Aya Gold & Silver (TSX: AYA) — finite reserves before development promise
Our maximum entry price is C$9.75 per share. At the November 24, 2026 TSX close of C$26.80, the decision is Wait: base fair value is C$16.33 and five-year net return is -1.32% versus modeled XIC 7.49%. The strongest credible contrary case is a joint metal-price, Zgounder operating, Boumadine timing/capex and dilution miss; it lowers fair value to C$4.67. It constrains the base-case entry to C$9.75, while the entry would be C$4.65 if the downside became the central forecast. The base retains the reserve-backed Zgounder schedule while heavily discounting the PEA project; FY2026 operating results and Boumadine feasibility are the next tests.
- Market close (CAD; TSX AYA, 2026-11-24)
- C$26.80
- Base fair value (CAD/share)
- C$16.33
Company details
- Maximum entry price (CAD/share)
- C$9.75
- Five-year 2031-11-24 exit (CAD/share)
- C$25.10
- Expected annual net return at close
- -1.32%
- Expected annual net return at entry
- 20.79%
- XIC modeled annual net return
- 7.49%
- Required annual net return
- 9.49%
- Decision at close
- WAIT
AYA is a Canadian-listed Moroccan miner; all share prices are CAD, mine cash is US dollars, and the five-year checkpoint is 2031-11-24. Stock Price History
Investment Thesis
AYA is a Moroccan silver producer plus an 85%-owned development option. Zgounder has a reserve-backed mine plan to 2036; Boumadine offers large potential cash flows but its PEA uses inferred resources. Our base uses US$3,600/oz gold and US$50/oz silver, discounts finite mine cash flows, and applies 65% execution weight to Boumadine. highlighted factual row highlighted factual row public Python model.
Market Mispricing
The TSX close of C$26.80 is C$10.47 above modeled fair value. Holding the other inputs fixed, present fair value equal to the close would require roughly US$96.82/oz silver across the plan versus the US$50 base; earning the XIC-plus-200bp hurdle from that close would require roughly US$105.41/oz and a C$42.21 2031 exit. These are conditional model solves, not a market forecast. generated valuation output.
Recent Developments
Aya amended Q3 2026 unit metrics on November 16: Zgounder sold 1,392,478 ounces, and Q3 cash cost was US$15.65/oz. Revenue and cash flow did not change. The Boumadine license renewal was still pending after a May 16 expiry. highlighted factual row highlighted factual row amended Q3 MD&A, Aya original, physical pp.2,14.
Earnings Outlook
Three frozen tests: FY2026 Zgounder production 5.6–5.8 Moz (bear below 5.6; upside above 5.8), settled by the FY2026 release; FY2027 Boumadine feasibility initial capex base at or below US$463m (bear above US$695m; upside below US$463m), settled by FS and license decision; FY2027 operating cash less PP&E and exploration additions base at least US$100m (bear below US$50m; upside above US$150m), settled by audited cash-flow rows. The last is cash before debt repayment. highlighted factual row highlighted factual row highlighted factual row.
Valuation Summary
Present NAV is C$16.33 per 162m assumed future diluted shares. At November 24, 2031 our retained-cash plus remaining finite mine NAV exit is C$25.10. No dividends are declared or forecast; the payment list is empty. From C$26.80, modeled five-year net CAGR is -1.32%, versus XIC 7.49%. generated valuation output.
Recommended Action and Entry Price
Wait. The unrounded XIC-plus-200bp hurdle permits C$15.9361; C$15.90 after C$0.05 downward rounding. A joint commodity, mine-operating and construction stress reduces the price by C$6.15 to C$9.75 so the modeled five-year downside at entry stays within 25%. At entry the base net CAGR is 20.79%; at the actual close it is -1.32%. generated valuation output.
Catalysts
Q4 2026 production and FY2026 cost reporting test Zgounder first; a 2027 Boumadine feasibility study, resource conversion and license renewal test the larger part of NAV. No future disclosure is assumed to have occurred by the cutoff. highlighted factual row highlighted factual row.
Primary Risks to Thesis
The strongest contrary case combines the PEA’s -25% metal deck with 10% less Zgounder output, 10% higher site cost, a one-year Boumadine delay, 50% initial-capital overrun, 45% execution probability and 170m shares. It yields C$4.67 fair value and C$7.34 2031 exit: still Wait at C$26.80. C$9.75 is the base-case maximum entry constrained by this downside, while C$4.65 would be the maximum entry if the joint downside became the central forecast. The base retains the reserve-backed Zgounder schedule and the PEA metal/capital case, while heavily haircutting the unbuilt asset. The license and feasibility work can reverse that judgment. highlighted factual row highlighted factual row generated valuation output.
