Capstone Copper Corp. (CS)
Capstone offers copper-price exposure through four operating mines in the Americas and potential growth from Mantoverde Optimized and Santo Domingo. The current issuer-share-count comparison places Capstone at approximately 19.48 times reported trailing common-shareholder earnings and 1.72 times their book equity, using the November 9 indicative CAD-to-USD conversion. The principal risks are weaker copper margins, uneven mine performance, higher costs and investment requirements, and funding or transaction outcomes that absorb the benefit of operating growth.
Current Price
CAD 11.70
Street Consensus
CAD 17.80
Company details
Sector
Basic Materials
Industry
Copper
Market Capitalization
$9B
Primary Exchange
Toronto
Benchmark
XIC - Canada
Status
Held
Current Price
CAD 11.70
Street Consensus
CAD 17.80
Sector
Basic Materials
Industry
Copper
Market Capitalization
$9B
Primary Exchange
Toronto
Benchmark
XIC - Canada
Status
Held
Capstone offers copper-price exposure through four operating mines in the Americas and potential growth from Mantoverde Optimized and Santo Domingo. The current issuer-share-count comparison places Capstone at approximately 19.48 times reported trailing common-shareholder earnings and 1.72 times their book equity, using the November 9 indicative CAD-to-USD conversion. The principal risks are weaker copper margins, uneven mine performance, higher costs and investment requirements, and funding or transaction outcomes that absorb the benefit of operating growth.
Current Price
CAD 11.70
Street Consensus
CAD 17.80
Sector
Basic Materials
Industry
Copper
Market Capitalization
$9B
Primary Exchange
Toronto
Benchmark
XIC - Canada
Status
Held
Key Catalysts
The most direct catalyst is evidence that Mantoverde Optimized can sustain the expanded throughput rate expected from early 2027, with the associated recoveries, costs and cash conversion. Q4 operating delivery provides an earlier checkpoint following the tie-in, but a brief peak daily rate is not the same milestone. Closing of the proposed Cozamin sale could clarify both the production perimeter and available proceeds; cash, share, deferred and contingent consideration should remain distinct. Santo Domingo's expected Q1 2027 investment decision, updated capital estimate and financing terms could sharpen the value and funding requirements of the development pipeline. Each catalyst can also disappoint. The valuation impact depends on the quality and shareholder economics of the evidence, rather than the arrival of an announcement alone.
Earnings Outlook
Near-term earnings remain highly sensitive to realized copper prices, mine sequencing, grades, recoveries, throughput and input costs. Management's October 29 outlook points to higher Q4 production following the Mantoverde Optimized tie-in, with sustained expanded throughput expected from early 2027. That expectation should be distinguished from the peak daily rate already observed. Full-year production near the low end of guidance and C1 costs near the high end leave less room for operating disappointment, while the US$830 million investment program affects cash conversion. The proposed Cozamin sale changes the future earnings perimeter even though 2026 guidance includes a full year of its production. Reported earnings also contain tax, derivative and other period-specific effects. A durable earnings improvement requires operating delivery alongside commodity support; the current quarter is not a normalized forecast.
Investment Thesis
Capstone offers copper-price exposure through four operating mines in the Americas and potential growth from Mantoverde Optimized and Santo Domingo. The investment case depends on turning that asset base into durable cash attributable to shareholders, rather than equating higher metal prices or announced processing capacity with value already realized. In Q3 2026, stronger realized copper prices lifted revenue and mining earnings despite lower payable sales volumes. Yet substantial investment and financing uses reduced cash. Sustained expanded Mantoverde throughput from early 2027 is therefore a critical operating test, while Santo Domingo remains a separately funded development decision. The pending Cozamin sale could alter production, cash generation and financing flexibility. The attractive feature is operating and project optionality; the central constraint is delivery after capital needs, minority ownership and transaction conditions.
Valuation Summary
At the C$11.70 reference quote, the current external street targets range from C$14.00 to C$22.00, with a C$17.795 mean across 20 analysts in the November 10 fetch. Consensus is an external comparison rather than an independently established estimate of business worth or expected return. The current issuer-share-count comparison places Capstone at approximately 19.48 times reported trailing common-shareholder earnings and 1.72 times their book equity, using the November 9 indicative CAD-to-USD conversion. Period-specific earnings items and accounting book values limit these measures. Sustainable Mantoverde output and capital discipline must translate into shareholder cash for growth to earn greater valuation credit. Santo Domingo capital and funding terms, conditional partner consideration and the pending Cozamin transaction remain central to that judgment. No independently calibrated DCF value is established.
Recommended Action
Treat Capstone as execution-dependent copper exposure with development optionality, and keep conviction tied to measurable operating and funding evidence. The priority is sustained expanded Mantoverde throughput and recoveries that improve cash generation after investment, rather than a higher production-capacity headline alone. Require clearer Cozamin closing terms and timing, and a funded Santo Domingo development case using its updated capital estimate, before giving full valuation credit to those transactions and projects. Reassess risk if costs remain elevated, cash absorption persists or financing terms dilute shareholder participation. The street-target gap is a reason to test the investment case, not a sufficient reason to increase risk. Position sizing and trading decisions depend on portfolio constraints beyond this company-level analysis.
Recent Developments
The October 29 update reported Q3 2026 revenue of US$712.0 million and earnings from mining operations of US$259.7 million. Realized copper prices increased, while payable copper sold fell to 45,409 tonnes. Cash ended September at US$263.4 million after investing and financing outflows exceeded operating cash generation. Management expected full-year production near the low end of its 200,000–230,000 tonne range and C1 costs near the high end of US$2.45–US$2.75/lb, and increased capital-expenditure guidance to US$830 million. Mantoverde Optimized had reached a peak daily throughput observation, with sustained expanded throughput expected from early 2027. Cozamin's proposed sale remained conditional, and the expected Santo Domingo investment decision moved to Q1 2027 subject to engineering, an updated capital estimate and financing. These developments change the timing and funding tests for the thesis.
Primary Risks To Thesis
The principal risks are weaker copper margins, uneven mine performance, higher costs and investment requirements, and funding or transaction outcomes that absorb the benefit of operating growth. Q3's falling cash balance despite positive operating cash flow illustrates why earnings momentum does not assure financial flexibility. Mantoverde must sustain expanded output, while Santo Domingo requires engineering, an updated capital estimate and financing before development proceeds. Cozamin closing and Orion consideration contain conditions and timing dependencies; maximum headline proceeds are not cash already held. Minority ownership, leases, related-party funding, closure obligations and working-capital facilities affect shareholder cash participation beyond a single net-debt metric. Water, tailings, permitting, labour and community risks can interrupt operations and project execution. An adverse combination could reduce both earnings and the valuation credit assigned to future growth.
Market Mispricing Rationale
Relative Performance
Historical return vs XIC · 2025-06-01–2026-06-01
The potential valuation disconnect is between the market's current treatment of execution and funding risk and the value that could emerge if Mantoverde expansion delivers sustained, cash-generative production. The dated street-target range sits above the current quote, but that gap does not establish mispricing: targets can change and do not replace a mine-level valuation. Conversely, treating every growth project and conditional transaction as immediately valuable would overstate what shareholders already own in producing cash flows. Evidence of mispricing would strengthen if expanded throughput, recoveries and capital discipline improve attributable cash generation without equivalent increases in financing demands. It would weaken if copper prices explain most of the earnings improvement, expansion absorbs the cash benefit, or project funding and disposal terms reduce shareholder participation. Current evidence supports this conditional debate rather than a proven valuation error.
Street
bull
Market-Implied
bear
Most Likely
base
Confidence
low
Assessment Rationale
The current external consensus range of C$14.00-C$22.00, with a C$17.795 mean across 20 analysts, is above the C$11.70 reference quote. The November 10 fetch therefore presents an optimistic street setup relative to the current quote, classified as bull. This describes the direction of published targets rather than a measured probability, an independently valued scenario or identical analyst operating assumptions. Convergence still requires operating delivery and acceptable financing outcomes that consensus alone cannot establish.
The C$11.70 reference quote is below the C$14.00 low end of the current external consensus range. The market-implied label is bear relative to that range: investors may be discounting commodity exposure, sustained Mantoverde output, cash absorption and conditional transaction or project funding. A single price cannot identify those weights or reveal a probability distribution. This is a directional interpretation of the quote-to-consensus relationship, rather than a reverse-engineered mine valuation.
