Avino Silver & Gold Mines Ltd. (TSX: ASM) — first equity edition
Our maximum entry price is C$0.50 per share. At the November 25, 2026 TSX unadjusted close of C$5.26, the decision is Wait; Needs underwriting. The base five-year return at that close is −84.8%; the linked downside loses 89.1%. Net XIC compounds at 7.4871% after costs and the two-point stock premium gives a 9.4871% hurdle. The strongest credible contrary case is a funded La Preciosa facility with higher recoveries: the existing-mill model permits 0.75 million tonnes annually and produces C$0.87 fair NAV, while a technical plan for more capacity, capex and financing is missing. The model stops cash-losing operations after the 2031 checkpoint and retains the disclosed 2043 closure cash; earlier shutdown costs and a new facility remain unpriced, so C$0.50 is conditional, not a qualified order. Observed recovery and throughput · Reserve recovery basis · Plant status.
- Market close (CAD)
- C$5.26
- Base fair value (CAD/share)
- C$0.87
Company details
- Maximum entry price (CAD/share)
- C$0.50
- Decision
- Wait / Needs underwriting
| Assumption | Close | Fair value | Maximum entry | Price rule |
|---|---|---|---|---|
| Base | C$5.26 | C$0.87 | C$0.50 | Wait |
| La Preciosa recovery remains 64% | C$5.26 | C$0.82 | C$0.46 | Wait |
| Mine cash cost +US$15/t | C$5.26 | C$0.62 | C$0.30 | Wait |
| Joint operating downside | C$5.26 | C$0.70 | C$0.36 | Wait |
| Upside metal and recovery | C$5.26 | C$1.10 | C$0.57 | Wait |
| Continue uneconomic mine after 2031 | C$5.26 | C$0.67 | C$0.30 | Wait |
Identity and cutoff. This is Avino Silver & Gold Mines Ltd. common stock, traded as ASM on TSX in CAD and ASM on NYSE American in USD. It is neither an ADR nor Australian Strategic Materials Ltd., whose ASX ASM security was acquired and delisted in August 2026. The TSX share is the portfolio quote. Company accounts use US dollars; the 2026-11-25 Bank of Canada rate of C$1.4219 per US$1 translates the mine NAV. Avino listing, MD&A p.1 · ASX transaction · Bank of Canada, FXUSDCAD 2026-11-25 · Frozen TSX quote.
Stock Price History · Detailed model · Scenario calculations. This report freezes information available through November 25, 2026 Vancouver time. The latest financial statements are the unaudited September 30, 2026 quarter, approved November 4; annual audited statements cover 2025 and 2024. A first edition has no valuation predecessor.
Investment Thesis
Avino owns a near-complete interest in its producing Avino mine and all of La Preciosa in Durango, Mexico. The credible investment case is a funded silver transition using existing mill circuits, not immediate monetization of the entire reserve inventory. The cash treasury supports development, but annualized September-quarter production and unit cost show that the La Preciosa ramp is not yet steady state. Ownership, Q3 statements note 3 · Q3 operating split.
Market Mispricing
At C$5.26, the November 4 basic count implies roughly C$891 million market capitalization. The reserve-capped existing-mill model gives C$0.87/share, or US$106.3 million NAV on 174.484 million fully diluted shares after five development years and a cash-preserving stop. This gap is not proof of market error: investors may price a larger funded plant, reserve conversion and higher metals. Allowing continuation once silver economics justify it, fair NAV equals the close at about US$131.42/oz 2031 silver versus US$45 base; the entry rule needs US$144.91/oz. These are conditional reverse solves, not consensus forecasts. Share basis · Quote · Reverse solves.
Recent Developments
The November 4 Q3 results reduced 2026 AgEq production guidance to 2.2–2.5 million ounces from 2.4–2.7 million and raised AISC guidance to US$30–32 per payable AgEq ounce from US$25–27. The MD&A says a separate La Preciosa facility remains under study. The October 26 drill results may improve a future plan, but they are not converted production or cash flow here. Revised guidance, Q3 results p.4 · Plant, MD&A p.7 · October drill release.
Earnings Outlook
Peralta's 2027 base forecasts 0.63 million raw Avino tonnes and 0.12 million La Preciosa tonnes, 1.22 million recovered silver ounces, US$96.4 million revenue and a US$3.4 million cash loss after US$25 million sustaining/development capital. The 2031 base produces 1.31 million silver ounces and a US$5.2 million cash loss. These analyst forecasts reflect a 0.75 million tonne existing-mill cap and no new facility, not issuer guidance. Q3 feed, grade, recovery · Forecast.
Valuation Summary
The 10% nominal US-dollar finite-life NAV is C$0.87 per diluted share. After five forecast development years, the base stops uneconomic existing-mill cash outflow at 2031; idle years carry no operating cash and 2043 pays disclosed closure cash. The five-year 2031 exit is C$0.803 base and C$0.576 linked downside, with no distributions. The base hurdle ceiling is C$0.509754 and downside nominal-preservation ceiling C$0.575465; the lower floors once to C$0.50. Extra care-and-maintenance or accelerated closure costs are unquantified, so this is conditional arithmetic. Model and exact precision.
Recommended Action and Entry Price
Wait; Needs underwriting. Both ceilings are far below the close. The C$0.50 model entry depends on an orderly stop after 2031 and is not a qualified order until shutdown costs and a funded production plan are underwritten. Reassess after a scoped mine plan states existing and new-mill capacity, capex, commissioning, payable production, closure and financing on a diluted basis. La Preciosa status.
Catalysts
The first checkpoint is FY2026 consolidated production against the revised 2.2–2.5 million AgEq-ounce range. The second is sustained production-ore grade and recovery, compared with Q3 La Preciosa's 147 g/t and 64% recovery. The third is an independently costed stand-alone mill schedule plus funded capital and share count. Each checkpoint is frozen with a base and downside/upside range in Financial Analysis. Q3 production table · Guidance.
Primary Risks to Thesis
The joint setback holds La Preciosa at 64% silver recovery, slows early feed, adds US$3/t mine cost and US$2 million annual 2027–31 development spending. It cuts conditional fair value to C$0.70 and 2031 exit to C$0.576. The mine stops after 2031 instead of continuing at a loss; projected year-end cash remains positive through the US$6.117 million 2043 closure cash. Actual care-and-maintenance and accelerated closure requirements are not published. Observed recovery/cost · Scenarios.
