Ero Copper Corp. (TSX: ERO) — 24 November 2026
Our maximum entry price is C$1.05 per share. At the 24 November 2026 TSX regular close of C$31.05, the decision is Wait. Our finite-mine base fair value is C$8.00 and the base 2031 exit is C$12.21; at the close that implies −17.05% net annual return against 7.49% net for XIC. The strongest contrary case is sustained US$6.25/lb copper, close to Q3 realized copper revenue per pound: with the downside copper deck also raised to US$5.75, its maximum entry is C$10.10, still Wait. The decision would change only around US$8.65/lb sustained under the same joint stress rule. We prefer the US$5.25 base because one high-price quarter does not establish a long-run mine deck; the joint US$4.75 copper, 5% volume and US$30 million annual capex downside sets the C$1.05 entry. Review first when FY2026 copper production, mined-gold output and spending are released. Q3 guidance, exact rows · November 24 ERO close · XIC same-day close.
- Market close (CAD)
- C$31.05
- Base fair value (CAD/share)
- C$8.00
Company details
- Maximum entry price (CAD/share)
- C$1.05
- 2031 base exit (CAD/share)
- C$12.21
- Expected annual return at close
- -17.05%
- Required annual return
- 9.49%
Issuer and basis. Ero Copper Corp.; TSX: ERO; CAD common-share prices; US-dollar mine accounts; materials/mining. Information cutoff: 24 November 2026 after the TSX close. Financial statements: 30 September 2026 interim and 31 December 2025 audited. Publication preparation: 25 November 2026, Vancouver. Five-year holding period ends 24 November 2031. This is an analyst scenario, not issuer guidance. Q3 filing, basis.
Investment Thesis
The operating assets can produce copper cash for a finite period, but future maintenance and growth investment, the Xavantina stream and existing claims consume much of that cash. We value Caraíba, Tucumã and Xavantina explicitly through their assumed end years, give no base value to unfunded Furnas, and subtract debt and leases before dividing by diluted shares. Q3 record cash flow is a poor perpetuity proxy because historic gold concentrate was sold. Q3 operating highlights · Furnas earn-in.
Market Mispricing
The C$31.05 close exceeds the base fair value by C$23.05. To earn the required 9.49% annual net return at the close under our volume, cost, capital, stream and FX assumptions, a flat long-run copper price would need to be about US$7.78/lb, versus our US$5.25 deck. This is a conditional price-implied solution, not a market forecast or consensus. The close and XIC C$54.34 close are aligned to 24 November; XIC's 7.5% gross annual future return is an assumed hurdle, not an observed price return. ERO price history · XIC price history.
Recent Developments
On 2 November Ero reported Q3 2026 copper output of 18,345 tonnes, Q3 cash flow from operations of US$191.2 million, and net debt of US$353.5 million. It retained 67,500–77,500 tonnes of FY2026 copper guidance, raised the unhedged C1 range to US$2.25–2.45/lb and kept capex guidance at US$285–330 million. Q3 highlights · Q3 guidance rows.
Earnings Outlook
Our 2027 attributable copper forecast is 72.2 thousand tonnes after 99.6% ownership, rising to 77.2 thousand tonnes in 2028–31; Xavantina contributes 34.2 thousand mined ounces in 2027 and no repeating stockpile sale. That path is an estimate from the 2026 company guidance and disclosed reserves, not management's 2027 guide. The model's first forecast net cash after capex and tax is shown below. Q3 guidance · Mine reserve table.
Valuation Summary
The 8%-discounted US-dollar 2027–42 finite cash NAV, net debt, other senior claims, fixed C$1.40 per US$ planning FX and 105.903 million diluted shares produce C$8.00 per share. The five-year return constraint without stress is C$7.75. Joint operating downside cuts the five-year hurdle ceiling by C$6.70 to C$1.05. The FX assumption is a fixed analyst sensitivity, not an observed November 24 rate. Net debt reconciliation · diluted shares.
Recommended Action and Entry Price
Wait at C$31.05. Entry is the lower of base fair value, the five-year benchmark-plus-200bp purchase ceiling and the jointly stressed purchase ceiling. All prices use the same diluted share and CAD basis; entry is rounded to cents only for display. A close below entry would need a fresh filing and price review, not an automatic trade.
Catalysts
FY2026 copper tonnes and cash cost, FY2026 mined versus stockpile gold, FY2026 capex and net debt, and the expected 2027 Furnas prefeasibility study can settle the main disputed assumptions. A lower-cost shaft ramp at Caraíba could raise future free cash; an unfunded Furnas plan remains excluded until a financed, attributable mine case exists. Q3 guidance and PFS timing.
Primary Risks to Thesis
The most material risk to our Wait call is that copper remains closer to Q3 realized sales prices for longer than our US$5.25 long-run deck, or that exploration converts resources into a larger funded reserve plan. Conversely, stronger BRL, delayed high-grade access, higher capex and gold-stream deliveries compress cash. Q3 copper cost change · 2025 AIF reserve caution.
