Endeavour Mining plc (TSX:EDV) — finite reserve underwriting, 25 November 2026
Our maximum entry price is C$9.14 per share. At the 25 November 2026 unadjusted TSX close of C$61.58, the decision is Wait. The strongest contrary assumption is a sustained US$1772/oz gold uplift over this reserve-only deck: it raises the five-year return at the close to the 9.49% hurdle, while nine-month 2026 realised gold was US$4,477/oz and the future mine plan does not establish that higher deck. TSX EDV unadjusted closing series, 25 November 2026 Q3 management report, p. 4
- Market close (CAD)
- C$61.58
- Base fair value (CAD/share)
- C$20.44
Company details
- Maximum entry price (CAD/share)
- C$9.14
- Price rule
- Wait
Share and cutoff. One UK ordinary voting share quoted as TSX:EDV in CAD; financials and mine economics in USD. Evidence cutoff and market close: 2026-11-25; latest issuer filing: 2026-11-12 Q3 results, nine months ended 2026-09-30. Fair value is a present reserve NAV; entry is the lower five-year price ceiling, floored to C$0.01. Next decision checkpoint: January 2027 preliminary mine guidance. Stock Price History
Investment Thesis
Endeavour owns economic interests in five operating West African gold mines and is building Assafou. The security is one ordinary voting share, TSX:EDV in CAD; LSE:EDV is the same issuer and EDVMF is an OTC quotation, while U.S. EDV is an unrelated Treasury ETF. The finite-reserve case prices only disclosed mineral reserves and a funded Assafou schedule. 2025 reserves, named mine tables Q3 management report, p. 4
Market Mispricing
The C$61.58 close exceeds base fair value by C$41.14 and the C$9.14 entry by C$52.44. The largest disputed input is the future gold price: nine-month 2026 realised US$4,477/oz versus a Peralta US$3,500/oz starting deck. The market may be capitalising higher gold for longer or unproved resource conversion; neither is included as free ounces. See price-implied output. Q3 management report, p. 4 TSX EDV unadjusted closing series, 25 November 2026
Recent Developments
On 28 October Mana access ramp subsided; processing is expected to remain paused until Q2 2027, with 2027 guidance due in January. Assafou FID has been approved, but the initial budget is now US$1.2 billion and first gold is expected H1 2029. These post-balance events supersede the earlier DFS timing and US$1.061 billion cost. Q3 management report, p. 30 Q3 management report, p. 37
Earnings Outlook
The model forecasts 1,060koz gross production in 2027, 1,440koz in 2030 after Assafou ramps, then declining output as existing reserves deplete. The 2027 owner cash after all modeled investment is US$224m because Assafou construction uses US$550m. These are analyst estimates, not issuer guidance. Full finite-mine forecast; starting results: Q3 management report, p. 4 and 2025 reserves, named mine tables.
Valuation Summary
Base finite-mine NAV is C$20.44 per diluted share at 10% USD discounting and frozen US$1 = C$1.4219. The five-year benchmark-plus-two-point ceiling is C$20.54; the linked downside capital-preservation ceiling is C$9.15 and binds. NAV bridge · entry calculation. Bank of Canada FXUSDCAD, 25 November 2026
Recommended Action and Entry Price
Wait at the TSX EDV unadjusted closing series, 25 November 2026 C$61.58 close. The C$9.14 limit is conditional on a model that still assumes a Q2 2027 Mana restart, Assafou completion and a positive long-term gold spread over costs. Even the US$500/oz bull gold case remains below the close. Reassess after January 2027 mine guidance and a signed Assafou convention. Q3 management report, p. 30 Q3 management report, p. 37
Stock Price History
Unadjusted TSX closes in CAD; no dividend or split adjustment is used for the entry rule. TSX EDV unadjusted closing series, 25 November 2026
| Date | Close (CAD) | Maximum entry (CAD) |
|---|---|---|
| 2026-11-12 | 70.81 | |
| 2026-11-18 | 65.18 | |
| 2026-11-20 | 58.35 | |
| 2026-11-23 | 60.83 | |
| 2026-11-24 | 59.45 | |
| 2026-11-25 | 61.58 | 9.14 |
Catalysts
January 2027 preliminary results should disclose Mana restart and 2027 production/capital guidance. Assafou construction contracts and the mining convention can settle timing, ownership and the US$1.2bn P80 budget. Quarterly realised prices, royalties and cash after minority distributions test gold conversion. Q3 management report, p. 30 Q3 management report, p. 37 Q3 financials, p. 4
Primary Risks to Thesis
The strongest credible contrary case is sustained higher gold plus reserve conversion: a uniform US$1772/oz uplift above our deck, with other inputs fixed, yields the 9.49% five-year hurdle at C$61.58. That would require about US$5272/oz in 2027 and US$4772/oz after 2033; nine-month 2026 realised price was US$4,477/oz, but the dated cash-market price is lower. The base is preferred because no filed mine plan guarantees this deck or reserve replenishment; a persistently high realised price and funded conversion would overturn the Wait. Q3 management report, p. 4 2025 reserves, named mine tables
Company Overview
Endeavour Mining plc is incorporated in the UK and reports IFRS in US dollars. The five producing assets are Houndé and Mana (Burkina Faso), Ity and Lafigué (Côte d’Ivoire), and Sabodala-Massawa (Senegal). Assafou is an approved development project; Kalana has reserves but no approved build in this model. Q3 management report, p. 3.