Company Overview
Aya owns the operating Zgounder silver mine and 85% of the Boumadine polymetallic project in Morocco. The latter remains at exploration and evaluation stage. highlighted factual row amended Q3 MD&A, Aya original, physical p.5.
Products and Services
Zgounder sells silver ingots. Boumadine’s proposed mine would sell zinc, lead and pyrite concentrates containing payable gold and silver; its temporary reclaim operation sells historical pyrite stockpile material. amended Q3 MD&A, Aya original, physical pp.5,13; Boumadine technical report, Aya original, physical pp.21-23.
Business Model
The shareholder claim is the after-tax free cash of two finite mines after development and sustaining capital, debt, payable taxes and dilution. Boumadine project FCF in the PEA already deducts its initial and sustaining capital; the model never subtracts them a second time. highlighted factual row public Python model.
Revenue Drivers
Zgounder revenue is silver ounces sold times realized price, net of offsite charges. Q3 2026 consolidated revenue was US$103.287m; the amended sold-ounces correction changes unit prices, not total revenue. Boumadine revenue depends on payable gold, silver, zinc and lead and concentrate terms. highlighted factual row highlighted factual row.
Cost Structure
The Zgounder technical plan gives 2027 site operating cost US$122.5m and capex US$12.3m; we add US$12m per year for incremental parent cost. The Boumadine PEA includes US$463m initial and US$507m later sustaining/closure capital, subject to Class 5 estimate accuracy. highlighted factual row highlighted factual row.
Operating Levers
Silver grade, mine recovery, mill throughput and mining mix drive Zgounder ounces. Boumadine’s payable metal recovery, 23:1 open-pit stripping ratio, financing, and 2029 construction timing dominate its economics. Zgounder technical report, Aya original, physical p.32 Table 1-5; Boumadine technical report, Aya original, physical pp.21,329-331.
Distribution
Q3 notes identify three Swiss clients for precious-metal sales. The Boumadine concentrate route requires transport to Nador-West Port. Aya has no ordinary cash dividend in the frozen return model. Q3 financial statements, Aya original, physical p.17 Note 11; Boumadine technical report, Aya original, physical p.23.
Geographic Exposure
Both modeled assets are Moroccan. Reported statements are in US dollars; the share and comparison benchmark trade in Canadian dollars. The November 24 Bank of Canada USD/CAD observation is 1.4296. Bank of Canada daily FX lookup.
Regulatory Environment
Zgounder’s license was renewed ahead of its 2027 expiry to October 2037, covering the modeled mine plan. Boumadine’s license had expired May 16, 2026; the renewal application was pending, and its environmental review was ongoing. amended Q3 MD&A, Aya original, physical pp.13-14; highlighted factual row.
Industry Structure
Aya is unusual among silver equities in deriving Zgounder output directly from silver rather than predominantly by-product credits. This strengthens silver exposure but also concentrates price risk. amended Q3 MD&A, Aya original, physical p.5; Zgounder technical report, Aya original, physical p.30.
Growth and Cyclicality
Zgounder’s 2027-2036 technical schedule averages about 6 Moz a year and ends in 2036. Commodity prices move NAV directly, and reserve replacement would require new economic proof. highlighted factual row.
Competitors
Pan American Silver and Fortuna Mining are useful listed precious-metals comparisons, but their multi-asset portfolios and by-product mix do not duplicate Aya’s mine or development concentration. Peer values therefore serve as a check, not the valuation engine. Pan American filings; Fortuna filings.
Market Share
A 6 Moz annual Zgounder plan is small relative to global silver supply; no defensible global market-share percentage is needed for the cash-flow model. Price is taken as exogenous, not set by Aya. highlighted factual row.
Competitive Advantages
Zgounder’s 73.39 Moz proven/probable reserve and recently expanded plant give an operating base. Boumadine’s scale is attractive only if its inferred-heavy PEA converts into a financeable reserve-backed project. highlighted factual row highlighted factual row.
