Energy Fuels (TSX: EFR) — 24 November 2026 equity research
Our maximum entry price is C$1.07 per share. At the 24 November 2026 TSX regular close of C$7.35, our decision is Wait. The base fair value is C$2.85, but a funded VAC close with slower rare-earth sales and higher Phase 2 cost takes the stress entry to C$1.07 and still says Wait; a more severe failure to earn REE profit by 2031 gives C$0.06. The base is preferred only if VAC closes on current terms, development remains fundable, and downstream cash profit builds toward the 2031 forecast. This is a five-year decision to 24 November 2031, on one diluted TSX common share in Canadian dollars.
- Market close
- 7.35
- Base fair value
- 2.85
Company details
- Maximum entry price
- 1.07
The C$7.35 close exceeds base fair value by C$4.50, and fair value exceeds our maximum entry by C$1.79. Our base five-year after-cost annual return from the close is -7.32%, versus XIC 7.49% after 3 bp per side: a -14.81 percentage-point spread, below the required +2.00 points. The largest unresolved risk is the ability to fund the VAC cash payment, White Mesa circuits and the 2031 convertible refinancing without issuing more stock than modeled. Dated TSX close · Bank of Canada USD/CAD 1.4296.
Closing prices
| Date | Close (CAD) | Entry (CAD) |
|---|---|---|
| 2026-11-04 | 10.03 | |
| 2026-11-18 | 8.08 | |
| 2026-11-20 | 7.07 | |
| 2026-11-23 | 7.48 | |
| 2026-11-24 | 7.35 | 1.07 |
Source: TSX EFR regular close history, S&P Global Market Intelligence via StockAnalysis; no intraday price enters this report.
Investment Thesis
EFR combines near-term contracted uranium with a proposed mine-to-magnet chain. The investment requires real cash profit after the acquisition and construction cycle. The 2026 nine-month operating cash outflow was US$38.46m, making funding central to the thesis source row. A severe no-REE-profit case gives C$0.06 fair value, a 94.5% loss from the C$1.07 maximum entry before trading costs; the entry does not insure this tail outcome.
Market Mispricing
At C$7.35 the close is C$4.50 above our C$2.85 fair value and C$6.28 above the C$1.07 entry. The model solves the gap through a large 2031 REE and VAC cash-profit ramp and an explicit equity raise; it does not credit conditional government lending as cash.
Recent Developments
The 4 November Q3 filing includes ASM and a proposed VAC acquisition requiring approximately US$718m cash plus 65.85m shares source row. On 23 November the company forecast a roughly one-million-pound mill campaign in December 2026–Q1 2027, but that is production, not a simultaneous extra sale. Issuer uranium update.
Earnings Outlook
Three frozen tests are: 2027 uranium sales 1.11m lb at US$85/lb and US$48/lb cash cost; 2028 qualified heavy REE oxide sales of 100 tonnes and US$10m REE EBITDA after US$274m cumulative Phase 1/2 spend; 2029 Phase 2 output of 1,000 tonnes, US$240m Phase 2 spend, and diluted shares from the funding schedule. These are Peralta forecasts, not issuer guidance.
Valuation Summary
The finite-horizon 2031 bridge produces C$5.03 exit value per diluted share, C$2.85 discounted fair value at 12%, and C$3.19 return-hurdle ceiling before the C$2.13 downside cut. See the reproducible tables in Valuation and Sources and Model.
Recommended Action and Entry Price
Wait at C$7.35. The maximum entry is C$1.07, rounded to cents after the joint downside. A buyer at this price would have more room for a delayed magnet ramp and construction overruns. No dividend is forecast or included.
Catalysts
The next test is the 2027 delivered pounds and gross cash margin. Later gates are commercial heavy REE sales and a financed Phase 2 commissioning. A VAC closing disclosure must specify cash, preferred shares, assumed debt and final issued common shares.
Primary Risks to Thesis
VAC could fail to close or require revised financing; the deal may close yet disappoint on EBITDA. The 2031 note needs repayment or refinancing before this horizon ends. The stress cuts both REE and VAC cash earnings and raises Phase 2 spend.
