Aris Mining (TSX: ARIS) — finite-mine-life investment edition
Our maximum entry price is C$5.00 per share. The November 24, 2026 TSX close was C$17.59, so the decision is Wait. The five-year base case to November 24, 2031 offers 8.09% net annual return at that close, versus 7.49% for a 7.5% gross XIC assumption and a required 9.49% stock return. The strongest contrary assumption is US$3,000/oz gold together with a 30% Marmato volume miss and 20% Toroparu permit-and-funding success probability; it cuts fair value to C$4.37 and the hurdle entry to C$5.15, supporting the C$5.00 rounded ceiling. The base case is preferred because Segovia added reserves in November and Marmato's plant was in commissioning, but neither outcome is yet a shareholder distribution. The first test is the December 2026 Marmato gold pour and its 2027 quarterly ramp.
- Market close (CAD)
- C$17.59
- Base fair value (CAD/share)
- C$15.52
Company details
- Maximum entry price (CAD/share)
- C$5.00
- Five-year base exit (CAD/share)
- C$25.98
- Expected annual return at close, net
- 8.09%
- XIC assumed annual return, net
- 7.49%
- Required net spread
- 2.00 pp
The model uses a US$3,600/oz common gold deck and the Bank of Canada November 24 USD/CAD observation of 1.4296. The close is the unadjusted TSX regular-session CAD price, matched by the November 24 BlackRock XIC holdings and the batch price history; XIC closed at C$54.34 on that same date, used only to align the benchmark start, not to infer its future return. Dates and figures in this edition were available by the November 24 information cutoff. Stock Price History
Investment Thesis
ARIS owns Segovia and Marmato in Colombia and Toroparu in Guyana. Segovia's November 10 reserve update gives 1.920 million ounces of proven and probable gold, only 6.4 years at management's 300 koz steady-state ambition, so the model explicitly exhausts that reserve. Marmato is modeled through its 3.2 Moz reserve and stream burden. Toroparu's November 12 PFS is risked for a pending licence, financing and a 32-month build. Soto Norte receives zero value pending an executable permit and funding plan. Segovia reserve update, table 1; Toroparu PFS, physical pp. 40–41.
Market Mispricing
The market close exceeds the C$15.52 base NAV by C$2.07. With other inputs fixed, approximately US$3,751/oz gold, rather than US$3,600, reconciles that price. Alternatively Toroparu success probability must rise from 45% to about 68%; neither is a claim about consensus. The close also requires a C$27.70 five-year exit to clear the XIC plus 200 bp hurdle, versus our C$25.98. These are three conditional market-price acceptance tests, not three independent explanations to add together.
Recent Developments
Q3 production was 69.3 koz, including just 5.8 koz from Marmato. The issuer guided toward the low end of 300–350 koz for 2026, planned first CIP gold in December, and expected 4,000 tpd by mid-2027 and 5,000 tpd by end-2027. Segovia reserves rose from 1.503 to 1.920 Moz. Toroparu's new PFS displaced the older PEA: 5.6 Moz of planned output over 29 processing years and US$1.005 billion initial funding requirement. Q3 MD&A, physical p. 4; Segovia update, table 1; Toroparu PFS, physical p. 40.
Earnings Outlook
At US$3,600 gold, forecast Segovia output is 280, 300 and 300 koz in 2027–29; Marmato is 100, 160 and 190 koz, then 200 koz as the new plant ramps. These are Peralta forecasts below the combined 500 koz steady-state aspiration, which is not yet achieved. No dividend or buyback is forecast through 2031 because accumulated operating cash must support expansion and possible Toroparu funding.
Valuation Summary
Reserve-limited Segovia and Marmato cash NAVs are US$1,141 million and US$929 million; risked Toroparu is US$600 million. Corporate costs of US$264 million and US$121 million of net claims yield US$2,285 million common NAV, divided by 210.5 million diluted shares at 1.4296 CAD/USD. See the generated valuation bridge and code below.
Recommended Action and Entry Price
Wait at C$17.59. The unstressed five-year required-return ceiling is C$16.4942, or C$16.50 at half-dollar precision. Joint downside lowers that ceiling to C$5.1534; rounding down to the next C$0.50 sets C$5.00. Base-case return at the entry is 39.01% annually, separately from 8.09% at the observed close; stressed return at entry is 10.15%, above the required 9.49%. The downside present NAV of C$4.37 is 12.7% below entry, so the rule does not promise capital preservation.
Catalysts
Marmato's first CIP gold in December 2026, the first full 2027 operating quarter, a Q1 2027 updated Marmato technical report, Toroparu's large-scale licence and construction financing, and the next Segovia reserve roll-forward are the measurable tests. Q3 release; Toroparu PFS, physical p. 40.
Primary Risks to Thesis
A gold-price reversal, Marmato ramp delay, Toroparu construction funding/dilution, and the need to replace Segovia ounces could overturn the base case. The combined case is quantified in Scenarios; the nearest operational test is 2027 Marmato output.
Company Overview
Aris is a Canadian gold producer with Colombia's Segovia and Marmato underground mines and Guyana's Toroparu development project. It acquired the remaining 49% of Soto Norte in December 2025 and now owns 100%; the former Soto stream was terminated. Q3 statements, physical p. 17.