Products and Services
Gold doré is refined and sold; by-product silver, copper and other revenue is minor in consolidated reporting. The Sabodala stream delivers specified ounces to Franco-Nevada at 20% of prevailing spot, a direct reduction to owner proceeds. FY2025 revenue note Q3 financials, note 17
Business Model
Mine ore tonnes, grade and recovery determine ounces; gold price less cash costs, royalties and sustaining capital determine operating cash. 2025 contained P&P reserves are 16.577Moz gross, 14.712Moz attributable, before 2026 extraction. The worksheet applies the issuer’s mine recoveries of 87%-95% before capping saleable ounces, rather than treating all contained metal as produced or extending a perpetuity. 2025 reserves, named mine tables
Revenue Drivers
Q3 2026 sold 258,716oz at US$4,258/oz realised and reported US$1,108.5m revenue; nine-month revenue US$3,677.8m. The realised price includes stream and revenue-protection effects, so it should not be paired mechanically with gross spot. Our gross gold deck deducts a separate stream loss once. Q3 management report, p. 4 Q3 financials, note 17
Cost Structure
Q3 group AISC was US$1,857/oz, up US$288 from Q3 2025; nine-month AISC was US$1,866 versus US$1,362. Royalties rose with gold prices and Mana had Q3 AISC US$3,338. AISC includes sustaining capital but not all project build spending. Q3 management report, p. 7 Q3 management report, p. 30
Operating Levers
Houndé and Ity grades, Sabodala recovery, and Mana access determine near-term ounces. Assafou adds a disclosed 320koz per year for its first eight producing years, conditional on completing the plant and mine infrastructure. Modelled 2029 output is only 120koz to reflect ramp-up. Assafou DFS, pp. 1-2 Q3 management report, p. 30
Distribution
Cash dividends and repurchases are the shareholder distribution channels. Management sets a US$1.0bn minimum 2026-28 dividend program conditional on realised gold above US$3,000/oz and leverage below 0.5x net debt/adjusted EBITDA. The model caps annual future dividends at available owner cash and retains residual value at exit. Q3 management report, p. 8.
Geographic Exposure
All five producing mines and Assafou operate in West Africa. Country risk is not an abstract premium: mine-level state interests, royalties, permits, grid reliability and security can alter the US dollar cash to the UK parent. The mine ownership weights are 85%, 85%, 85%, 90% and 80% respectively. Q3 financials, note 13 2025 reserves, named mine tables
Regulatory Environment
Mineral title, environmental approvals and host-government mining conventions govern extraction. Assafou FID was approved but mining convention terms were agreed only in principle at the Q3 filing, so a 90% economic interest is an analyst assumption with an 80% bear test. Q3 management report, p. 37 2025 reserves, named mine tables
Industry Structure
Endeavour is a price taker in global bullion; mine quality is expressed through ore grade, recovery, jurisdiction, sustaining capital and reserve life. Unlike a branded product, gold ounces have no issuer-specific pricing premium. 2025 reserves, named mine tables World Gold Council market data.
Growth and Cyclicality
Gold prices and royalty schedules dominate the cycle, while ore depletion makes production growth capital intensive. Assafou is a new-mine expansion, not organic perpetual growth: its US$1.2bn budget precedes H1 2029 first gold. Q3 management report, p. 37 Assafou DFS, pp. 1-2
Competitors
Agnico Eagle and Barrick are liquid North American-listed gold comparators, though AEM has a different geographic risk mix and Barrick has copper and a much larger asset base. AEM Q3 2026 filing · Barrick Q3 2026 release.
