Endeavour Silver Corp. (TSX: EDR) — 24 November 2026
Our maximum entry price is C$1.45 per share. EDR closed at C$8.27 on the TSX on 24 November 2026, so the decision is Wait. The base finite-life NAV is C$1.90; the modeled 24 November 2031 exit is C$3.77, implying a −14.55% annual net return at the close versus 7.49% for XIC. The strongest credible contrary case is weaker silver at US$50/oz and a 50% chance of Pitarrilla construction rather than the base US$60/65%; it reduces fair value to C$0.11 and the entry ceiling to C$0.11. The latest Q3 financial statements, Q3 MD&A, and 19 November Pitarrilla study announcement favor caution: Guanaceví output declined, construction funding and a tailings permit remain unresolved. This is Peralta's judgment, not company guidance.
- Market close
- C$8.27
- Base fair value
- C$1.90
Company details
- Five-year hurdle ceiling · 2031-11-24
- C$2.39
- No-stress entry · lower of fair and hurdle
- C$1.90
- Joint-risk reserve · 25% of lower-ceiling gap
- C$0.45
- Maximum entry price
- C$1.45
- 2031 base exit · diluted
- C$3.77
- Expected net annual return at close
- -14.55%
- Net XIC benchmark annual return
- 7.49%
- Required net excess return
- 2.00 percentage points
- Decision at close
- Wait
Cutoff: 24 November 2026 after the regular TSX close. EDR is a Canadian-listed, USD-reporting silver producer. The next review is the Q4/full-year 2026 operating report and Pitarrilla permit/financing update. Stock Price History is frozen below. This same-cutoff correction preserves the first authored EDR edition and its unchanged valuation.
Investment Thesis
EDR owns three producing mines and a large proposed fourth mine, Pitarrilla. The production base has material metal-price exposure, but its reserves, reinvestment, mine-site royalties, streams, derivatives, corporate spending and 2031 convertible principal consume value before one common share receives cash. The model assigns no perpetual mine cash or free value to unconverted resources. 2025 AIF, business and risk discussion and Q3 segment table anchor that assessment.
Market Mispricing
At C$8.27, the base shares and 24 November FX imply roughly US$1.74bn of equity value, before the US$350m principal and other claims. Solving the public worksheet with the base construction probability and all other inputs fixed requires approximately US$100.49/oz silver for fair value to meet the close; US$101.29/oz is required for the five-year excess-return ceiling to reach the close. These are conditional prices, not a spot quote or consensus forecast. The gap may also reflect a valuable unmodeled discovery or much longer mine lives. Bank of Canada 24 November USD/CAD 1.4296 and frozen model document the basis.
Recent Developments
The 19 November Pitarrilla feasibility announcement reports 25.078Mt of probable reserves, 18 years of output, US$585m initial capex, a US$736m after-tax NPV at 5% and US$50 silver, and an outstanding tailings-storage permit. The full NI 43-101 technical report was not filed by this cutoff. The 9 November Q3 update narrowed 2026 silver guidance to 7.8–8.1Moz and raised Terronera direct operating cost guidance to US$170–180/t. Pitarrilla study, Key Metrics and Permits · Q3 guidance.
Earnings Outlook
Peralta estimates first-year after-tax cash after sustaining capital of US$71.16m Terronera, US$19.62m Guanaceví and US$50.22m Kolpa at US$60 silver and US$3,600 gold, before US$45m corporate/exploration spending and Pitarrilla construction. These are Q3 run-rate translations, not issuer forecasts; the income-to-cash and capital bridge appears in First-year output.
Valuation Summary
The finite 2027–47 cash schedule has US$595.22m present value at 10%, plus US$287.9m September cash, less US$485.1m of enumerated principal and other claims: US$398.02m attributable common equity, or C$1.90 on 300.0m economic shares. The 2031 return hurdle sets a C$2.39 ceiling, so fair value binds before a C$0.45 reserve against the joint silver/project stress. Q3 balance sheet · valuation output.
Recommended Action and Entry Price
Wait at C$8.27. The maximum C$1.45 is the lower of finite NAV and the price that clears the XIC plus 200bp net-return requirement, less one quarter of the C$1.79 gap to the modeled joint downside. Bear fair value C$0.11 is C$1.34 or 92.4% below that entry, before any recovery; the five-year bear exit is a different metric. Rounding occurs once to cents. The risk reserve is analyst judgment, and at the current close the wait call holds even without it.
Catalysts
Observe the full technical report, tailings permit and board construction decision; the next quarterly Terronera throughput/cost, Guanaceví reserve replacement and Kolpa stream cash; and any committed Pitarrilla financing. Each could move the NAV or dilution rather than merely the narrative. Study next steps · Q3 MD&A.