Company Overview
Avino is a British Columbia corporation reporting under IFRS, with Mexican operations and TSX/NYSE American common listings. The operating Avino property and development-stage La Preciosa are modeled separately; the oxide tailings reserve is excluded until its timing and investment are underwritten. Q3 MD&A p.1 · Reserve split.
Products and Services
The issuer sells concentrate containing payable silver, gold and copper, rather than refined silver ounces alone. Q3 produced 303,189 silver ounces, 1,732 gold ounces and 1.203 million copper pounds from 190,379 tonnes milled. Q3 MD&A operating table.
Business Model
Avino converts mined tonnes into recovered metal, then sells payable concentrate after treatment and refining deductions. Avino mine supplies copper, silver and gold; La Preciosa's development material supplies mostly silver. The model uses separate feed, grades, recoveries, payability and the 99.67%/100% effective ownership factors before consolidated costs. Q3 production split · Model inputs.
Revenue Drivers
The largest drivers are silver grade/recovery, payable ounces and realized prices. Q3 2026 average realized silver price was US$63.33/oz, but a quarter of unusually high realized price is not assumed permanently: the model starts silver at US$50 in 2027 and settles at US$45 by 2030. Gold and copper are modeled separately, avoiding a fixed AgEq conversion when prices change. Reported realized price · Price deck.
Cost Structure
Q3 consolidated cash cost was US$71.40/t and La Preciosa development material cost US$133.92/t versus Avino's US$59.60/t. At the modeled 0.63/0.12 million tonne mix, these site rates weight to about US$71.5/t. The base starts conservatively at US$75/t and rises US$1/t annually through the 2031 checkpoint. A +US$15/t stress cuts conditional fair value from C$0.87 to C$0.62 and five-year exit from C$0.80 to C$0.48; no subsequent loss-making feed is credited. Corporate cash, sustaining/development capex and taxes are explicit. Operating cost table · Cost stress.
Operating Levers
La Preciosa recovered 91,441 silver ounces from 30,239 tonnes in Q3. The decision case uses 0.12 million tonnes in 2027 and 0.14 million yearly through 2031 within 0.75 million total existing-mill feed; production stops thereafter at the economic checkpoint unless a funded plan changes it. Holding other inputs fixed, 64% recovery through 2031 reduces fair value by C$0.047/share and exit by C$0.065/share. Operation split · Recovery stress.
Distribution
The company has no regular dividend in the source filings. It bought back 784,771 shares for US$4.629 million in the nine months and 249,943 subsequently for US$1.316 million. The subsequent cash and share-count changes are incorporated once; no future buyback is credited without a matching cash use. Q3 statements notes 12/19 · Subsequent shares.
Geographic Exposure
All nine-month revenue was attributable to Mexico. Costs in Mexican pesos and USD sales create FX risk, separate from the CAD translation of the TSX share. The model freezes CAD per USD at the November 25 Bank of Canada observation; it does not forecast MXN/USD. Revenue note · Bank of Canada FXUSDCAD.
Regulatory Environment
NI 43-101 reserves are estimates contingent on mining, metallurgy, price and permit assumptions, not cash equivalents. The 2026 reserve release notes geotechnical, productivity, throughput and recovery risks. Mexican mining rules and community relationships can delay production and increase closure costs; the edition credits no unpermitted capacity. Reserve release, risks · AIF risk factors.
Industry Structure
Silver miners compete for grade, recoveries, processing capacity and capital, while prices are globally quoted. Primary-silver exposure is not equivalent to silver revenue alone because Avino has gold and copper by-products. The model treats payable metals independently, and the peer table makes the denominators explicit. Avino MD&A Q3 metal mix · First Majestic Q3.
Growth and Cyclicality
The reserve base offers optional duration, but metal prices and available mill capacity control realized cash. The April reserve calculation used US$36.90/oz silver and 80–87% silver recovery for underground reserves; the model does not simply multiply 127 million AgEq reserve ounces by a spot margin. Reserve assumptions.
Competitors
First Majestic operates multiple producing silver mines and reported Q3 attributable AISC US$30.45 per AgEq ounce. Pan American reported Q3 Silver Segment AISC US$11.21 per silver ounce after by-product treatment. Both are larger, more diversified comparables, so neither cost number is substituted for Avino's cash costs. First Majestic Q3 table · Pan American Q3 table.
Market Share
Avino's Q3 silver production of 0.303 million ounces was less than one tenth of First Majestic's 3.44 million attributable ounces, using the same quarter but different site mix. That makes Avino a small producer with more single-district execution risk; it is not an estimate of global market share. Avino Q3 table · First Majestic Q3 table.
Competitive Advantages
The nearby La Preciosa deposit can share Avino processing during development, reducing the need to assume immediate standalone construction. The cash balance of US$138.247 million offers near-term financing capacity, although issuance funded a meaningful part of it. These advantages need to be measured against the weak current recovery and high development-ore unit cost. MD&A mill circuit · Cash balance · ATM issue.
Pricing and Cost Position
Q3 Avino AISC/realized silver price was 54.8% versus 49.5% at First Majestic, but each ratio mixes by-products differently. La Preciosa's US$40.58 cash cost per payable AgEq ounce is materially above Avino mine's US$24.77. The model forecasts tonnes and cash costs, then uses these ratios only as reasonableness checks. Avino operation table · First Majestic Q3.
Entry Barriers and Substitutes
A reserve inventory, operating mill and local development access are difficult to replicate, but a reserve still needs productive mining and metallurgy. Silver buyers can own bullion or larger diversified producers, so Avino must earn a return after more company-specific capital and dilution risk. Reserve inventory · Q3 ramp status.
Supplier and Customer Dynamics
Concentrate offtake creates customer concentration. In 2025 one customer provided US$87.761 million of US$92.227 million revenue, so treatment terms, settlement timing and counterparty exposure matter. The model applies a 95% silver payability assumption and does not give unearned gross metal value to common shareholders. 2025 audited statements, revenue note · Model.