Company Overview
Energy Fuels is a U.S.-based uranium producer and developer of rare-earth, heavy-mineral-sands, metals and magnet assets. It reports in US dollars; EFR is the TSX CAD common-share listing. ASM entered the consolidation in August 2026, while VAC remained a proposed transaction at this cutoff source row.
Products and Services
Uranium U3O8 is sold to utilities under spot and long-term contracts. The company also seeks to turn monazite into separated rare-earth oxides at White Mesa, metals/alloys through ASM, and magnets through the proposed VAC deal. The latter chain is mostly development cash at the cutoff.
Business Model
Uranium sales convert stored and newly milled pounds into invoices; inventory and delivery dates differ. REE assets require feedstock, licensed separation, qualified alloy and magnet customers, and construction capital. VAC would add an operating magnet business, but also its own debt.
Revenue Drivers
Nine-month 2026 consolidated revenue was US$90.126m, versus US$38.820m in the comparable period source row. Q3 uranium sales of 320,000 lb at US$88.90/lb accounted for US$28.4m of US$29.2m revenue issuer Q3 release. Nine-month REE metals/alloys revenue was only US$0.44m, with US$0.41m direct cost; HMS revenue was zero source row. These are not evidence of the forecast 2031 REE profit.
Cost Structure
Costs applicable to nine-month revenue were US$43.469m, but exploration/development, standby, selling/general and transaction costs made operating loss US$72.816m source row. Forecast segment EBITDA is therefore not equivalent to consolidated free cash.
Operating Levers
The model separates delivered uranium pounds, realized price and cash cost. A US$1/lb margin change on 1.70m 2031 lb alters terminal uranium EBITDA by US$1.70m before the valuation multiple. For REE, qualified commercial sales and achieved margins determine whether 2031 EBITDA can reach US$150m.
Distribution
Utility sales depend on contract deliveries, not physical production in the same quarter. Downstream VAC, if acquired, sells magnets and materials to industrial customers. The US$2bn pipeline cited by management is opportunity, not a booked-revenue input VAC release.
Geographic Exposure
Uranium and separation are in the U.S.; potential feedstock comes from Madagascar, Australia and Brazil; ASM manufacturing is in Korea and VAC would extend to Europe and the U.S. Cross-border permits, currency and logistics therefore sit inside the 12% discount rate.
Regulatory Environment
White Mesa operations, mine and mineral-sands development, REE circuits, acquisition approvals and foreign investment review all require regulatory steps. The 10-Q describes Phase 2 as subject to financing, licensing and sufficient feedstock source row.
Industry Structure
Uranium has long-cycle contracts and spot-linked inventory monetization; rare-earth separation and magnets have distinct qualification bottlenecks. Cameco forecasts average annual contracted uranium deliveries above 28m lb for five years, a scale EFR has not achieved Cameco Q3 report.
Growth and Cyclicality
The model holds uranium realized prices at US$85–88/lb, rather than treating the 23 November production campaign as incremental contracted revenue. REE EBITDA is phased from zero to US$150m by 2031; delays affect cash and dilution as well as terminal value.
Competitors
Cameco offers contracted large-scale uranium economics; MP Materials is building a U.S. rare-earth-to-magnet chain. MP had US$18.623m Q3 magnetics external revenue and US$5.348m adjusted magnetics EBITDA, with material start-up capital source row. This is an operating counterweight to EFR capacity claims.
Market Share
EFR does not disclose a reliable achieved share of the combined oxide-to-magnet market. Capacity and a prospective customer pipeline are not market share. The forecast grants no value to uncontracted share of that market.
Competitive Advantages
White Mesa is an existing licensed U.S. uranium mill able to process monazite, which can reduce a greenfield siting hurdle. It does not remove feedstock, yield, qualification or funding risks source row.
Pricing and Cost Position
The modeled 2031 uranium cash margin is US$42/lb, versus Q3 2026 disclosed sales at US$88.90/lb realized. REE and VAC margins are analyst judgments pending reported segment economics. Gold US$3,600 and WTI US$80 have no direct modeled EFR revenue exposure.
Entry Barriers and Substitutes
Licensed uranium processing and customer qualification create barriers, while other uranium producers and global rare-earth suppliers remain substitutes. MP’s operating Q3 magnetics figures show that even a scaled supply chain still consumes substantial capital source row.