Company Overview
Ero is a Brazil-focused copper and gold producer with Caraíba in Bahia, Tucumã in Pará and Xavantina in Mato Grosso. It also has an option to earn an interest in Furnas. Its TSX and NYSE listings both trade as ERO; this decision uses the TSX CAD share. Q3 business overview.
Products and Services
Caraíba and Tucumã sell copper concentrate; Xavantina sells gold doré and recovered historic concentrate. The mines and their unit costs have different economics, so consolidated revenue cannot be modeled as a single undifferentiated margin. Q3 operations.
Business Model
Value comes from mineral extraction, processing and concentrate or gold sales less site operating costs, replacement and development capital, taxes, corporate costs and claims. The model explicitly ends Tucumã in 2034, Xavantina in 2037 and Caraíba in 2042. Tucumã model production after 2026 totals 288.2kt against 356.6kt of August 2021 reported contained-copper reserves less actual 2024 output 5.156kt, 2025 output 28.272kt and estimated 2026 output 35kt; Xavantina future mined output totals 413.5koz against 466.2koz of June 2025 reserves less roughly 52.5koz for second-half 2025 and 2026 mined depletion. These are approximate reserve caps and do not add resources as new reserves. Tucumã reserve row and effective date · 2024 and 2025 production · Xavantina reserve row and effective date. These are analyst limits informed by reserves and old technical plans, not a claim that exploration ceases then. 2025 AIF technical summaries.
Revenue Drivers
Tonnes of payable copper, US$/lb, mined gold ounces, US$/oz and recoveries drive sales. Q3 sales also included historic gold concentrate: 2026 total gold guidance 75–80 thousand ounces includes only 30–35 thousand mined ounces and about 45 thousand recovered from historic concentrate. Our post-2026 stockpile forecast is zero. Exact gold guidance rows.
Cost Structure
FY2026 copper C1 guide is US$2.25–2.45/lb before applying US$30.3 million of realized year-to-date FX hedge gains; mined-gold AISC is US$3,300–3,600/oz. Our site C1 costs escalate 2% annually and all site/corporate capital is cash deducted. C1 is non-IFRS and does not include every tax, capital or financing item. Exact copper cost rows and hedge note · mined-gold cost row.
Operating Levers
Mine grade, throughput, recovery, BRL and development timing determine whether the company can meet output at the modeled unit cost. The Caraíba shaft can improve access but needs capital first. A 5% output miss paired with US$30 million more annual capex is the joint operating stress. Caraíba and Tucumã Q3 commentary.
Distribution
The modeled investor receives no common dividend during the five years; all after-tax residual cash is retained and counted once in the 2031 exit bridge. This is a conservative explicit forecast, not a claim that no payout can occur. The precious-metal stream is a senior operating delivery obligation, not a common distribution. Stream terms.
Geographic Exposure
All three operating mines are in Brazil while reporting and investor values use USD and CAD. A stronger BRL raises dollar costs; a lower CAD raises translated per-share NAV. We hold CAD/USD at 1.40 and show that its observed as-of quote was not independently frozen. Q3 MD&A risk discussion.
Regulatory Environment
Mining, water, tailings, permitting and closure obligations in Brazil govern mine continuity. Furnas remains a preliminary study with meaningful permitting and financing work. We allow mine closure cash and give no base Furnas option value pending a prefeasibility study. AIF environmental and permitting discussion.
Industry Structure
Copper concentrate competes in a global market where Ero takes the metal price and must manage mine grades and treatment terms. Its Brazilian, multi-mine footprint differs from geographically diversified peers. Q3 MD&A product and risk.
Growth and Cyclicality
Attributable production can rise from Tucumã's ramp and Caraíba investment, but copper price and mining grade cycles dominate value. The model's copper price change of US$0.50/lb has a larger effect than gold because the copper operations are the main recurring cash engine. 2026 production guidance.
Competitors
Hudbay and Lundin Mining are useful copper operating references, but their mine mixes, byproduct credits, ownership and spending differ. Hudbay's Q3 2026 filing reports consolidated all-in sustaining cash cost of US$2.25/lb, net of byproduct credits; it is not directly equal to Ero's C1 metric. Hudbay Q3 filing · Lundin Q3 results.
Market Share
Ero's guided 67.5–77.5 thousand copper tonnes in 2026 show company scale, not a verified global market share. We found no comparable 2026 global denominator in the reviewed issuer filings, so assign no market-share premium. Guidance row.
Competitive Advantages
The integrated Caraíba complex and operating Tucumã mill may lower execution risk relative to a greenfield project, but neither eliminates grade, cost or currency risk. We grant value only to an explicit mine plan, not an exploration premium. Caraíba description and reserve table · Tucumã operation.