Regulation and Structural Risks
Mexican permits, labour, water and mine closure can change throughput and costs. Reserve conversion and future mill construction require technical and regulatory work; the issuer explicitly lists throughput and metallurgy as reserve-estimate risks. The modeled 2043 closure cash is the filing's US$6.117 million undiscounted obligation, without also subtracting the US$3.100 million accounting provision. Closure note · Reserve risks.
Historical Performance
Revenue rose from US$66.178 million in FY2024 to US$92.227 million in FY2025; 9M2026 revenue reached US$99.605 million against US$61.683 million a year earlier. Mine operating income was US$23.201 million, US$48.535 million and US$51.221 million for those respective periods. Price, not just volume, drove the 2026 sales gain: 9M payable AgEq ounces sold fell 22% while realized silver price nearly doubled. Annual income p.7 · Interim income p.3 · MD&A operating table p.3.
Income Statement Analysis
Q3 2026 revenue was US$33.385 million and mine operating income US$14.832 million, a 44.4% mine margin. The 9M 2026 net income of US$32.915 million includes US$6.234 million FX gain and investment/derivative marks; the forecast instead starts from metal volumes, realized price, cash operating costs, corporate cost, an US$8 million depletion tax proxy and 30% cash tax. Q3 statements p.3 · Nine-month income · Model.
Balance Sheet Analysis
September 30 cash was US$138.247 million. Financing claims relevant to common equity are US$5.903 million finance leases, US$1.720 million equipment loans and US$0.523 million derivative liability; October's US$1.316 million share repurchase is deducted from cash. The US$8.75 million La Preciosa deferred consideration was paid during 9M2026 and is not deducted again. The US$3.100 million reclamation provision is replaced by the US$6.117 million undiscounted closure cash in 2043 in this cash model. Q3 position p.2 · Cash flow p.5 · Closure note p.14.
Cash Flow Analysis
9M2026 operating cash flow was US$39.592 million, plant/mining-property additions US$14.723 million, and exploration/evaluation cash US$0.170 million. The simple after-investment residual is US$24.699 million before financing, then US$2.594 million lease payments and US$0.413 million equipment-loan payments reduce it to US$21.692 million; US$4.629 million buybacks and US$8.750 million deferred consideration further reduce owner cash to US$8.313 million. ATM and option cash proceeds were separate financing inflows, not operating surplus. Interim cash flow p.5.
Earnings Quality
Reported 9M2026 net income of US$32.915 million differs from US$39.592 million operating cash flow. Adjustments include US$3.177 million share-based compensation and US$6.516 million depreciation/depletion, while the US$6.234 million FX gain in earnings is not a stable mine margin. The model assigns future awards to the 174.484 million diluted share denominator, with no cash proceeds from unexercised options. Interim income p.3 · Cash flow p.5.
Nonrecurring Items
The 2025 audited accounts included US$2.769 million investment gains and US$1.789 million unrealized derivative gains, which are excluded from modeled mine cash. The 2026 La Preciosa royalty buyout's US$8.75 million deferred payment has already been settled. Those are not recurring distributions to shareholders. FY2025 income p.7 · Q3 cash flow p.5.
Funding and Cash Conversion
In FY2025, operating cash of US$27.423 million did not alone fund US$26.875 million investing cash, US$2.307 million lease payments and US$0.325 million equipment-loan payments; the treasury increase chiefly reflected US$74.216 million share sales. In 9M2026, US$24.738 million net share issuance again bolstered cash while the share count rose. The forecast credits the treasury once and requires each year's operating cash to pay capital, tax and closure before any distribution. FY2025 cash flow p.9 · Q3 cash flow p.5.
Key Ratios
Q3 mine margin was 44.4% (US$14.832/33.385 million), while 9M operating-cash/revenue was 39.7% (US$39.592/99.605 million). These ratios benefited from high realized metal prices and cannot be applied to a lower long-run deck without recalculating tax and reinvestment. Q3 AISC US$34.71/payable AgEq ounce is a non-IFRS cash metric with its own denominator, not a substitute for the model's mine cash cost per tonne. Income p.3 · MD&A cost reconciliation p.18.
Forward Outlook
Three frozen, decision-driving checkpoints follow. The outcome bands are Peralta judgments, anchored to September operating data and November guidance; a future release settles each. A miss changes feed, recovery, capital or diluted shares in the worksheet, rather than being explained away as a price move.
| Settling disclosure and period | Definition and unit | Base | Downside / upside | Underwriting effect |
|---|---|---|---|---|
| FY2026 results, expected 2027 | Consolidated produced AgEq ounces under issuer's 2026 budget conversion | 2.35m oz | 2.2m / 2.5m oz | Lower volume reduces next-year feed confidence; compare with revised 2.2–2.5m guidance. |
| First full quarter of production long-hole mining at La Preciosa | Silver recovery on La Preciosa feed; Q3 development benchmark 64% | 68–70% | 64% / 76% | Holding 64% through the 2031 stop checkpoint cuts fair NAV from C$0.87 to C$0.82. |
| Technical mill plan / 2027 capital budget | Disclosed stand-alone facility capex, funded schedule and diluted share count | No facility credited; US$18m 2027 development capex and 174.484m shares | Higher capex / funded plant with verified output | A plant's economics cannot enter NAV until capex, ramp and financing are measured. |
Guidance · Recovery · Facility status · Model inputs and sensitivity.
Model Choice
This is a finite-life, attributable mine cash NAV, not a perpetual earnings multiple. Drivers are site feed, silver/gold/copper grades and recoveries, payability, prices, cash cost per tonne, corporate cash, tax, sustaining/development capital and closure. The 2027–2031 decision case develops within the existing mill; because forecast cash remains negative, the mine stops after 2031 and the next five years show explicit idle cash statements. A reserve-constrained continuation stress uses the full 2027–2041 raw feed schedule and is worth only C$0.67/share, below the stop case's C$0.87. Both retain 2043 closure cash and no residual multiple. Mine data · Closure timing · Public code.