Supplier and Customer Dynamics
Vara Mada, Donald and Bahia remain prospective monazite feed sources. The model spends on early development but attributes no full-scale Vara Mada mine EBITDA before a funded final investment decision.
Regulation and Structural Risks
The proposed US$725m OSC loan is conditional and omitted from cash and debt; if finalized it could reduce near-term equity issuance while adding a senior claim and interest. Phase 2 cost is US$410m ±15% in the issuer 10-Q source row.
Historical Performance
Revenue was US$37.928m in 2023, US$78.114m in 2024 and US$65.922m in 2025, but all three years had operating losses source row. The 2026 nine-month revenue improvement to US$90.126m was largely uranium.
Income Statement Analysis
Nine-month 2026 operating loss was US$72.816m and parent net loss US$96.428m. Q3 loss was magnified by marketable-security marks; those are not uranium cash costs. The forecast starts from sales economics but keeps a separate US$65–75m corporate cash overhead source row.
Balance Sheet Analysis
At 30 September 2026 unrestricted cash plus current marketable securities was US$855.893m. The US$779.472m securities fair value comprised US$759.129m current debt securities, primarily U.S. Treasury bills and agency bonds, and US$20.343m equities; the reported fair value already reflects unrealized losses source row. Restricted cash of US$23.044m is excluded. US$700m note principal is a senior claim, not US$678.694m carrying value source row source row.
Cash Flow Analysis
Nine-month 2026 CFO was negative US$38.460m; PP&E and mineral additions were US$38.665m and investment contributions US$17.706m. Share issuance delivered US$153.075m net cash source row source row.
Earnings Quality
Operating cash remains negative despite positive uranium sales margin because corporate, exploration, integration and working capital consume cash. We do not treat unrealized securities gains or development spending as distributable.
Nonrecurring Items
Q3 2026 transaction/integration costs were US$9.030m, while nine-month costs were US$22.145m source row. Excluding them entirely would overstate near-term funding if the acquisition proceeds. The US$99.862m 2023 parent net profit included a US$119.257m gain on asset sales, so it is not a baseline for recurring mining earnings source row.
Funding and Cash Conversion
VAC cash consideration alone uses US$718m of the US$855.893m unrestricted cash and current securities, leaving US$137.893m before operating needs. The base requires US$754.45m additional equity at US$5/share through 2031 and assumes a US$700m note refinancing on 1 November 2031. No conditional loan proceeds are counted.
Key Ratios
The 9M 2026 revenue less costs-applicable-to-revenue margin is 51.8%, but CFO/revenue is −42.7%; the gap is the central conversion issue. Shares increased from 240.366m at 2025 year-end to 264.828m by September 2026 source row.
Forward Outlook
The reported trailing cash to first forecast has a large analyst reset; this is uncertainty, not a historical reconciliation claim. source row source row
| Trailing CFO to first forecast, USD m | Signed change | Running cash |
|---|---|---|
| 2025 CFO + 9M26 CFO − 9M25 CFO | -54.67 | -54.67 |
| 2027 perimeter, uranium volume and cost, VAC EBITDA, overhead and working-capital reset (analyst residual) | +70.74 | 16.07 |
| 2027 development capex | -165.00 | -148.93 |
| 2027 sustaining capex | -35.00 | -183.93 |
| 2027 working-capital investment | -15.00 | -198.93 |
| 2027 tax and debt interest | -15.14 | -214.07 |
The model-generated yearly forecasts are:
| Year | Uranium sold (m lb) | REE EBITDA (USD m) | Development capex (USD m) |
|---|---|---|---|
| 2027 | 1.11 | 0.00 | 165.00 |
| 2028 | 1.30 | 10.00 | 309.00 |
| 2029 | 1.50 | 40.00 | 331.00 |
| 2030 | 1.60 | 90.00 | 40.00 |
| 2031 | 1.70 | 150.00 | 30.00 |
| Year | Free cash (USD m) | Equity issued (USD m) | Diluted shares (m) |
|---|---|---|---|
| 2027 | -214.07 | 126.18 | 356.91 |
| 2028 | -330.14 | 330.14 | 423.94 |
| 2029 | -298.14 | 298.14 | 484.57 |
| 2030 | 60.06 | 0.00 | 485.57 |
| 2031 | 143.52 | 0.00 | 486.57 |
Frozen checkpoint 1, calendar 2027 uranium: 1.11m lb sold at US$37/lb cash margin; downside 0.89m lb and US$25/lb, upside 1.30m lb and US$45/lb. With 1.32m lb opening finished inventory and a one-million-pound mill campaign, simple ending inventory is 1.21m lb base, 1.43m downside, 1.02m upside before other production or purchases. Calendar 2027 sales, cost and inventory disclosures settle it source row. Frozen checkpoint 2, calendar 2028 heavy REE: 100 qualified tonnes base, zero downside, 200 upside, with US$10m REE EBITDA (≤0/≥30) and US$274m cumulative circuit spend (US$340m downside/US$240m upside). Plant sales, qualification and construction disclosures settle it. Frozen checkpoint 3, 2029 Phase 2: 1,000 commissioned tonnes base (zero/2,000), US$240m spending, and 484.57m year-end diluted shares base (base +25m/down 25m). FID, funded capex, output and share registry settle it.