Pricing and Cost Position
The Zgounder plan’s LOM cash cost is US$16.26/oz at its reserve deck; Q3 amended actual cash cost was US$15.65/oz. These differ in period and definition and are not a peer ranking. Zgounder technical report, Aya original, physical p.32 Table 1-5; highlighted factual row.
Entry Barriers and Substitutes
Permits, geology, capital and concentrate qualification create entry barriers. Silver bullion and diversified miners offer investors alternative silver exposure without Aya’s single-country and construction risk.
Supplier and Customer Dynamics
The Q3 financial note says sales were to three clients in Switzerland. This customer concentration and Boumadine concentrate payability matter more than an asserted market share. Q3 financial statements, Aya original, physical p.17 Note 11; Boumadine technical report, Aya original, physical p.330 Table 22-3.
Regulation and Structural Risks
A PEA is preliminary and cannot itself establish reserves. The pending Boumadine license and Moroccan environmental study are direct constraints on the modeled start date. highlighted factual row highlighted factual row.
Historical Performance
FY2025 revenue was US$202.102m versus US$39.117m in FY2024 after Zgounder ramp-up. Q3 2026 revenue was US$103.287m and nine-month revenue US$317.355m, so the new run rate is materially above 2025 but commodity price and pyrite reclaim contributions cannot be treated as permanent. 2025 audited financial statements, Aya original, physical p.9; highlighted factual row.
Income Statement Analysis
Nine-month 2026 operating income was US$190.210m versus US$26.167m a year earlier; nine-month net income attributable to Aya holders was US$116.396m. The Q3 diluted earnings denominator 149.821m is a weighted average, not the modeled future share count. Q3 financial statements, Aya original, physical p.4; highlighted factual row.
Balance Sheet Analysis
September 30 unrestricted cash was US$183.791m; current plus long-term debt US$69.651m. The bridge deducts US$46.365m tax payable, US$3.409m leases and US$1.549m purchase-price obligation, yielding US$62.817m net start cash; restricted US$16.405m is excluded. highlighted factual row highlighted factual row.
Cash Flow Analysis
Nine-month CFO was US$166.652m, less US$18.294m PP&E and US$42.211m exploration additions = US$106.147m before US$43.571m debt principal and US$9.151m borrowing costs. Those debt and interest uses are not shareholder distributions. highlighted factual row highlighted factual row.
Earnings Quality
Working capital contributed US$3.467m to nine-month CFO, while tax payable rose US$26.467m from year-end. Our starting equity bridge subtracts that payable rather than treating all reported cash as free. Q3 financial statements, Aya original, physical pp.3,5; public Python model.
Nonrecurring Items
Boumadine pyrite reclaim began in late 2025 from a finite historical stockpile, so its Q3 contribution is excluded as a perpetual stream. The 2025 comparative also includes one-time impairment recovery and Amizmiz-sale gain. amended Q3 MD&A, Aya original, physical pp.12-13; Q3 financial statements, Aya original, physical p.4.
Funding and Cash Conversion
In the success branch, Aya’s 85% of the PEA’s US$463m initial capital is roughly US$394m before any overrun. Full success-branch construction cash can temporarily exceed current liquidity; the 162m future share assumption reserves 7.9m shares above the November 11 reserved total, with no credit for their issue proceeds. Financing price and terms remain unconfirmed. highlighted factual row highlighted factual row.
Key Ratios
At C$26.80, equity value on 144.195m issued shares is about C$3.86bn. Nine-month earnings are not annualized into a P/E due price and development volatility. NAV and five-year owner return carry the decision. highlighted factual row generated valuation output.
Forward Outlook
Base Zgounder 2027 silver is 6.2 Moz with US$122.5m site cost and US$12.3m sustaining capital; first Boumadine positive project FCF is modeled in 2030 following 2028-29 construction. By 2031, risk-adjusted retained net cash is US$901.9m, not a cash dividend. highlighted factual row highlighted factual row.
Model Choice
A finite mine-life DCF uses Zgounder’s 2027-2036 reserve mine plan and Boumadine’s Table 22-3 2028-2047 post-tax FCF, without terminal perpetuity or speculative exploration discovery value. The project plan is 85% Aya owned and weighted 65% for execution. highlighted factual row highlighted factual row public Python model.
Growth
Zgounder output follows the actual dated mine schedule and falls to 4.0 Moz in 2036. Boumadine has 14 years of proposed production beginning after construction; no cash is projected after the PEA closure tail. Zgounder technical report, Aya original, physical p.32; Boumadine technical report, Aya original, physical pp.21,329-331.