The central operating case assumes progress toward sustained Mantoverde expansion while retaining substantial uncertainty around costs, cash conversion and development funding. Strong Q3 operating cash flow supports the ability to invest, but the falling cash balance shows that investment and financing uses remain consequential. Cozamin closing and Santo Domingo's conditional Q1 2027 decision should be treated as separate milestones. Base is therefore the central planning case, with no numerical probability assigned and no assumption that the street range must be reached. Weak operating delivery or unfavorable funding terms would move the balance toward bear; sustained attributable cash generation and clearer funded growth would support bull.
Confidence in the case ordering is low because copper prices, sustained expansion performance and transaction or development funding can change the outcome materially. The street and market labels describe their relationship at the November 9 quote and November 10 consensus fetch; they are not calibrated probabilities. The base case is a planning assumption that should be tested against new operating and funding evidence.
Case Narratives
Bear Case
Investment and operating pressure absorb Capstone’s copper-price benefit
Copper margins weaken or mine performance remains uneven, and Mantoverde's expanded processing capacity fails to translate into sustained cash-generative output. Investment, stripping and financing requirements continue to absorb operating inflows. Cozamin closing or proceeds disappoint expectations, while Santo Domingo's updated cost and funding requirements limit the value shareholders can assign to its optionality. In this case, the current discount to external consensus can persist without implying an inevitable recovery.
What Must Go Right: To contain losses in this adverse case, operating mines must preserve cash generation, management must maintain financing flexibility and investment must remain disciplined. Sustained Mantoverde performance and transparent transaction terms could prevent a difficult operating period from becoming a more severe funding problem. These stabilizers would limit the bear case; they would not by themselves prove that growth-project value has been realized.
What Must Go Wrong: The bear case develops if weaker realized prices coincide with elevated unit costs, disappointing recoveries or throughput, continued working-capital absorption and a capital program that cannot be funded on acceptable terms. Conditional disposal and partner proceeds fail to arrive when needed or carry less favorable economics, and project delays extend the period before new cash generation. The combination matters more than any single unfavorable quarter.
Base Case
Mantoverde progresses while funding and cash conversion remain the tests
Capstone makes operating progress after the Mantoverde Optimized tie-in and moves toward sustained expanded throughput from early 2027, but the benefit is partly absorbed by investment and operating costs. Existing mines continue to provide commodity-linked cash generation. Cozamin and Santo Domingo advance through their separate closing, engineering and financing conditions without treating maximum consideration or development capacity as cash already secured. The result is a viable growth case whose value remains sensitive to delivery and funding terms.
What Must Go Right: The base case requires sustained plant availability, recoveries and mine sequencing that support production without proportionate increases in cost and cash absorption. Management must preserve liquidity through the investment cycle and clarify how Cozamin proceeds, partner funding and Santo Domingo requirements fit together. Production, spending and ownership assumptions must be updated when transactions close, so the earnings perimeter and financing case remain consistent.
What Must Go Wrong: The base case weakens if expansion performance remains intermittent, costs stay elevated or copper margins fail to support the investment program. Material delays or unfavorable transaction and funding terms could turn an orderly development sequence into additional financing pressure. It would also lose credibility if the valuation relied on a peak daily operating rate, maximum conditional proceeds or the street range without evidence of attributable cash generation.
Bull Case
Sustained output and funded growth earn greater valuation credit
Mantoverde delivers sustained expanded throughput with recoveries and costs that improve cash generation after investment, while supportive copper margins reinforce operating leverage. Cozamin closing terms and cash timing become clear, and Santo Domingo advances with an updated capital estimate and financing structure that preserves attractive participation for common shareholders. Reduced uncertainty allows investors to give more credit to the operating platform and development options. The external consensus range provides context, but the case does not depend on assuming its high estimate is fair value.
What Must Go Right: The favorable case needs repeated operating evidence, not one strong throughput observation: reliable production, recoveries, capital discipline and better conversion of mine earnings into shareholder cash. Transactions must complete on workable terms, and development commitments must be funded without transferring away an excessive share of future value. Progress on permitting, water, tailings and labour controls also needs to support the operating and project timetable.
What Must Go Wrong: The bull case fails if the apparent improvement mainly reflects temporary copper prices or if expanded output requires enough additional spending to consume its cash benefit. Adverse financing terms, transaction delays or a higher development cost base could offset operational gains. If liquidity or minority and contractual commitments constrain shareholder participation, better group production alone would not justify a stronger common-equity valuation.
Street Targets
Reference Price
$11.70
Street Mean Target
$17.80
Price-only Change
+52.1%
Street consensus is a comparison. This price-only change excludes dividends and uses the stored reference price.
Street Target Range
Current vs low/median/mean/high target prices
Growth
Capstone's valuation depends on converting expanded processing capacity into sustained, attributable copper sales rather than capitalizing a peak throughput observation. The current financial analysis records management's October 29 expectation for 2026 production near the low end of 200,000–230,000 tonnes and sustained Mantoverde Optimized throughput of 45,000 tonnes per day from early 2027. Higher copper prices supported Q3 revenue even as payable copper sold declined, so recent revenue growth does not isolate underlying volume growth. The pending Cozamin sale also changes the future operating perimeter; full-year guidance still includes that mine. Santo Domingo supplies longer-term optionality, with a conditional Q1 2027 investment decision, rather than an immediate earnings contribution. A stronger growth valuation requires sustained throughput, recoveries and sales with an updated post-transaction production base, not merely an extrapolation of current metal prices.
Profitability
Q3 mining earnings improved to US$259.7 million as realized copper prices increased, but shareholder income of US$98.5 million was below the prior-year quarter that contained an impairment reversal. For valuation, the reviewed annual-plus-current-YTD-minus-prior-YTD calculation yields US$325.8 million of reported trailing earnings attributable to Capstone shareholders. The 2025 Santo Domingo reversal cancels out of this September 2026 trailing window; other period-specific effects remain. Management expected full-year C1 costs near the high end of its US$2.45–US$2.75/lb range, and cash generation still depends on grades, throughput, recoveries, by-product credits and input costs. These facts support sensitivity to both commodity margins and operating delivery rather than treating reported earnings as a normalized perpetuity. Sustained profitability must be demonstrated through a broader range of copper prices and after expansion costs and minority interests.
Reinvestment
The current outlook raises 2026 capital-expenditure guidance to US$830 million, including higher capitalized stripping, while retaining a full year of Cozamin in the guidance perimeter. That makes the timing and purpose of investment central to shareholder value: sustaining mine capacity, stripping and expansion do not have the same growth or cash-return profile. Q3 operating cash flow of US$226.6 million coexisted with US$231.1 million of investing outflows and a falling cash balance. Company-defined free cash flow from operations was positive, while free cash flow after expansion was negative. Santo Domingo requires updated engineering, a refreshed capital estimate and financing before its investment decision; the older study cost base is not a current fixed commitment. Conditional Orion consideration and proposed disposal proceeds should enter a funded development case only when their terms and timing are established.
Discounting (WACC)
Implied Discount Rate
—
Cost Of Equity
15.91%
Beta
2.33
Equity Weight
85.88%
Debt Weight
14.12%
More Inputs
Risk Free Rate
4.25%
Equity Risk Premium
5.00%
Illustrative estimate from profile and statement data. See More Inputs for the assumptions.
A discount-rate assessment must reflect Capstone's commodity exposure, mine and construction execution, country-specific operating risks, funding commitments and the distinction between consolidated cash generation and cash attributable to common shareholders. The current report identifies current liabilities above current assets, substantial investment requirements and obligations beyond the company's narrower net-debt measure. Those factors make financing access and project timing consequential even when operating cash flow is positive. A debt coupon or a reported accounting return would not alone establish the required return on the whole business. No independently calibrated WACC or completed discounted-cash-flow valuation is supplied by the reviewed inputs. The valuation implication is to require project-specific funding and downside cash-flow resilience before assigning a lower risk premium; combining optimistic copper, throughput, funding and discount-rate assumptions would compound uncertainty rather than diversify it.
Terminal Value
Long-term value rests on economically recoverable ore, mine lives, replacement investment, closure obligations and the ability to convert development opportunities into producing assets. Book equity of US$3.698 billion attributable to Capstone shareholders is an accounting balance, not an estimate of the fair value of the mineral portfolio. A terminal-growth assumption therefore cannot be inferred from the current expansion target or from copper demand alone. Mantoverde operating performance must first become sustained, while Santo Domingo remains subject to its investment decision, updated capital estimate and financing. A defensible long-duration case would connect production, recoveries, sustaining capital, taxes and closure spending to the relevant asset lives and ownership shares. Until that bridge is established, the report supports conditional project optionality and sensitivity analysis rather than a perpetual-growth value or a claimed intrinsic price target.