Growth
Existing-circuit throughput is limited to 0.75 million tonnes annually, near Q3's 190,379 tonnes annualized and the issuer's original 2026 0.725–0.750 million tonne plan. The reserve-constrained raw schedule is 0.63 million Avino tonnes in 2027, then 0.61 million with 0.14 million La Preciosa tonnes annually through 2041; it totals 9.17 million Avino tonnes within the 10 million tonne P&P reserve effective October 2025 after a 0.80 million tonne depletion allowance. The decision case counts only 2027–31 feed and then stops cash-losing operations; it does not presume 2032 production. The allowance includes reported 0.487 million tonnes in 9M2026 and estimates for November–December 2025 and Q4 2026. If actual reserve depletion exceeds 0.83 million tonnes, shorten the continuation schedule. Q3 site feed · 9M Avino feed · Avino reserve · 2026 outlook · Reserve ledger.
Profitability
The base assumes US$50/oz silver in 2027, falling to US$45 by 2030; gold US$3,200 to US$3,000/oz and copper US$4.40 to US$4.20/lb, with stated payable factors. Cost starts at US$75/t versus observed Q3 US$71.40/t, then rises US$1/t annually. The price deck and future site mix are analyst judgments; the US$133.92/t La Preciosa development cost motivates the +US$15/t stress. Q3 operating costs · Inputs.
Reinvestment or Required Capital
The five-year development case pays US$7–11 million yearly sustaining capital and US$18 million 2027–28 development capital tapering to US$10 million by 2031; it adds explicit working capital. Cash-losing operations then stop, idle years have no modeled capital spending, and US$6.117 million closure cash is paid in 2043. This is more reinvestment than the Q3 non-IFRS AISC sustaining-capex line, because La Preciosa development is economically required to obtain forecast output. No separate mill is built or valued. 9M plant cash additions US$14.723m · Issuer 2026 capital budget · Forecast.
Discount Rate
A 10% nominal USD mine cash discount rate is Peralta's risk judgment, applied to post-tax cash flows in the same currency. It is above the 9.49% CAD base investor hurdle but the two serve different jobs: the former prices the asset; the latter controls a five-year entry. Concentrated Mexico, metallurgy and capital execution risks justify a wide sensitivity; at the current close, changing discount rate alone does not bridge the C$4.39 fair-value gap. Model.
| Variant | Fair value (CAD/share) | Maximum entry (CAD/share) | Decision at C$5.26 |
|---|---|---|---|
| 8% mine discount rate | C$0.85 | C$0.50 | Wait |
| 10% base | C$0.87 | C$0.50 | Wait |
| 12% mine discount rate | C$0.88 | C$0.51 | Wait |
Terminal Economics
The 2043 endpoint follows the reported closure start. The decision case stops mine cash after 2031 when its existing-mill economics are negative, holds residual cash through idle years and pays US$6.117 million closure cash in 2043. It assigns no stand-alone La Preciosa mill, unmined reserve premium or terminal multiple; care-and-maintenance and earlier closure costs are unknown. The 301 million AgEq measured/indicated resources include reserves and are not added. Closure note · Reserve/resource distinction.
| Year | Revenue (US$m) | Mine cash cost | Sustaining capex | Development capex | Closure cash | Free cash |
|---|---|---|---|---|---|---|
| 2036 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 2037 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 |
| 2043 | 0.0 | 0.0 | 0.0 | 0.0 | 6.1 | -6.1 |
Bridge to One Common Share
Starting US$138.247 million September cash less US$1.316 million subsequent repurchase, US$5.903 million leases (US$2.827 million current plus US$3.076 million long-term), US$1.720 million equipment debt and US$0.523 million derivative liability yields US$128.785 million adjusted net cash. Closure cash is paid in the model, so the US$3.100 million provision is not deducted twice. Discounted 2027–31 mine cash losses and 2043 closure cash subtract US$22.439 million, producing US$106.346 million common NAV; at C$1.4219/US$ and 174.484 million fully diluted shares, fair value is C$0.87/share. Options are counted in full without exercise proceeds. Current lease · Long-term lease · Share count · Exact bridge.
| Common NAV bridge (US$m unless noted) | Signed amount | Running value |
|---|---|---|
| 2026-09-30 cash | +138.247 | 138.247 |
| October buyback | -1.316 | 136.931 |
| Finance leases | -5.903 | 131.028 |
| Equipment loans | -1.720 | 129.308 |
| Derivative liability | -0.523 | 128.785 |
| PV mine cash 2027–2043 | -22.439 | 106.346 |
| CAD per USD / diluted shares (m) | 1.4219 / 174.484 | C$0.87/share |
| Price bridge (CAD/share) | Signed change | Running price |
|---|---|---|
| 2026-11-25 TSX close | — | C$5.26 |
| Mine NAV versus close | C$-4.39 | C$0.87 |
| Five-year downside entry rule | C$-0.37 | C$0.50 |
| Year | Avino / LP feed (Mt) | Ag (Moz) | Au (koz) | Cu (Mlb) | Revenue (US$m) | Mine cash cost | Tax | Sustaining / development | Free cash | Cash at year end |
|---|---|---|---|---|---|---|---|---|---|---|
| 2027 | 0.63 / 0.12 | 1.22 | 6.9 | 4.5 | 96.4 | 56.1 | 6.7 | 7.0 / 18.0 | -3.4 | 125.4 |
| 2028 | 0.61 / 0.14 | 1.27 | 6.8 | 4.3 | 94.6 | 56.8 | 5.8 | 8.0 / 18.0 | -6.5 | 118.9 |
| 2029 | 0.61 / 0.14 | 1.28 | 6.8 | 4.3 | 91.7 | 57.6 | 4.5 | 9.0 / 15.0 | -7.4 | 111.4 |
| 2030 | 0.61 / 0.14 | 1.29 | 6.8 | 4.3 | 91.1 | 58.3 | 4.0 | 10.0 / 12.0 | -5.8 | 105.7 |
| 2031 | 0.61 / 0.14 | 1.31 | 6.8 | 4.3 | 91.6 | 59.1 | 3.8 | 11.0 / 10.0 | -5.2 | 100.5 |
| 2032 | 0.00 / 0.00 | 0.00 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 / 0.0 | 0.0 | 100.5 |
| 2033 | 0.00 / 0.00 | 0.00 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 / 0.0 | 0.0 | 100.5 |
| 2034 | 0.00 / 0.00 | 0.00 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 / 0.0 | 0.0 | 100.5 |
| 2035 | 0.00 / 0.00 | 0.00 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 / 0.0 | 0.0 | 100.5 |
| 2036 | 0.00 / 0.00 | 0.00 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 / 0.0 | 0.0 | 100.5 |
| 2037 | 0.00 / 0.00 | 0.00 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 / 0.0 | 0.0 | 100.5 |
| 2038 | 0.00 / 0.00 | 0.00 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 / 0.0 | 0.0 | 100.5 |
| 2039 | 0.00 / 0.00 | 0.00 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 / 0.0 | 0.0 | 100.5 |
| 2040 | 0.00 / 0.00 | 0.00 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 / 0.0 | 0.0 | 100.5 |
| 2041 | 0.00 / 0.00 | 0.00 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 / 0.0 | 0.0 | 100.5 |
| 2042 | 0.00 / 0.00 | 0.00 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 / 0.0 | 0.0 | 100.5 |
| 2043 | 0.00 / 0.00 | 0.00 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 / 0.0 | -6.1 | 94.3 |
Price-Implied Expectations
At all other base inputs fixed, lifting the full silver deck to approximately US$131.42/oz in 2031 makes finite NAV equal C$5.26. The entry-rule equality requires US$144.91/oz in 2031 for both base and linked downside decks, conditional on unpriced downside financing. These diagnostic levels exceed the issuer's US$36.90 reserve assumption and Q3 realized US$63.33; they may stand in for a funded capacity build that this model excludes. They are not claims about investor forecasts. Reserve price basis · Q3 realized price · Reverse solves.