Profitability
Zgounder annual cash uses silver ounces at US$50/oz less technical-plan operating costs, 35% tax on positive pre-capex margin, sustaining capital and US$12m extra parent expense. Boumadine starts from the PEA post-tax project FCF and adds only the US$100/oz gold difference at 65% after-tax capture on payable ounces. highlighted factual row Boumadine technical report, Aya original, physical pp.329-331; public Python model.
Reinvestment or Required Capital
Zgounder sustaining and closure capital totals US$71.42m in the technical plan. Boumadine’s US$463m initial and US$507m later costs are already in its FCF sequence. We subtract US$45m extra 2027 and US$30m extra 2028 pre-decision exploration, an analyst allowance, once outside the PEA. highlighted factual row highlighted factual row public Python model.
Discount Rate
Peralta judgments: 9% USD nominal for producing Zgounder and 10% for the development project, both above the PEA 5% engineering NPV rate. The 65% execution weight is separate and reflects inferred-resource, permit, capex and finance risks. At the 2026-11-24 FX of 1.4296 CAD/USD, each US$100m changes value by about C$0.88 per 162m shares. Boumadine technical report, Aya original, physical p.24; Bank of Canada FX.
Terminal Economics
The terminal date is the five-year checkpoint, not mine exhaustion. At November 24, 2031, model cash is US$901.9m; remaining Zgounder 2032-36 NAV US$479.3m and Boumadine 2032-47 NAV US$1462.8m. Finite closure years are retained, with no reinvestment step-down or perpetuity. generated valuation output.
Bridge to One Common Share
The US$62.817m start cash derives from the precise Q3 balance rows; the 162m denominator exceeds November 11 fully reserved 154.088m by 7.912m to provide an uncredited financing/dilution reserve. It is an analyst estimate, not issuer guidance. highlighted factual row highlighted factual row.
Present NAV bridge
| 2026-11-24 NAV bridge | US$m | CAD/share |
|---|---|---|
| Unrestricted cash less debt, payable tax, leases and purchase price | 62.8 | 0.55 |
| Zgounder 2027-2036 finite cash PV, 9% | 741.3 | 6.54 |
| Boumadine 2028-2047 project FCF PV, 10%, 85% Aya, 65% execution | 1111.6 | 9.81 |
| Additional pre-decision exploration | -65.7 | -0.58 |
| Common equity / 162m future shares | 1850.0 | 16.33 |
Exit bridge
| 2031-11-24 exit bridge | US$m | CAD/share |
|---|---|---|
| Retained net cash after 2027-2031 flows | 901.9 | 7.96 |
| Zgounder remaining 2032-2036 PV | 479.3 | 4.23 |
| Boumadine remaining 2032-2047 PV | 1462.8 | 12.91 |
| Exit common equity / 162m shares | 2844.0 | 25.10 |
Price-Implied Expectations
At the close, fair NAV requires US$96.82/oz silver with all other base inputs fixed. A five-year return equal to XIC plus 200bp requires C$42.21 exit and US$105.41/oz silver. The 2026-11-24 observed silver reference near US$42.40 is below even the US$50 base; this makes the market hurdle particularly demanding. Umicore dated silver observation and generated valuation output.
Independent Cross-Check
The PEA Table 22-3 after-tax FCF sums to US$4.694bn and its own 5% column to about US$3.537bn. Our higher-rate, later-date project PV before ownership and probability is US$2.012bn. The gap reflects 10% discounting from November 2026 and project timing; applying 85% ownership and 65% weight leaves US$1.112bn. The PEA US$463m capex is not deducted again. highlighted factual row generated valuation output.
Conclusion and Change from Prior Edition
This is Aya’s first authored edition, with no predecessor. Fair NAV is C$16.33, the hurdle-only ceiling C$15.94 unrounded, and the downside-bound entry C$9.75. The difference is traceable to dates, transaction fees and the joint stress rather than a target-price haircut. generated valuation output.
Peer Selection
Pan American Silver and Fortuna Mining are relevant public precious-metal operators. They are not single-asset or identical silver-price exposures, so an EV/EBITDA screen cannot replace the mine NAV. Pan American filings; Fortuna filings.