Comparables
The current reviewed comparison uses Lundin Mining as one operating copper-producer reference, with common-shareholder earnings and book-equity denominators. Capstone is approximately 19.48 times reported trailing earnings and 1.72 times attributable book equity; Lundin is approximately 12.14 times and 2.67 times respectively. CAD capitalizations are converted using the November 9 Bank of Canada indicative rate of C$1.4123 per US dollar. Capstone uses its October 29 issued count of 766,250,575 common shares multiplied by the November 9 C$11.70 ordinary-share quote. Both statement periods end September 30, 2026. Reported earnings contain exceptional items, and asset mix, minority ownership, development programs and acquisition exposures differ. These are bounded reference points rather than a relative-value ranking. Consistent ownership and forecast bases have not been established for sales, enterprise-value or forward-earnings multiples and growth or profitability rankings.
Valuation Conclusion
At the current C$11.70 reference quote, Capstone trades below the external street-target range of C$14.00-C$22.00, with a C$17.795 mean across 20 analysts in the November 10 fetch. That gap describes consensus expectations rather than verified intrinsic value, an expected return or a probability-weighted outcome. The current issuer-count comparison implies roughly 19.48 times reported trailing common-share earnings and 1.72 times book equity; neither measure captures mine fair value or establishes sustainable earnings. The investment question remains whether sustained Mantoverde delivery and capital discipline translate copper-price exposure into durable cash attributable to shareholders while preserving financing flexibility. Pending Cozamin and Orion terms and Santo Domingo funding requirements can change that assessment. The evidence supports a conditional operating and funding case, with no new portfolio action or independently established price target.
Convergence Probability
Convergence toward the street-target range is conditional and does not have a defensible numerical probability in the reviewed report. A quote below the low target is not evidence that convergence is likely by a particular date: consensus targets are external estimates, and the current operating and transaction assumptions can change. The strongest observable support would be sustained expanded Mantoverde throughput with recoveries and costs that improve attributable cash generation, followed by clearer disposal proceeds and a funded Santo Domingo decision. Evidence in the opposite direction would be continued cash absorption, weaker copper margins, delayed throughput or financing terms that reduce common-shareholder participation. The appropriate current assessment is meaningful upside exposure paired with unresolved execution and funding uncertainty, rather than a high-confidence claim derived mechanically from the target-price gap.
Convergence Probability Rationale
The distinction between operating progress and shareholder cash realization drives the convergence assessment. Q3 operating cash inflow was substantial, yet investing and financing uses produced a lower cash balance; the present evidence therefore does not justify treating higher copper prices as assured distributable cash. Expanded Mantoverde throughput is a measurable near-term checkpoint, while Santo Domingo's conditional Q1 2027 investment decision and updated capital estimate are separate funding checkpoints. Cozamin's proposed consideration contains closing, deferred and contingent components, and full-year guidance still includes its production. Clear execution on those milestones would reduce uncertainty; delays, unfavorable terms or weaker margins would increase it. The current consensus range and reviewed common-equity multiples contextualize the market's expectations, but neither establishes a catalyst date or a statistically supported probability of convergence. Reassessment should follow new source-backed operating and funding evidence.
Thesis Specific Risks
The principal execution risks in management's current growth plans concern sustained Mantoverde expansion performance and the funding, engineering and approval steps for Santo Domingo and related district opportunities. Santo Domingo's expected Q1 2027 investment decision is conditional; the older US$2.3 billion initial-capital estimate used 2023 dollars and was being updated. Orion consideration includes investment-decision, matching-contribution and contingent milestones, so the maximum headline amount is not immediately available funding. Cozamin consideration likewise includes closing cash, shares, deferred and contingent components. The 2026 guidance includes a full year of Cozamin despite the pending sale. Failure to meet operating or transaction assumptions could change funding needs, portfolio mix and project timing.
Regulatory And Legal Risks
The operating and project portfolio is subject to mineral rights, environmental and safety requirements, tailings and water controls, labour rules, taxation and closure obligations in several jurisdictions. The AIF describes potential fines, capital requirements, modifications or operating delays from compliance failures or changing requirements. Expansion and transaction approvals are separate from permission to operate existing facilities. The planned Cozamin sale still required regulatory and other closing conditions, and at September 30 the company did not classify the mine as held for sale because a substantive approval remained outstanding. Mantos Blancos Phase II was in an environmental assessment and permitting process. Management's development or completion schedules therefore remain exposed to decisions and processes outside the company's control.
Financial And Liquidity Risks
Cash generation is sensitive to copper prices, volumes, working capital, tax payments and investment. Q3 2026 illustrates why positive operating cash flow does not assure rising cash: investing and financing uses exceeded the operating inflow, and the cash balance declined. Reported liquidity combines cash and undrawn revolving credit; future access to credit depends on facility terms and compliance. Leases, related-party funding, working-capital facilities, closure obligations and precious-metal streams add commitments beyond a single net-debt measure. Management reported compliance with relevant debt covenants at September 30, which is a dated observation rather than assurance of future compliance. Proposed disposal proceeds and conditional partner funding are not cash already held, while share issuance or other financing can change shareholder participation.
Business And Operational Risks
Production depends on ore grade, recovery, mine sequencing, reliable equipment, labour and access to power, water and transport. The current quarter provides concrete examples: Pinto Valley experienced maintenance and reliability interruptions; Mantos Blancos faced grade, recovery and input-cost effects; and Mantoverde experienced weather disruption and expansion tie-ins. A high daily throughput result does not establish the sustained operating rate targeted for Mantoverde Optimized from early 2027. Reported production also includes 100% of Mantoverde despite Capstone's 70% ownership. Mine plans, resources and reserve assumptions can change with new drilling, costs and operating experience. These risks affect saleable volumes, capital requirements and the conversion of infrastructure investment into cash generation.
Industry And Competitive Risks
Benchmark copper and by-product prices are outside the company's control and can offset improvements in physical mine performance. Conversely, higher prices can mask lower volumes, as the current revenue comparison illustrates. Provisional pricing, treatment terms and currency movements can create differences between shipments, revenue recognition and cash settlements. Producers compete for resources, skilled labour, supplies, financing and infrastructure, including against companies with greater resources. Diesel, electricity, acid, freight and maintenance costs can rise while sales prices fall. Concentration in copper leaves the business more sensitive to that commodity than a broadly diversified miner, as the AIF notes. Recycling and application-specific substitution are additional demand and supply considerations rather than guarantees of a particular future price path.
Business Model
Capstone develops or acquires mineral properties, mines and processes ore, and sells payable metal through established concentrate and cathode channels. Site cash flow funds sustaining work and helps finance larger brownfield or district projects. The Mantoverde and Santo Domingo district includes existing infrastructure, permitted development options and adjacent mineral assets. Project partners, streams and financing arrangements affect how cash generated by an operation reaches Capstone common shareholders.
Cost Structure
Mining, processing, royalties, power, labour, diesel and consumables shape site costs, while grades and recoveries determine how much payable metal absorbs those costs. Treatment charges and gold by-product credits also affect the reported sulphide C1 measure. In Q3 2026, sulphide C1 was US$2.56 per pound produced and cathode C1 was US$5.68. At Mantoverde, high sulphuric acid costs made some calcium-carbonate-rich oxide material uneconomic to process, and Capstone reduced heap throughput.
Revenue Drivers
Payable copper tonnes sold, realized metal prices and treatment and selling deductions drive reported revenue. Provisional pricing can create adjustments between shipment and final settlement. In Q3 2026, Capstone sold 45,409 payable copper tonnes and reported revenue of US$712.0 million. Its realized copper price rose to US$6.61 per pound from US$4.49 a year earlier, more than offsetting the decline in tonnes sold. The timing of Mantoverde shipments helped sales exceed payable production during the quarter.
Company Overview
Capstone Copper operates Mantoverde and Mantos Blancos in Chile, Pinto Valley in Arizona and Cozamin in Zacatecas, Mexico. It owns 70% of Mantoverde and reports the mine's operating results on a 100% basis. Capstone agreed to sell Cozamin to Luca Mining in September 2026, with closing still subject to regulatory and customary conditions at the October quarterly release. Santo Domingo, Sierra Norte and the newly acquired San Pietro copper assets sit within its Chilean development portfolio.