Model Choice
A five-year funded enterprise-to-common bridge fits an early-stage miner and proposed magnet acquisition better than a perpetuity on today’s negative cash flow. The exit EV uses separate uranium, VAC, rare-earth and HMS EBITDA at 7×, 9×, 8× and 7×, then capitalizes corporate overhead at 8×. These are analyst assumptions, not issuer guidance.
Growth
The model grows VAC EBITDA from US$40m in 2027 to US$120m in 2031 and REE EBITDA from zero to US$150m. VAC’s legacy 2025 adjusted EBITDA was US$28.6m per the transaction release; its later Sumter potential is not booked as current cash VAC release and reconciliation.
Profitability
Uranium EBITDA is sold pounds times realized price less cash cost. The base reaches US$71.40m in 2031; REE and VAC profitability remain the largest judgmental inputs. The Q3 2026 issuer release’s US$88.90/lb realized price anchors the opening price, while cost is an analyst estimate.
Reinvestment or Required Capital
The five-year model funds US$104m Phase 1, US$410m Phase 2, US$121m Vara Mada pre-FID, US$240m Donald/other development and US$225m sustaining capex. This allocates named projects once and does not claim full Vara Mada Stage 1 output. Its separate US$769m post-FID construction requirement is unfunded and excluded from valued EBITDA issuer feasibility study.
Discount Rate
The 12% USD nominal required return is analyst judgment for construction, sovereign, counterparty and refinancing risk. A 14% alternative lowers fair value; exact sensitivity follows from the public input. CAD/USD is held at the 24 November observed 1.4296 for per-share conversion Bank of Canada daily digest.
Terminal Economics
No cash-flow perpetuity is used. The 2031 terminal EV is a multiple on EBITDA; 2031 sustaining and development cash are separately reflected in the funded cash roll. A lower multiple is the stress to continued investment risk. This first post-exit year is a cash cross-check, not an additional value added to EV.
| Cash basis (USD m) | 2031 explicit | 2032 first post-exit, with US$30m development carried |
|---|---|---|
| EBITDA after corporate overhead | 306.40 | 312.53 |
| Development capex | 30.00 | 30.00 |
| Sustaining capex | 55.00 | 56.10 |
| Working capital increase | 25.00 | 25.50 |
| Cash tax | 35.00 | 35.70 |
| Debt interest | 17.88 | 65.89 |
| Free cash after claims service | 143.52 | 99.34 |
Bridge to One Common Share
| 2031 exit bridge | USD millions unless noted |
|---|---|
| Uranium enterprise value | 499.80 |
| VAC enterprise value | 1,080.00 |
| Rare earth enterprise value | 1,200.00 |
| HMS enterprise value | 280.00 |
| Corporate overhead capitalization | (600.00) |
| Enterprise value | 2,459.80 |
| Unrestricted ending cash | 253.58 |
| Senior claims, including refinanced note | (1,001.36) |
| Common equity value | 1,712.01 |
| Diluted shares (millions) | 486.57 |
| Exit CAD/share at USD/CAD 1.4296 | 5.03 |
The US$700m note matures on 1 November 2031, 23 days before exit. The base assumes a same-principal refinance and subtracts that replacement debt once at exit. The original US$5.25m annual coupon is included through 2030; 2031 uses 311 days of original coupon plus 23 days at an assumed 8% refinancing rate. VAC debt and other debt interest are funded annually at analyst-estimated 7% and 4%. The capped calls and 34.417m conversion shares do not enter because the note is assumed cash-refinanced; a conversion scenario must replace the debt claim with net settlement dilution, never add both source row.