Dated Ratio Table
| Company | TSX close 2026-11-24 CAD | Sep 30 2026 attributable book US$m | Price/book at 1.4296 FX |
|---|---|---|---|
| Aya (AYA) | 26.80 | 520.198 | 5.20x |
| Fortuna (FVI) | 10.91 | 1,813.019 | 1.25x |
AYA uses 144.195m November 11 issued shares, Fortuna 295.957m quoted shares; price/book is market capitalization translated into US dollars divided by the September 30 owner equity. The Fortuna quote and share count are observed market data; its book value is the issuer Q3 financial-position row, which was available at cutoff but the publisher PDF returned 403 in this collection. Fortuna Q3 financial statements, physical p.3; Fortuna dated quote; highlighted factual row.
Comparability Adjustments
A peer ratio would need matching trailing periods, US$ to C$ translation, treatment of project capital and noncontrolling interests. Aya’s Boumadine PEA cannot be valued as current EBITDA because the project is not producing. highlighted factual row.
Implications for Value
The absence of a verified peer EV/EBITDA does not make the US$3.537bn PEA NPV comparable to current market capitalization. The decision rests on the independently reconstructed finite mine cash-flow bridge, with a wide commodity sensitivity. highlighted factual row generated valuation output.
Bear Case
The joint stress applies PEA Table 7’s -25% metal deck (US$2,625 Au/US$37.50 Ag plus proportionate base-metal cuts), 10% lower Zgounder ounces, 10% higher Zgounder cost, one-year Boumadine delay, 50% initial capex overrun, execution weight 45% and 170m shares. It gives C$4.67 fair and C$7.34 2031 exit. The 50% capex increase is consistent with the PEA Class 5 accuracy range; the combination is an analyst stress, not a forecast. Boumadine PEA release, Table 7; Boumadine technical report, Aya original, physical p.23; generated valuation output.
Base Case
US$3,600 gold, US$50 silver, PEA zinc/lead deck, technical Zgounder volumes/costs, 65% Boumadine execution and 162m shares yield C$16.33 fair and C$25.10 exit. generated valuation output.
Bull Case
US$4,000 gold, US$60 silver, 5% higher Zgounder ounces, 15% higher positive Boumadine project cash, 80% execution and 158m shares yield C$25.61 fair and C$39.30 exit. It is conditional and requires evidence beyond the PEA. generated valuation output.
Outcomes at Close and Entry
At C$26.80 the base five-year net CAGR is -1.32%; XIC’s modeled net CAGR is 7.49%, a -8.81-percentage-point spread. At C$9.75 the base net CAGR is 20.79%. In the joint downside, the five-year loss at entry is 24.76%. generated valuation output.
| Assumption | Close | Fair value | Maximum entry | Price rule |
|---|---|---|---|---|
| Base | C$26.80 | C$16.33 | C$9.75 | Wait |
| Joint downside | C$26.80 | C$4.67 | C$4.65 | Wait |
| Upside | C$26.80 | C$25.61 | C$9.75 | Wait |
Scenario return table
| Case | 2026 fair CAD/share | 2031 exit CAD/share | Net CAGR at C$26.80 | Decision |
|---|---|---|---|---|
| Joint downside | 4.67 | 7.34 | -22.83% | WAIT |
| Base | 16.33 | 25.10 | -1.32% | WAIT |
| Upside | 25.61 | 39.30 | 7.93% | WAIT |
Market-Implied Case
The base model cannot justify the close at the stated US$50 silver deck. US$96.82 silver is needed for current fair value equal to the close; US$105.41 for the required five-year spread. An FS showing lower capex and firmer reserves could shift that threshold. generated valuation output.
Analyst Assessment
The strongest case for buyers is rapid Boumadine de-risking and sustained much higher silver. The pending renewal, inferred-heavy mine plan, and current gold/silver deck favor keeping the execution haircut and waiting. The first decisive observable test is FY2026 Zgounder ounces and cash cost, then Boumadine FS capex and reserve conversion. highlighted factual row highlighted factual row.
Operating Risks
A 10% Zgounder production miss with 10% cost inflation compresses the reserve mine’s annual cash simultaneously. Grade, stripping and mill recovery are measurable drivers. highlighted factual row generated valuation output.
Financial and Liquidity Risks
The full Boumadine success branch requires roughly US$394m attributable initial capital and could need outside financing before positive project cash. Higher share issuance than the 162m reserve would lower every per-share figure. highlighted factual row highlighted factual row.
