Denison Mines Corp. (TSX: DML) — Uranium development and common-share value
Our maximum entry price is C$1.05 per share. At the November 24, 2026 TSX regular-session close of C$2.48, the rule is Wait. The strongest contrary view is that Phoenix reaches full output on time at US$115/lb realized uranium rather than our US$90/lb: fair value rises to C$2.52, but the joint delay, funding and price stress still limits entry to C$1.75. We prefer the lower base because 24% completion, a still-unfinalized cost-to-complete schedule and a contractual 2031 note maturity leave little room for a clean five-year outcome. Q3 construction and cost status
- Market close (CAD/share)
- 2.48
- Base fair value (CAD/share)
- 1.71
Company details
- Maximum entry price (CAD/share)
- 1.05
Cutoff: November 24, 2026 after the TSX close. Horizon: November 24, 2031. Share: TSX DML common share in CAD; NYSE American DNN is a separate USD quote. Next review: early 2027 revised construction cost and schedule. Stock Price History
Investment Thesis
Denison owns 95% of Wheeler River, where Phoenix is under construction, plus interests in Gryphon, McClean Lake and other uranium properties. Our share claims a finite 56.7 million-pound Phoenix reserve before any speculative exploration credit. The cash model includes attributable production and the full remaining construction spend, then pays US$345 million of notes before the exit. Phoenix reserve row Wheeler ownership
Market Mispricing
The C$2.48 close exceeds modeled fair value by C$0.77 and the maximum entry by C$1.43. Our base five-year net return is 1.58% versus net XIC 7.49%, a -5.90 percentage-point spread. The largest gap is the price and timing of saleable pounds; the public model gives the cash and share denominator.
Recent Developments
Federal construction approval and FID arrived in February 2026, full-scale work began in July, and the company reported 24% completion at September 30. Rain temporarily impeded work and added an estimated C$20 million to construction/EPCM cost. Management expected to finalize the remaining schedule and cost in early 2027. rain-cost line completion line
Earnings Outlook
Current accounting earnings do not measure mine economics: nine-month 2026 revenue was only C$2.872 million and net loss C$7.548 million, while Q3 net income included a large noncash note derivative revaluation. First saleable Phoenix production in H2 2028 is a management target, not a delivered result. interim revenue row derivative gain row first-production target
Valuation Summary
A 9.5% nominal CAD residual-cash discount rate and US$90/lb realized uranium yield C$1.71 present fair value. The C$1.05 entry survives a joint one-year delay, C$120 million capex overrun and US$75/lb realized price after C$0.05 downward rounding. Base diluted exit price is C$2.69; no common distributions are forecast. All numbers are analyst estimates unless cited as reported.
Recommended Action and Entry Price
Wait at C$2.48. An executable limit at C$1.05 or lower would meet the five-year net XIC plus 200-basis-point hurdle and the quantified stress. A qualifying price is a research entry ceiling, not a direction to trade. Recheck immediately on a new cost estimate, off-take price disclosure or funding issue.
Catalysts
The 2027 cost-to-complete plan, first-saleable-pound evidence in 2028 and 2029 run rate can narrow the exit distribution. Uranium contract terms matter more than a temporary spot quote because firm post-2028 commitments are mostly market-related. contract pricing line
Primary Risks to Thesis
Delay, capex inflation, realized price, recovery performance and capital issuance interact. The observed C$20 million weather cost is a concrete warning; a second similar miss while winter work falls behind is a reason to lower entry. Capped calls protect the note conversion economics only within their strike/cap range, and the model instead assumes cash repayment. capped-call cap line
Company Overview
Denison is a Canadian uranium developer and investor focused on Saskatchewan's Athabasca Basin. Its effective Wheeler River interest is 95%; McClean Lake mill participation and equity-accounted holdings create other exposures. Wheeler ownership row McClean interest row
Products and Services
Phoenix is planned to produce U3O8 through in-situ recovery. Existing disclosed revenue is mainly deferred toll-milling recognition at McClean Lake; inventory sales monetize held uranium and are separate from future mine output. revenue description
Business Model
The mine plan creates pounds that are sold under a mix of market-related and base-escalated commitments. The separate sale of physical uranium finances construction; its proceeds are not recurring Phoenix operating cash. contract mix
Revenue Drivers
Saleable pounds, USD/lb realization and USD/CAD translation drive modeled mine revenue. The base 2029 attributable 7.98 million pounds derives from 8.4 million-pound 100% first-five-year rate times 95% ownership; 2028 1.90 million is our ramp assumption. study production row
Cost Structure
The reported study's C$8.51/lb cash operating cost is dated and not refreshed. We add C$15/lb royalty and C$12/lb sustaining/closure allowance as analyst assumptions, then 28% cash tax; this is not company guidance. study operating-cost row
Operating Levers
A US$1/lb uranium move changes modeled after-tax Phoenix cash about C$1.01 per attributable pound before funding effects. Timing shifts the entire production curve and can trigger an equity raise at our C$100 million liquidity floor.