Pricing and Cost Position
Ero's 2026 copper C1 guide midpoint is US$2.35/lb, which cannot be compared mechanically with Hudbay's all-in sustaining cost or Lundin's cost per pound sold. Our per-mine forecast begins US$2.65/lb at Caraíba and US$2.05/lb at Tucumã in 2027, a weighted level near guide after site mix, then escalates. Ero guide · Hudbay definitions.
Entry Barriers and Substitutes
Permits, reserves, mills and capital make new copper supply slow; they do not give a single miner pricing power. Additional supply or weaker demand would pressure the copper deck. The market-implied US$7.78/lb hurdle shows how exposed the equity is to a persistently high price thesis. Ero AIF mine and risk descriptions.
Supplier and Customer Dynamics
Ero sells concentrate to smelters and relies on mining contractors, energy and equipment. A named customer concentration ratio is not verifiable from the sources reviewed; we therefore do not credit bargaining power. The Q3 MD&A describes receivable credit exposure, including an impaired Paranapanema balance. Q3 credit-risk section.
Regulation and Structural Risks
Furnas cannot be valued as an approved operating mine: its PEA includes inferred resources, funding and permits remain open and Vale retains material economics. A higher permit or capital burden reduces the share of a future project available to Ero holders. Furnas PEA and earn-in · earn-in.
Historical Performance
Revenue rose from US$470.3 million in 2024 to US$785.8 million in 2025; nine-month 2026 revenue was US$895.5 million versus US$465.7 million a year earlier. Q3 2026 revenue US$348.0 million and operating cash US$191.2 million benefited from copper and recovered historic gold concentrate. 2025 audited income · Q3 highlights.
Income Statement Analysis
2025 operating income was US$270.6 million versus US$108.9 million in 2024; 2025 net income was US$266.9 million. The model does not extrapolate those results because FX gains and a 2026 gold-stockpile event are not normal mine earnings. Audited income rows.
Balance Sheet Analysis
September 2026 debt was US$467.5 million and cash US$114.1 million, producing company-defined net debt US$353.5 million. We subtract this plus US$25 million approximate leases/other senior claims from the asset NAV; closure is deducted as future cash, and the stream is deducted through gold receipts. Net-debt row · 2025 lease/debt rows.
Cash Flow Analysis
2025 operating cash was US$395.1 million, but included US$50 million advances from customers; cash additions to mineral assets and exploration were US$282.4 million. Nine-month 2026 operating cash was US$421.9 million and management's capital-expenditure table totals US$236.7 million; the table differs from statement additions because of accruals and classification. Audited cash-flow rows · YTD management capex.
Earnings Quality
The 2025 cash conversion should be adjusted for the US$50 million customer advance, while 2026 Q3 should be adjusted for finite stockpile sales. Our NAV uses future unit volumes and recurring site economics instead of applying a multiple to Q3 cash flow. 2025 cash-flow statement · 2026 gold guidance.
Nonrecurring Items
Management discloses US$30.3 million realized FX hedge gains through Q3, reducing adjusted unit costs if allocated to operations. We use the unhedged guided cost basis and do not repeat the gain. Historic gold concentrate also receives no production after 2026. Hedge footnote.
Funding and Cash Conversion
Operating cash must first fund sustaining and growth capex, tax, financing and closure. The model retains residual after-tax unlevered cash to reduce debt or build cash through 2031; it does not add that retained cash to current fair value and then again to the exit. Negative future cash is a funding need, not a distribution. 2026 capex guide.
Key Ratios
Nine-month 2026 management capex of US$236.7 million was about 56% of US$421.9 million CFO, before financing costs; 2025 additions of US$282.4 million were about 71% of US$395.1 million CFO including the US$50 million advance. These are period-specific cash conversion diagnostics, not peer-normalized valuations. 2026 cash and capex · 2025 cash statement.
Forward Outlook
Three frozen tests: (1) FY2026 copper output, tonnes in concentrate, base 72.5kt and downside below 67.5kt/upside above 77.5kt; FY2026 annual filing settles it. (2) FY2026 mined gold, not historic concentrate, base 32.5koz and downside below 30koz/upside above 35koz, then FY2027 mined base 35koz versus downside below 30koz; the annual operating tables settle it. (3) FY2026 capital expenditure base US$307.5m versus downside above US$330m/upside below US$285m, with year-end net debt versus September's US$353.5m; the FY2026 MD&A and balance sheet settle it. Exact guidance rows.
Model Choice
Finite-life discounted cash from producing mines is more suitable than a perpetuity because deposits deplete. Each year uses attributable volumes, metal prices, C1 operating cost, capital, closure, corporate spending and approximate cash taxes. The net amount is discounted at 8% to 24 November 2026 using whole-year 2027–42 steps, a simplifying convention. The forecast preserves current reserve depletion after estimated 2026 extraction and allows no reserve-free perpetual tail. Furnas receives zero base value until its 60% earn-in, Vale carry, PFS, permits and financing can be underwritten. AIF reserve and mine plan · Furnas PEA.