Regulatory and Legal Risks
Boumadine’s mining license renewal was unresolved at the cutoff; a rejection or long delay would remove or defer the project contribution. Zgounder’s renewed license covers the current mine plan to 2037. highlighted factual row amended Q3 MD&A, Aya original, physical p.13.
Industry and Competitive Risks
Sustained lower gold/silver prices or concentrate payability have direct effects on finite project NAV. Published Boumadine -25% metal prices lower project NPV5 by US$1.729bn before ownership and investor-risk adjustments. Boumadine PEA release, Table 7.
Thesis-Specific Risks and Reconsideration Triggers
Reconsider after FY2026 Zgounder output below 5.6 Moz, Boumadine FS initial capex above US$695m, nonrenewal of the license, or a FY2027 cash-after-PP&E-and-exploration figure below US$50m. Each threshold tests a frozen model driver, not an open-ended news reaction. highlighted factual row highlighted factual row.
Environmental Factors
Boumadine requires a Moroccan EIA and international-lender ESIA work; the PEA describes water, tailings and biodiversity baseline work still in progress. Initial and closure capital are material, including US$11m TSF closure in the plan. Boumadine technical report, Aya original, physical pp.24,26.
Social Factors
Moroccan mine development requires land, labor and community support. A delay is expressed in the one-year Boumadine downside rather than as an unsupported separate dollar cost. Boumadine technical report, Aya original, physical pp.26-27.
Governance Factors
The 2026 circular states no holder known to management owned at least 10% as of the April 23 record date. This does not rule out later changes; the November 11 equity awards would expand the share base if settled. Aya circular, physical p.10; amended Q3 MD&A, Aya original, physical p.31.
Financially Material Risks and Opportunities
The key ESG-linked financial channels are permitting delay, water/tailings capital and closure obligations; the model uses the PEA’s US$507m sustaining/closure budget and a lower execution weight, avoiding a second unquantified ESG premium. highlighted factual row generated valuation output.
Annual Results
| US$m, year ended Dec 31 | 2024 | 2025 |
|---|---|---|
| Revenue | 39.117 | 202.102 |
| Operating income (loss) | (38.747) | 62.517 |
| Net income (loss) | (26.027) | 46.280 |
2025 audited financial statements, Aya original, physical p.9 income statement.
Interim Results
| US$m, three/nine months ended Sep 30 | Q3 2025 | Q3 2026 | 9M 2025 | 9M 2026 |
|---|---|---|---|---|
| Revenue | 54.337 | 103.287 | 126.783 | 317.355 |
| Operating income | 15.171 | 59.472 | 26.167 | 190.210 |
| Net income | 12.422 | 35.007 | 27.994 | 118.572 |
Q3 financial statements, Aya original, physical p.4; highlighted factual row.
Trailing Results
Trailing revenue to Sep 30, 2026 = FY2025 202.102 + 9M2026 317.355 - 9M2025 126.783 = US$392.674m. This mixed metal-price and reclaim period is not the mine-plan starting volume. 2025 audited financial statements, Aya original, physical p.9; Q3 financial statements, Aya original, physical p.4.
Material Adjustments
The November 16 amended MD&A corrects ounces sold and unit costs but not IFRS revenue or earnings. Forecasts therefore use the corrected operating starting point without altering reported statement totals. highlighted factual row Q3 financial statements, Aya original, physical p.4.
Annual Positions
| US$m, Dec 31 | 2024 | 2025 |
|---|---|---|
| Cash and equivalents | 30.944 | 136.322 |
| Total assets | 400.107 | 631.733 |
2025 audited financial statements, Aya original, physical p.8 balance sheet.
Interim Positions
| US$m, Sep 30 2026 | Amount |
|---|---|
| Unrestricted cash | 183.791 |
| Restricted cash | 16.405 |
| Current debt | 28.571 |
| Long-term debt | 41.080 |
| Income tax payable | 46.365 |
| Lease liabilities | 3.409 |
| Purchase price payable | 1.549 |
highlighted factual row highlighted factual row.
Capital and Claims Reconciliation
183.791 - 28.571 - 41.080 - 46.365 - 0.904 - 2.505 - 1.549 = US$62.817m, matching the frozen input. Restricted cash and the US$6.034m associate are excluded; this is conservative. Q3 financial statements, Aya original, physical p.3; public Python model.