Geographic Exposure
Chile hosts both of Capstone's large open-pit complexes and its Atacama development district. Pinto Valley gives it a producing asset in Arizona, and Cozamin adds Mexican underground exposure until the announced sale closes. Operating conditions are local even though metal pricing is global. Water, power, freight and workforce requirements differ across the sites, and Capstone reports consolidated financial results in US dollars.
Key Operating Levers
Mine sequencing controls feed grade and the sulphide-to-oxide mix. Crusher uptime, mill throughput and metallurgical recovery translate feed into payable copper. Pinto Valley's unplanned maintenance and scheduled crusher and filter rebuilds reduced Q3 throughput. At Mantos Blancos, lower grades and recoveries reduced concentrate output. Mantoverde completed the Optimized concentrator tie-in during its September shutdown, so ramp-up and recovery determine how much of the added capacity reaches shipped tonnes.
Products And Services
Capstone sells copper concentrate from sulphide ore and copper cathode from oxide or dump-leach circuits. Mantoverde produces both forms and recovers gold in concentrate. Mantos Blancos produces concentrate and cathode with a silver by-product credit, while Pinto Valley sells predominantly copper concentrate and also recovers molybdenum. Cozamin is an underground copper-silver operation with separate concentrate streams. These routes produce different grades, sale terms and cash costs.
Distribution And Go To Market
Capstone sells copper concentrate to domestic and overseas smelters through contracted shipments and sells cathode under term or spot arrangements, depending on the mine and grade. In 2025, Mantos Blancos sent its concentrate to a nearby Chilean smelter by truck and exported cathode through Angamos or Antofagasta. Mantoverde shipped most concentrate to Asia and Europe under long-term agreements and exported cathode to the US Gulf. Actual revenue follows deliveries and final price settlement.
Regulatory And Operating Environment
Mine permits and environmental, water, tailings and reclamation obligations vary across Chile, Arizona and Mexico. Operating plans must account for approvals, permit renewals and closure work at individual sites. Labour continuity, severe weather, mine access and the reliability of processing infrastructure also affect realized output. Cozamin's proposed transfer still depended on customary closing and regulatory approvals at the October quarterly release.
Industry Description
Capstone operates in primary copper mining, producing concentrates for downstream processing and cathodes from leaching and electrowinning. These are different stages of the copper supply chain from smelting, refining and fabrication into finished products. The approved USGS February 2026 summary estimated 2025 world mine production at 23 million tonnes of copper content and refinery production at 29 million tonnes. Refined supply also involves secondary material, so those totals should not be treated as identical measures of primary mining output. Capstone's by-product gold, silver and other metal credits influence individual mine economics, but copper remains its principal revenue exposure. Its commodity and processing mix differs from a diversified miner or a downstream manufacturer.
Competitive Landscape
Copper producers compete for mineral resources, development opportunities, skilled people, equipment, financing and access to processing and transport. The AIF states that Capstone competes with companies possessing similar or greater financial and technical resources. Its disclosed competitive position rests on cost, concentrate quality and the ability to sustain the business through metal-price cycles, rather than control over benchmark copper prices. Mine concentration, jurisdiction, ore characteristics and the mix of sulphide and cathode production affect comparisons. The approved USGS data also show that mining and refining have different geographic concentrations. A producer's location within the mining chain should not be confused with the scale or bargaining position of major refiners and customers downstream.
Market Share And Positioning
Capstone is an Americas-focused producer with operating assets in Chile, the United States and Mexico, rather than a geographically universal copper supplier. The Q3 2026 update reports 45,218 tonnes of contained copper production, with Mantoverde operating figures shown on a 100% basis despite Capstone's 70% ownership. This consolidated measure should not be presented as wholly shareholder-attributable production or directly compared with an annual global total to manufacture a precise market-share estimate. Its portfolio combines established mines with expansion and development options. The proposed Cozamin disposal could change that mix, but the mine remained within the reported portfolio at September 30. The source packet supports this operating position, not a definitive global cost or market-share ranking.
Supplier And Customer Dynamics
The AIF describes mine-specific sales channels involving trading companies, smelters, competitive tenders, long-term contracts and spot arrangements. Treatment and selling charges, concentrate specifications, provisional pricing and shipment timing affect realized revenue. Logistics connect the mines with local processing or export ports, so truck, port and vessel access matter as well as customer demand. The company also depends on equipment, skilled labour, energy, fuel, water and, for leaching, sulphuric acid. Of particular relevance, management reduced some cathode production to limit exposure to elevated spot acid purchases. Streams and financing-related offtake arrangements can commit portions of future output or by-products. Contracted volumes do not eliminate delivery, counterparty or force-majeure risk.
Competitive Advantages And Moat
Existing mineral rights, operating mines, processing facilities, water and power arrangements, logistics and specialized operating knowledge are assets that a new entrant cannot reproduce immediately. Mantoverde Optimized is intended to use and expand existing infrastructure, and the Mantoverde-Santo Domingo district provides potential integration opportunities described by management. These attributes can support development choices and operating efficiency, but they are not evidence of assured project returns or immunity from commodity cycles. The AIF explicitly describes world-market copper prices as outside the company's control. Durable operating performance still depends on ore quality, recoveries, reliable equipment, cost control, permits and funding. Resource scale or nearby exploration ground alone does not establish an economic barrier that guarantees profitability.
Industry Growth And Cyclicality
Copper demand connects to construction, electrical and electronic products, transportation and industrial equipment; the USGS end-use figures in the source packet describe the US market, not a global demand forecast. Electrification is one demand theme identified by management, but it does not remove exposure to industrial and construction cycles. Capstone's Q3 2026 revenue increased despite lower sales volumes because higher realized prices outweighed the volume decline. That is evidence of price sensitivity, not proof of a permanent growth rate. Supply also responds unevenly: mine development, maintenance, grades, strikes and processing interruptions can constrain output while prices move. Long-term resource availability and near-term deliverable metal supply therefore answer different questions.
Pricing Power And Cost Position
Capstone is principally exposed to benchmark metal pricing and contractual adjustments, rather than discretionary pricing of a differentiated consumer product. Realized prices differ from reference prices because of timing, provisional settlements, metal content and selling terms. The Q3 2026 update shows materially different unit-cost outcomes between sulphide and cathode operations, with higher acid and diesel costs pressuring particular assets. Consolidated C1 cash costs of US$2.95/lb are a management-defined measure and should not be treated as full accounting cost or an externally certified industry percentile. By-product credits, grades, recoveries and utilization can change relative costs over time. The approved packet does not establish a uniform lowest-cost position across the portfolio.
Barriers To Entry And Substitutes
Developing a mine requires economically recoverable mineralization, rights and approvals, engineering, infrastructure, capital and operating expertise. Capstone's current project updates illustrate the distinction between a resource opportunity, a study, an investment decision and producing capacity: Santo Domingo still requires engineering and financing work, while further expansions involve separate approvals and execution. The USGS identifies application-specific substitutes for copper, including aluminium in certain electrical and heat-transfer uses, optical fibre in telecommunications and plastics in some pipe applications. Substitution depends on the application; it does not imply that all copper demand is interchangeable. Recycling provides another source of metal supply. Geological resource estimates alone therefore do not determine commercial supply, demand or project economics.
Industry Regulation And Structural Risks
Mining depends on environmental and operating permits, tailings and water management, closure provisions, labour standards, taxes, mineral rights and community relationships. The AIF notes that changing environmental requirements can require additional equipment, capital or design changes and can delay or halt activity. These constraints interact with physical risks such as weather, water availability and equipment failures. Different operating jurisdictions also create different approval and fiscal exposures. The approved USGS summary provides dated 2025 trade and policy context; it is not a statement that those tariff conditions remain unchanged in every later period. Expansion studies, management plans and announced transactions should therefore be assessed against their specific permitting and completion conditions, not treated as completed industry capacity.