Primary Risks to Thesis
The bearish call would weaken if silver remains well above US$60, Terronera earns substantially more than Q3, Pitarrilla obtains permits and funding without dilutive equity, or reserves grow at little cost. The study's US$50–60 silver sensitivity adds US$313m to its 5%-discount project NPV; the Peralta model tests the effect at a 10% issuer discount and only 65% development probability. Study sensitivity table.
Company Overview
EDR reports in USD and operates Guanaceví and Terronera in Mexico and Kolpa in Peru. Bolañitos was sold in January 2026 and is excluded from the prospective mine base. Pitarrilla is a proposed Mexican underground silver-lead-zinc project. Q3 statements, Note 16.
Products and Services
Guanaceví sells silver and gold doré; Terronera sells precious-metal concentrate; Kolpa sells silver, lead, zinc and copper concentrates. Metal content, recovery, treatment charges and payable ounces differ. Pitarrilla's planned 5.4Moz annual silver and base-metal concentrates are not yet produced. 2025 AIF, Description of Business · Pitarrilla study.
Business Model
Ore is mined and processed, then bullion or concentrates are sold at realized metal prices net of contract terms. Mine cash must fund sustaining development, reclamation, taxes and central costs; project cash precedes project revenue. EDR's Q3 cash flow statement shows US$76.5m operating cash, US$27.3m fixed-asset cash spending and US$2.8m copper-stream repayment, illustrating why revenue and mine operating earnings cannot be distributed in full. Q3 cash flows.
Revenue Drivers
Q3 sales were 1.900m silver ounces and 9,499 gold ounces at realized US$62.42/oz and US$4,290/oz, alongside base metals. Revenue was US$184.5m: Guanaceví US$47.4m, Terronera US$70.6m and Kolpa US$66.5m, summing to the consolidated amount. Volume, grade, recovery, payable factor and price each matter. Q3 release, revenue highlights · Q3 segment table.
Cost Structure
Q3 direct mine production cost was US$82.4m, royalties US$7.4m and depreciation US$25.7m; general and administrative cost was US$4.7m and exploration/evaluation US$10.5m. Project capital is outside operating cost. The model uses Q3 segment direct and other costs, then separate estimated tax, sustaining and corporate cash. Q3 income statement · Q3 segment table.
Operating Levers
Terronera Q3 processed 165,171t and produced 710,670oz silver; September's 60,313t/299,398oz showed recovery after the August blockade. Guanaceví Q3 processed 89,722t, with roughly one third third-party feed. Kolpa processed 256,052t after its expansion. The mine assumptions explicitly decline cash through finite lives rather than extrapolate peak throughput. Q3 operating release, mine tables · Q3 MD&A mine review.
Distribution
No shareholder cash dividend is declared in the frozen 2027–31 model. The statements show no cash dividend line for the first nine months of 2026; equity issuance and options increased shares. This is a modeling assumption, not a statement that future dividends are impossible. Q3 cash flows · Q3 share reconciliation.
Geographic Exposure
Mexican mining, permits, local communities, peso costs and taxes affect Guanaceví, Terronera and Pitarrilla; Peruvian labour and copper-stream terms affect Kolpa. Neither mine output nor fiscal treatment can be transferred across jurisdictions without adjustment. 2025 AIF, properties and risk · Pitarrilla permit summary.
Regulatory Environment
Pitarrilla's tailings-storage permit remains outstanding and the 19 November announcement says the NI 43-101 technical report will follow within 45 days. Reserve and resource estimates are distinct; unconverted resources and exploration are not producing cash. Study, Permits and Qualified Persons · AIF reserve cautions.
Industry Structure
Silver miners sell fungible metals into global markets and have little control over realized prices. The economic edge must come from ore quality, mine productivity, recovery, royalties and the price paid for shares. The peer comparison below checks EDR against larger Pan American and First Majestic's Mexican portfolio using issuer Q3 releases. PAAS Q3 results · AG Q3 results.
Growth and Cyclicality
Q3 EDR revenue benefited from realized US$62.42 silver and US$4,290 gold; sustained prices below that quarter reduce cash, even if output grows. Pitarrilla offers substantial future ounces only after permit, capex and 30 months of proposed construction. The model holds base metals flat and tests US$50, US$60 and US$75 silver. Q3 release · Pitarrilla study.
Competitors
PAAS operates a more diversified silver/gold portfolio and reports attributable cash inclusive of joint ventures; First Majestic operates four Mexican underground mines, including a 70% Los Gatos venture. They are relevant operating checks, but their ounces, by-product mix, joint-venture ownership and reserve lives prevent an unadjusted multiple transfer. PAAS Q3 release · AG Q3 release.
Market Share
EDR guided 7.8–8.1Moz silver in 2026 versus PAAS's 25–27Moz silver guidance. This compares reported production scope, not global market share. EDR remains materially smaller and more exposed to each mine's interruption. A defensible world-share denominator was not disclosed in the checked issuer sources, so no global share is claimed. EDR Q3 guidance · PAAS guidance.