Price-Implied Expectations
At C$7.35, five-year net 9.49% annual required wealth implies approximately C$11.58 exit value per share, versus base C$5.03. Holding the funded share count and all other EV components fixed, the gap requires roughly US$278m more 2031 REE EBITDA at the 8× multiple. This is conditional price-implied economics, not consensus.
Independent Cross-Check
MP reported Q3 2026 magnetics US$18.623m external revenue, US$5.348m segment adjusted EBITDA and US$56.170m segment capex. EFR’s forecast 2031 REE EBITDA US$150m requires far more qualified volume and capital efficiency than that current operating comparison; the peer is not a direct multiple match source row.
Conclusion and Change from Prior Edition
The 24 November first edition established the C$2.85 fair value and C$1.07 entry. The independent challenge preceded that model and directed the VAC cash, preferred, debt and dilution treatment. The second edition corrected report history and the 2023 gain; the third added Q3 REE/HMS revenue and liquid-securities composition. This fourth edition tightens numeric PDF highlights. Valuation inputs and decision are unchanged.
Peer Selection
Cameco is a scaled uranium comparator; MP Materials is a rare-earth and magnet-development comparator. Neither reproduces EFR’s proposed acquisition mix or its funding structure.
Dated Ratio Table
Nine months ended 30 September 2026; figures are each issuer’s reporting currency and own accounting definition.
| Issuer | Revenue (m) | Direct gross margin |
|---|---|---|
| EFR, USD | 90.126 | 51.8% |
| Cameco, CAD | 2,278 | 27.0% |
| MP, USD | 346.794 | 33.1% |
EFR revenue, direct cost and cash flow: source row source row source row. Cameco revenue and gross profit: source row source row. MP revenue and direct cost: source row source row. EFR CFO/revenue is −42.7%; Cameco CFO/revenue is 4.9%. MP cash-flow ratio is omitted because its price-protection income and buildout make it a poor same-basis comparison.
Comparability Adjustments
EFR and MP direct margins exclude different depreciation and development charges; Cameco reported gross profit includes its own segment mix and equity interest elsewhere. The table is an operating sanity check, not an equal-definition P/E or EV/EBITDA valuation.
Implications for Value
EFR’s positive direct gross margin alongside negative cash conversion argues for explicit corporate cost, capex and dilution. No peer multiple is copied blindly into the base EV.
Bear Case
Joint downside cuts rare-earth EBITDA 50%, VAC EBITDA 25%, and adds US$61.5m (15%) to Phase 2 cost. The stressed fair value is C$1.07, with an entry at C$1.07. Delayed qualification and overruns can coincide because feedstock processing and magnet utilization are linked. A more severe zero-REE-profit outcome is C$0.06 fair value and would lose 94.5% at our maximum entry, so the ceiling is not a floor on possible losses.
Base Case
The base assumes VAC closes on US$718m cash plus 65.85m common shares and US$135m conditional preferred claim, and annual funded equity issuance as shown in the forecast. The model credits no conditional OSC loan or unbuilt Vara Mada Stage 1 EBITDA.
Bull Case
A conditional bull raises rare-earth EBITDA 50%, VAC EBITDA 25%, and reduces Phase 2 cost by US$61.5m. It gives C$4.86 fair value and C$5.44 after-cost return-hurdle entry. The result requires qualified sales, better utilization and less funding dilution; it is not the published entry rule.
Outcomes at Close and Entry
| Assumption | Close | Fair value | Maximum entry | Price rule |
|---|---|---|---|---|
| Base | 7.35 | 2.85 | 1.07 | Wait |
| REE EBITDA half | 7.35 | 1.64 | 1.64 | Wait |
| VAC EBITDA 75% | 7.35 | 2.27 | 2.27 | Wait |
| Discount rate 14% | 7.35 | 2.61 | 0.98 | Wait |
| Joint downside | 7.35 | 1.07 | 1.07 | Wait |
| No REE through 2031 | 7.35 | 0.06 | 0.06 | Wait |
| Conditional bull | 7.35 | 4.86 | 5.44 | Wait |
At the C$7.35 close the base exit gives -7.32% after stock costs, below XIC’s 7.49% net annualized. At C$1.07, the base exit gives roughly 36.34% annualized before any distribution.