Balance Sheet Analysis
Balance Sheet Snapshot
Capital structure composition and liquidity ratios
At September 30, 2026, consolidated assets were US$7.479 billion, liabilities US$3.267 billion and equity US$4.212 billion. Equity attributable to Capstone shareholders was US$3.698 billion; the remaining US$513.5 million was non-controlling interest. Cash and equivalents were US$263.4 million, down from US$304.2 million at December 31, 2025. Current assets of US$866.6 million were below current liabilities of US$899.0 million. Inventory increased to US$331.8 million from US$270.1 million, while receivables declined to US$247.0 million from US$353.2 million. Mineral properties, plant and equipment accounted for US$6.461 billion of assets, concentrating the balance sheet in long-lived mining operations and projects. Lease liabilities totalled US$239.6 million across current and non-current classifications. These obligations, related-party balances and closure provisions should be read alongside the company's narrower net-debt disclosure rather than omitted from the assessment of financial commitments.
Forward Financial Outlook
In its October 29, 2026 update, management expected full-year copper production near the low end of its 200,000-230,000 tonne range and C1 cash costs near the high end of US$2.45-US$2.75/lb. Consolidated capital-expenditure guidance increased by US$40 million to US$830 million, reflecting higher capitalized stripping costs and mine-sequence changes at Mantoverde. This guidance includes a full year of Cozamin despite its pending sale. Management expected higher Q4 production after the Mantoverde Optimized tie-in, but sustaining the expanded 45,000 tonnes-per-day throughput rate was expected from early 2027; a peak daily rate is not a sustained operating rate. Santo Domingo's expected Q1 2027 investment decision remained subject to engineering, an updated capital estimate and financing work. Project-partner consideration and the Cozamin transaction contain timing and completion conditions. These are dated management expectations, not cash-flow outcomes already secured or forecasts independently guaranteed by the report.
Income Statement Analysis
Income Statement Levels
Revenue (USD) and profitability margins (% of revenue)
For the three months ended September 30, 2026, Capstone reported revenue of US$712.0 million versus US$598.4 million a year earlier. Higher realized copper prices of US$6.61/lb, compared with US$4.49/lb, outweighed a reduction in payable copper sold from 56,368 to 45,409 tonnes. Earnings from mining operations increased to US$259.7 million from US$131.5 million. Reported income nevertheless requires a separate comparison: consolidated net income was US$132.0 million and income attributable to Capstone shareholders was US$98.5 million, versus US$262.5 million and US$248.1 million respectively in Q3 2025. The earlier quarter included a US$209.5 million Santo Domingo impairment reversal. Current diluted earnings were US$0.13 per share versus US$0.32. The rise in operating mining earnings and decline in reported shareholder earnings therefore describe different effects; the prior reversal should not be treated as recurring mine profitability.
Cashflow Statement Analysis
Cash Flow Composition
Operating, investing, and financing cash flow by period
Q3 2026 operating cash flow was US$226.6 million, compared with US$153.4 million in Q3 2025. The current quarter's US$329.1 million operating cash flow before working-capital and other non-cash changes was reduced by US$103.9 million of working-capital absorption, partly offset by US$1.5 million of other changes. Investing used US$231.1 million and financing used US$97.6 million; currency effects reduced cash by a further US$1.6 million. Together these reconcile the US$103.7 million quarterly cash decline from US$367.1 million to US$263.4 million. For the first nine months, operating cash flow was US$726.8 million, investing outflows US$565.8 million and financing outflows US$200.1 million. Company-defined Q3 free cash flow from operations was positive US$63.7 million, but free cash flow after expansionary spending was negative US$26.3 million. Neither non-GAAP measure is the same as the actual change in the cash balance.
Historical Performance Summary
In the nine months ended September 30, 2026, revenue was US$2.104 billion versus US$1.675 billion in the corresponding 2025 period, while shareholder-attributable income was US$275.2 million versus US$265.3 million. Operating cash flow increased to US$726.8 million from US$511.6 million. Higher commodity prices supported this financial improvement even as contained copper production declined from 166,492 to 144,939 tonnes and payable sales volumes declined. The history therefore combines price effects, operating interruptions, capital investment and non-cash accounting changes; revenue and reported income should not be read as evidence of uninterrupted production growth.
Key Financial Ratios And Metrics
Calculated from the September 30, 2026 statements, current assets divided by current liabilities were approximately 0.96 times. Q3 earnings from mining operations of US$259.7 million represented about 36.5% of US$712.0 million revenue, while operating cash flow represented about 31.8% of revenue. Operating cash flow divided by consolidated net income was approximately 1.72 times; the denominator is consolidated US$132.0 million income, not the lower shareholder-attributable figure. This cash-conversion observation is affected by working capital and tax timing and is not an overall quality grade. Reported net debt was a company-defined US$564.0 million, versus US$780.1 million at December 31, 2025, and should be assessed alongside lease, working-capital and other contractual obligations. Operationally, consolidated C1 cash costs were US$2.95/lb in Q3 versus US$2.42/lb a year earlier. C1 is a non-GAAP operating measure and differs from the full cost base of the consolidated income statement.
Balance Sheet And Cashflow Analysis
The decline in cash despite positive operating cash flow reflects investment and financing uses, not a negative operating cash-flow figure. In Q3, the company repaid US$303.0 million of borrowings while drawing US$90.0 million of new borrowings and receiving US$175.7 million through working-capital facilities, against US$5.0 million of repayments of those facilities. Financing also included lease and interest payments. Management reported US$782.0 million of long-term debt drawn and US$45.4 million outstanding on the Mitsubishi cost-overrun facility at September 30. Its reported available liquidity of about US$1.089 billion combined US$263.4 million of cash with US$826.0 million undrawn on the revolving facility; undrawn credit is financing capacity, not cash already held. Expansion spending, debt service, working-capital needs and covenant conditions remain relevant to that capacity. Expected Cozamin sale proceeds and conditional project-partner funding were not quarter-end cash and should not be added to the reported balance.
Non Recurring Items And Trend Extrapolation
Two accounting effects need separate treatment when comparing periods: the US$209.5 million Santo Domingo impairment reversal in 2025 and the US$22.0 million gain on extinguishment of the gold-stream obligation in Q1 2026. The latter did not eliminate a cash outflow: the nine-month cash-flow statement includes the US$30.0 million early-deposit repayment to Wheaton. Management also identified higher union-bonus expenses following the Mantos Blancos collective agreement. Stronger copper prices, derivative and provisional-pricing movements, tax changes, interruptions and expansion spending affect how much current earnings can be extrapolated. Cozamin remained consolidated and was not classified as held for sale at September 30 because a substantive regulatory approval was outstanding; its proposed consideration should not be treated as an already completed disposal. Reported operating cash flow, sustaining free cash flow, expansion spending and changes in cash should remain distinct when assessing whether an apparent quarterly improvement is recurring.
Earnings Quality And Accounting Considerations
The Q3 comparison is affected by the absence of the US$209.5 million non-cash impairment reversal recorded in Q3 2025. Current earnings also include exchange and derivative movements: the nine-month income statement reports a US$6.7 million foreign-exchange gain and US$10.5 million derivative gain. These amounts do not translate one-for-one into cash received during the period. Income-tax expense rose to US$254.3 million for the first nine months from US$57.1 million; management cites higher Mexican and Chilean mining royalty taxes and higher taxable income. The cash-flow statement separately records US$136.7 million of net income taxes paid. Provisionally priced concentrate sales can produce later settlement adjustments, and the company reported no formal hedge-accounting designations for outstanding derivatives at quarter-end. Adjusted earnings and adjusted EBITDA are management-defined non-GAAP measures; they should be reconciled to reported results, not substituted for them without preserving the exclusions and period basis.
Growth
[]
Valuation
| P/B | P/E | Peer Set | Currency | Market Cap | Company Name |
|---|---|---|---|---|---|
| 2.67 | 12.14 | LUN | CAD | $27.0bn | Lundin Mining Corporation |
| 1.72 | 19.48 | CAD | $9.0bn | Subject (CS) |
Profitability
[]
Comparison Basis
Reported P/E uses earnings attributable to common shareholders; P/B uses their book equity. Statement periods: CS 2026-09-30; LUN 2026-09-30. CAD market capitalizations are converted to USD using the Bank of Canada’s 2026-11-09 indicative rate of C$1.4123 per US dollar. Reported earnings include exceptional items and different commodity and acquisition exposures. Book equity is an accounting balance, not mine fair value. Sales, enterprise-value and forward-earnings multiples and growth/profitability rankings are unavailable because consistent ownership and forecast bases have not been established. These comparisons do not establish a relative-value ranking. CS capitalization uses 766,250,575 issued common shares disclosed as of 2026-10-29 and a C$11.70 ordinary-share price dated 2026-11-09; this can differ from vendor capitalization shown elsewhere.