Competitive Advantages
Terronera's Q3 mine operating earnings of US$34.8m and improving September grades/recoveries show a potentially strong cash engine. Pitarrilla's study economics at US$50 silver suggest valuable scale. Both advantages are conditional on sustained throughput and the high initial investment; the base assigns finite life and probability. Q3 segments · Pitarrilla study.
Pricing and Cost Position
EDR Q3 consolidated AISC was US$29.54 per payable silver ounce, net of by-products; Guanaceví nine-month AISC was US$47.20, while Terronera Q3 was US$21.81. PAAS reported US$11.21 Q3 silver-segment AISC, using a different attributable portfolio and cost definition. This comparison signals exposure, not a like-for-like cost-curve rank. EDR Q3 release · PAAS Q3 release.
Entry Barriers and Substitutes
Orebody access, permitting, local agreements and construction funding are barriers to new supply. Silver can be held directly or through more diversified miners, so EDR needs a larger prospective excess return to compensate for single-project and mine-life risk. The 200bp net hurdle above XIC is a user-specified minimum, not a claim that it fully prices these risks.
Supplier and Customer Dynamics
Concentrate treatment and refining terms, local third-party Guanaceví ore and mining labour can erode the metal-price benefit. AIF states one Terronera concentrate customer represented a significant portion of 2025 sales; the segment model does not assume stronger bargaining power without evidence. 2025 AIF, customers · Q3 MD&A, local ore.
Regulation and Structural Risks
Mexican special mining duty and royalties are real project costs. The Pitarrilla study's US$73m third-party 1.25% NSR, US$44m government royalty and US$254m special mining duty are embedded in its project cash economics; they are not deducted again from NAV. The outstanding tailings permit is the gating structural risk. Study operating-cost table.
Historical Performance
2025 consolidated revenue was US$467.5m versus US$217.6m in 2024, but 2025 net loss was US$119.1m, including a US$126.2m derivative loss. Nine-month 2026 revenue rose to US$606.3m from US$294.9m, aided by Terronera's commercial output, more Kolpa ownership and higher prices. These perimeters differ; 2025 includes Bolañitos and only eight Kolpa months. FY2025 audited income statement · Q3 interim income statement.
Income Statement Analysis
Nine-month 2026 mine earnings of US$236.2m followed US$606.3m revenue and US$370.1m cost of sales. Q3 mine earnings were US$68.7m, but derivative loss US$10.3m, finance US$5.7m and tax US$13.1m reduced net earnings to US$26.4m. The model starts from mine cash margins and does not capitalize accounting derivative gains. Q3 interim income statement.
Balance Sheet Analysis
At 30 September: cash US$287.9m; US$350m convertible principal versus only US$245.9m IFRS liability carrying value; other loans US$4.8m; copper stream US$47.2m; derivative liabilities US$50.5m; Kolpa contingent payment US$9.8m; reclamation US$23.7m. The bridge uses US$49.6m estimated gold-forward portion, not the whole US$50.5m derivative total, and treats the remainder as covered by forecast/rounding. This US$0.9m gap is about C$0.004/share. Q3 balance sheet · Note 9 · Note 18.
Cash Flow Analysis
Nine-month 2026 operating cash US$137.0m minus US$94.3m property/plant cash investment leaves US$42.7m before financing, stream repayment and acquisitions. Q3 US$76.5m less US$27.3m yields US$49.2m, but Q3 working capital released US$28.1m and hedge settlements consumed US$21.9m within operating cash. Neither quarterly figure is a clean recurring shareholder distribution. Q3 cash flows.
Earnings Quality
The US$36.5m nine-month gain on the Bolañitos sale and derivative fair-value changes are excluded from continuing mine economics. Cash balances include earlier convertible financing and asset sale proceeds; they are not internally earned cumulative free cash. Q3 interim income statement · Q3 cash flow.
Nonrecurring Items
The 2026 Bolañitos disposal changes operating perimeter and contributes a gain, cash proceeds and deferred consideration. The Q3 Terronera blockade and Guanaceví mill repair depressed volumes; their exact recurrence is uncertain, so the forecast uses observed cash with explicit decline and downside rather than adding back every lost day. Q3 statements Note 4 · Q3 operating release.
Funding and Cash Conversion
The proposed US$585m Pitarrilla capex exceeds 30 September cash by US$297.1m before minimum liquidity and other commitments. A US$25m committed revolver is not equivalent to the additional US$75m accordion, which requires approval. The worksheet displays a US$23.43m modeled 2031 base liquidity gap and 4.77m new shares at a 15% discount to the cutoff close if equity fills it; actual funding timing and price are uncertain. Pitarrilla study capex and funding · Q3 release, revolver.
Key Ratios
At the cutoff, C$8.27 × 296.227m basic shares / 1.4296 is approximately US$1.71bn equity market capitalization. Q3 operating cash/revenue was 41.5%; nine-month operating cash/revenue was 22.6%. These ratios mix working-capital and hedge effects, so NAV and per-share claims take precedence over a trailing P/E. Q3 share count · Q3 cash flow.