Growth
Attributable copper rises from 72.2kt in 2027 to 77.2kt in 2028–31, then declines as mines exhaust. The assumption is an analyst path around 2026 guidance, not a company long-range forecast. We assume Xavantina 35koz mined in 2027 and 39koz through 2036, followed by 27.5koz in 2037, no recurring historic-stockpile recovery.
| Year | Attributable copper kt | Mined gold koz | Revenue less C1 US$m | Capex US$m | Closure US$m | Corporate US$m | Cash tax US$m | Free cash US$m |
|---|---|---|---|---|---|---|---|---|
| 2027 | 72.2 | 34.2 | 504.8 | 267.8 | 0.0 | 35.0 | 60.6 | 141.4 |
| 2028 | 77.2 | 38.1 | 532.4 | 233.2 | 0.0 | 35.0 | 79.3 | 184.9 |
| 2029 | 77.2 | 38.1 | 522.8 | 233.2 | 0.0 | 35.0 | 76.4 | 178.3 |
| 2030 | 77.2 | 38.1 | 525.4 | 233.2 | 0.0 | 35.0 | 77.2 | 180.1 |
| 2031 | 77.2 | 38.1 | 515.5 | 233.2 | 0.0 | 35.0 | 74.2 | 173.1 |
| 2032 | 71.7 | 38.1 | 473.6 | 193.3 | 0.0 | 35.0 | 73.6 | 171.7 |
| 2033 | 71.7 | 38.1 | 463.9 | 193.3 | 0.0 | 35.0 | 70.7 | 164.9 |
| 2034 | 69.9 | 38.1 | 442.6 | 193.3 | 23.9 | 35.0 | 57.1 | 133.2 |
| 2035 | 36.9 | 38.1 | 225.0 | 143.5 | 0.0 | 35.0 | 14.0 | 32.6 |
| 2036 | 36.9 | 38.1 | 218.4 | 143.5 | 0.0 | 35.0 | 12.0 | 27.9 |
| 2037 | 29.9 | 26.8 | 166.6 | 118.7 | 19.5 | 35.0 | 0.0 | -6.6 |
| 2038 | 29.9 | 0.0 | 128.8 | 79.7 | 0.0 | 35.0 | 4.2 | 9.9 |
| 2039 | 29.9 | 0.0 | 124.4 | 79.7 | 0.0 | 35.0 | 2.9 | 6.8 |
| 2040 | 29.9 | 0.0 | 120.0 | 79.7 | 0.0 | 35.0 | 1.6 | 3.7 |
| 2041 | 29.9 | 0.0 | 115.5 | 79.7 | 0.0 | 35.0 | 0.2 | 0.6 |
| 2042 | 29.9 | 0.0 | 110.9 | 79.7 | 24.9 | 35.0 | 0.0 | -28.7 |
Profitability
Base copper US$5.25/lb and gold US$3,600/oz are analyst long-run prices, held nominal. Caraíba 2027 C1 begins US$2.65/lb and Tucumã US$2.05/lb, each growing 2%; gold mined C1 begins US$1,750/oz and grows 2%. Stream deliveries reduce Xavantina revenue by 60% of spot on 25% of ounces through 2029 and 10% afterward, an approximation of the cumulative stream step. Gold operating margin remains modest after spending. 2026 cost guide · stream terms.
Reinvestment or Required Capital
The 2027 plan deducts US$170m Caraíba, US$45m Tucumã, US$55m Xavantina and US$35m corporate cash. Caraíba falls to US$140m annually in 2028–31 and US$100m in 2032–36, then US$80m through 2042; Tucumã remains US$50m through 2034 and Xavantina US$45m through 2036, with US$40m in 2037. These are analyst estimates anchored to 2026 site guidance; lower capital without lower production would raise value, but shaft and grade access are uncertain. 2026 site capex guide.
Discount Rate
Eight percent nominal USD is a judgemental mine-asset discount rate, not a measured beta/WACC. It sits beside an explicit 10% sensitivity in the public output; moving to 10% cuts fair value while leaving the Wait decision. The CAD conversion is fixed at 1.40, so a 10% weaker CAD mechanically raises CAD fair and entry about 10% before any operating BRL effects. Neither discount nor FX can explain the entire gap to C$31.05.
| Single change; others at base | Fair CAD/share | 2031 exit | No-stress entry | At C$31.05 |
|---|---|---|---|---|
| Copper -US$0.50/lb | 2.38 | 4.61 | 2.38 | Wait |
| Copper +US$0.50/lb | 13.43 | 19.52 | 12.40 | Wait |
| Discount 10% | 7.05 | 12.00 | 7.05 | Wait |
| Gold US$3,300/oz | 7.32 | 11.29 | 7.17 | Wait |
Terminal Economics
There is no perpetuity. The last explicit 2031 year is followed by 2032 cash with lower modeled mine output; Tucumã ends 2034, Xavantina 2037, Caraíba 2042, with US$24m, US$20m and US$25m closure cash respectively. The 2031 exit values only remaining 2032–42 finite cash plus retained 2027–31 cash. Carrying 2031 investment forward instead of allowing the planned decline would reduce fair and exit; the downloadable year schedule permits that stress. AIF mine capital/closure discussion · Tucumã closure.