Annual
| All numbers in thousands except per-share amounts; TTM through 2026-09-30; TTM EPS approximate (USD) | TTM | Dec 2025 | Dec 2024 | Dec 2023 | Dec 2022 |
|---|---|---|---|---|---|
| Total Revenue | 2,789,149 | 2,359,890 | 1,599,222 | 1,345,511 | 1,296,024 |
| Cost of Revenue | 1,809,507 | 1,803,850 | 1,387,669 | 1,262,496 | 1,088,228 |
| Gross Profit | 979,642 | 556,040 | 211,553 | 83,015 | 207,796 |
| Operating Expenses | 62,299 | -149,630 | 48,679 | 50,085 | 67,578 |
| Operating Income | 917,343 | 705,670 | 162,874 | 32,930 | 140,218 |
| Finance and Other Costs | 179,515 | 220,287 | 29,460 | 123,933 | -53,503 |
| Pretax Income | 737,828 | 485,383 | 133,414 | -91,003 | 193,721 |
| Income Tax Expense | 332,825 | 135,655 | 47,540 | 33,723 | 57,582 |
| Net Income | 405,003 | 349,728 | 85,874 | -124,726 | 136,139 |
| Net Income Common Stockholders | 325,792 | 315,874 | 82,906 | -101,672 | 122,199 |
| Basic EPS | 0.42 | 0.41 | 0.11 | -0.15 | 0.20 |
| Diluted EPS | 0.42 | 0.41 | 0.11 | -0.15 | 0.19 |
Quarterly
| All numbers in thousands except per-share amounts (USD) | 3 Months Ended 2026-09-30 | 3 Months Ended 2025-09-30 | 9 Months Ended 2026-09-30 | 9 Months Ended 2025-09-30 |
|---|---|---|---|---|
| Total Revenue | 712,043 | 598,439 | 2,104,183 | 1,674,924 |
| Cost of Revenue | 452,309 | 466,921 | 1,357,141 | 1,351,484 |
| Gross Profit | 259,734 | 131,518 | 747,042 | 323,440 |
| Operating Expenses | 17,275 | -192,533 | 46,788 | -165,141 |
| Operating Income | 242,459 | 324,051 | 700,254 | 488,581 |
| Finance and Other Costs | 7,467 | 42,726 | 99,365 | 140,137 |
| Pretax Income | 234,992 | 281,325 | 600,889 | 348,444 |
| Income Tax Expense | 103,010 | 18,864 | 254,287 | 57,117 |
| Net Income | 131,982 | 262,461 | 346,602 | 291,327 |
| Net Income Common Stockholders | 98,472 | 248,094 | 275,196 | 265,278 |
| Basic EPS | 0.13 | 0.33 | 0.36 | 0.35 |
| Diluted EPS | 0.13 | 0.32 | 0.36 | 0.35 |
Annual
| All numbers in thousands (USD) | Dec 2025 | Dec 2024 | Dec 2023 | Dec 2022 |
|---|---|---|---|---|
| • Total Assets | 7,196,877 | 6,365,032 | 5,873,915 | 5,380,908 |
| • Total Current Assets | 940,384 | 541,084 | 486,857 | 569,491 |
| • Cash, Cash Equivalents & Short Term Investments | 304,192 | 131,593 | 126,820 | 171,860 |
| Cash And Cash Equivalents | 304,192 | 131,593 | 126,016 | 170,307 |
| • Short Term Investments | -- | 753 | 804 | 1,553 |
| Other Short Term Investments | -- | 753 | 804 | 1,553 |
| Derivative Investment and Hedging Assets, Current | 19 | 24,618 | 18,984 | 19,981 |
| • Inventories | 270,099 | 209,448 | 149,613 | 140,797 |
| Raw Materials Consumables and Supplies | 190,043 | 125,220 | 96,481 | 78,717 |
| Work in Process | 27,665 | 20,961 | 21,477 | 29,386 |
| Finished Goods and Merchandise | 52,391 | 63,267 | 31,655 | 32,694 |
| • Trade and Other Receivables, Current | 353,217 | 147,765 | 147,318 | 191,887 |
| Trade/Accounts Receivable, Current | 299,949 | 96,977 | 108,349 | 143,534 |
| Taxes Receivable, Current | 23,398 | 23,668 | 24,298 | 36,590 |
| Other Receivables, Current | 29,870 | 27,120 | 14,671 | 11,763 |
| Prepayments and Deposits, Current | 12,857 | 27,660 | 41,322 | 42,426 |
| Other Current Assets | -- | 2,676 | 2,800 | 2,540 |
| • Total non-current assets | 6,256,493 | 5,823,948 | 5,387,058 | 4,811,417 |
| • Net Property, Plant and Equipment | 2,846,437 | 2,781,398 | 2,468,037 | 2,040,366 |
| • Gross Property, Plant and Equipment | 5,026,143 | 4,687,718 | 4,299,628 | 3,748,599 |
| • Machinery Furniture and Equipment | 4,364,706 | 4,118,301 | 2,881,315 | 2,665,873 |
| Plant and Machinery | 4,364,706 | 4,118,301 | 2,881,315 | 2,665,873 |
| Construction in Progress and Advance Payments | 175,432 | 171,817 | 1,171,538 | 896,371 |
| Leased Property Plant and Equipment | 486,005 | 397,600 | 246,775 | 186,355 |
| • Accumulated Depreciation and Impairment | -2,179,706 | -1,906,320 | -1,831,591 | -1,708,233 |
| • Accumulated Depreciation | -2,179,706 | -1,906,320 | -1,831,591 | -1,708,233 |
| • Accumulated Depreciation of Machinery Furniture and Equipment | -1,994,186 | -1,764,316 | -1,718,912 | -1,613,621 |
| Accumulated Depreciation of Plant and Machinery | -1,994,186 | -1,764,316 | -1,718,912 | -1,613,621 |
| Accumulated Depreciation of Leased Property Plant and Equipment | -185,520 | -142,004 | -112,679 | -94,612 |
| Accumulated Depreciation of Construction in Progress | 0 | 0 | 0 | 0 |
| • Net Mineral Property Interests and Exploration Assets | 3,279,115 | 2,936,851 | 2,818,220 | 2,665,945 |
| Gross Mineral Property Interests and Exploration Assets | 4,312,708 | 3,743,639 | 3,490,719 | 3,196,894 |
| Accumulated Amortization of Mineral Property Interests and Exploration Assets | -1,033,593 | -806,788 | -672,499 | -530,949 |
| • Total Long-Term Investments | 4,350 | 1,439 | 824 | 1,628 |
| • Investment in Financial Assets, Non-Current | 4,350 | 1,439 | 824 | 1,628 |
| • Financial Investment Securities Available for Sale and Held to Maturity, Non-Current | 4,350 | 1,439 | 824 | 1,628 |
| Available for Sale Securities, Non-Current | 4,350 | 1,439 | 824 | 1,628 |
| Derivative Investment and Hedging Assets, Non-Current | 0 | 11,723 | 16,565 | 28,582 |
| • Trade and Other Receivables, Non-Current | 1,374 | 1,155 | 0 | 431 |
| Finance Lease Receivable, Non-Current | -- | -- | 0 | 431 |
| Taxes Receivable, Non-Current | 1,374 | 1,155 | 0 | -- |
| Other Receivables, Non-Current | -- | -- | -- | 6,839 |
| • Prepayments and Deposits, Non-Current | 22,388 | 24,541 | 18,435 | 26,222 |
| Prepayments, Non-Current | 18,045 | 18,045 | 18,045 | 18,045 |
| Deposits Paid for Business and Fixed Assets, Non-Current | 4,343 | 6,496 | 390 | 8,177 |
| Inventories, Non-Current | 23,403 | 16,366 | 8,474 | 2,700 |
| Deferred Tax Assets, Non-Current | 79,426 | 50,475 | 53,401 | 38,704 |
| Other Non Current Assets | -- | 2,043 | 3,102 | 6,839 |
| • Total Liabilities | 3,365,272 | 2,902,224 | 2,807,793 | 2,201,052 |
| • Total Current Liabilities | 785,563 | 694,064 | 431,820 | 408,532 |
| • Payables and Accrued Expenses, Current | 595,125 | 400,589 | 281,706 | 295,859 |
| • Trade and Other Payables, Current | 595,125 | 400,589 | 281,706 | 295,859 |
| Trade/Accounts Payable, Current | 501,314 | 330,183 | 272,277 | 284,913 |
| Amount Due to Related Parties Shareholders, Current | 6,486 | 6,486 | 3,243 | 0 |
| • Taxes Payable, Current | 73,563 | 16,345 | 6,186 | 10,946 |
| Income Tax Payable, Current | 63,163 | 16,345 | 6,186 | 10,946 |
| Other Tax Payable, Current | 10,400 | 0 | -- | -- |
| Other Payable, Current | 13,762 | 47,575 | 0 | 0 |
| • Financial Liabilities, Current | 151,354 | 251,812 | 104,320 | 73,351 |
| • Current Debt And Capital Lease Obligation | 108,499 | 249,443 | 87,532 | 28,928 |
| • Current Debt | 39,893 | 117,049 | 25,618 | 0 |
| Bank Credit Facilities Current Debt | 39,893 | 117,049 | 25,618 | 0 |
| • Current Portion of Long-Term Debt and Capital Lease | 68,606 | 132,394 | 61,914 | 28,928 |