Annual Flows
| US$m, year ended Dec 31 | 2024 | 2025 |
|---|---|---|
| Operating cash flow | (8.615) | 71.948 |
| Ending cash | 30.944 | 136.322 |
FY2025 alone is not the forecast cash base after the mine ramp. 2025 audited financial statements, Aya original, physical pp.8,11 cash and cash-flow statements.
Interim Flows
| US$m, nine months ended Sep 30 | 2025 | 2026 |
|---|---|---|
| CFO | 38.099 | 166.652 |
| PP&E additions | (25.468) | (18.294) |
| Exploration additions | (25.445) | (42.211) |
| Debt principal repaid | 0 | (43.571) |
Q3 financial statements, Aya original, physical p.5; highlighted factual row.
Trailing Flows
Trailing CFO = FY2025 71.948 + 9M2026 166.652 - 9M2025 38.099 = US$200.501m. Taxes, precious-metal prices and reclaim cash differ from the frozen long-run mine deck. 2025 audited financial statements, Aya original, physical p.11; Q3 financial statements, Aya original, physical p.5.
Reconciliation to Common Shareholders
Nine-month CFO 166.652 less PP&E 18.294 and exploration 42.211 = US$106.147m. After debt principal 43.571, cash interest 9.151 and lease payments 0.635, residual is US$52.790m before other financing and FX; no cash dividend is counted. Future modeled residual is retained until exit and appears once in 2031 cash, with no separately capitalized buyback. highlighted factual row highlighted factual row generated valuation output.
Shareholder cash schedule
| Year | Zgounder US$m | Boumadine risk-adjusted attributable US$m | Extra exploration US$m | Cumulative cash US$m |
|---|---|---|---|---|
| 2027 | 97.6 | 0.0 | -45.0 | 115.4 |
| 2028 | 109.6 | -89.5 | -30.0 | 105.5 |
| 2029 | 109.8 | -166.3 | -0.0 | 49.0 |
| 2030 | 110.2 | 360.2 | -0.0 | 519.4 |
| 2031 | 131.0 | 251.5 | -0.0 | 901.9 |
Primary Sources and Locators
The first inline numeric links open a Peralta factual reconstruction with highlighted rows, issuer URL and exact physical PDF page. Aya financial originals and relevant technical-report page excerpts are retained owner-only; the full technical originals remain at the issuer URLs. The public factual exhibit is a navigation aid and the issuer original controls. Core origins: Q3 financial statements, Aya original pp.3-5; amended Q3 MD&A, Aya original pp.2,5,10,14,31; Zgounder technical report, Aya original pp.27,30-32; Boumadine technical report, Aya original pp.24-25,329-331; Bank of Canada FX; BlackRock XIC holdings.
Frozen Inputs and Assumptions
Frozen JSON inputs state every source row, unit, year, US$ deck, FX, dilution, execution weight and investor hurdle. Aya TSX close C$26.80 and XIC C$54.34 are November 24 regular CAD closes. XIC is modeled at 7.5% gross annual total return, with 3bp buy and sell costs; Aya 5bp each side and 9.5% carry on any dated cash distribution (none forecast). XIC dated close; AYA issuer quote.
Worksheets and Saved Outputs
Frozen inputs and unrounded JSON result accompany the worksheet. Reproduce with Python 3.12.13 from the edition root: PYTHONDONTWRITEBYTECODE=1 PYTHONPATH=. python support/valuation.py. No packages, network access, private paths or credentials are required. generated valuation output.
Changes from the Preceding Edition
This revision clarifies the distinction between the base-case C$9.75 entry and the joint-downside scenario’s C$4.65 entry, adds visible row highlighting to the factual exhibit, and states precisely which originals and excerpts are retained owner-only. The valuation, price and November 24, 2026 evidence cutoff are unchanged. Preceding immutable edition.
| Revision driver | Fair value | Maximum entry |
|---|---|---|
| Prior | C$16.33 | C$9.75 |
| Wording and source navigation | +0.00 | +0.00 |
| Rounding | +0.00 | +0.00 |
| Current | C$16.33 | C$9.75 |
| Date | Close (CAD) | Entry (CAD) |
|---|---|---|
| 2026-11-20 | 25.00 | |
| 2026-11-23 | 26.98 | |
| 2026-11-24 | 26.80 | 9.75 |
Dated TSX unadjusted regular closes, not total returns. AYA TSX price history; BlackRock XIC holdings at cutoff.