Forward Outlook
Three frozen forecasts are testable. (1) 2027 silver output, consolidated produced ounces: base 8.0Moz, downside 7.4Moz, upside 8.7Moz; compare the issuer's 2027 annual production release with its 2026 revised 7.8–8.1Moz guide. (2) 2027 Terronera direct operating cost, USD per processed tonne: base US$165, downside US$190, upside US$150; compare the 2027 MD&A mine cost table with 2026's revised US$170–180/t guidance. (3) 2027 property/plant cash spending including Pitarrilla construction, USDm: probability-weighted base US$217, no-build downside US$90, accelerated-build upside US$285; compare the FY2027 cash-flow investing row and project disclosures. These bands are Peralta estimates; the base is 35+20+35 mine sustaining plus 65% of US$195m first-year project construction and therefore is an expected value, not a single observable realization. Q3 guidance · Q3 cash flow capex.
Model Choice
The Python worksheet discounts mine-level after-tax cash after sustaining capital for 3, 6 and 8 years and a separately probability-weighted 18-year Pitarrilla build/operation. It includes no terminal perpetuity or automatic resource conversion. The mine-life assumptions are analyst estimates constrained by current reserves, especially Guanaceví's 0.413Mt 2025 reserve base and Kolpa's historical resource status. EDR reserves page, 2025 tables · 2025 AIF, reserve caution.
Growth
The model starts in 2027 using the Q3 mine segment cash margin (revenue less direct and other mine cost), annualizes the quarter, resets silver from US$62.42 to US$60 and gold from US$4,290 to US$3,600, taxes positive pre-tax cash at 30% and removes estimated annual sustaining spending. EDR's 2026 guidance is a check on volume, not a guarantee of future years. The bridge is generated below and tied to the cited Q3 segment and realized-price tables. Q3 segments · Q3 realized prices.
| Mine, USDm | Q3 cash margin before depreciation | Annualized at Q3 prices | First year at $60 silver/$3,600 gold | Tax-adjusted less sustaining | Modeled years |
|---|---|---|---|---|---|
| Terronera | 44.50 | 178.00 | 151.65 | 71.16 | 8 |
| Guanacevi | 17.90 | 71.60 | 56.60 | 19.62 | 3 |
| Kolpa | 32.00 | 128.00 | 121.75 | 50.22 | 6 |
Profitability
Terronera's first-year US$71.16m after-tax/sustaining cash declines 2% per year through 2034. Guanaceví's US$19.62m declines 20% for three years, recognizing depleted booked reserves and uncertain conversion. Kolpa's US$50.22m declines 3% for six years; its older 6.2Mt M&I inventory is historical and not treated as current reserves. The Q3 run rate could be unusually favorable or weak, which the silver/project sensitivities test. Q3 MD&A, mine costs · Kolpa historical technical report.
Reinvestment or Required Capital
Estimated annual sustaining capital is US$35m Terronera, US$20m Guanaceví and US$35m Kolpa, separate from US$195m Pitarrilla construction in each of 2027–29 if the project is approved. Pitarrilla's US$119m life-of-mine sustaining investment is already embedded in the modeled annual after-tax project cash, matching the feasibility study's cash-after-capex basis. No project royalty is deducted again. Q3 cash-flow capex · Pitarrilla study, Capital Expenditures.
Discount Rate
The USD nominal 10% rate is an analyst-required return for finite mine cash, above the Pitarrilla sponsor's 5% study convention because of unpermitted development, commodity and sovereign exposure. The separate shareholder hurdle uses XIC's assumed 7.5% annual gross wealth less 3bp each side, plus 200bp net annual; EDR incurs 5bp on purchase and sale. Raising the NAV discount to 12% alone reduces fair value to C$1.45; silver US$50 alone reduces it to C$0.32. The rate is judgment, not a disclosed company WACC. Pitarrilla study NPV convention · model input.
| Single changed assumption from base | Fair value CAD/share | Hurdle ceiling CAD/share | Decision at C$8.27 |
|---|---|---|---|
| Base | C$1.90 | C$2.39 | Wait |
| Silver US$50, permit 65% | C$0.32 | C$1.51 | Wait |
| Silver US$60, permit 50% | C$1.56 | C$1.93 | Wait |
| Discount rate 12%, other inputs base | C$1.45 | C$2.18 | Wait |
| Joint silver US$50 and permit 50% | C$0.11 | C$1.17 | Wait |
Terminal Economics
This is a depleting-asset model with no perpetuity. Terronera ends after modeled 2034, Guanaceví after 2029 and Kolpa after 2032; Pitarrilla runs 2030–47 only if developed. The final explicit cash year 2047 is US$101.40m expected project cash minus US$20m corporate cost = US$81.40m, followed by zero 2048 cash, and closure's US$23.7m provision is deducted as a senior claim today. Carrying the 2047 cash into perpetuity would falsely capitalize a depleted reserve. 2025 reserve discussion · Pitarrilla 18-year plan.
