Aya Gold & Silver (TSX: AYA) — finite reserves before development promise

Our maximum entry price is C$9.75 per share. At the November 24, 2026 TSX close of C$26.80, the decision is Wait: base fair value is C$16.33 and five-year net return is -1.32% versus modeled XIC 7.49%. The strongest credible contrary case is a joint metal-price, Zgounder operating, Boumadine timing/capex and dilution miss; it lowers fair value to C$4.67 and leaves C$9.75 as the downside-bound entry. The base retains the reserve-backed Zgounder schedule while heavily discounting the PEA project; FY2026 operating results and Boumadine feasibility are the next tests.

Stock Price History

Market close (CAD; TSX AYA, 2026-11-24)
C$26.80
Base fair value (CAD/share)
C$16.33
Company details
Maximum entry price (CAD/share)
C$9.75
Five-year 2031-11-24 exit (CAD/share)
C$25.10
Expected annual net return at close
-1.32%
Expected annual net return at entry
20.79%
XIC modeled annual net return
7.49%
Required annual net return
9.49%
Decision at close
WAIT

AYA is a Canadian-listed Moroccan miner; all share prices are CAD, mine cash is US dollars, and the five-year checkpoint is 2031-11-24. Stock Price History

Investment Thesis

AYA is a Moroccan silver producer plus an 85%-owned development option. Zgounder has a reserve-backed mine plan to 2036; Boumadine offers large potential cash flows but its PEA uses inferred resources. Our base uses US$3,600/oz gold and US$50/oz silver, discounts finite mine cash flows, and applies 65% execution weight to Boumadine. highlighted factual row highlighted factual row public Python model.

Market Mispricing

The TSX close of C$26.80 is C$10.47 above modeled fair value. Holding the other inputs fixed, present fair value equal to the close would require roughly US$96.82/oz silver across the plan versus the US$50 base; earning the XIC-plus-200bp hurdle from that close would require roughly US$105.41/oz and a C$42.21 2031 exit. These are conditional model solves, not a market forecast. generated valuation output.

Recent Developments

Aya amended Q3 2026 unit metrics on November 16: Zgounder sold 1,392,478 ounces, and Q3 cash cost was US$15.65/oz. Revenue and cash flow did not change. The Boumadine license renewal was still pending after a May 16 expiry. highlighted factual row highlighted factual row amended Q3 MD&A, Aya original, physical pp.2,14.

Earnings Outlook

Three frozen tests: FY2026 Zgounder production 5.6–5.8 Moz (bear below 5.6; upside above 5.8), settled by the FY2026 release; FY2027 Boumadine feasibility initial capex base at or below US$463m (bear above US$695m; upside below US$463m), settled by FS and license decision; FY2027 operating cash less PP&E and exploration additions base at least US$100m (bear below US$50m; upside above US$150m), settled by audited cash-flow rows. The last is cash before debt repayment. highlighted factual row highlighted factual row highlighted factual row.

Valuation Summary

Present NAV is C$16.33 per 162m assumed future diluted shares. At November 24, 2031 our retained-cash plus remaining finite mine NAV exit is C$25.10. No dividends are declared or forecast; the payment list is empty. From C$26.80, modeled five-year net CAGR is -1.32%, versus XIC 7.49%. generated valuation output.

Recommended Action and Entry Price

Wait. The unrounded XIC-plus-200bp hurdle permits C$15.9361; C$15.90 after C$0.05 downward rounding. A joint commodity, mine-operating and construction stress reduces the price by C$6.15 to C$9.75 so the modeled five-year downside at entry stays within 25%. At entry the base net CAGR is 20.79%; at the actual close it is -1.32%. generated valuation output.

Catalysts

Q4 2026 production and FY2026 cost reporting test Zgounder first; a 2027 Boumadine feasibility study, resource conversion and license renewal test the larger part of NAV. No future disclosure is assumed to have occurred by the cutoff. highlighted factual row highlighted factual row.

Primary Risks to Thesis

The strongest contrary case combines the PEA’s -25% metal deck with 10% less Zgounder output, 10% higher site cost, a one-year Boumadine delay, 50% initial-capital overrun, 45% execution probability and 170m shares. It yields C$4.67 fair value, C$7.34 2031 exit and C$9.75 maximum entry under the 25% loss rule: still Wait at C$26.80. The base retains the reserve-backed Zgounder schedule and the PEA metal/capital case, while heavily haircutting the unbuilt asset. The license and feasibility work can reverse that judgment. highlighted factual row highlighted factual row generated valuation output.