The saved durability test carries Caraíba's US$140m annual investment through its modeled closure instead of stepping down, reducing fair value to C$5.35 and the 2031 exit to C$8.32. A separate ownership-allocation test assumes only half of 2027–31 retained cash ultimately benefits today's common shareholders; its 2031 exit is C$6.54 and the annual return at the dated close is −26.78%. These tests expose how much the exit depends on capital discipline and cash retention; neither produces a buy at C$31.05. Reproducible durability output.
| Durability test | Base | Stress | Interpretation |
|---|---|---|---|
| 2031 / 2032 capex, US$m | 233.2 / 193.3 | 233.2 / 233.2 | Keep Caraíba 2031 capex level after 2031 until closure |
| Finite fair, CAD/share | 8.00 | 5.35 | No terminal perpetuity |
| Five-year exit, CAD/share | 12.21 | 8.32 | Investment step-down matters |
| Residual cash benefiting holders | 100% | 50% | Other half receives no value |
| Five-year exit with residual test, CAD/share | 12.21 | 6.54 | At the dated close |
| Annual return with residual test | -17.05% | -26.78% | Net of 5bp each side |
Bridge to One Common Share
The public worksheet's bridge below is generated from frozen inputs. It subtracts US$353.461m September net debt and US$25m estimated leases/other senior claims. Attributable mine cash is already reduced for ownership, and the stream is in gold receipts; neither is subtracted again. Diluted shares are 105.903492m, the reported nine-month weighted average, used as a proxy for economically diluted future shares. It may understate later dilution. Net debt · diluted shares.
| Bridge, US$m unless stated | Base |
|---|---|
| 2027–2042 finite cash NAV at 8% | 983.5 |
| Furnas option value (unfunded PEA excluded) | 0.0 |
| Less September 2026 net debt | (353.5) |
| Less other senior claims / leases | (25.0) |
| CAD per USD | 1.40 |
| Diluted shares, millions | 105.903 |
| Base fair, CAD/share | 8.00 |
| 2031 residual NAV | 444.2 |
| 2027–2031 retained cash | 857.7 |
| Less initial claims at 2031 | (378.5) |
| 2031 exit, CAD/share | 12.21 |
Price-Implied Expectations
The market-close acceptance test holds all modeled operating assumptions fixed except long-run copper and solves for a 2031 exit sufficient to produce XIC's assumed 7.5% gross annual return, 3bp XIC round-trip sides, 5bp stock sides and 200bp required net spread. The no-stress hurdle solution is approximately US$7.78/lb copper; preserving the joint stress rule raises the buy-threshold deck to US$8.65/lb. The same exercise for base fair versus close is weaker but still implies an elevated deck. These are conditional requirements, not evidence that copper will trade there. Q3 reported copper sales.
Independent Cross-Check
Q3 2026 realized copper sales of US$252.9m on 40.1m lb imply US$6.31/lb gross realized copper revenue, while the 2025 AIF reserve parameters use US$3.85/lb for Caraíba. Neither spot-like Q3 revenue nor reserve price is a sufficient shareholder valuation: the former is a short period with capex and the latter is a reserve test. Our US$5.25 long-run deck sits between them and the US$7.78 required at the close. Q3 sales rows · reserve price basis.
Conclusion and Change from Prior Edition
This is ERO's first Markdown edition; there is no prior published Markdown entry to bridge. Base fair is C$23.05 below the close and the maximum entry is C$30.00 below it. The discrepancy reflects the finite mine plan, capital, senior claims and a five-year required return, not a correction to a predecessor. Full arithmetic appears in the linked output.
Peer Selection
Hudbay and Lundin are listed copper operators with contemporaneous Q3 2026 disclosures, included to test Ero's operating-cost claim. Their mine, byproduct and project funding mix differ materially; no stock multiple is asserted without aligned, dated share prices, enterprise values and trailing denominators. Hudbay Q3 filing · Lundin Q3 results.
Dated Ratio Table
| Issuer and disclosure | 2026 Q3 ratio / unit | Numerator and denominator | Limitation |
|---|---|---|---|
| Ero, 2 Nov 2026 | 2.51 | consolidated C1 cash cost / lb produced | excludes capex; site mix; gold separate |
| Hudbay, Nov 2026 | 2.25 | consolidated all-in sustaining cost / lb copper, net byproducts | includes sustaining and byproduct credits; not Ero C1 |
| Lundin, 2 Nov 2026 | 2.27 | consolidated cash cost / lb copper sold | sold vs produced and geography differ |
Ero Q3 C1 row · Hudbay Q3 definition and result · Lundin Q3 result.