| • Current Portion of Long-Term Debt | 0 | 85,748 | 28,398 | 0 |
| Bank Institutional Loans Current Portion of Long-Term Debt | 0 | 85,748 | 28,398 | 0 |
| Capital Lease Obligations, Current | 68,606 | 46,646 | 33,516 | 28,928 |
| Derivative and Hedging Liabilities, Current | 42,855 | 2,369 | 16,788 | 44,423 |
| • Provisions, Current | 0 | 18,049 | 23,943 | 0 |
| Provision for Mine Maintenance, Current | 0 | 18,049 | 23,943 | 0 |
| • Deferred Liabilities, Current | 13,416 | 11,389 | 12,139 | 8,524 |
| Deferred Income Customer Advances Billings in Excess of Cost, Current | 13,416 | 11,389 | 12,139 | 8,524 |
| Other Current Liabilities | 25,668 | 12,225 | 9,712 | 30,798 |
| • Total Non-Current Liabilities | 2,579,709 | 2,208,160 | 2,375,973 | 1,792,520 |
| • Financial Liabilities, Non-Current | 1,223,683 | 937,671 | 1,073,241 | 684,110 |
| • Long Term Debt And Capital Lease Obligation | 1,223,683 | 936,331 | 1,073,241 | 674,044 |
| • Long Term Debt | 1,013,950 | 736,008 | 970,258 | 599,075 |
| Bank Institutional Loans, Non-Current | 1,013,950 | 736,008 | 970,258 | 599,075 |
| Capital Lease Obligations, Non-Current | 209,733 | 200,323 | 102,983 | 74,969 |
| Derivative and Hedging Liabilities, Non-Current | 0 | 1,340 | 0 | 10,066 |
| • Provisions, Non-Current | 265,198 | 239,844 | 281,168 | 246,046 |
| • Provision for Employee Entitlements, Non-Current | 5,726 | 5,083 | 13,036 | 6,411 |
| Pension and Other Post Retirement Benefit Plans, Non-Current | 5,726 | 5,083 | 13,036 | 6,411 |
| Other Provisions, Non-Current | 259,472 | 234,761 | 268,132 | 239,635 |
| • Tax Liabilities, Non-Current | 695,949 | 636,783 | 630,225 | 597,585 |
| Deferred Tax Liabilities, Non-Current | 695,949 | 636,783 | 630,225 | 597,585 |
| • Deferred Liabilities, Non-Current | 131,003 | 146,017 | 147,619 | 160,462 |
| Deferred Income Customer Advances Billings in Excess of Cost, Non-Current | 131,003 | 146,017 | 147,619 | 160,462 |
| • Payables and Accrued Expenses, Non-Current | 246,176 | 240,589 | 235,017 | 100,364 |
| • Trade and Other Payables, Non-Current | 246,176 | 240,589 | 235,017 | 100,364 |
| Amount Due to Related Parties Shareholders, Non-Current | 246,176 | 240,589 | 192,628 | 60,000 |
| Other Payables, Non-Current | -- | 0 | 42,389 | 40,364 |
| Other Non Current Liabilities | 17,700 | 7,256 | 8,703 | 3,953 |
| • Total Equity | 3,831,605 | 3,462,808 | 3,066,122 | 3,179,856 |
| • Equity Attributable to Parent Stockholders | 3,389,465 | 3,054,605 | 2,660,587 | 2,751,217 |
| • Paid in Capital | 2,766,836 | 2,753,196 | 2,451,572 | 2,447,377 |
| • Capital Stock | 2,766,836 | 2,753,196 | 2,451,572 | 2,447,377 |
| Common Stock | 2,766,836 | 2,753,196 | 2,451,572 | 2,447,377 |
| Retained Earnings/Accumulated Deficit | 569,928 | 254,054 | 168,886 | 262,512 |
| • Reserves/Accumulated Comprehensive Income/Losses | 52,701 | 47,355 | 40,129 | 41,328 |
| Other Reserves Accumulated Comprehensive Income | 52,701 | 47,355 | 40,129 | 41,328 |
| Non-Controlling/Minority Interests | 442,140 | 408,203 | 405,535 | 428,639 |
| • Balance Sheet, Supplemental | ||||
| Total Liabilities as Reported, Supplemental | 3,365,272 | 2,902,224 | 2,807,793 | 2,201,052 |
| Total Equity as Reported, Supplemental | 3,831,605 | 3,462,808 | 3,066,122 | 3,179,856 |
| • Ordinary Shares Number | 763,656.71 | 761,894.18 | 696,073.15 | 691,639.97 |
| Common Shares Outstanding | 763,656.71 | 761,894.18 | 696,073.15 | 691,639.97 |
| • Debt Maturity Schedule Total | 1,335,218 | 938,805 | 1,024,274 | 599,075 |
| Debt Due in Year 1 | 76,814 | 242,176 | 54,016 | -- |
| Debt Due in Year 2 | 87,013 | 120,207 | 85,748 | -- |
| Debt Due in Year 3 | 96,183 | 442,450 | 88,640 | -- |
| Debt Due in Year 4 | 365,036 | 98,876 | 504,353 | 75,000 |
| Debt Due Beyond | 880,232 | 243,013 | 286,861 | 520,000 |
| Debt - Interests Charges and Other Adjustments | -170,060 | -207,917 | 4,656 | 4,075 |
| • Capital Lease Obligation Maturity Schedule Total | 278,339 | 246,969 | 136,499 | 103,897 |
| Capital Lease Due in Year 1 | 81,514 | 64,734 | 35,746 | 34,748 |
| Capital Lease Due in Year 2 | 70,788 | 57,805 | 25,147 | 27,915 |
| Capital Lease Due in Year 3 | 62,861 | 49,805 | 20,507 | 16,059 |
| Capital Lease Due in Year 4 | 53,258 | 43,684 | 15,861 | 14,051 |
| Capital Lease Due Beyond | 65,995 | 82,287 | 30,454 | 21,883 |
| Capital Lease - Interests Charges and Other Adjustments | -56,077 | -51,346 | 8,784 | -10,759 |
| • Other Contractual Obligations Maturity Schedule Total | -- | 407,687 | 533,619 | 344,913 |
| Other Contractual Obligations Due in Year 1 | -- | 344,002 | 296,140 | 284,913 |
| Other Contractual Obligations Due in Year 2 | -- | 9,677 | 28,646 | 3,243 |
| Other Contractual Obligations Due in Year 3 | -- | 9,244 | 29,117 | 6,486 |
| Other Contractual Obligations Due in Year 4 | -- | 8,818 | 25,002 | 6,486 |
| Other Contractual Obligations Due Beyond | -- | 35,946 | 154,714 | 43,785 |
| Total Debt | 1,332,182 | 1,185,774 | 1,160,773 | 702,972 |
| Net Debt | 1,027,990 | 1,054,181 | 1,033,953 | 531,112 |
| Working Capital | 154,821 | -152,980 | 55,037 | 160,959 |
| Invested Capital | 5,163,787 | 4,648,582 | 4,226,895 | 3,882,828 |
| Tangible Book Value | 3,831,605 | 3,462,808 | 3,066,122 | 3,179,856 |
| Common Equity Book Value | 3,389,465 | 3,054,605 | 2,660,587 | 2,751,217 |
Quarterly
| All numbers in thousands except per-share amounts (USD) | As At 2026-09-30 | As At 2025-12-31 |
|---|---|---|
| Cash And Cash Equivalents | 263,410 | 304,192 |
| Accounts Receivable | 246,958 | 353,217 |
| Inventory | 331,751 | 270,099 |
| Current Assets | 866,601 | 940,384 |
| Net PPE | 6,461,245 | 6,125,552 |
| Non-current Assets | 6,612,544 | 6,256,493 |
| Total Assets | 7,479,145 | 7,196,877 |
| Current Liabilities | 898,989 | 785,563 |
| Long Term Debt | 767,104 | 1,013,950 |
| Lease Liabilities | 239,582 | 278,339 |
| Non-current Liabilities | 2,368,157 | 2,579,709 |
| Total Liabilities | 3,267,146 | 3,365,272 |
| Common Equity | 3,698,453 | 3,389,465 |
| Non-controlling Interest | 513,546 | 442,140 |
| Stockholders Equity | 4,211,999 | 3,831,605 |
Annual
| All numbers in thousands except per-share amounts; TTM through 2026-09-30 (USD) | TTM | Dec 2025 | Dec 2024 | Dec 2023 | Dec 2022 |
|---|---|---|---|---|---|
| Operating Cash Flow | 900,445 | 685,208 | 398,643 | 116,817 | 87,422 |
| Investing Cash Flow | -723,499 | -519,097 | -506,773 | -673,279 | -370,741 |
| Financing Cash Flow | -221,761 | 5,793 | 115,940 | 508,470 | 192,138 |
| Effect Of Exchange Rate Changes | -1,046 | 695 | -2,233 | 3,701 | -606 |
| Change In Cash | -45,861 | 172,599 | 5,577 | -44,291 | -91,787 |
| Beginning Cash Position | 309,271 | 131,593 | 126,016 | 170,307 | 262,094 |
| End Cash Position | 263,410 | 304,192 | 131,593 | 126,016 | 170,307 |
| Capital Expenditure | -720,724 | -519,097 | -448,032 | -616,729 | -559,752 |
Quarterly
| All numbers in thousands except per-share amounts (USD) | 3 Months Ended 2026-09-30 | 3 Months Ended 2025-09-30 | 9 Months Ended 2026-09-30 | 9 Months Ended 2025-09-30 |
