Endeavour Mining plc (TSX:EDV) — finite reserve underwriting, 25 November 2026

Our maximum entry price is C$9.14 per share. At the 25 November 2026 unadjusted TSX close of C$61.58, the decision is Wait. The strongest contrary assumption is a sustained US$1772/oz gold uplift over this reserve-only deck: it raises the five-year return at the close to the 9.49% hurdle, while nine-month 2026 realised gold was US$4,477/oz and the future mine plan does not establish that higher deck. TSX EDV unadjusted closing series, 25 November 2026 Q3 management report, p. 4

Stock Price History

Market close (CAD)
C$61.58
Base fair value (CAD/share)
C$20.44
Company details
Maximum entry price (CAD/share)
C$9.14
Price rule
Wait

Share and cutoff. One UK ordinary voting share quoted as TSX:EDV in CAD; financials and mine economics in USD. Evidence cutoff and market close: 2026-11-25; latest issuer filing: 2026-11-12 Q3 results, nine months ended 2026-09-30. Fair value is a present reserve NAV; entry is the lower five-year price ceiling, floored to C$0.01. Next decision checkpoint: January 2027 preliminary mine guidance. Stock Price History

Investment Thesis

Endeavour owns economic interests in five operating West African gold mines and is building Assafou. The security is one ordinary voting share, TSX:EDV in CAD; LSE:EDV is the same issuer and EDVMF is an OTC quotation, while U.S. EDV is an unrelated Treasury ETF. The finite-reserve case prices only disclosed mineral reserves and a funded Assafou schedule. 2025 reserves, named mine tables Q3 management report, p. 4

Market Mispricing

The C$61.58 close exceeds base fair value by C$41.14 and the C$9.14 entry by C$52.44. The largest disputed input is the future gold price: nine-month 2026 realised US$4,477/oz versus a Peralta US$3,500/oz starting deck. The market may be capitalising higher gold for longer or unproved resource conversion; neither is included as free ounces. See price-implied output. Q3 management report, p. 4 TSX EDV unadjusted closing series, 25 November 2026

Recent Developments

On 28 October Mana access ramp subsided; processing is expected to remain paused until Q2 2027, with 2027 guidance due in January. Assafou FID has been approved, but the initial budget is now US$1.2 billion and first gold is expected H1 2029. These post-balance events supersede the earlier DFS timing and US$1.061 billion cost. Q3 management report, p. 30 Q3 management report, p. 37

Earnings Outlook

The model forecasts 1,060koz gross production in 2027, 1,440koz in 2030 after Assafou ramps, then declining output as existing reserves deplete. The 2027 owner cash after all modeled investment is US$224m because Assafou construction uses US$550m. These are analyst estimates, not issuer guidance. Full finite-mine forecast; starting results: Q3 management report, p. 4 and 2025 reserves, named mine tables.

Valuation Summary

Base finite-mine NAV is C$20.44 per diluted share at 10% USD discounting and frozen US$1 = C$1.4219. The five-year benchmark-plus-two-point ceiling is C$20.54; the linked downside capital-preservation ceiling is C$9.15 and binds. NAV bridge · entry calculation. Bank of Canada FXUSDCAD, 25 November 2026

Recommended Action and Entry Price

Wait at the TSX EDV unadjusted closing series, 25 November 2026 C$61.58 close. The C$9.14 limit is conditional on a model that still assumes a Q2 2027 Mana restart, Assafou completion and a positive long-term gold spread over costs. Even the US$500/oz bull gold case remains below the close. Reassess after January 2027 mine guidance and a signed Assafou convention. Q3 management report, p. 30 Q3 management report, p. 37

Stock Price History

Unadjusted TSX closes in CAD; no dividend or split adjustment is used for the entry rule. TSX EDV unadjusted closing series, 25 November 2026

DateClose (CAD)Maximum entry (CAD)
2026-11-1270.81
2026-11-1865.18
2026-11-2058.35
2026-11-2360.83
2026-11-2459.45
2026-11-2561.589.14

Catalysts

January 2027 preliminary results should disclose Mana restart and 2027 production/capital guidance. Assafou construction contracts and the mining convention can settle timing, ownership and the US$1.2bn P80 budget. Quarterly realised prices, royalties and cash after minority distributions test gold conversion. Q3 management report, p. 30 Q3 management report, p. 37 Q3 financials, p. 4

Primary Risks to Thesis

The strongest credible contrary case is sustained higher gold plus reserve conversion: a uniform US$1772/oz uplift above our deck, with other inputs fixed, yields the 9.49% five-year hurdle at C$61.58. That would require about US$5272/oz in 2027 and US$4772/oz after 2033; nine-month 2026 realised price was US$4,477/oz, but the dated cash-market price is lower. The base is preferred because no filed mine plan guarantees this deck or reserve replenishment; a persistently high realised price and funded conversion would overturn the Wait. Q3 management report, p. 4 2025 reserves, named mine tables