Distribution
Utility contracts and physical storage arrangements bridge mine output to delivery; no common dividend is disclosed or modeled. Contracted 2028–33 deliveries include a prepaid discount for 4.5 million pounds, so a fully spot-priced forecast may overstate realized price. prepaid delivery note
Geographic Exposure
Wheeler River and other projects sit in Saskatchewan; legacy reclamation duties include former Elliot Lake properties. Costs are largely CAD, uranium pricing USD, so USD/CAD matters. reclamation note
Regulatory Environment
Phoenix obtained federal environmental approval and its construction licence in February 2026. Operating completion, environmental compliance and permitted execution remain separate from an approved construction start. licence line
Industry Structure
Nuclear utilities buy physical U3O8 through long contracts and spot transactions. Denison's reserve-to-cash conversion differs from established integrated fuel suppliers; delivery commitments with market linkage leave real price exposure. contract price language
Growth and Cyclicality
The principal growth event is company-specific startup, not market share gain in an existing producing business. A move in uranium term pricing can lift NAV but also shift financing availability before 2029.
Competitors
Cameco is an operating Canadian peer with 19.5–20.5 million pounds of attributable 2026 production guidance. Energy Fuels operates uranium and rare-earth lines; neither is a pure Phoenix development comparable. Cameco production guidance Energy Fuels Q3 2026
Market Share
A projected 7.98 million attributable full-rate pounds are a mine-plan forecast, not current sales or an established market share. We do not assign a market share percentage without a consistent worldwide production denominator.
Competitive Advantages
Phoenix's high-grade resource and relatively low stated C$8.51/lb cash cost provide potential economics; actual reagent use, recovery and sustaining capital remain untested at commercial scale. study cost line
Pricing and Cost Position
US$90/lb and C$1.40/USD are analyst assumptions. The issuer's updated capex economics used a UxC Q4 2025 price curve of US$68.89–78.36/lb with a different schedule and tax basis, so the C$1.57 billion study NPV is a cross-check, not an add-on. study price row study NPV row
Entry Barriers and Substitutes
Permits, grade, infrastructure and capital funding limit quick supply entry. Other nuclear-fuel sourcing and inventory drawdowns can substitute for incremental mine output in a utility's procurement plan.
Supplier and Customer Dynamics
Post-2028 firm commitments total substantial uranium volume and are largely market-related; execution of delivery and pricing terms will settle our realized price assumption. contract mix row
Regulation and Structural Risks
ISR groundwater, radioactive material and reclamation obligations create a higher consequence of operational failure than the narrow cash operating-cost table reveals. We reserve C$30.548 million of Elliot Lake and McClean/Midwest obligations in the exit bridge; the C$8.458 million Wheeler portion of the reported C$39.006 million total is instead covered by project closure allowance. liability row
Historical Performance
2025 annual revenue row Q3 2026 revenue row
| Measure | FY2024 C$m | FY2025 C$m | 9M2025 C$m | 9M2026 C$m |
|---|---|---|---|---|
| Revenue | 4.02 | 4.92 | 3.70 | 2.87 |
| Operating cash flow | -40.38 | -68.15 | -59.71 | -87.52 |
Annual rows are audited year-end figures; interim rows are unaudited. The four periods are intentionally separate, not added to an artificial trailing total. 2024 operating-cash row 2026 operating-cash row
Income Statement Analysis
Q3 2026 revenue C$1.046 million and net income C$81.768 million coexist because fair-value movements on financing instruments dominate accounting income. Operating losses matter for cash burn; the derivative gain does not fund construction. net-income row
Balance Sheet Analysis
At September 30 cash was C$362.749 million, uranium investments C$120.998 million and accounts payable/accruals C$97.250 million. The model rolls that last reported balance through Q4 2026, including the known October uranium sale; actual October–November construction cash and accrual settlement are not separately disclosed. The payable includes construction timing that may make expenditure less than cash paid; our C$438.9 million remaining-project calculation has an unresolved payable overlap. cash row payables row