Independent Cross-Check
The reported 9M2026 operating cash of US$39.592 million less US$14.893 million plant/exploration cash equals US$24.699 million before lease/equipment financing, but metal realizations were unusually high and issuance funded much of the cash balance. Annualizing that residual at 10% as a perpetuity would overstate a depleting asset and omit future development; it therefore does not overturn the finite mine NAV. The peer cost ratios below show this company is still paying for a transition. Cash flow p.5 · MD&A realized silver price.
Conclusion and Change from Prior Edition
This first edition has no predecessor. C$0.87 fair value, C$0.509754 base hurdle ceiling and C$0.575465 downside capital ceiling point to Wait at C$5.26. The base ceiling binds at C$0.50 after flooring. Missing earlier-shutdown cost and stand-alone facility economics keep the entry conditional and outside passing ranks. Model.
Peer Selection
First Majestic is a larger Mexico-focused silver comparator. Pan American is a much larger and geographically diversified silver/gold operator. Neither is a direct plant-stage match; the ratios below provide cost and cash discipline rather than a transplanted multiple. First Majestic Q3 release · Pan American Q3 financial report.
Dated Ratio Table
All figures are the September 2026 quarter in US dollars; calculations are Peralta's from each issuer's original table. AISC/realized Ag price divides each company's stated AISC by its realized silver price, despite different by-product conversion conventions. Mine margin is IFRS mine operating income divided by revenue where comparable.
| Issuer, Q3 2026 | Revenue (US$m) | Mine operating income (US$m) | Mine margin | AISC / realized Ag price | Source |
|---|---|---|---|---|---|
| Avino (ASM) | 33.4 | 14.8 | 44.4% | 54.8% | Q3 statements · AISC and price |
| First Majestic (AG) | 394.1 | 170.1 | 43.2% | 49.5% | Q3 release, pp.1–3 |
| Pan American (PAAS) | 1,006 | Not directly comparable across its silver/gold segments | — | Silver-segment AISC US$11.21/Ag oz; no consolidated ratio | Q3 report p.5 |
Comparability Adjustments
Avino AISC uses payable AgEq ounces sold and includes development material; First Majestic reports attributable payable AgEq with a larger multi-mine perimeter; Pan American reports silver-segment AISC per silver ounce after by-product credits and an acquired Juanicipio interest. The AISC/price ratios are therefore directional, not interchangeable margins. For NAV, issuer-specific tonnes, metal payability and cash capital are safer. Avino cost definition · First Majestic method note · Pan American segment note.
Implications for Value
Avino's Q3 mine margin matched First Majestic's 43.2% despite a much smaller sales base, but Avino's cost per payable AgEq was higher relative to its realized silver price. This supports treating a large La Preciosa margin improvement as a sensitivity rather than a fact. No peer ratio justifies a price above the issuer-specific five-year downside ceiling without a funded plant plan. Peer table and worksheet.
Bear Case
The linked downside holds La Preciosa silver recovery at observed 64%, slows early feed to 0.12–0.13 million tonnes, adds US$3/t mine cost and US$2 million yearly development capital in 2027–31. These misses can occur together as development ore persists. The modeled stop after 2031 preserves cash rather than assuming indefinite loss-making production. Fair NAV is C$0.70, 2031 exit C$0.576 and there is no projected funding gap using the disclosed US$6.117 million 2043 closure cash; incremental shutdown or care costs remain unquantified. Observed recovery and cost · Scenario output.
Base Case
La Preciosa recovery improves from 68% in 2027 to 76% by 2031 within existing-mill feed. By-product metals, sustaining and development capital remain explicit. Fair NAV is C$0.87 and 2031 exit C$0.803 with no distributions. At the C$5.26 close, the five-year loss is 84.8%; at the conditional C$0.50 entry, base gain is 60.4%. A higher metal deck can justify continuing rather than stopping. Frozen inputs · Exact returns.
Bull Case
A US$7/oz higher silver deck and up to four percentage points better La Preciosa recovery, without an unbuilt facility, raises conditional fair value to C$1.10 and 2031 exit to C$1.11. Even this path loses roughly 78.8% at the C$5.26 close over five years. Upside output.