Market Share
Endeavour produced 820koz in nine months to September 2026. At group 2026 guidance scale it is material among listed gold miners, but its output cannot influence the world gold price; no market-share premium is included. Q3 management report, p. 4
Competitive Advantages
Assafou DFS expects 320koz annually at US$1,026/oz AISC for its first eight years at a US$2,500/oz gold-price basis. That asset could lower group unit costs, but the 2026 cost increase and convention uncertainty reduce near-term certainty. Assafou DFS, pp. 1-2 Q3 management report, p. 37
Pricing and Cost Position
Q3 AISC of US$1,857/oz was well below Q3 realised US$4,258/oz, but Mana at US$3,338/oz had a much thinner cushion. The model uses mine-specific cost bases and 2% annual escalation, with royalties already in AISC; the gold deck does not assume the Q3 spread persists. Q3 management report, p. 4 Q3 mine statistics, p. 1.
Entry Barriers and Substitutes
A reserve, permits, plant, power, water and community agreements are needed before an ounce is saleable. ETFs and other gold miners provide alternative exposure to the commodity; Endeavour earns no premium solely for bullion demand. The Assafou DFS lays out a 24-30 month construction window. Assafou DFS, pp. 1-2
Supplier and Customer Dynamics
Mining contractors, fuel, power and consumables drive costs; higher contractor and royalty expense contributed to 2026 AISC inflation. Bullion buyer concentration does not confer pricing power because the reference market sets the price. Q3 management report, p. 7.
Regulation and Structural Risks
Burkina Faso permits govern Mana reopening and Côte d’Ivoire convention terms govern Assafou economics. These are independent of gold price and can coincide with construction or liquidity stress. Q3 management report, p. 30 Q3 management report, p. 37
Historical Performance
2025 revenue US$4,233.9m versus US$2,675.9m in 2024, but Q3 2026 output fell year-on-year to 256koz and nine-month output fell to 820koz from 911koz. Strong gold price more than offset lower ounces in reported revenue. 2025 audited statements, p. 7 Q3 management report, p. 4
Income Statement Analysis
2025 mine operating earnings were US$2,093.5m against US$868.7m in 2024; 2025 operating profit US$1,638.5m included US$193.4m impairment. Nine-month 2026 mine earnings US$1,893.7m and shareholder net income US$816.8m after US$197.5m noncontrolling earnings. 2025 audited statements, p. 7 Q3 financials, p. 3.
Balance Sheet Analysis
At 30 September 2026 cash was US$849.1m, debt principal US$586.4m, lease obligations US$134.8m, reclamation provision US$137.3m and NCI book equity US$339.8m. Mine cash is already weighted to the parent; the model therefore does not also subtract NCI book equity. Q3 financials, p. 5 Q3 management report, p. 15.
Cash Flow Analysis
Nine-month operating cash US$1,461.4m less investing cash US$438.9m equals the issuer US$1,022.5m free-cash-flow label. US$241.0m dividends to minority holders, US$200.4m parent dividends, US$71.5m buybacks and lease principal followed in financing. Consolidated FCF is therefore not all available to one common share. Q3 financials, p. 4
Earnings Quality
Q3 adjusted EBITDA US$638.9m exceeds reported EBITDA US$609.7m and is not free cash. Taxes, working capital, mine capital, stream economics and NCI separate headline earnings from owner cash. The worksheet starts from mine ounces and costs instead of capitalising adjusted EBITDA. Q3 management report, p. 4 Q3 financials, p. 4
Nonrecurring Items
2025 operating earnings include US$193.4m mining-interest impairment and financial-instrument loss US$193.3m. Mana subsidence is a post-September non-adjusting event, with remediation and insurance not yet quantified; no insurance asset is credited. 2025 audited statements, p. 7 Q3 financials, note 18
Funding and Cash Conversion
At the modelled 2027 gold deck, 2027 mine margin after stream US$1,520m less US$456m cash-tax proxy, US$235m other mine/exploration investment, US$550m Assafou construction and US$55m corporate cost leaves US$224m owner cash. This is the first-year bridge from reported 9M26 CFO US$1,461m and FCF US$1,023m: lower realised price (-US$977/oz versus the nine-month price), smaller Mana output and build capital explain the contraction; it is not a same-period accounting reconciliation. The uncertain year-end 2026 cash stub is stated in model inputs. Q3 management report, p. 4 Q3 financials, p. 4 Q3 management report, p. 37
Key Ratios
The vendor displayed about 3.6x trailing EV/EBITDA for EDV on 25 November, compared with Barrick 4.5x and Agnico 7.4x, but vendor captures and EBITDA definitions are not fully aligned. Our NAV avoids using the apparent discount as an independent value anchor. EDV ratio series · Barrick ratio series · AEM ratio series.