Cash Flow Analysis
Nine-month operating cash use was C$87.516 million. Uranium-investment sales C$91.624 million helped fund C$114.574 million additions to property, plant and equipment; one must not add sales proceeds to the opening uranium asset twice. uranium-sale cash row capital-additions row
Earnings Quality
The Q3 C$110.828 million note-derivative gain is noncash and reverses with stock/volatility assumptions. We exclude it from per-pound project cash. noncash gain row
Nonrecurring Items
Rain caused an estimated C$20 million cost during 2026 work. We treat this as observed execution evidence for the stress, not a normalized recurring annual expense. weather cost
Funding and Cash Conversion
C$600 million 100% post-FID budget less C$161.1 million spent to September implies C$438.9 million unspent on a cost basis, or C$416.96 million at 95%; the FY2026 C$278.6 million expenditure forecast is part of that budget path, not additive. Annual funding schedule includes assumed asset sales and a C$100 million cash floor. YTD spend row FY2026 spending row
Key Ratios
At C$2.48, basic equity value is C$2.2455 billion. September cash is 16.2% of that value; C$490.970 million contractual note principal at September FX is 21.9%. The ratios use common market value and contractual debt, not IFRS fair-value mark. share count row principal FX row
Forward Outlook
Three frozen tests: (1) December 2027 construction completion base 70%, downside 55%, upside 85%, and cumulative post-FID spending base C$478.6m, downside C$550m, upside C$450m on a 100% basis; 2027 year-end MD&A resolves both. (2) 2028 saleable pounds base 2.0m, downside 0, upside 3.0m 100%, then FY2029 base 8.4m, downside 2m, upside 9m; 2028/29 MD&A resolves it. (3) November 2031 cash after September note payoff base C$930m, downside C$0–300m with issuance, upside over C$1.5bn; 2031 statements and note settlement resolve. These are analyst ranges, not guidance.
Model Choice
A finite-life after-tax Phoenix cash schedule from 2028–38, explicit remaining capex and 2031 note repayment underpins one share. We do not add the C$1.57bn Phoenix study NPV to our project cash or assume a perpetuity. Gryphon contributes a C$220.03m option at exit: C$864.2m 100% study NPV × 95% ownership × 50% assumed FID probability × 53.6% timing/financing factor. The C$737.4m 100% initial capex (C$700.53m attributable) is already netted in study NPV but would still need committed cash or new financing on a real FID. The option carries no committed Gryphon spend before the 2031 exit. Phoenix study NPV Gryphon study NPV Gryphon initial capex
Growth
The cash schedule assumes 2.0m Phoenix pounds in 2028, 8.4m annually in 2029–32, 6.3m in 2033 and 2.96m in 2034–38, all at 100% mine basis. Total is 56.7m reserves; 95% accrues to DML. This is an analyst calendar distribution consistent with the study's first-five/last-five average, not an issuer annual schedule. reserve row
Profitability
US$90/lb × 1.40 CAD/USD less C$8.51 cash cost, C$15 royalty and C$12 sustaining/closure, then 28% cash tax, leaves C$65.15 per attributable pound. Royalty, sustaining and tax are analyst estimates. The cost estimate itself has not been refreshed since the study. cost caveat
Reinvestment or Required Capital
The model funds C$416.96m remaining attributable Phoenix construction: about C$111.6m in Q4 2026, C$190m in 2027 and C$115.33m in 2028. C$120m overrun stress adds C$114m attributable. Pre-FID costs are sunk at our cutoff and already reflected in the opening cash. Accrued construction liabilities may shift cash timing; C$97.25m total payables set an uncertainty bound, not an extra automatic deduction. capex comparison row payable row
Discount Rate
9.5% CAD nominal discounts post-2031 Phoenix cash and base terminal exit. An 11% alternative lowers fair value to the sensitivity table result. The rate is analyst judgment for uranium price, permitting execution and mine concentration, not a quoted WACC. The five-year investor test uses net XIC 7.4871% plus 2.0 points = 9.4871% annual.