Comparability Adjustments
A direct Ero/Hudbay/Lundin cost ranking would be false because Ero quotes C1 per produced pound, Hudbay all-in sustaining net byproducts, and Lundin cash cost per sold pound. We use this table only to bound site economics and insist on Ero's own capex schedule. A dated EV/EBITDA peer table could improve cross-checking after aligned quotes and trailing adjusted cash are frozen; it is absent rather than invented.
Implications for Value
Peers show that cost per pound alone does not pay for Ero's capital program or overcome a low mine-life NAV. The modeled fair value should be judged against attributable cash, claims and reserve conversion, not a mechanically applied peer multiple.
Bear Case
Copper US$4.75/lb, 5% less copper output and US$30m more annual capex in 2027–31 represent linked grade, BRL and development misses. Historic stockpile gold does not recur in any case. This combination is credible because a delayed high-grade ramp can raise cash spent per pound while a lower metal price erodes revenue. Q3 cost and grade discussion.
Base Case
US$5.25/lb copper, US$3,600/oz gold, the explicit 2027–42 finite mine schedule, 8% USD discount and C$1.40/USD produce C$8.00 fair and C$12.21 exit. Our investment decision does not depend on a Furnas PEA uplift. The Furnas execution case would need an attributable PFS, permits and a financing plan; the break case leaves zero project benefit after sunk studies.
Bull Case
US$5.75/lb copper with 3% more output and unchanged capital illustrates upside from grade and a sustained metal price. It still has finite mine lives; new resources are not made reserves automatically. The generated table shows the resulting fair, exit and return.
| Case | Copper US$/lb | Volume | Extra capex US$m/y 2027–31 | Fair CAD/share | 2031 exit CAD/share | Hurdle CAD/share | Return at close |
|---|---|---|---|---|---|---|---|
| Joint downside | 4.75 | 95% | 30 | 0.09 | 1.65 | 1.05 | -44.41% |
| Base | 5.25 | 100% | 0 | 8.00 | 12.21 | 7.75 | -17.05% |
| Upside | 5.75 | 103% | 0 | 14.43 | 20.86 | 13.24 | -7.67% |
Outcomes at Close and Entry
The jointly stressed fair value is C$0.09, a 91% mark-to-fair loss from the C$1.05 entry. This is the bear-case loss at entry if the market immediately prices the stressed NAV, even though the five-year stressed exit ceiling is higher. The close-to-fair bridge is +C$8.00 fair minus C$31.05 close = −C$23.05. Fair-to-entry is C$1.05 minus C$8.00 = −C$6.95; close-to-entry is −C$30.00. No-stress entry C$7.75 less C$6.70 joint stress = C$1.05. Base annual return at the close is −17.05%; at the entry it is higher and is labelled separately in the worksheet. The benchmark net annual return is 7.487% and the required stock net annual return 9.487%.
| Assumption | Close | Fair value | Maximum entry | Price rule |
|---|---|---|---|---|
| Base | 31.05 | 8.00 | 1.05 | Wait |
| Sustained copper US$6.25/lb, stressed US$5.75 | 31.05 | 18.81 | 10.10 | Wait |
| No joint stress | 31.05 | 8.00 | 7.75 | Wait |
| Joint copper, volume and capex downside | 31.05 | 0.09 | 1.05 | Wait |
| Metric | CAD/share or rate |
|---|---|
| Dated close | 31.05 |
| Base fair | 8.00 |
| Close to fair | -23.05 |
| No-stress entry | 7.75 |
| Joint stress reduction | -6.70 |
| Maximum entry | 1.05 |
| Fair to entry | -6.95 |
| Close to entry | -30.00 |
| Net XIC annual | 7.487% |
| Required stock annual | 9.487% |
| Base stock annual at close | -17.047% |
| Base stock annual at entry | 63.388% |
Market-Implied Case
US$7.78/lb constant copper is the model's approximate no-stress price-implied requirement; US$8.65/lb is required for the stressed entry ceiling to reach the current close. This is an extreme conditional deck, not our forecast. US$7.78/lb is the requirement to earn the benchmark plus 200bp at C$31.05 with all other inputs fixed. If output rises, spending falls or CAD weakens, the required copper price declines; if mine life shortens it rises. An independently funded reserve extension or sustained realized pricing above this threshold would invalidate the current Wait thesis.
Analyst Assessment
The strongest case against us is lasting high copper prices and reserve conversion; the strongest case against a buyer is the end of stockpile gold coupled with cost and capital pressure. The known Q3 unit-cost revision and mine investment schedule favour the cautious base over a repeat of Q3's unusually high cash, while our exact price-implied deck makes the market disagreement testable. Q3 cost revision and capex.