Forward Outlook
Three frozen checkpoints: (1) FY2027 gross production, koz: base 1060, joint downside 1000, upside 1060; issuer FY2027 mine guidance and annual statistics settle it. (2) FY2029 Assafou production, koz: base 120, downside 0, upside 120; first-gold and mill disclosures settle it. (3) FY2027 owner cash after project capital, US$m: base 224, downside -200, upside 538; audited cash flow, mine interests spending and NCI distributions settle it. Base forecast Q3 management report, p. 30 Q3 management report, p. 37
Model Choice
A finite mine-level discounted owner-cash NAV is appropriate for depleting reserves. The model projects 2027-2045 with no perpetuity, caps saleable output at 2025 P&P contained ounces times the issuer recovery rates, less estimated 2026 output, and excludes resource conversion, Kalana and speculative discoveries. It adds Assafou only with its own construction budget and reserve-limited output. 2025 reserves, named mine tables Assafou DFS, pp. 1-2
Growth
FY2027 gross output is 1,060koz as Mana restarts only in Q2; 2030 output reaches 1,440koz as Assafou ramps, then falls as Houndé, Mana and other reserve blocks run out. The model gives no terminal growth beyond disclosed recoverable ounces. Forecast Q3 management report, p. 30 2025 reserves, named mine tables
Profitability
Initial 2027 gold deck is US$3,500/oz and tapers to US$3,000/oz from 2033. This is Peralta judgment, below nine-month 2026 realised US$4,477/oz. Mine AISC bases run from US$1,450 at Ity to US$3,000 at Mana and rise 2% yearly; 30% tax is a cash-tax approximation, below the 2026 nine-month effective rate, which raises model risk. Q3 management report, p. 4 Q3 mine statistics, p. 1.
Reinvestment or Required Capital
Assafou spends a remaining US$1.1bn in 2027-29 after a modeled Q4 2026 US$70m stub; the approved P80 initial budget is US$1.2bn. Other mine non-sustaining capital begins at US$180m gross annually, plus US$80m exploration even though no discovery value is credited. The 2026 mine capital outlook is about US$525m and growth capital US$50-100m. Q3 management report, p. 37 Q3 management report, p. 16.
Discount Rate
Peralta uses a 10% nominal USD rate for West African mine and project cash. It is an analyst required return, not a market-observed WACC. A 12% challenge would further lower the NAV; discount-rate risk does not rescue a Buy at C$61.58. The CAD conversion holds the 25 November BOC US$1=C$1.4219 rate constant; changing exit FX changes returns. Bank of Canada FXUSDCAD, 25 November 2026
Terminal Economics
There is no perpetuity. At the reserve boundary gross output declines from 320koz in 2036 to 200koz in 2037; the 2045 final modeled 140koz yields negative owner cash after corporate and exploration spend. The model credits no salvage and deducts the September rehabilitation provision once in the equity bridge. Generated boundary table Q3 financials, p. 5
| Finite-life boundary | 2036 | 2037 | 2045 final modeled year |
|---|---|---|---|
| Gross production (koz) | 320 | 200 | 140 |
| Other reinvestment incl. exploration (US$m) | 132 | 132 | 132 |
| Owner cash (US$m) | 140 | 14 | -67 |
Bridge to One Common Share