Terminal Economics
The exit is November 24, 2031, so the modeled 2031 cash row includes 328/365 of that calendar year, or 7.55m lb mine basis; the 0.85m lb balance belongs in residual value. The first full residual year, 2032, produces 8.4m lb mine basis with the C$12/lb sustaining/closure allowance and 28% tax, yielding C$519.92m attributable. The remaining post-exit 2031–38 pounds total 30.35m 100% and produce C$1,438.95m residual NAV at exit. Carrying 2031 reinvestment forward has no effect because the per-pound C$12 reserve is maintained; removing that allowance would overstate residual value. late-life reserve row
Bridge to One Common Share
| Exit bridge at 2031-11-24 | C$m or shares m |
|---|---|
| Cash after note repayment | 930.02 |
| PV of post-exit 2031–38 Phoenix cash | 1438.95 |
| Gryphon option, after financing/timing haircut | 220.03 |
| Other nonproject assets | 35.00 |
| Legacy reclamation claim | -30.55 |
| Common equity at exit | 2593.44 |
| Basic shares | 905.45 |
| Awards and future grants | 26.89 |
| New funding shares | 33.45 |
| Diluted shares at exit | 965.79 |
| Exit CAD/diluted share | 2.69 |
The annual funding rows raise approximately C$66.9m of equity at C$2/share to keep C$100m minimum cash before positive production, adding about 33.45m shares. The 2031 US$345m note is paid C$490.97m at September 2026 FX; the capped-call derivative and embedded derivative are not added to this contractual cash payoff. Conversion above the capped call cap remains a scenario risk. note payoff row capped call cap
Price-Implied Expectations
At C$2.48 and the 9.4871% required five-year net return, the exit must reach about C$3.91 per diluted share, versus C$2.69 base. Holding production and costs fixed, realized uranium must approach US$115/lb without the required execution stress; a buyer at this close would need that favorable path plus little further funding dilution. The report therefore treats a high spot quote as insufficient proof until sales and funding confirm it.
Independent Cross-Check
The issuer's updated Phoenix post-tax NPV8 of C$1.57bn at 100% project basis implies C$1.492bn for 95% ownership at its FID valuation date. It already nets post-FID capex and uses a lower UxC curve than our US$90/lb; our model's later cash and terminal value differ in date, price, tax and risk. Adding the study NPV to this model would double count the asset. Gryphon study NPV is similarly excluded except for a risk-adjusted option. Phoenix study NPV row Gryphon study NPV row
Conclusion and Change from Prior Edition
This same-cutoff correction retains the first edition's economics: fair value C$1.71, stressed entry C$1.05 and Wait. It makes the displayed Q4 2026 capex split approximate at the model's precision and corrects the manifest summary's fair value from a C$1.70 transcription to C$1.71. The underlying calculation is unchanged.
Peer Selection
Cameco offers an operating Saskatchewan uranium benchmark; Energy Fuels offers a uranium/rare-earth comparator. Whole-company P/E or EV/EBITDA mixes unlike production and loss stages. We instead compare financing ratios on the same CAD equity basis and keep production context visible. Cameco production guide Energy Fuels Q3 results
Dated Ratio Table
Prices are November 24, 2026 TSX CAD closes; balance-sheet numerators September 30, 2026 CAD millions, contractual debt for DML and reported debt for CCO. DML shares are November 4 and CCO shares October 28 Q3-reported counts; both are millions. DML cash row CCO cash row CCO debt row CCO shares row CCO close
| Issuer | Close C$ | Shares m | Equity C$m | Cash C$m | Debt C$m | Cash / equity | Debt / equity |
|---|---|---|---|---|---|---|---|
| DML | 2.48 | 905.45 | 2,245.50 | 362.75 | 490.97 | 16.2% | 21.9% |
| CCO | 85.26 | 435.53 | 37,133.54 | 859.82 | 997.00 | 2.3% | 2.7% |
Comparability Adjustments
Cameco owns producing mines, fuel services and 49% of Westinghouse; its 19.5–20.5m lb 2026 attributable output is not a direct denominator for DML's 2029 forecast. DML's note fair-value liability differs from cash settlement; we use the latter. Energy Fuels' US-dollar statements and REE business prevent a clean same-currency uranium multiple without segment separation. CCO guidance row DML contractual principal
Implications for Value
DML's higher gross note/equity exposure and pre-revenue state justify an explicit funding path. These ratios are capital-structure checks, not price targets; the entry is derived from cashflows, not a peer-multiple average.