Operating Risks
Lower grade or recoveries reduce production while fixed mine and shaft spending persists. A 5% volume miss is embedded in the joint case; FY2026 output below 67.5kt is the first concrete trigger. Q3 guidance.
Financial and Liquidity Risks
US$353.5m net debt and the gold stream sit ahead of common shareholders. If annual capex exceeds US$330m or residual cash turns negative, debt or new equity must fund the gap; our exit would then fall, with dilution not yet explicitly forecast. Net debt · capex.
Regulatory and Legal Risks
Brazilian mine permits, environmental liabilities, water and tailings controls can delay or raise costs. Furnas is particularly exposed because its preliminary assessment is not a construction permit or financing package. Closure cash is explicit but could be understated. AIF Furnas discussion · AIF tailings discussion.
Industry and Competitive Risks
Global copper pricing and Brazilian costs are outside Ero's control. A US$0.50/lb copper move alone changes the modeled fair materially; a persistent US$7.78/lb long-run deck would support much more of the current price. AIF commodity-price risk.
Thesis-Specific Risks and Reconsideration Triggers
Reconsider after FY2026 results if copper exceeds 77.5kt with C1 below US$2.25/lb and capex below US$285m, or if a 2027 PFS supplies an attributable Furnas financing path. Reconsider the base downward if mined gold falls below 30koz, capex exceeds US$330m, or net debt rises materially from September 2026. These are tests of forecast definitions, not automatic trade signals. Q3 guided ranges.
Environmental Factors
Tailings, water and closure are financially material; the Tucumã technical discussion estimates about US$24m closure and describes contact-water treatment. We deduct closure cash but a revised plan could increase it. AIF Tucumã closure section.
Social Factors
Community land access and workforce safety affect permits and production continuity. Furnas has not been treated as a producing asset; stakeholder and permitting progress are a checkpoint rather than assumed value. AIF Furnas project.
Governance Factors
The 2026 circular describes board and executive share ownership rules and the board's oversight. We rely on filed share and compensation data, not an unverified governance score. The board nominees together held or controlled about 2.24% at the circular date. 2026 circular, nominees and denominator.
Financially Material Risks and Opportunities
Better environmental and social execution can protect mine access; failure can add capital or shorten a mine life. That uncertainty is more important to this price than an ESG label. No separate speculative ESG premium appears in the model.
Annual Results
| US$ millions except EPS | FY2024 | FY2025 |
|---|---|---|
| Revenue | 470.3 | 785.8 |
| Gross profit | 180.6 | 344.6 |
| Operating income | 108.9 | 270.6 |
| Net income attributable to owners | −68.5 | 263.7 |
| Diluted EPS (US$) | −0.66 | 2.53 |
Audited 2025 and 2024 income rows, physical PDF page 8.
Interim Results
| US$ millions except EPS | Q3 2025 | Q3 2026 | Nine months 2025 | Nine months 2026 |
|---|---|---|---|---|
| Revenue | 177.1 | 348.0 | 465.7 | 895.5 |
| Gross profit | 57.4 | 169.6 | 180.2 | 396.9 |
| Operating cash | 110.3 | 191.2 | 266.0 | 421.9 |
| Owner diluted EPS (US$) | 0.35 | 1.10 | 1.80 | 2.97 |
Q3 release and nine-month table, PDF page 5 · original interim statements.
Trailing Results
Trailing twelve-month revenue through September 2026 is FY2025 US$785.844m plus nine-month 2026 US$895.517m minus nine-month 2025 US$465.690m = US$1,215.671m. It is unusually exposed to historic stockpile sales and copper price, so it is not capitalized at a perpetual multiple. FY2025 audited revenue · interim comparative.
Material Adjustments
The valuation starts from mine volumes and site C1, not IFRS net income. The reported 2025 US$95.743m FX gain, 2025 US$50m customer advance and 2026 historic concentrate sale are excluded from recurring free cash. 2025 income and cash statements · 2025 advance · 2026 historic gold.
Annual Positions
| US$ millions | 31 Dec 2024 | 31 Dec 2025 |
|---|---|---|
| Cash | 50.4 | 105.4 |
| Total assets | 1,458.0 | 1,923.9 |
| Loans and borrowings, current + noncurrent | 602.2 | 607.1 |
| Lease liabilities, current + noncurrent | 17.9 | 25.2 |
| Equity attributable to owners | 587.1 | 935.5 |
Audited balance-sheet exact rows, PDF page 7.
Interim Positions
| US$ millions | 31 Dec 2025 | 30 Sep 2026 |
|---|---|---|
| Cash and equivalents | 105.4 | 114.1 |
| Loans and borrowings | 607.1 | 467.5 |
| Company-defined net debt | 501.7 | 353.5 |
Q3 net-debt reconciliation, physical PDF page 39 · interim balance sheet.