| Year | Expected Pitarrilla FCF USDm | Corporate USDm | Combined USDm | Next-year finite cash |
|---|---|---|---|---|
| 2047 | 101.40 | -20.00 | 81.40 | 0.00 |
| 2048 | 0.00 | 0.00 | 0.00 | 0.00 |
Bridge to One Common Share
The model uses 296.227m actual 30 September common shares plus a 3.773m estimated award cushion, 300.0m total. It subtracts US$350m principal, not the US$245.9m carrying value, because the C$8.27 close is far below the US$12.455 conversion price. If the notes convert, substitute 28.101m new shares for principal rather than subtracting both. At 24 November FX, subtracting only IFRS carrying value would overstate value by about C$0.50 per basic share. Copper stream, gold forwards, contingent consideration, other debt and reclamation total another US$135.1m; the Q3 mine cash basis is before later stream settlement, so the stream is charged once. Note 9 and diluted EPS · Note 18 · share table.
| USD millions unless noted | Base | Joint silver/project stress | Bull |
|---|---|---|---|
| Cash at 2026-09-30 | 287.90 | 287.90 | 287.90 |
| PV 2027–2047 after-tax cash after investment | 595.22 | 221.18 | 1,241.42 |
| Full 2031 convertible principal and other claims | (485.10) | (485.10) | (485.10) |
| Common equity value, USDm | 398.02 | 23.98 | 1,044.22 |
| Economic shares, millions | 300.00 | 300.00 | 300.00 |
| USD/CAD, Bank of Canada 2026-11-24 | 1.4296 | 1.4296 | 1.4296 |
| Fair value, CAD/share | 1.90 | 0.11 | 4.98 |
| Hurdle ceiling, CAD/share | 2.39 | 1.17 | 5.35 |
| 2031 exit, CAD/share | 3.77 | 1.83 | 8.42 |
| Cash needed at 2031 to meet minimum, USDm | 23.43 | 237.50 | 0.00 |
| New shares if funded at 15% discount, millions | 4.77 | 48.30 | 0.00 |
Price-Implied Expectations
At constant 65% project probability, US$3,600 gold, cost and finite-life assumptions, US$100.49 silver is needed for fair value to equal C$8.27. To earn 9.49% net annually from that close through 24 November 2031 with no distributions and 5bp each-side EDR costs, the model needs roughly US$101.29 silver. The associated 2031 exit requirement is C$13.03/share. An observable sustained silver price and mine cash near those levels would undermine this wait thesis. These solved figures are conditional and not independent analyst consensus. model JSON output.
Independent Cross-Check
The November Pitarrilla study's US$50 NPV5 US$736m, US$40 US$423m and US$60 US$1,049m imply about US$31.3m NPV movement per US$1 silver. A stylized 2027–29 US$195m annual construction outlay plus 2030–47 US$126m annual after-tax cash reproduces about US$741m NPV5 at US$50; raising cash US$3m/year per US$1 silver reproduces approximately US$438m at US$40 and US$1,044m at US$60. The few-percent residual reflects simplified timing. The published model discounts those same finite cash flows at 10% and weights approval at 65%, rather than booking US$736m as cash. study sensitivity table · worksheet.
Conclusion and Change from Prior Edition
This correction retains the first edition’s valuation. Its low fair value follows a shorter finite mine base, a higher discount than the project sponsor's 5%, project permit probability, US$350m full principal, and recurring reinvestment/corporate costs. The Q3 segment data and the 19 November study are the latest available evidence at cutoff. Q3 statements · study.
Peer Selection
PAAS provides a diversified silver-segment reference; First Majestic provides a more Mexico-focused silver/gold mine reference. EDR's Q3 figures are from IFRS consolidated statements, while both peers disclose non-GAAP metrics with different ownership and metal-credit conventions. PAAS Q3 results · AG Q3 results.
Dated Ratio Table
All USDm, Q3 ended 30 September 2026, released by 24 November. CFO/revenue uses consolidated CFO and reported consolidated revenue; AISC is the issuer's reported silver or AgEq definition, so the cost column is directional only. EDR CFO/revenue = 76.5/184.5, PAAS = 377/1,006, and AG = 214/394.1.
| Q3 2026 issuer | Revenue USDm | CFO USDm | CFO / revenue | Silver or AgEq AISC USD/oz |
|---|---|---|---|---|
| EDR | 184.5 | 76.5 | 41.5% | 29.54 |
| PAAS | 1,006.0 | 377.0 | 37.5% | 11.21 |
| AG | 394.1 | 214.0 | 54.3% | 30.45 |
Sources: EDR statements, income and cash flow, EDR AISC release, PAAS Q3 financial table, AG Q3 release/MD&A.