Each producing asset cash flow is multiplied by its disclosed parent ownership, and Assafou by an assumed 90% pending the convention. The September balance is adjusted for the October parent dividend, November buyback and a labeled Q4 owner-cash/capex stub before deducting debt, leases, reclamation and other financial liabilities. Shares are 246.2m diluted versus 241.4m ordinary outstanding. Model code Q3 financials, p. 5 Q3 financials, note 18
| Bridge | US$m | C$/diluted share |
|---|---|---|
| PV of finite mine owner cash, 2027-2045 | 3,680.7 | 21.26 |
| Estimated cash after Q4 stub and paid distributions | 756.5 | 4.37 |
| Debt principal | -586.4 | -3.39 |
| Leases | -134.8 | -0.78 |
| Rehabilitation provision | -137.3 | -0.79 |
| Other financial liabilities | -39.6 | -0.23 |
| Common equity / base fair value | 3,539.1 | 20.44 |
Price-Implied Expectations
At C$61.58, the base 2031 exit and funded distributions provide only a negative five-year gain. Holding all other assumptions fixed, a uniform gold uplift of US$1772/oz is needed to earn the 9.49% annual hurdle, with US$5,090/oz gold in 2027. That is conditional implied economics, not an analyst or market consensus. Generated solve Q3 management report, p. 4
| Conditional market case | Result |
|---|---|
| Uniform gold price increase above Peralta deck (US$/oz) | 1772 |
| 2027 gold price needed (US$/oz) | 5272 |
| 2033+ gold price needed (US$/oz) | 4772 |
| Five-year terminal cash (C$/share) | 96.93 |
| Five-year annual return at C$61.58 | 9.49% |
Independent Cross-Check
At the quote, equity value is 241.4m ordinary shares × C$61.58 = about C$14.87bn (US$10.46bn at BOC FX) before cash/debt adjustments. The model common NAV is US$3,539m; the gap cannot be explained by a single lease or share-count adjustment and largely reflects a gold deck and reserves beyond the explicit model. The issuer DFS NPV is deliberately not added to modeled Assafou cash. TSX EDV unadjusted closing series, 25 November 2026 Bank of Canada FXUSDCAD, 25 November 2026 Assafou DFS, pp. 1-2
Conclusion and Change from Prior Edition
This is the first authored edition; no comparable prior entry price exists. C$61.58 minus C$20.44 is the market-to-fair gap, then C$9.14 minus C$20.44 is the fair-to-entry gap; together they reconcile to entry less close. The binding constraint is linked downside capital preservation, not a discretionary haircut. Decision worksheet.
Peer Selection
AEM and ABX are listed gold-mining comparators. Both have different geographic, production and copper exposure; the peer set is an orientation check only. AEM Q3 filing · Barrick Q3 filing.
Dated Ratio Table
Vendor trailing multiples as displayed on 25 November 2026; EBITDA is each vendor-defined trailing period, price and EV use respective CAD or USD listing currency consistently within each ratio. EDV vendor capture was earlier intraday and is not the frozen close; use only as a range check. EDV · ABX · AEM.
| Issuer / listing | Date | TTM P/E | TTM EV/EBITDA | Basis |
|---|---|---|---|---|
| EDV / TSX CAD | 2026-11-25 | 12.09 | 3.61 | Vendor, early capture |
| ABX / TSX CAD | 2026-11-25 | 8.81 | 4.54 | Vendor, close |
| AEM / NYSE USD | 2026-11-25 | 13.14 | 7.42 | Vendor, close |
Comparability Adjustments
These ratios have neutral currency denominators but differ in jurisdiction, mine life, copper mix, minority claims, accounting treatment and vendor snapshot time. EDV Q3 realised gold was unusually high relative to the model, which makes trailing EBITDA a poor proxy for long-run reserve cash. EDV Q3 EBITDA, p. 4.