Outcomes at Close and Entry
The generated table runs each case through the same CAD share basis and the 2031 stop policy. Holding La Preciosa recovery at 64% cuts fair NAV C$0.047; adding US$15/t mine cost cuts fair NAV C$0.243. Continuing the uneconomic existing-mill mine through 2041 reduces fair NAV to C$0.67 and base 2031 exit to C$0.48. None approaches C$5.26. Decision worksheet · Exact output.
| Assumption | Close | Fair value | Maximum entry | Price rule |
|---|---|---|---|---|
| Base | C$5.26 | C$0.87 | C$0.50 | Wait |
| La Preciosa recovery remains 64% | C$5.26 | C$0.82 | C$0.46 | Wait |
| Mine cash cost +US$15/t | C$5.26 | C$0.62 | C$0.30 | Wait |
| Joint operating downside | C$5.26 | C$0.70 | C$0.36 | Wait |
| Upside metal and recovery | C$5.26 | C$1.10 | C$0.57 | Wait |
| Continue uneconomic mine after 2031 | C$5.26 | C$0.67 | C$0.30 | Wait |
The policy ceilings for the base plus linked downside are C$0.509754 and C$0.575465 before flooring. With no distributions, base 2031 terminal sale cash is C$0.802402/share after a 5 bp sale cost; linked downside sale cash is C$0.575753/share. Purchase cost is 5 bp. Net XIC CAGR is 7.4871%; adding two percentage points gives the 9.4871% base hurdle. The base hurdle binds and flooring once gives conditional C$0.50. At the close, base annualized return is −31.35% versus +7.49% net XIC, a −38.84 percentage-point spread. Rule calculation.
| Case | Fair NAV/share | 2031 exit/share | Funding (US$m) | Base hurdle ceiling | Downside preservation ceiling | Five-year return at close |
|---|---|---|---|---|---|---|
| Observed 64% LP recovery | C$0.82 | C$0.74 | 0.0 | C$0.47 | C$0.74 | -86.0% |
| Mine cash cost +US$15/t | C$0.62 | C$0.48 | 0.0 | C$0.31 | C$0.48 | -90.8% |
| Joint downside | C$0.70 | C$0.58 | 0.0 | C$0.37 | C$0.58 | -89.1% |
| Base | C$0.87 | C$0.80 | 0.0 | C$0.51 | C$0.80 | -84.8% |
| Upside | C$1.10 | C$1.11 | 0.0 | C$0.71 | C$1.11 | -78.8% |
| Continue uneconomic mine after 2031 | C$0.67 | C$0.48 | 0.0 | C$0.31 | C$0.48 | -90.8% |
Market-Implied Case
Lifting both base and linked-downside silver decks, allowing mine continuation only when its higher cash flows warrant it, requires roughly US$144.91/oz in 2031 for the entry ceiling to reach C$5.26; fair NAV equality needs US$131.42/oz. These diagnostic price levels are far above the US$45 base and do not prove a purchasable price. A funded La Preciosa system could substitute for part of that gap, but no disclosed capacity/cost/output schedule supports a priced case. Reverse solves · Plant disclosure.
Analyst Assessment
The conditional C$0.50 is governed by the base hurdle: C$0.509754 before flooring versus C$0.575465 downside preservation. It still does not make ASM a qualified entry because accelerated shutdown and future-facility terms are missing. The next study must reconcile reserve depletion, existing-mill economics, shutdown costs and funded expansion cash flows. Reserve/plant evidence · Model.
Operating Risks
La Preciosa Q3 silver recovery was 64% against an 80% reserve estimate and development-ore cash cost was US$40.58/payable AgEq ounce. If grade, recovery or long-hole feed remain below plan, the base's 76% recovery and 0.14 million tonne annual La Preciosa feed fail. Each quarter's site production and recovery table tests the assumption. Q3 operation table · Reserve basis.
Financial and Liquidity Risks
US$138.247 million cash is substantial but 2025/26 ATM issuance produced cash and dilution. The forecast deducts lease and equipment claims and includes all disclosed RSUs/options in 174.484 million shares. A more expensive mill may consume cash or require new equity; the 9M operating cash cannot be assumed to finance it at lower metals prices. Watch the capex budget, cash, ATM notices, exercise/RSU movements and fully diluted count together. Cash and claims · Share count.
Regulatory and Legal Risks
Mexican environmental, water, labour and community conditions can delay feed or add remediation. The 2025 AIF describes these exposures, while the September 2026 statements record a US$6.117 million undiscounted closure obligation. A new permit condition or revised closure estimate belongs immediately in mine costs and terminal cash. AIF risks · Closure note.
Industry and Competitive Risks
Silver, gold and copper prices are cyclical; a permanent silver price below the base US$45 long-run deck would reduce NAV and may trigger funding. First Majestic and Pan American have wider operating portfolios, so peer valuation strength would not cure a La Preciosa execution miss. The Q3 Avino guidance cut demonstrates that unit cost can rise as payable AgEq volume falls. Q3 guidance · Peer comparison.
Thesis-Specific Risks and Reconsideration Triggers
The first trigger is FY2026 AgEq below 2.2 million ounces or Q4 evidence of continued low La Preciosa recovery. The second is a stand-alone mill study that quantifies capex, commissioning, payable production and financing. The third is further ATM dilution that makes the 174.484 million denominator stale. A credible, fully funded plan could reverse the conservative Wait call; without it, falling price alone is insufficient to qualify the company. Guidance and mill · Shares.
Downside at the current price
The linked miss combines 64% La Preciosa recovery, slower early feed, US$3/t more mine cash cost and US$2 million additional yearly development cash in 2027–31, then stops loss-making feed. Base 2031 gross exit is C$0.802804/share; after a 5 bp sale cost terminal cash is C$0.802402/share, all sale proceeds and C$0.00 distributions. Linked downside gross exit is C$0.576041/share, net terminal cash C$0.575753/share, also no distributions. Scenarios · Public calculation.
The base ceiling is C$0.509754 at the 9.4871% five-year hurdle; downside nominal-preservation ceiling is C$0.575465. The base binds and floors once to C$0.50. At the C$5.26 close, base five-year loss is −84.8% and downside −89.1%. At C$0.50, conditional base gain is +60.4% and downside +15.1% after 5 bp purchase/sale costs. No distributions or retained cash are counted twice. Earlier shutdown/maintenance costs could lower both ceilings, so this remains Needs underwriting and outside qualified ranks. Exact ceilings and returns.
The first observable change is sustained La Preciosa production-ore recovery above 70% with payable ounces and a current-mill cash-margin plan. A second is a costed, funded new facility, including dilution. Before a conditional entry becomes qualified, the company must also disclose care-and-maintenance or accelerated closure costs if the existing-mill program fails. Observed recovery · Uncosted facility.
Environmental Factors
Avino and La Preciosa need tailings, water and closure management. The September statements estimate US$6.117 million undiscounted reclamation and US$3.100 million accounting provision, with Avino/La Preciosa work expected to begin in 2043. The forecast pays the undiscounted amount once and does not count the provision as a second liability. Reclamation note.