Bear Case
Joint downside uses a one-year delay, C$120m 100% Phoenix overrun and US$75/lb realized price. It yields C$1.10 fair value, C$1.73 exit and about 137.6m new funding shares; C$1.05 entry survives only after rounding. The C$20m observed rain cost and unfinalized schedule make the combined event plausible. rain overrun evidence
Base Case
On-time 2028 startup, US$90/lb, 95% share, C$1.40/USD, a C$100m cash floor and cash repayment of the note yield C$1.71 fair and C$2.69 exit. C$1.05 entry is set by the joint stress, not by discount-rate arithmetic alone.
Bull Case
US$115/lb realized on time, holding the other operating inputs fixed, yields C$2.52 fair and C$3.96 exit. A price of C$2.48 would clear the simple no-stress hurdle, but a companion one-year delay, overrun and US$100/lb would limit the entry to C$1.75. Firm price evidence is required before treating that bull as base.
Outcomes at Close and Entry
| Assumption | Close | Fair value | Maximum entry | Price rule |
|---|---|---|---|---|
| Base | 2.48 | 1.71 | 1.05 | Wait |
| Delay + overrun + US$75/lb | 2.48 | 1.10 | 1.05 | Wait |
| US$115/lb, on time | 2.48 | 2.52 | 1.75 | Wait |
| 11% residual discount rate | 2.48 | 1.56 | 1.05 | Wait |
The downside's C$1.05 ceiling is reached at the same C$0.05 rounded precision as the opening, and the base row is the portfolio action. The 11% rate alternative is held apart from the operating stress; its change is in the public worksheet.
Market-Implied Case
The close needs roughly C$3.91 at exit to meet the benchmark plus spread with costs and no distributions. US$115/lb on-time is one conditional way to reach C$3.96, but the same favorable price with joint development stress would fail the entry test. The first invalidating observation would be a 2027 cost/schedule revision that raises the remaining capex above C$720m 100% or projects first saleable pounds after 2028.
Analyst Assessment
Our strongest disagreement is with assuming a high term uranium price and no additional funding. We choose a Wait because construction, production and 2031 debt repayment must all work on the same one-share basis. A disclosed fixed-price off-take above US$115/lb alongside a funded remaining budget would warrant immediate re-underwriting.
Operating Risks
ISR recovery, wellfield build, freeze technology and commissioning may make the reserve curve late or smaller. A missed 2028 first-pound date shifts cash behind the note maturity; rerun the delayed case on any revised schedule. construction work description
Financial and Liquidity Risks
C$363m September cash is less than remaining attributable construction plus corporate burn and note coupons; uranium sales and possibly equity must bridge it. A C$97m payable balance could move near-term cash use. Material dilution at below C$2/share would reduce the modeled exit. payables row
Regulatory and Legal Risks
Construction approval is a milestone, but environmental performance and reclamation obligations remain. The C$39.006m reported obligation is split between C$30.548m older-site claims in the bridge and C$8.458m Wheeler/other addressed within project cash; a remediation estimate increase lowers common value before dilution. reclamation row
Industry and Competitive Risks
Uranium market-linked contracts can fall with the price; the US$75/lb stress cuts per-pound after-tax cash by about C$15.12. Cigar Lake toll milling payments are already sold to Ecora and should not be assigned as new common cash. market-pricing contract row Ecora cash proceeds arrangement
Thesis-Specific Risks and Reconsideration Triggers
Recalculate at 2027 final cost-to-complete, at 2028 saleable output and at the 2031 note settlement plan. A 2027 construction completion below 55% or revised post-FID cost over C$720m, all at 100%, would force the stress or worse as base; a documented higher realized price and pre-funded capex could raise entry.