Implications for Value
EDV appears inexpensive on TTM EV/EBITDA versus AEM, yet a finite-reserve model at lower gold gives only C$20.44. A peer multiple based on a high realised-price quarter would capitalise cyclically elevated cash and omit Assafou construction. The discrepancy motivates gold and reserve sensitivities rather than an automatic Buy. Q3 management report, p. 4
Bear Case
Joint setback: gold US$500/oz below the base deck, Mana delayed into 2028, Assafou first gold delayed one year, build capex 20% above US$1.2bn, and 80% Assafou ownership. These risks can coincide if project/host-country friction strikes while gold weakens. Finite NAV is C$4.87. Q3 management report, p. 30 Q3 management report, p. 37 2025 reserves, named mine tables
Base Case
Gold US$3,500/oz initially, tapering to US$3,000, Mana Q2 2027 restart, Assafou 2029 partial output and 90% modeled interest. Fair value C$20.44; the five-year exit NAV is C$21.80. Q3 management report, p. 30 Q3 management report, p. 37
Bull Case
Gold US$500/oz above base, normal Mana recovery and 100% Assafou interest produce C$34.59 fair value. The 100% interest is explicitly optimistic because the host-state economic stake remains unsettled. 2025 reserves, named mine tables Q3 management report, p. 37
Outcomes at Close and Entry
The same C$61.58 close is tested against every price rule. Each row reruns the base-hurdle ceiling and a linked downside at that row’s gold level; the joint-bear row applies a further US$250/oz downside. Negative or near-zero entries reflect zero nominal preservation after debt and construction, not a prediction of a zero stock price. Decision worksheet TSX EDV unadjusted closing series, 25 November 2026
| Assumption | Close | Fair value | Maximum entry | Price rule |
|---|---|---|---|---|
| Base | C$61.58 | C$20.44 | C$9.14 | Wait |
| Gold lower US$250/oz | C$61.58 | C$14.14 | C$0.27 | Wait |
| Joint bear: gold -US$500/oz, Mana delay, Assafou delay/overrun/80% | C$61.58 | C$4.87 | C$0.27 | Wait |
| Gold higher US$500/oz, Assafou 100% | C$61.58 | C$34.59 | C$26.84 | Wait |
Market-Implied Case
At the close, the market-equivalent five-year hurdle requires a US$1772/oz higher gold deck with all mine cash and exit math unchanged. This tests an observable source of disagreement, not a consensus target; a firm reserve-conversion plan could substitute for some of that gold uplift. Price-implied solve 2025 reserves, named mine tables
Analyst Assessment
The joint downside is the binding entry test: C$9.15 versus the base C$20.54 ceiling. At C$61.58, the joint case loses -85.1% over five years after costs; this is a severe capital loss and makes EDV ineligible for a passing rank. January Mana guidance and Assafou contract costs can narrow the case. Entry output.
Operating Risks
Mana processing is paused until expected Q2 2027 and the regulator must approve ore mining; a further delay removes modeled 2027 ounces and can require funding while the mine still incurs costs. The bear case cuts 2027 output to zero. Q3 management report, p. 30
Financial and Liquidity Risks
US$586.4m principal debt, US$134.8m leases and US$137.3m closure provision rank ahead of residual equity value. The group had US$700m undrawn RCF at September, but a construction overrun could consume liquidity and reduce discretionary distributions. The model deducts all claims once. Q3 financials, p. 5 Q3 management report, p. 16.
Regulatory and Legal Risks
Assafou convention terms are only agreed in principle and host-country participation could lower ownership below modeled 90%; Burkina Faso approvals condition Mana restart. The Q3 filing has not quantified Mana incident liabilities or insurance. Q3 management report, p. 37 Q3 financials, note 18
Industry and Competitive Risks
A US$250/oz gold miss reduces base fair value from C$20.44 to C$14.14 with other operating inputs fixed. Higher royalties, power costs or contractor costs can amplify a price miss. Q3 management report, p. 4 Generated sensitivity.
Thesis-Specific Risks and Reconsideration Triggers
Reconsider after January 2027 disclosure if Mana can process by Q2 with forecast AISC below US$3,000/oz, if Assafou contract/ownership are signed without moving the US$1.2bn budget or H1 2029 first gold, and if the next two quarters show owner cash after minority dividends and construction at least US$200m per quarter. Failure to meet any one lowers the ceiling; sustained gold above the price-implied deck with proven reserve conversion could raise it. Q3 management report, p. 30 Q3 management report, p. 37 Q3 financials, p. 4
Downside at the current price
Joint gold, Mana and Assafou disruption produces C$2.67 2031 sale value and C$6.48 carried distributions per share, or C$9.15 total after the sale fee. The base hurdle ceiling is C$20.54; downside zero-return ceiling C$9.15 binds and floors once to C$9.14. Joint case five-year gain/loss is -85.1% at C$61.58 and approximately zero at entry after purchase/sale costs. Gold below the deck, longer Mana delay or a smaller Assafou stake may make the ceiling still lower. Linked scenarios · public rule output Q3 management report, p. 30 Q3 management report, p. 37
| Five-year test | Base | Joint downside |
|---|---|---|
| 2031 exit value (C$/share) | 21.80 | 2.67 |
| Distributions carried to exit (C$/share) | 10.54 | 6.48 |
| Net terminal cash (C$/share) | 32.34 | 9.15 |
| Base hurdle / downside floor | 9.49% annually | 0% nominal |
| Ceiling (C$/share) | 20.54 | 9.15 |
| 5-year gain/loss at close | -47.5% | -85.1% |
| 5-year gain/loss at entry | +253.6% | +0.1% |
Environmental Factors
Five mines and a new plant have tailings, water, rehabilitation and energy exposures. September 2026 rehabilitation provision was US$137.3m; the model deducts it once rather than claiming costless closure. The 2025 sustainability report and AIF describe site-specific controls, but actual future closure cash may exceed the provision. Q3 financials, p. 5 2025 AIF environmental section.