Comparability Adjustments
PAAS attributable free cash includes a 44% Juanicipio interest; its consolidated CFO does not. AG's 30.45 is per AgEq ounce, while EDR's 29.54 is net of by-product credits per payable silver ounce and PAAS's 11.21 covers its silver segment. EDR's Q3 working capital release also boosts CFO. These definitions block a direct AISC or CFO multiple valuation. PAAS non-GAAP definitions · AG MD&A · EDR reconciliation.
Implications for Value
The peer table confirms that a single strong CFO quarter is insufficient to price EDR's depleted reserves, financing and future capex. A listed peer multiple cannot substitute for project probabilities and senior claims, so the finite NAV remains the primary method. The next useful peer check is a common metal-price and reserve-life-normalized cash yield.
Bear Case
Joint US$50 silver and 50% Pitarrilla success, with gold still US$3,600, yields C$0.11 finite NAV and a C$1.83 2031 exit. This links lower mine margin to a lower chance that a US$585m project is financed and permitted. Base-to-bear fair-value loss is C$1.78/share; the Q3 cost and study sensitivity make it credible, though the exact probability is analyst judgment. Pitarrilla study sensitivity · valuation output.
Base Case
US$60 silver, US$3,600 gold, 65% Pitarrilla success and a 10% discount yield C$1.90 fair and C$3.77 2031 exit. No dividend is assumed. The US$1.45 entry leaves a C$0.45 risk reserve below fair, but the close remains far above both. model inputs · generated outputs.
Bull Case
US$75 silver and 85% Pitarrilla success yield C$4.98 fair and C$8.42 2031 exit. Even this modeled case does not clear the C$8.27 close with the XIC plus 200bp hurdle. It is not a cap on price: a higher silver deck, new reserves or a better project plan could add value. generated outputs.
Outcomes at Close and Entry
| Assumption | Close | Fair value | Maximum entry | Price rule |
|---|---|---|---|---|
| Base | C$8.27 | C$1.90 | C$1.45 | Wait |
| Silver US$50; Pitarrilla 50% | C$8.27 | C$0.11 | C$0.11 | Wait |
| Silver US$75; Pitarrilla 85% | C$8.27 | C$4.98 | C$4.53 | Wait |
At the base entry of C$1.45, the C$3.77 exit yields a high conditional return; the bear C$1.83 exit would still exceed cost before opportunity cost. The most severe risk is an operating/project failure deeper than the specified joint case. Annualized return at the close is −14.55%, below XIC net 7.49% by 22.04 percentage points, calculated from unrounded values. decision output · return worksheet.
Market-Implied Case
US$100.49 silver is the one-variable fair-value solution; US$101.29 silver is the one-variable hurdle solution at the observed close. The stronger case for the market is that large unconverted resources, project upside and silver prices above the current normalized deck have a real option value the finite NAV sets to zero. The next full technical report and sustained 2027 silver output/cost/financing observations could support that view. Pitarrilla resources and permits.
Analyst Assessment
The base case is preferred over the market-implied case because booked Guanaceví reserves are short, Kolpa's old resource estimate is historical, and Pitarrilla lacks its tailings permit and committed construction financing. These are evidence of uncertainty, not evidence that the project will fail. The most important disconfirming observation is a funded Pitarrilla board decision with approved tailings works and operating mine cash sufficient to maintain liquidity without meaningful new shares. EDR reserve table · Pitarrilla study next steps.
Operating Risks
Guanaceví's nine-month silver production fell 28% year over year and its nine-month AISC reached US$47.20/oz. Terronera had an August blockade and 2026 direct-cost guidance rose. If 2027 Terronera exceeds US$190/t or consolidated silver falls below 7.4Moz, rerun lower mine cash and reserve replacement costs before revisiting entry. Q3 MD&A Guanaceví/Terronera · Q3 updated guidance.
Financial and Liquidity Risks
The US$350m note matures in 2031 and is not extinguished by its US$245.9m carrying amount. Pitarrilla's US$585m capex could require debt, a stream or equity. The worksheet shows a base US$23.43m modeled minimum-cash gap by 2031 and a much larger US$237.50m joint-stress gap. Reassess after committed financing terms, especially if equity issuance exceeds 4.77m base modeled shares. Q3 Note 9 · Pitarrilla study.
Regulatory and Legal Risks
Tailings-storage approval is outstanding for Pitarrilla; community disruption at Terronera was observed in August. The model's 65% project probability and delayed first cash in 2030 are explicit analyst responses. A denied permit or >1-year construction delay would reduce entry further. Pitarrilla permits · Terronera blockade release.
Industry and Competitive Risks
Metal prices can overwhelm operating gains; payable factors, treatment charges, royalties and peso/labour inflation limit pass-through. The US$50 silver stress reduces both mine cash and project economics. Do not infer competitive advantage from AgEq output without the equivalent ratio and by-product treatment. Q3 MD&A cost discussion · Pitarrilla cost table.