Environmental Factors
ISR requires groundwater controls, process containment and closure plans. The reported C$39.006m reclamation obligation comprises C$16.637m Elliot Lake, C$13.911m McClean/Midwest and C$8.458m Wheeler/other. Our C$12/lb project allowance addresses Phoenix sustaining/closure; the C$30.548m older-site component is deducted once in the exit bridge. reclamation amount row all-in cost definition
Social Factors
Construction and operation in Saskatchewan depend on local workforce and Indigenous engagement. We do not translate an unverified qualitative agreement into cash uplift; a work stoppage would appear in schedule and burn. Denison corporate policy list
Governance Factors
The 2026 circular reports no known shareholder controlling over 10%; common shares carry one vote. Option and unit grants have a measurable dilution burden, included with 14.888m current awards and 12m assumed future grants. principal-holders statement option count row
Financially Material Risks and Opportunities
Permitted construction is positive, but delayed cost-to-complete guidance and C$20m weather impact require board oversight of procurement and contingency. Our stress adds C$120m 100% capex and delays a year, making governance quality observable in 2027 spending and progress. 2027 cost timetable
Annual Results
| CAD millions | 2024-12-31 | 2025-12-31 |
|---|---|---|
| Revenue | 4.023 | 4.918 |
| Net income (loss) | -91.119 | -217.288 |
The audited annual net losses include financing marks and are not used as steady-state mine earnings. annual revenue row
Interim Results
| CAD millions | 2025-09-30 | 2026-09-30 | 2026-07-01 to 2026-09-30 |
|---|---|---|---|
| Revenue | 3.696 | 2.872 | 1.046 |
| Net loss / income | -166.001 | -7.548 | 81.768 |
Trailing Results
Last-four-quarter revenue through September 2026 equals FY2025 4.918 less 9M2025 3.696 plus 9M2026 2.872 = C$4.094m. The perimeter is continuing operations, and this accounting revenue is not Phoenix output. annual revenue row interim revenue row
Material Adjustments
Q3 note-derivative gain C$110.828m is noncash. The cash model replaces accounting finance marks with contractual coupon and principal. noncash note gain
Annual Positions
| CAD millions | 2024-12-31 | 2025-12-31 |
|---|---|---|
| Cash and equivalents | 108.518 | 465.918 |
| PP&E | 259.661 | 316.926 |
Interim Positions
| CAD millions | 2025-12-31 | 2026-09-30 |
|---|---|---|
| Cash | 465.918 | 362.749 |
| Uranium investments | 190.276 | 120.998 |
| PP&E | 316.926 | 504.584 |
| Accounts payable and accruals | 41.202 | 97.250 |
interim balance sheet uranium row total uranium investment row
Capital and Claims Reconciliation
Contractual US$345m principal translated at September FX equals C$490.970m, rather than IFRS carrying value C$583.021m that embeds a marked derivative. Reported reclamation totals C$39.006m; we deduct C$30.548m for Elliot Lake and McClean/Midwest separately and address Wheeler/other within project cash. Ecora toll-milling deferred revenue is a pass-through, and discounted prepaid uranium deliveries reduce future realization rather than creating another cash payoff in our model. The C$97.250m payables balance may overlap Phoenix spend. principal settlement row IFRS carrying row
Annual Flows
| CAD millions | 2024-12-31 | 2025-12-31 |
|---|---|---|
| Operating cash flow | -40.384 | -68.148 |
| PP&E additions | -7.690 | -50.496 |
Interim Flows
| CAD millions | 9M2025 | 9M2026 |
|---|---|---|
| Operating cash flow | -59.714 | -87.516 |
| PP&E additions | -19.092 | -114.574 |
| Uranium investment sales | 31.166 | 91.624 |
interim CFO row uranium monetization row
Trailing Flows
Last-four-quarter operating cash flow through September 2026 is FY2025 -68.148 minus 9M2025 -59.714 plus 9M2026 -87.516 = C$-95.950m. This is a reported-business cash measure, not Phoenix steady-state cash.