Social Factors
Assafou relocation and crop compensation account for roughly 60% of the US$139m increase from DFS to P80 initial capital. These obligations are directly in modeled build cost, and additional claims would lower owner cash. Q3 management report, p. 37.
Governance Factors
The board approved Assafou FID before the convention was signed; model approval should not be mistaken for fixed economics. The issuer reported post-balance dividends and repurchases separately, and the model treats these as already paid rather than future income. Q3 management report, p. 37 Q3 financials, note 18
Financially Material Risks and Opportunities
If Assafou runs at the DFS 320koz and cost profile, future cash improves; if construction, state interest or community commitments differ, value falls. Our 80%-100% ownership range is a direct governance/host-stake sensitivity, while no speculative resource upside is credited. Assafou DFS, pp. 1-2 2025 reserves, named mine tables
Annual Results
IFRS US$ millions; continuing group operations, fiscal years ended 31 December. 2025 audited statements, p. 7
| Metric (US$m) | FY2024 | FY2025 |
|---|---|---|
| Revenue | 2,675.9 | 4,233.9 |
| Mine operating earnings | 868.7 | 2,093.5 |
| Operating earnings | 367.8 | 1,638.5 |
| Shareholder net earnings | -300.2 | 679.2 |
Interim Results
IFRS US$ millions; three and nine months ended 30 September 2026 against 2025. Q3 financials, p. 3
| Metric (US$m) | Q3 2025 | Q3 2026 | 9M 2025 | 9M 2026 |
|---|---|---|---|---|
| Revenue | 910.1 | 1,108.5 | 2,960.0 | 3,677.8 |
| Mine operating earnings | 424.8 | 514.4 | 1,438.1 | 1,893.7 |
| Operating earnings | 386.3 | 453.7 | 1,279.6 | 1,736.7 |
| Shareholder net earnings | 167.3 | 212.0 | 611.3 | 816.8 |
Trailing Results
TTM to September 2026 equals FY2025 + 9M26 − 9M25, on continuing-operations perimeter. Revenue is US$4,951.7m; shareholder net earnings US$884.7m. TTM is backward looking and uses the elevated gold-price period, not the forward deck. 2025 audited statements, p. 7 Q3 financials, p. 3.
Material Adjustments
2025 US$193.4m impairment and noncash financial-instrument loss are kept separate from mine cash. The forecast starts with physical ounces and US$/oz costs, not adjusted earnings. 2027 gold deck is lower than Q3 realised price by US$758/oz if comparing to Q3 US$4,258/oz, and US$977/oz versus 9M US$4,477/oz. 2025 audited statements, p. 7 Q3 management report, p. 4
Annual Positions
IFRS US$ millions at 31 December. 2025 audited statements, p. 9
| Metric (US$m) | 2024-12-31 | 2025-12-31 |
|---|---|---|
| Cash | 397.3 | 453.3 |
| Total assets | 5,513.4 | 5,606.8 |
| Total liabilities | 2,520.5 | 2,188.7 |
| Parent equity | 2,705.5 | 3,034.8 |
Interim Positions
IFRS US$ millions at the latest filing. Q3 financials, p. 5
| Metric (US$m) | 2025-12-31 | 2026-09-30 |
|---|---|---|
| Cash | 453.3 | 849.1 |
| Total assets | 5,606.8 | 6,136.9 |
| Total liabilities | 2,188.7 | 2,201.1 |
| Parent equity | 3,034.8 | 3,596.0 |
| Noncontrolling equity | 383.3 | 339.8 |
Capital and Claims Reconciliation
At September: debt principal US$586.4m (carrying debt US$584.5m), leases US$134.8m, rehabilitation US$137.3m and other financial liabilities US$39.6m. The US$77m post-period short-term draw adds cash and debt together and is neutral to net cash until spent. The model excludes minority net assets because mine FCF is already ownership-weighted. Q3 financials, p. 5 Q3 financials, note 18
Annual Flows
IFRS US$ millions for years ended 31 December. 2025 audited statements, p. 8
| Metric (US$m) | FY2024 | FY2025 |