Social Factors
The operating district and mine workforce face contractor, safety and community continuity risks. A disruption would first show up as lower feed and higher cash cost per tonne; those are directly stressed in the joint downside. The AIF describes community and labour exposures, but there is no quantified probability to add as a separate charge. AIF risk factors · Downside.
Governance Factors
The 2026 circular states no person was known to control over 10% of votes at April 20. It lists CEO David Wolfin with 27,510 direct and 5,142,168 indirect shares; related-party services are disclosed in the interim notes. The board's capital allocation matters because it issued 3.099 million ATM shares in 9M2026 while also repurchasing stock. Treat share count and cash changes together. Circular principal holders · Wolfin shares · Interim share note.
Financially Material Risks and Opportunities
A costed La Preciosa build could make the reserve base more economically valuable, but it can also demand capital and dilute common holders. The current model counts neither the new output nor new-plant investment. A future environmental permit, closure-cost update or financed engineering study should update the annual mine schedule and both entry ceilings together. Plant development status · Closure.
Annual Results
Audited IFRS figures, US$ millions except diluted EPS; the fiscal year ends December 31. The original statement is 2025 audited financials p.7. Differences below reflect displayed rounding.
| Line | FY2024 | FY2025 |
|---|---|---|
| Revenue | 66.178 | 92.227 |
| Cost of sales | 42.977 | 43.692 |
| Mine operating income | 23.201 | 48.535 |
| G&A | 6.226 | 8.690 |
| Share-based payments | 2.035 | 3.726 |
| Net income | 8.100 | 26.643 |
| Diluted EPS (US$) | 0.06 | 0.17 |
Interim Results
Unaudited IFRS quarter and nine-month comparisons, US$ millions except diluted EPS. September 2026 statements p.3.
| Line | Q3 2025 | Q3 2026 | 9M2025 | 9M2026 |
|---|---|---|---|---|
| Revenue | 21.042 | 33.385 | 61.683 | 99.605 |
| Cost of sales | 11.137 | 18.553 | 30.992 | 48.384 |
| Mine operating income | 9.905 | 14.832 | 30.691 | 51.221 |
| G&A | 1.832 | 2.044 | 5.928 | 7.359 |
| Net income | 7.702 | 6.103 | 16.183 | 32.915 |
| Diluted EPS (US$) | 0.05 | 0.03 | 0.10 | 0.19 |
Trailing Results
Trailing September 2026 equals FY2025 less 9M2025 plus 9M2026; it is not a fresh audited year. Revenue = 92.227 − 61.683 + 99.605 = US$130.149 million; net income = 26.643 − 16.183 + 32.915 = US$43.375 million. The 2027 model's US$96.4 million revenue is US$33.7 million below trailing sales, mainly from a lower silver deck and finite existing-mill feed. Annual income · Interim income · Forecast.
| Line (US$m) | FY2025 | Less 9M2025 | Add 9M2026 | TTM Sep 2026 |
|---|---|---|---|---|
| Revenue | 92.227 | −61.683 | 99.605 | 130.149 |
| Mine operating income | 48.535 | −30.691 | 51.221 | 69.065 |
| Net income | 26.643 | −16.183 | 32.915 | 43.375 |
Material Adjustments
A 2026 trailing earnings multiple is not used because share issuance, derivative/FX marks and elevated metal prices distort annualization. The operating forecast separately models metal prices, payability, capital and taxes. The US$33.7 million revenue gap to 2027 is an analyst forecast difference; operating revenue remains USD and only equity value converts to CAD. Q3 income · Inputs.
Annual Positions
Audited December 31 balances, US$ millions. FY2025 audited financial position p.6.
| Line | 2024-12-31 | 2025-12-31 |
|---|---|---|
| Cash | 27.317 | 101.724 |
| Total assets | 148.711 | 279.032 |
| Current liabilities | 15.534 | 32.506 |
| Total liabilities | 23.312 | 45.002 |
| Equity | 125.399 | 234.030 |
Interim Positions
September 30 is unaudited; December 31 is the audited comparator. Q3 financial position p.2.
| Line (US$m) | 2025-12-31 | 2026-09-30 |
|---|---|---|
| Cash | 101.724 | 138.247 |
| Current assets | 132.068 | 164.293 |
| Total assets | 279.032 | 322.777 |
| Current liabilities | 32.506 | 22.764 |
| Total liabilities | 45.002 | 34.584 |
| Equity | 234.030 | 288.193 |
Capital and Claims Reconciliation
The equity bridge starts with cash, deducts the disclosed October buyback and financing claims, then adds discounted mine cash. The US$8.750 million deferred consideration is absent from September liabilities because it was paid. Accounts payable, taxes payable and ordinary working capital are handled in ongoing operations rather than treated as permanent financing claims. A material rise in either should update working-capital assumptions. Position p.2 · Cash flow p.5 · Bridge.
Annual Flows
Audited US$ millions; capex is cash additions to plant and mining properties plus exploration/evaluation. FY2025 audited cash flows p.9.
| Line | FY2024 | FY2025 |
|---|---|---|
| Operating cash | 23.124 | 27.423 |
| Plant/mine additions | −4.455 | −26.299 |
| Exploration/evaluation | −2.105 | −0.576 |
| Share issuance net of costs | 9.104 | 74.216 |
| Lease payments | −1.909 | −2.307 |
| Cash end | 27.317 | 101.724 |
Interim Flows
Unaudited US$ millions for nine months to September 30. The Q3 2026 quarter by itself supplied US$12.700 million operating cash, but the full 9M cash and capital rows govern the bridge. Q3 statements cash flow p.5 · Q3 MD&A p.3.
| Line | 9M2025 | 9M2026 |
|---|---|---|
| Operating cash | 17.437 | 39.592 |
| Plant/mine additions | −22.258 | −14.723 |
| Exploration/evaluation | −0.568 | −0.170 |
| Share issuance net | 35.936 | 24.738 |
| Lease payments | −1.608 | −2.594 |
| Deferred consideration paid | 0 | −8.750 |
| Repurchases | 0 | −4.629 |
Trailing Flows
TTM September 2026 operating cash = 27.423 − 17.437 + 39.592 = US$49.578 million; plant/mine capex = 26.299 − 22.258 + 14.723 = US$18.764 million. TTM operating cash less plant capex and exploration ≈ US$30 million before financing, but it reflects high metal prices and is not the model's 2027 free cash. Annual cash flow · Interim cash flow.