|---|---|---|---|---|
| Operating Cash Flow | 226,617 | 153,419 | 726,849 | 511,612 |
| Investing Cash Flow | -231,149 | -132,294 | -565,791 | -361,389 |
| Financing Cash Flow | -97,578 | -22,481 | -200,127 | 27,427 |
| Effect Of Exchange Rate Changes | -1,555 | -172 | -1,713 | 28 |
| Change In Cash | -103,665 | -1,528 | -40,782 | 177,678 |
| Beginning Cash Position | 367,075 | 310,799 | 304,192 | 131,593 |
| End Cash Position | 263,410 | 309,271 | 263,410 | 309,271 |
| Capital Expenditure | -227,738 | -132,264 | -562,937 | -361,310 |
Social Factors
For 2025, Capstone reported a group lost-time injury frequency rate of 0.23 and total recordable injury frequency rate of 0.69 per 200,000 hours worked, compared with 0.48 and 0.91 respectively in 2024. The rates combine employee and contractor exposure, while results vary by site. The report also notes that corporate-office safety data were added in 2025 without restating prior years and that some earlier near-miss figures were restated after classification errors. These boundaries matter when interpreting the improvement. Women represented 12% of employees in the selected KPI table; that denominator differs from the reported total workforce of 8,152. Management identifies continuing work on critical-risk controls, investigation quality and high-potential incidents. The Social Performance Standard introduced in 2025 addresses community baselines, grievances, human-rights assessments and site plans, with implementation actions extending beyond the assessment year. Reported policies and improving aggregate rates do not remove site-specific workforce and community risks.
Governance Factors
The sustainability governance framework assigns strategy, disclosure and engagement oversight to the Governance, Nominating and Sustainability Committee; site-level environmental and safety matters to the Technical and Operational Performance Committee; and financially significant sustainability risks and disclosure integrity to the Audit Committee. The Human Resources and Compensation Committee incorporates sustainability objectives into incentives. Safety and sustainability each account for 15% of the Corporate Scorecard, together 30%; this is a scorecard weighting rather than a statement that 30% of all executive compensation is ESG-based. The Board approved a 125% overall scorecard achievement for 2025, which should be read separately from progress against each environmental target. The report was reviewed and approved by the Board but explicitly states that the 2025 Sustainability Report was not subject to independent third-party assurance. Site participation in The Copper Mark is a distinct process with its own scope and status, and should not be presented as assurance over every metric in the report.
Environmental Factors
The 2025 Sustainability Report, published June 29, 2026, covers calendar 2025 and includes 100% of Mantoverde under an operational-control approach despite Capstone's 70% ownership. It reports fuel-and-power emissions of 601,286 tonnes CO2e on a market-based basis, up 6% from 2024, and 782,497 tonnes on a location-based basis. The market-based total was 7% below the 2021 baseline against a stated 30% reduction target by 2030. These are energy-related measures: the disclosed Scope 1 fuel boundary excludes explosives, refrigerants and heap-leach process emissions, and the totals do not include Scope 3. Renewable electricity certificates at the two Chilean operations affect the market-based calculation. Water withdrawal increased 17% to 35.75 million cubic metres; 87% was classified as Other Water, defined by dissolved-solids content. The report states that water consumption is not currently measured, so withdrawal figures should retain that label rather than be presented as measured consumption.
Esg Risks And Opportunities
Water availability, energy consumption, tailings integrity, closure obligations, workforce safety and community relationships are material operating issues for the mine and development portfolio. The 2025 report describes approximately 80% progress toward GISTM conformance and a target to implement the standard across tailings storage facilities by 2028; this remains progress toward a standard, not a claim that every facility was fully conformant. Pinto Valley received The Copper Mark in 2025, joining Mantos Blancos and Mantoverde, while Cozamin entered the assurance process without a disclosed award in that reporting period. Improvements in processing and resource use create opportunities, but growing throughput can increase absolute energy and water demands. Market-based emissions intensity per tonne of copper improved in 2025 even as market-based emissions intensity per tonne of ore processed worsened, illustrating the importance of the denominator. The annual ESG reporting period also differs from the September 2026 financial period, so later operational or transaction developments should not be treated as already reflected in these sustainability metrics.
2023 NI 43 101 Technical Report on the Cozamin Mine Zacatecas Mexico.pdf PDF capstonecopper.com
Annual Information Form 2025 Final.pdf PDF capstonecopper.com
Bank of Canada Daily Exchange Rates observed October 30 2026 Web page www.bankofcanada.ca
Capstone Copper Corp Results News Release 2026 Q1 2026.pdf PDF capstonecopper.com
CS Q3 2026 Interim MD&A and Financial Statements PDF capstonecopper.com
CS Q3 2026 Investor Results Presentation PDF capstonecopper.com
Mantoverde NI 43 101 Technical Report and Feasibility Study FINAL.pdf PDF capstonecopper.com
PV3Update NI 43 101 Technical Report Jun 11 2021.pdf PDF capstonecopper.com
Q1 2026 Capstone Copper Conference Call.pdf PDF capstonecopper.com
Santo Domingo NI 43 101 Tech Report Feasibility Study.pdf PDF capstonecopper.com
| Worksheet | Output |
|---|---|
| Reproduce archived values | Recorded values |
- 2023 NI 43 101 Technical Report on the Cozamin Mine Zacatecas Mexico.pdf
- 2025 Q4 Report to Shareholders.pdf
- 2026 Information Circular.pdf
- 2026 Q1 Report to Shareholders.pdf
- Annual Information Form 2025 Final.pdf
- Bank of Canada Daily Exchange Rates observed October 30 2026
- Capstone Copper 2023 audited consolidated financial statements, including 2022 comparative
- Capstone Copper Corp Results News Release 2026 Q1 2026.pdf
- CS 2024 Sustainability Report.pdf
- CS Q3 2026 Earnings Results Release
- CS Q3 2026 Interim MD&A and Financial Statements
- CS Q3 2026 Investor Results Presentation
- CS Sustainability Report 2025
- Mantoverde NI 43 101 Technical Report and Feasibility Study FINAL.pdf
- PV3Update NI 43 101 Technical Report Jun 11 2021.pdf
- Q1 2026 Capstone Copper Conference Call.pdf
- Santo Domingo NI 43 101 Tech Report Feasibility Study.pdf
The price-history chart preserves the series returned by the original reader on November 20, 2026. The report carries its original publication date.