Market-Implied Case
The conditional price-implied case is the REE EBITDA threshold in Valuation; it requires a durable downstream cash yield, not merely a plant nameplate. The 2028 qualified-tonnage and gross-margin disclosure is the first direct test.
Analyst Assessment
The joint stress condition binds the entry, below the 9.49% after-cost hurdle ceiling alone. Even the unstressed hurdle ceiling is only C$3.19, far below the C$7.35 close. Evidence is insufficient to assume government financing, a successful VAC close and full-scale REE output simultaneously.
Operating Risks
If uranium deliveries fall below 0.89m lb in 2027, the starting cash margin is overestimated. A mill campaign does not itself confirm a sale. Check quarterly pounds sold, inventory and realized margin.
Financial and Liquidity Risks
The acquisition consumes US$718m of initial liquid resources, and 2031 note refinancing is assumed rather than secured. If US$5/share equity is unavailable, project delays or higher-cost debt could be necessary. The model’s US$135m preferred claim may change under final VAC terms.
Regulatory and Legal Risks
VAC requires approvals. Vara Mada and White Mesa expansion require permits and stable operating terms. A final investment decision without financing or permitting should reduce the assumed time to cash.
Industry and Competitive Risks
Uranium price changes and magnet qualification failures affect different model segments. MP’s Q3 magnetics EBITDA demonstrates commercial activity but also large capital needs source row.
Thesis-Specific Risks and Reconsideration Triggers
Reconsider after VAC closing documents specify final consideration; after 2027 uranium delivered sales; after 2028 heavy-REE qualified sales; and after a Phase 2 FID with funded capex. A decline in terminal REE EBITDA toward US$75m under the joint downside sustains Wait even at a lower quote.
Environmental Factors
Uranium and monazite processing create tailings, reclamation and water obligations. The 30 September 2026 ARO was US$24.152m and restricted cash US$23.044m. The model subtracts the full ARO as a claim and excludes restricted cash from distributable assets source row.
Social Factors
Vara Mada development is exposed to Madagascar community and permitting processes. The base does not value an unapproved full-scale mine and therefore avoids treating feasibility NPV as current shareholder cash issuer feasibility release.
Governance Factors
The proposed VAC consideration gives Ara about 19.9% ownership and a board nomination right if completed, changing influence over capital allocation. Exact rights depend on closing documents issuer VAC transaction terms.
Financially Material Risks and Opportunities
An adverse permitting outcome delays cash and raises funding dilution; a genuinely qualified and funded U.S. supply chain could improve earned margins. Neither a policy narrative nor an unfinalized loan is booked as cash.
Annual Results
USD millions, fiscal years ended 31 December.
| Row | 2023 | 2024 | 2025 | Source |
|---|---|---|---|---|
| Revenue | 37.928 | 78.114 | 65.922 | source row |
| Operating income/(loss) | −32.367 | −47.515 | −101.155 | source row |
| Parent net income/(loss) | 99.862 | −47.765 | −85.634 | source row |
Interim Results
USD millions, nine months ended 30 September.
| Row | 2025 | 2026 | Source |
|---|---|---|---|
| Revenue | 38.820 | 90.126 | source row |
| Operating loss | −79.034 | −72.816 | source row |
| Parent net loss | −64.845 | −96.428 | source row |
Trailing Results
Trailing 12 months to 30 September 2026 = 2025 full year + 2026 nine months − 2025 nine months: revenue US$117.228m; operating loss US$94.937m; parent net loss US$117.217m. This is the consistent perimeter before the pending VAC deal.
Material Adjustments
The first 2027 operating forecast is built from 2026 nine-month uranium sales and a full-year contract volume, not from a simple annualized net loss. Vacuumschmelze is excluded from trailing accounts and added only after assumed close. Negative marketable-security marks do not become operating cash.