Thesis-Specific Risks and Reconsideration Triggers
Reopen the wait decision if verified 2027 output is at least 8.7Moz, Terronera direct cost at most US$150/t, and Pitarrilla construction funding is committed with the tailings permit and limited equity dilution; rerun the same finite schedule with those disclosures. Conversely, 7.4Moz or US$190/t moves toward the joint downside. The first forecast checkpoint is the Q4/FY2026 report and initial FY2027 guidance, followed by the FY2027 audited result.
Environmental Factors
Pitarrilla proposes dry-stack filtered tailings but still needs a tailings-storage permit; the physical design and approval therefore change project probability and the 2030 start. Q3 balance sheet has US$23.7m reclamation provision, charged once in the common-equity bridge. A materially higher closure estimate should reduce fair value. Pitarrilla study, tailings and permits · Q3 balance sheet.
Social Factors
The Terronera blockade from 12 August involved local concerns about roads, medical services, communication and water access; September throughput improved after removal. The model's finite output and probability reserve accommodate potential recurrence, but no separate community-cost estimate is disclosed. A second interruption should trigger a throughput and cash forecast revision. issuer blockade notice · Q3 operating update.
Governance Factors
The 2026 circular says no person controlled more than 10% of voting rights as of its record date, and each common share had one vote. The US$350m convertible may change future voting and economic dilution if in the money; at the cutoff it is modeled as principal. Board construction approval, capital allocation and new equity terms therefore materially affect common shareholders. 2026 circular p9 · Q3 Note 9.
Financially Material Risks and Opportunities
An approved, funded Pitarrilla with a workable tailings plan could add long-life silver cash; failure to secure those conditions can strand design spending. Social continuity at Terronera protects current cash, while closure obligations and special mining duties reduce what reaches common shares. The public model explicitly changes project success probability and deducts reclamation; it does not assign an unverifiable ESG premium. Pitarrilla study · Q3 statements.
Annual Results
Audited USDm, years ended 31 December. FY2025 audited income statement physical p8.
| USDm | FY2024 | FY2025 |
|---|---|---|
| Revenue | 217.6 | 467.5 |
| Mine operating earnings | 42.0 | 82.8 |
| Operating earnings | 8.3 | 35.7 |
| Net loss | (31.5) | (119.1) |
Interim Results
Unaudited USDm, September quarters; 2025 includes Bolañitos while 2026 does not. Q3 income statement physical p3.
| USDm | Q3 2025 | Q3 2026 |
|---|---|---|
| Revenue | 142.8 | 184.5 |
| Mine operating earnings | 15.6 | 68.7 |
| Operating earnings | 1.8 | 53.5 |
| Net earnings (loss) | (42.0) | 26.4 |
Trailing Results
Nine months through 30 September 2026 revenue US$606.3m, mine earnings US$236.2m and net earnings US$157.8m. Adding FY2025 and subtracting nine-month 2025 produces trailing revenue US$778.9m and mine earnings US$282.8m; this mixes acquisition/disposal periods, so it is a descriptive bridge rather than the modeled run rate. Q3 9M columns · FY2025.
Material Adjustments
The forecast removes the 2026 Bolañitos US$36.5m gain, excludes noncash derivative revaluation as operating profit, resets Q3 realized metal prices, and replaces accounting depreciation with estimated sustaining cash investment. The Q3 segments already exclude sold Bolañitos going forward. Q3 income · First-year output.
Annual Positions
Audited USDm, 31 December; acquisition and convertible financing make 2025 materially different from 2024. FY2025 audited statement physical p7.
| USDm | 2024-12-31 | 2025-12-31 |
|---|---|---|
| Cash | 106.4 | 215.4 |
| Total assets | 719.2 | 1,235.7 |
| Total liabilities | 234.8 | 656.6 |
| Common equity book value | 484.4 | 579.1 |
Interim Positions
Unaudited USDm, 30 September 2026 versus December 2025. Q3 balance sheet physical p2.
| USDm | 2025-12-31 | 2026-09-30 |
|---|---|---|
| Cash | 215.4 | 287.9 |
| Total assets | 1,235.7 | 1,289.0 |
| Total liabilities | 656.6 | 548.9 |
| Common equity book value | 579.1 | 740.1 |
Capital and Claims Reconciliation
The US$485.1m NAV deduction is US$350.0m note principal + US$4.8m other loans + US$47.2m copper stream + US$49.6m modeled gold-forward liability + US$9.8m Kolpa contingent payment + US$23.7m closure. Compare the IFRS note carrying value US$245.9m only as accounting context; full principal is the economic settlement if unconverted. No material non-controlling interest is shown in Q3 consolidated equity; 100% subsidiary ownership appears in the AIF. Q3 balance sheet/Notes 9,18 · AIF subsidiaries.