Reconciliation to Common Shareholders
| Year | Phoenix saleable Mlb attributable | Project after-tax cash C$m | Uranium + invest sales C$m | Remaining capex C$m | Corp/JV burn C$m | Note coupon C$m | Note principal C$m | Equity raised C$m | End cash C$m |
|---|---|---|---|---|---|---|---|---|---|
| 2026 | 0.00 | 0.00 | 17.84 | 111.62 | 20.00 | 5.13 | 0.00 | 0.00 | 243.83 |
| 2027 | 0.00 | 0.00 | 131.86 | 190.00 | 60.00 | 20.53 | 0.00 | 0.00 | 105.16 |
| 2028 | 1.90 | 123.79 | 0.00 | 115.33 | 60.00 | 20.53 | 0.00 | 66.90 | 100.00 |
| 2029 | 7.98 | 519.92 | 0.00 | 0.00 | 45.00 | 20.53 | 0.00 | 0.00 | 554.39 |
| 2030 | 7.98 | 519.92 | 0.00 | 0.00 | 45.00 | 20.53 | 0.00 | 0.00 | 1008.78 |
| 2031 | 7.17 | 467.22 | 0.00 | 0.00 | 40.44 | 14.57 | 490.97 | 0.00 | 930.02 |
In 2028 the model issues equity only to maintain C$100m cash floor; no dividends or repurchases occur. Positive 2029–31 project cash is retained for note repayment, Gryphon optionality and future mine funding. C$120.998m September uranium investment is converted once: the known October 150,000 lb sale at US$84.94/lb is estimated at C$17.84m using the model FX, and the balance is assumed sold in 2027. The C$220.03m Gryphon option does not imply an already funded development program; its C$700.53m attributable initial capital is a future funding gate. A 50% diversion of positive residual cash before the exit to investments with zero incremental value would cut base exit by roughly C$0.8/share; retained cash is central to the case. uranium asset row
Primary Sources and Locators
- Denison Q3 2026 MD&A and interim statements, released November 4, 2026; physical PDF pp. 2–3 construction, 8–13 Phoenix/Gryphon studies, 22–28 notes and shares, 32–35 statements, 43–48 note disclosures. Local first citations open the matching physical page and row.
- Denison 2025 annual report, published March 2026; physical PDF pp. 69–73 audited statements. 2024 comparative figures share that document.
- Denison 2026 circular, physical PDF p. 9 ownership and vote.
- Cameco Q3 2026 report, pp. 20, 25–26 and 54 for guidance, shares, debt and cash. Energy Fuels Q3 release supports qualitative peer perimeter.
- DML closing prices and CCO November 24 close. Nov 17 TSX official daily record supports one earlier DML point: TSX daily record. XIC C$54.34 and DML C$2.48 November 24 closes were separately verified at intake.
Frozen Inputs and Assumptions
Public frozen JSON distinguishes reported balance sheet, shares, Phoenix spend/reserves and analyst uranium price, FX, royalties, sustaining, taxes, timing, Gryphon option, discount, funding floor and future grants. It models no oil, natural gas or gold exposure; WTI US$80, gold US$3,600 and PEY gas peer are inapplicable to DML. The US$90/lb uranium input is an effective realized price after any 2028–33 prepayment discount, explicitly a judgment rather than a quoted contract or consensus. Operating cash uses C$1.40 per USD, while the 2031 note principal conservatively uses the higher observed September 2026 translation of C$490.97m; this is an asymmetric FX stress, not a hedge. In the issuer's November presentation a C$539m liquidity graphic marks inventory to market; our model uses C$120.998m book uranium investment and C$28.701m other investment, avoiding the extra finished-goods inventory mark. investment carrying row
Worksheets and Saved Outputs
| Worksheet | Output |
|---|---|
| Finite-life valuation and entry | Annual cash, bridge and sensitivity |
| Finite-life valuation and entry | Opening decision |
Run from the edition root using PYTHONDONTWRITEBYTECODE=1 PYTHONPATH=. /Users/johnperalta/johnperalta4vanilla/.venv/bin/python support/valuation.py (Python 3.12.13; standard library only). Exact results JSON records unrounded values. All links and inputs are public; no writer credentials are required.
Changes from the Preceding Edition
The first DML edition is the dated predecessor. This revision corrects the displayed Q4 capex split's cent precision and the manifest summary's fair-value transcription. It changes no model input, recommendation or per-share economic output.
| Revision driver | Fair value | Maximum entry |
|---|---|---|
| Prior | 1.71 | 1.05 |
| Precision and manifest correction | 0.00 | 0.00 |
| Rounding | 0.00 | 0.00 |
| Current | 1.71 | 1.05 |
Closing Prices
| Date | Close (CAD) | Maximum entry price (CAD) |
|---|---|---|
| 2026-11-17 | 2.72 | |
| 2026-11-23 | 2.55 | |
| 2026-11-24 | 2.48 | 1.05 |