Annual Positions
USD millions at 31 December.
| Row | 2024 | 2025 | Source |
|---|---|---|---|
| Cash | 38.603 | 64.736 | source row |
| Current securities | 80.854 | 797.106 | source row |
| Total assets | 611.969 | 1,411.852 | source row |
| Convertible carrying value | 0 | 675.688 | source row |
Interim Positions
USD millions at 30 September 2026.
| Row | Amount | Source |
|---|---|---|
| Cash | 76.421 | source row |
| Current marketable securities | 779.472 | source row |
| Restricted cash | 23.044 | source row |
| Total assets | 1,724.729 | source row |
| Parent shares (millions) | 264.828 | source row |
Capital and Claims Reconciliation
Start with US$855.893m cash and current securities; pay US$718m VAC consideration in the assumed close; exclude US$23.044m restricted cash; carry US$700m note principal, US$140m assumed VAC debt, US$135m conditional preferred, US$2.210m other debt and US$24.152m ARO. Add 65.85m VAC common shares, annual equity-financing shares and 1m net employee shares per year. The note principal differs from its US$678.694m accounting value source row.
Annual Flows
USD millions, fiscal years ended 31 December.
| Row | 2023 | 2024 | 2025 | Source |
|---|---|---|---|---|
| Operating cash flow | −15.409 | −43.973 | −89.480 | source row |
| PP&E additions | −15.437 | −22.174 | −19.261 | source row |
| Mineral additions | −29.273 | −7.209 | −32.532 | source row |
Interim Flows
USD millions, nine months ended 30 September.
| Row | 2025 | 2026 | Source |
|---|---|---|---|
| Operating cash flow | −73.269 | −38.460 | source row |
| PP&E and mineral additions | −32.840 | −38.665 | source row |
| Net common issuance | 226.843 | 153.075 | source row |
Trailing Flows
Trailing CFO to 30 September 2026 = −89.480 −38.460 − (−73.269) = −US$54.671m. Trailing PP&E/mineral additions = US$57.618m. A positive direct uranium margin has yet to cover this consolidated spend.
Reconciliation to Common Shareholders
2026 nine-month CFO −US$38.460m minus PP&E/mineral additions US$38.665m minus investment contributions US$17.706m = −US$94.831m before acquisitions or other investing flows. Dividends were zero; the shortfall was financed principally with US$153.075m net share proceeds. The model carries all 2027–31 residual cash into retained cash or minimum-cash equity funding and counts no buyback. A 50% attribution of positive residual cash is irrelevant to the 2027–29 deficits; it would lower cash and value when later years turn positive source row.
Primary Sources and Locators
Primary originals: 2026 Q3 10-Q, 2025 audited 10-K, Cameco 2026 Q3, MP 2026 Q3. Publisher originals: EFR Q3 10-Q SEC, Cameco Q3, MP Q3, EFR 2026 proxy, VAC release, 23 November uranium update.
Frozen Inputs and Assumptions
Public frozen inputs list every forecast driver, USD/CAD, share basis, costs and entry rule. Hard-coded assumptions are Peralta judgments except the cited dated source rows. Source-to-input map: Q3 pages 12/16/26 → liquidity, VAC consideration, note; Q3 page 44 → circuit capex; 23 November release → uranium initial volume; Bank of Canada 24 November → FX; TSX regular close → price. OSC lending is omitted pending definitive documentation.
Worksheets and Saved Outputs
Run from edition root with Python 3.12 standard library: PYTHONDONTWRITEBYTECODE=1 python support/valuation.py. Delete outputs in a disposable public copy and rerun; the script regenerates decision, forecast, first-year bridge, equity bridge, terminal cash, scenarios, revision and exact JSON.
| Worksheet | Output |
|---|---|
| Valuation | Decision · Forecast · Forecast summary · Opening bridge · Equity bridge · Terminal cash · Scenarios · Revision · Exact result |
Changes from the Preceding Edition
The prior 24 November 2026 edition is retained. This same-cutoff correction retargets numeric PDF highlights to the full claimed rows, with no economic revision.
| Revision driver | Fair value | Maximum entry |
|---|---|---|
| Prior | 2.85 | 1.07 |
| Numeric source locators | 0.00 | 0.00 |
| Rounding | 0.00 | 0.00 |
| Current | 2.85 | 1.07 |
The next review should compare actual VAC closing terms and 2027 uranium delivery results with these frozen inputs.