: Enbridge has gas utilities, Pembina has broad pipelines and NGL, Keyera has processing and Marketing. Their published leverage ratios use company definitions, not the common-claim basis used here.
Dated Ratio Table
| Issuer, Q3 2026 disclosure | Net debt / adjusted EBITDA (reported) | Quarterly dividend/share (CAD) | Basis |
|---|---|---|---|
| GEI | 3.9x | 0.45 | TTM, hybrid excluded from net debt |
| Enbridge | 5.1x | 0.97 | TTM issuer measure; utility/gas mix |
| Keyera | 3.6x | 0.5625 | TTM issuer measure; Plains acquisition |
GEI leverage, p.25 · Enbridge Q3 release, debt/EBITDA · Keyera Q3 release, debt/EBITDA.
Comparability Adjustments
Issuer ratios differ in hybrid, lease and acquisition treatment; therefore the table is a funding cross-check, not a mechanically transferable exit multiple. The GEI common EV bridge subtracts hybrids in full.
Implications for Value
GEI reported leverage is below Enbridge but above Keyera; neither ratio proves a 11.5x exit. The GEI spot EV/TTM EBITDA on the same common-claim basis is 13.44x at the cutoff; 11.5x terminal assumes compression. The model tests 10.0x, but no peer reported leverage alone proves a terminal price.
Bear Case
Joint stress delays or underfills Chauvin, normalizes Marketing down C$20m, adds C$20m annual growth spend, and re-rates exit 1.5x lower. Fair value C$21.78; entry C$20.58.
Base Case
Base 2031 EBITDA C$812m, 11.5x exit and C$34.94 exit per share. C$29.70 fair and C$28.49 entry.
Bull Case
A C$40m sustained infrastructure uplift plus 0.5x exit multiple yields C$33.50 fair, C$32.30 entry and C$40.92 exit per share. It requires completed, contracted projects and is not credited to base.
Outcomes at Close and Entry
| Assumption | Close | Fair value | Maximum entry | Price rule |
|---|---|---|---|---|
| Base | 31.72 | 29.70 | 28.49 | Wait |
| Marketing −C$20m | 31.72 | 28.50 | 27.30 | Wait |
| Exit multiple −1.5x | 31.72 | 25.27 | 24.07 | Wait |
| Bull: Infrastructure +C$40m, exit +0.5x | 31.72 | 33.50 | 32.30 | Buy |
| Joint: expansion −C$40m, Marketing −C$20m, exit −1.5x, spend +C$20m | 31.72 | 21.78 | 20.58 | Wait |
At the base C$28.49 entry, the joint case exit C$22.47 plus carried dividends leaves materially less wealth than the hurdle. The chosen entry reserve absorbs only the quantified C$20m Marketing normalization, not every joint loss. Annualized net returns from C$31.72 are 8.06% base, 10.69% bull and 1.56% joint downside. Cash distributions are included in these returns.
Market-Implied Case
At C$31.72, an exit multiple around 12.18x with base cash and debt is needed for the required return. This is above the analyst base of 11.5x; if durable infrastructure growth outruns the C$840m 2031 path, the market can be right.
Analyst Assessment
The company has contracted assets, but Chauvin expansion is not yet producing. Keep Wait pending an H1 2028 service and volume disclosure; revise the model when actual capacity, spending and contracted EBITDA are disclosed.
Operating Risks
Chauvin expansion completion and volume risk: 50% acquired volume was Teine-contracted, so underfill could leave C$40m less infrastructure EBITDA in a sustained stress. contracted volume, p.6
Financial and Liquidity Risks
C$2.95bn net claims including hybrids, a 2027 C$325m maturity and growth funding constrain flexibility. Refinance costs above forecast C$155m 2027 interest reduce DCF dollar for dollar. 2027 maturity, p.12
Regulatory and Legal Risks
Permitting and environmental obligations can consume capital before revenue. C$184.9m recorded provisions are separately deducted at exit; changes to remediation estimates would alter common value. provisions, p.2
Industry and Competitive Risks
Marketing benefit from high crack spreads and crude dislocation could reverse; a persistent C$20m reduction lowers fair by C$1.20. Marketing driver, p.8
Thesis-Specific Risks and Reconsideration Triggers
Reconsider if FY2027 Infrastructure EBITDA misses C$670m, DCF falls below C$340m, net debt including hybrids rises above C$3.3bn, or Chauvin misses H1 2028 service. These are analyst thresholds; the next FY2026 filing establishes a better opening run rate.
Environmental Factors
Storage, pipelines and remediation create environmental liabilities; C$184.9m provisions as at September 2026 are a real common claim. The estimate can change with scope and discount rates. provisions, p.2
Social Factors
Workforce safety and community access affect reliability and permit timing. The November deck cites 0.00 total recordable injury frequency at its snapshot; monitor actual annual injury disclosures instead of capitalizing that claim. safety snapshot, p.2
Governance Factors
M&G held 27.9m shares, 16.18% at March 23, 2026, making voting influence material. No controlling majority was reported. principal holder row, p.18
Financially Material Risks and Opportunities
Safer operations support contract renewals; remediation claims and project delays consume cash. Neither sustainability ratings nor prospective project opportunities receive independent value outside the cash and claim bridge. AIF exposure, p.40
Annual Results
| C$m, fiscal year | 2024 | 2025 |
|---|---|---|
| Revenue | 11,779.9 | 10,689.2 |
| Net income | 152.2 | 197.6 |
| Adjusted EBITDA, non-GAAP | 610.1 | 580.7 |
FY2025 MD&A consolidated rows, p.3.