Annual Flows
Audited USDm, years ended 31 December. The FY2025 cash-flow page is the original locator; development and acquisitions make its raw free cash nonstationary. FY2025 cash flows physical p10.
| USDm | FY2024 | FY2025 |
|---|---|---|
| Cash from operations | 19.1 | 67.4 |
| Cash paid for property, plant and equipment | (195.4) | (169.2) |
| Indicative CFO less property spending | (176.3) | (101.8) |
Interim Flows
Unaudited USDm, quarters ended 30 September. Q3 cash flows physical p5.
| USDm | Q3 2025 | Q3 2026 |
|---|---|---|
| Cash from operations | 27.1 | 76.5 |
| Property, plant and equipment cash spending | (34.7) | (27.3) |
| CFO less property spending | (7.6) | 49.2 |
Trailing Flows
Nine-month 2026 CFO US$137.0m and property/plant cash spending US$94.3m imply US$42.7m before note cash, stream repayments and acquisitions. The nine-month 2025 comparable was US$52.0m CFO and US$130.4m spending; the business perimeter changed. Q3 cash-flow nine-month columns.
Reconciliation to Common Shareholders
The Q3 US$49.2m CFO less property spending is not a dividend: US$28.1m working-capital release boosted CFO, US$2.8m copper-stream repayment and US$0.8m loan repayment were financing cash, and Pitarrilla construction has not begun. The worksheet deducts mine sustaining, taxes, US$45m corporate/exploration and probability-weighted growth capex, then retains net cash for a 2031 NAV exit. It assumes zero dividends and zero buybacks; awards add 3.773m economic shares. Surplus cash is kept at zero return rather than credited twice, and the modeled base shortfall requires 4.77m new shares if filled at the stated price. Q3 cash flow · annual schedule.
Primary Sources and Locators
Primary originals and claim locators: FY2025 audited statements physical pp7–10 for statements; 2025 amended AIF for subsidiaries, reserves and risk; Q3 2026 interim statements physical pp2–5 and notes 9/16/18; Q3 2026 MD&A for mine costs and guidance; 2026 circular for voting. The 19 November Pitarrilla issuer study announcement is cited by its named Key Assumptions, Sensitivity, Capital Investment, Permits and Mineral Reserve tables; its supporting technical report remained forthcoming at cutoff. Independent checks: Bank of Canada 24 November USD/CAD, PAAS Q3 and AG Q3. The PDFs are original issuer files in the public inventory; the unavailable technical report and historical Kolpa estimate are not represented as current originals.
Frozen Inputs and Assumptions
model.json freezes every material input and distinguishes Q3 reported mine rows from estimates: silver US$60, gold US$3,600, tax 30%, 10% discount, 65% Pitarrilla success, 2030 first output, finite mine lives, sustaining and corporate spending, 300m economic shares, and 1.4296 USD/CAD. The first-year bridge, 21-year schedule, equity bridge and exact unrounded JSON are generated. Price history uses TSX CAD closes 17 and 24 November; the 24 November EDR C$8.27 and XIC C$54.34 are the verified batch quote cutoff. EDR TSX historical quote · BoC FX.
Worksheets and Saved Outputs
Run from this edition folder with Python 3.12.13: PYTHONDONTWRITEBYTECODE=1 PYTHONPATH=. /Users/johnperalta/johnperalta4vanilla/.venv/bin/python support/nav.py. Only Python standard library and relative frozen public inputs are required. The generated Markdown is pasted in the opening, first-year and valuation tables; the complete annual rows and unrounded JSON remain downloadable. A fresh public-only checkout should reproduce the same bytes.
| Worksheet | Output |
|---|---|
| Finite mine NAV and decision | Decision and sensitivity · First year · Equity bridge · Single-driver tests · Terminal cash · Annual cash schedule |
Changes from the Preceding Edition
This 24 November 2026 correction follows edition 2026-11-24-01. It fixes the circular’s physical page label (15, corresponding to printed page 9) and moves the opening financial-statement highlight from the Revenue heading to the cash balance. The valuation, decision, model inputs and forecast are unchanged; the worksheet now generates this revision ledger. The original edition remains available in the edition picker.
| Revision driver | Fair value | Maximum entry |
|---|---|---|
| Prior | 1.90 | 1.45 |
| Citation locator and page label | 0.00 | 0.00 |
| Rounding | 0.00 | 0.00 |
| Current | 1.90 | 1.45 |
Closing Prices
| Date | Close (CAD) | Maximum entry (CAD) |
|---|---|---|
| 2026-11-17 | 10.20 | |
| 2026-11-24 | 8.27 | 1.45 |
Source: TSX:EDR daily historical close, CAD, unadjusted, 17 and 24 November 2026. XIC's C$54.34 regular TSX close on 24 November is the same-date benchmark observation; the worksheet uses the user-specified 7.5% forward gross benchmark return, not its past-price change.