|---|---|---|
| Operating cash | 943.3 | 1,663.7 |
| Investing cash | -630.0 | -507.8 |
| Parent dividends | -200.0 | -288.2 |
| Minority dividends | -123.5 | -119.1 |
| Buybacks | -39.2 | -87.4 |
Interim Flows
IFRS US$ millions; same nine-month period for each year. Q3 financials, p. 4
| Metric (US$m) | 9M 2025 | 9M 2026 |
|---|---|---|
| Operating cash | 1,054.7 | 1,461.4 |
| Investing cash | -375.1 | -438.9 |
| Parent dividends | -139.3 | -200.4 |
| Minority dividends | -119.1 | -241.0 |
| Buybacks | -84.1 | -71.5 |
Trailing Flows
TTM to 30 September 2026: operating cash US$2,070.4m and investing cash −US$571.6m by FY2025 + 9M26 − 9M25; consolidated cash after investing is US$1,498.8m. That figure still precedes NCI distributions, parent dividends and debt/lease flows. Q3 financials, p. 4 FY2025 cash statement, p. 8.
Reconciliation to Common Shareholders
2026 9M consolidated CFO 1,461.4 − investing 438.9 = 1,022.5; less minority dividends 241.0 gives 781.5 before parent dividend 200.4 and buybacks 71.5, leaving 509.6 for debt, leases, cash and other financing. The forecast instead ownership-weights mine margin, deducts project capital, and distributes at most cash produced; retained cash increases 2031 exit value once. Generated cash schedule Q3 financials, p. 4
| Year | Owner cash after investment (US$m) | Cash dividend (US$m) | Retained / debt reduction (US$m) | Net cash after senior claims (US$m) |
|---|---|---|---|---|
| 2027 | 223.9 | 223.9 | 0.0 | -141.6 |
| 2028 | 267.0 | 267.0 | 0.0 | -141.6 |
| 2029 | 865.5 | 350.0 | 515.5 | 373.9 |
| 2030 | 958.3 | 350.0 | 608.3 | 982.2 |
| 2031 | 978.4 | 350.0 | 628.4 | 1610.6 |
Primary Sources and Locators
Primary documents: Q3 2026 MD&A, Q3 2026 IFRS financials, FY2025 audited IFRS statements, 2025 AIF, Assafou DFS release, Q3 mine statistics. Original publisher index: Endeavour results; 2025 reserves, named mine tables; price TSX EDV unadjusted closing series, 25 November 2026; FX Bank of Canada FXUSDCAD, 25 November 2026. Local PDFs are issuer filings released publicly; each quoted metric is located by physical page and nearby row. The model is Peralta judgment, not issuer guidance.
Frozen Inputs and Assumptions
Frozen model input JSON records listing, 25 November quote and BOC FX, 2025 reserve and 2026 output bases, ownership, price deck, costs, capital, tax, dilution, discounting and trading costs. Every estimated 2026 mine depletion, Q4 cash stub and future gold/cost path is labeled as analyst input. 2025 source 2025 reserves, named mine tables; 2026 output Q3 management report, p. 4; quote TSX EDV unadjusted closing series, 25 November 2026; FX Bank of Canada FXUSDCAD, 25 November 2026.
Worksheets and Saved Outputs
Run from this edition folder: PYTHONDONTWRITEBYTECODE=1 PYTHONPATH=. /Users/johnperalta/johnperalta4vanilla/.venv/bin/python support/valuation.py (Python 3.12.13; standard library only). For portable reproduction, use any Python 3.12 interpreter with this public folder; no credentials or network are read. Generated files are frozen and byte-comparable. Open code and outputs below.
| Worksheet | Output |
|---|---|
| Finite mine NAV and entry | Decision · Forecast · NAV bridge · Entry rule · Cash allocation · Finite boundary · Price implied |
Changes from the Preceding Edition
First edition without a predecessor. The unpublished structured source entity dated 13 May 2026 was checked for identity but supplied no published economic baseline to bridge. Current authored calculations are independent and retain the original primary filings in this package.