Interim Results
| C$m, nine months to Sep 30 | 2025 | 2026 |
|---|---|---|
| Revenue | 8,384.3 | 11,277.6 |
| Net income | 156.3 | 158.6 |
| Adjusted EBITDA, non-GAAP | 435.7 | 500.5 |
Trailing Results
TTM adjusted EBITDA C$645.5m at September 2026 equals FY2025 C$580.7m plus nine-month 2026 C$500.5m less nine-month 2025 C$435.7m. TTM row, p.25
Material Adjustments
Adjusted EBITDA excludes C$8.1m restructuring and C$6.2m integration costs in 2026 nine months; cash flow still funds these if recurring. restructuring reconciliation, p.23
Annual Positions
| C$m, Dec 31 | 2024 | 2025 |
|---|---|---|
| Total assets | 4,971.5 | 4,630.2 |
| Total non-current liabilities | 2,650.2 | 3,128.0 |
Interim Positions
| C$m, as at | Dec 2025 | Sep 2026 |
|---|---|---|
| Cash | 55.8 | 92.8 |
| Debt current and long-term | 2,702.3 | 2,932.0 |
| Lease liabilities | 79.1 | 106.5 |
| Total assets | 4,630.2 | 5,644.9 |
Capital and Claims Reconciliation
C$2,932.035m debt + C$106.468m leases − C$92.816m cash = C$2,945.687m; subtract full C$450m hybrids only for management's C$2,495.687m non-GAAP net debt. An additional C$184.936m provision is deducted at exit. capital bridge, p.12 · provision, p.2
Annual Flows
| C$m, FY | 2024 | 2025 |
|---|---|---|
| Operating cash flow | 598.5 | 510.2 |
| Distributable cash flow, non-GAAP | 375.3 | 337.1 |
| Growth capex / equity investment | 162.0 | 110.9 |
Interim Flows
| C$m, nine months to Sep 30 | 2025 | 2026 |
|---|---|---|
| Operating cash flow | 416.8 | 429.8 |
| Distributable cash flow | 257.6 | 289.6 |
| Growth/acquisition/equity investment | 104.4 | 439.0 |
Trailing Flows
September 2026 TTM operating cash C$523.1m plus C$88.2m working capital/tax timing adjustment, less C$52.0m replacement, C$141.4m interest, C$27.1m leases and C$34.1m current tax, plus C$12.3m exceptional add-backs equals C$369.1m DCF. TTM DCF reconciliation, p.24
Reconciliation to Common Shareholders
2027 forecast EBITDA C$682m less C$58m maintenance, C$155m interest, C$55m cash tax and C$28m leases = C$386m DCF. Less C$314.5m dividends and C$130m growth capex gives C$58.5m funding deficit; net claims rise. By 2031 DCF C$484m less C$342.4m dividends and C$100m growth capex leaves C$41.6m to reduce net claims. No buybacks are credited. replacement, p.24
Primary Sources and Locators
Issuer originals retained in this edition: Q3 2026 MD&A, Q3 2026 financial statements, FY2025 MD&A, FY2025 financial statements, 2025 AIF, November 2026 presentation, and 2026 circular. Original publisher index: Gibson financial reports and presentations. Physical PDF pages are specified in inline citations. Issuer documents are publicly posted; local copies are used for factual research and reader verification.
Frozen Inputs and Assumptions
Frozen assumptions use C$m and 174.7m diluted shares. The latest Q3 MD&A segment table, pp.6–8 anchors Infrastructure and Marketing; Q3 financials, p.2 and MD&A debt bridge, p.12 anchor claims; Q3 financials, p.19 anchors dilution; Q3 MD&A DCF, p.24 anchors cash conversion. Unreported EBITDA growth, Marketing normalization, tax, capex, exit multiple and distributions are Peralta estimates. XIC same-day close C$54.34 is a dated observation; 7.5% gross forward return and 9.5% distribution carry are investor conventions. GEI price history · XIC price history.
Worksheets and Saved Outputs
Run PYTHONDONTWRITEBYTECODE=1 PYTHONPATH=. /Users/johnperalta/johnperalta4vanilla/.venv/bin/python support/valuation.py from the edition folder; Python 3.12.13, standard library only. The script reads frozen relative inputs and emits tables and exact JSON.
| Worksheet | Output |
|---|---|
| Valuation | Decision · Forecast and bridge |
Exact output JSON records unrounded calculations and dated payments.
Changes from the Preceding Edition
First edition without a predecessor. Draft cutoff is November 24, 2026; no older GEI Markdown head was returned by the trusted operator.
Stock Price History
Frozen TSX unadjusted closes in CAD; the C$28.49 entry line is shown on the final row. Price history.
| Date | Close (CAD) | Maximum entry (CAD) |
|---|---|---|
| 2026-11-20 | 31.14 | |
| 2026-11-23 | 31.06 | |
| 2026-11-24 | 31.72 | 28.49 |