Capital and Claims Reconciliation
US$467.514m borrowings less US$114.053m cash = US$353.461m net debt. We add US$25m approximate lease/other senior claims; accrued closure is represented through forecast cash, not subtracted twice. The Xavantina stream reduces forecast proceeds. The difference between current total common shares and weighted diluted shares is a dilution limitation to recheck on the next filing. Exact debt/cash rows · stream.
Annual Flows
| US$ millions | FY2024 | FY2025 |
|---|---|---|
| Cash from operations | 145.4 | 395.1 |
| Mineral-property additions | −329.0 | −262.8 |
| Exploration additions | −8.6 | −19.7 |
| Interest paid on borrowings | −32.2 | −42.7 |
| Lease payments | −14.2 | −18.0 |
Audited cash flow exact rows, PDF page 9.
Interim Flows
Nine-month 2026 CFO was US$421.9m; management's consolidated capital table reports US$236.651m, including US$132.619m sustaining, US$61.653m growth, US$34.403m exploration and US$7.976m project deposits. These categories are the spending bridge for the model, though cash-statement additions differ with accruals and classification.
| US$ millions | Nine months 2025 | Nine months 2026 |
|---|---|---|
| Operating cash | 266.0 | 421.9 |
| Consolidated management capex | 236.7 |
Q3 cash-flow summary · capital table rows.
Trailing Flows
Comparable trailing CFO is FY2025 US$395.136m + nine-month 2026 US$421.9m − nine-month 2025 US$266.0m ≈ US$551.0m. It contains finite concentrate sales and volatile working capital, and therefore is only a diagnostic. Annual CFO · interim CFO.
Reconciliation to Common Shareholders
FY2025 CFO US$395.136m less mineral/exploration additions US$282.439m, lease payments US$17.973m and debt interest US$42.736m left about US$51.99m before other financing, debt repayment and changes in cash; the US$50m customer advance makes this an optimistic recurring proxy. The model projects operating cash after required investment and cash tax, applies it to the US$353.461m initial net debt or retained cash, then counts the residual once in the 2031 exit. No common dividends or buybacks are assumed; actual distributions must be added as dated payments and removed from retained cash in a successor model. A funding deficit would increase claims rather than magically become a shareholder distribution. FY2025 cash-flow exact rows.
Primary Sources and Locators
The issuer's 2 November 2026 Q3 MD&A is preserved as a public PDF; the critical guidance is physical PDF page 14, net debt page 39, consolidated capital table page 27 and financial highlight table page 5. 2025 audited statements are preserved as a public PDF with balance page 7, income page 8 and cash flow page 9. 2025 AIF is preserved as a public PDF with reserve and Furnas details; its available mirror was checked against the SEC text. 2026 interim statements and 2026 circular are preserved as original SEC HTML. The peer and price sources are linked at each claim. The issuer PDF pages are physical, not the printed page labels, which begin after cover material.
Frozen Inputs and Assumptions
Frozen model inputs distinguish reported net debt/shares/close from Peralta's mine years, copper and gold deck, cost escalation, capex, 8% discount, 30% approximate cash tax and 1.40 CAD/USD fixed conversion. The BlackRock XIC 24 November holdings file shows ERO at C$31.05; independently observed TSX ERO close is C$31.05 and XIC close is C$54.34 on the same day. No live price later than the cutoff enters the model. The expected XIC 7.5% gross future return, 3bp each side, ERO 5bp each side, 9.5% distribution carry and 200bp required spread are investor rules, not historical observations. There are no forecast common payments, so carried distribution FV is zero. ERO close · XIC close · BlackRock XIC fund.
Worksheets and Saved Outputs
Run in this edition root with Python 3.12.13 and standard library only: PYTHONDONTWRITEBYTECODE=1 PYTHONPATH=. python support/valuation.py. The script reads the frozen JSON and rewrites seven Markdown outputs plus exact JSON. The public code and outputs allow a reader to change a disputed copper, capex or FX assumption and reproduce the entry without credentials. Output tables below are pasted from saved files at the stated precision.
| Worksheet | Output |
|---|---|
| Finite mine NAV and entry | Opening decision · Full annual forecast · Common-share bridge · Scenarios · Single-factor sensitivities · Decision arithmetic · Durability tests |
Changes from the Preceding Edition
This is the first edition without a predecessor. First Markdown publication for ERO at the 24 November 2026 cutoff. There is no predecessor model or decision to restate. The next edition must preserve this frozen deck and update it with FY2026 production, mined/stockpile split, capital, debt and Furnas PFS evidence.
| Date | Close (CAD) | Maximum entry (CAD) |
|---|---|---|
| 2026-11-18 | 34.24 | |
| 2026-11-19 | 33.54 | |
| 2026-11-20 | 30.76 | |
| 2026-11-23 | 33.56 | |
| 2026-11-24 | 31.05 | 1.05 |
Source: TSX ERO unadjusted daily close, CAD, 18–24 November 2026. The chart is a dated observation, not a model input other than 24 November.