| Line (US$m) | FY2025 | Less 9M2025 | Add 9M2026 | TTM Sep 2026 |
|---|---|---|---|---|
| Operating cash | 27.423 | −17.437 | 39.592 | 49.578 |
| Plant/mine capex | 26.299 | −22.258 | 14.723 | 18.764 |
| Exploration/evaluation | 0.576 | −0.568 | 0.170 | 0.178 |
Reconciliation to Common Shareholders
For 9M2026, US$39.592 million operating cash less US$14.723 million plant additions, US$0.170 million exploration, US$2.594 million lease and US$0.413 million equipment-loan payments leaves US$21.692 million. The US$4.629 million buyback and US$8.750 million deferred consideration payment leave US$8.313 million retained before share issuance and option proceeds. There were no dividends. US$24.738 million ATM cash and US$3.086 million option/RSU cash are financing, accompanied by dilution, and are not a second operating benefit. Cash flow p.5 · Share movements p.14.
The forecast pays development, sustaining, taxes and closure before common distributions. It retains residual cash in the 2031 exit and pays no interim dividend or modeled buyback, so each dollar benefits the share once. The displayed base and linked downside require US$0 new funding and maintain cash above the US$20 million floor under the 2031 stop assumption. A new facility could need issuance; its price and dilution are not modeled without a funded plan. A common 50% residual-cash payout test is deferred from ranking because ASM is unqualified and no second issuer is under review in this edition. Cash and funding schedule.
Primary Sources and Locators
The local PDFs of SEC HTML exhibits are browser-printed copies of the original issuer filings, without browser path footers, so the signed-out reader can open a specific physical page and highlight the cited number. Owner-only original HTML bytes remain in the package. The public PDF is a faithful layout conversion, not a new issuer PDF. The listed publisher URLs identify the authoritative original. Each critical financial number was checked against the downloaded original, its print page and the public worksheet input.
| Original publisher and date | Decision use / physical page | Publisher original |
|---|---|---|
| Avino, Nov 4 2026 unaudited Q3 statements | Income p.3, cash p.5, share and closure notes | SEC Form 6-K exhibit |
| Avino, Nov 4 2026 Q3 results and revised outlook | Guidance and budget p.4 | SEC Form 6-K exhibit |
| Avino, Nov 4 2026 Q3 MD&A | Operation split p.5, recovery p.17, share table p.34 | SEC Form 6-K exhibit |
| Avino, Mar 10 2026 audited FY2025/FY2024 | Income p.8, cash p.10 | SEC Form 6-K exhibit |
| Avino, Mar 27 2026 AIF | Operating and regulatory risks | SEC Form 40-F exhibit |
| Avino, Apr 16 2026 reserve release | P&P reserve p.3, price/recovery p.4 | SEC Form 6-K exhibit |
| Avino, Apr 20 2026 circular | Control p.11, Wolfin p.15 | SEC Form 6-K exhibit |
| First Majestic, Nov 5 2026 Q3 results | AISC/price p.3 | Issuer PDF |
| Pan American, Nov 4 2026 Q3 report | Silver-segment AISC p.5 | Issuer PDF |
| Yahoo Finance, Nov 25 2026 TSX close | Frozen quote, unadjusted Close, CAD | ASM.TO quote |
| Bank of Canada, Nov 25 2026 daily FX | FXUSDCAD 1.4219, indicative daily rate | Official daily FX |
Frozen Inputs and Assumptions
Public frozen inputs state the dated quote, official FX, share basis, balance-sheet claims, physical mine drivers, metal deck, cash costs, capital, taxes, discount rate and trade/benchmark costs. Reported inputs are the September cash/claims, November share count, Q3 operating parameters and April reserve parameters. Every forward tonnage, recovery improvement, price, cost, tax proxy and capital schedule is Peralta judgment. The 2026-11-25 quote is unadjusted TSX Close, not an ADR or adjusted total return. Source-capture HTML is owner-only; no private path or credential is needed to run the public model. Quote file · Q3 statements · MD&A.
Worksheets and Saved Outputs
Run from this edition folder with Python 3.12.13: PYTHONDONTWRITEBYTECODE=1 PYTHONPATH=. python support/valuation.py. The script reads frozen relative JSON and writes saved Markdown and exact JSON without network or credentials. Its 17-year schedule shows five active years, explicit 2032–43 idle/closure years, a separate reserve-constrained continuation stress, and an upside that can continue when metal economics support it. Model inputs.
| Worksheet | Output |
|---|---|
| Finite mine NAV and entry rule | Decision · Cash forecast · NAV and price bridges · Terminal boundary · Discount sensitivity · Scenarios · Exact JSON |
Changes from the Preceding Edition
This is a same-cutoff reader correction to the first ASM edition. Five sampled chart closes replace the crowded daily chart labels, the fair-value gap is corrected to C$4.39, and the owner-cash paragraph no longer implies an issue-price assumption absent from the model. Frozen quote, mine drivers, NAV, both ceilings and decision are unchanged. The first edition remains immutable at its permalink; the table reconciles rounded prior and current values.
| Revision driver | Fair value | Maximum entry |
|---|---|---|
| Prior | C$0.87 | C$0.50 |
| Reader and chart corrections | C$0.00 | C$0.00 |
| Rounding | C$0.00 | C$0.00 |
| Current | C$0.87 | C$0.50 |
Stock Price History
The chart samples five dated unadjusted TSX closes in CAD from the frozen 23-session Yahoo Finance ASM.TO quote; the full daily series remains in the linked JSON. Sampling keeps the desktop date labels legible. The chart does not adjust for distributions; the investor model forecasts zero distributions. Quote snapshot.
| Date | Close (CAD) | Volume |
|---|---|---|
| 2026-10-26 | 6.47 | 416,600 |
| 2026-11-04 | 6.65 | 1,117,100 |
| 2026-11-11 | 6.53 | 603,200 |
| 2026-11-20 | 4.86 | 1,345,200 |
| 2026-11-25 | 5.26 | 1,341,900 |