Products and Services
The company sells gold doré and concentrate and has silver/copper by-products at Toroparu. Toroparu's PFS plans 5.582 Moz of recovered gold, 5.340 Moz silver and 235 million pounds copper over its finite plan. Toroparu PFS, physical p. 40, table 1.10.
Business Model
Segovia combines owner mining with contract mining partners (CMPs); Marmato adds a large bulk mine and CIP circuit. Cash to common holders is gold revenue less mining, royalties, tax, sustaining and growth capital, streams, parent costs and senior claims. AISC is a non-IFRS measure, not distributable cash. Q3 MD&A, physical pp. 4, 19.
Revenue Drivers
Gold price, recoveries, ore grade and throughput drive ounces sold. In Q3 2026 realized gold was US$4,205/oz on 68.4 koz sold, while the model uses US$3,600 long-term; this deliberately removes some of the recent price benefit. Q3 MD&A, physical p. 4.
Cost Structure
Q3 Segovia owner-mining AISC was US$1,945/oz, up from 9M US$1,729; CMPs earned a 37% Q3 AISC sales margin. The model's US$2,050/oz Segovia effective cost is an analyst blend plus contingency, not a reported consolidated AISC. Marmato uses US$1,950/oz and a separate 10.5% stream of gold at 18% of spot, implying a US$310/oz effective burden at US$3,600. Q3 MD&A, physical p. 4; Marmato PFS, physical p. 26.
Operating Levers
Segovia's added mine development and haulage capacity could support 300 koz annually, but its 1.920 Moz reserve is finite. Marmato's new 5,000 tpd CIP plant is the larger volume lever, contingent on commissioning and underground delivery. Segovia reserve update, table 1; Q3 release.
Distribution
Customers purchase precious metals through ordinary refining and offtake arrangements; Wheaton receives contractual Marmato and prospective Toroparu metal deliveries. The issuer's 2026 cash flow shows no common dividend, and this model assumes zero distributions to 2031. Q3 statements, physical pp. 6, 16.
Geographic Exposure
Operating cash is Colombia exposed; Toroparu is in Guyana. The translated common value is sensitive to USD/CAD: a 5% lower CAD/USD rate lowers the C$15.52 fair value by about C$0.78 with USD economics fixed.
Regulatory Environment
Toroparu needs a large-scale mining licence and ancillary approvals before a construction decision. Soto Norte needs environmental and community consultation; neither is treated as a permitted producing asset. Toroparu PFS, physical pp. 2–3; Q3 release.
Industry Structure
Gold producers compete for reserve conversion, skilled mining teams, processing capacity and development capital. ARIS has two producing mines, unlike a single-asset developer, but future output depends on both underground execution and a major new project.
Growth and Cyclicality
US$3,600 is the common gold deck across this batch, below ARIS's 9M 2026 realized US$4,515. Gold price is the largest modeled valuation driver: US$3,000 alone reduces fair value to C$7.27. Q3 MD&A, physical p. 4.
Competitors
Larger gold producers such as Agnico Eagle have deeper funding and more diversified reserves; Toroparu competes for capital with other long-build gold projects. Peer ratios below are deliberately limited because reserve lives, project funding and silver exposure differ.
Market Share
The global gold supply share of a 0.3–0.5 Moz producer is too small to determine price; ARIS is a price taker. The investment case rests on its share of mine economics, not gold market pricing power.
Competitive Advantages
Segovia's 13.32 g/t reserve grade and reserve growth support strong unit economics; contract partners formalize local production. These advantages need repeated reserve replacement and stable local relationships. Segovia reserve update, table 1.
Pricing and Cost Position
Segovia's Q3 AISC of US$1,945/oz leaves a US$1,655 margin at US$3,600 before growth capex, tax and corporate costs. Toroparu PFS AISC is US$1,494/oz, but its project NPV is conditional on construction and the Wheaton stream. Q3 MD&A, physical p. 4; Toroparu PFS, physical p. 40.
Entry Barriers and Substitutes
Reserve definition, underground access, processing and permitting form barriers. Gold investment vehicles can substitute for a miner if an investor wants gold exposure without project execution risk; XIC is the opportunity-cost benchmark, not a gold peer.
Supplier and Customer Dynamics
Explosives supply constrained Segovia CMP output earlier in 2026; management said the constraint had resolved by Q3. Wheaton's streams reduce future spot-price participation. Both affect the modeled effective margin. Q3 release; Q3 statements, physical p. 16.
Regulation and Structural Risks
Colombian social and environmental execution and Guyanese licence terms can change the timing or ownership economics. The Toroparu probability discount covers permission, funding and build risks together; it is an analyst judgment, not an issuer-stated probability.
Historical Performance
Revenue rose from US$510.6 million in 2024 to US$927.7 million in 2025; 9M 2026 revenue reached US$998.1 million versus US$619.1 million a year earlier. Gold price and higher volume both contributed; the table does not prove the higher realized price persists. FY25 statements, physical p. 6; Q3 statements, physical p. 3.
Income Statement Analysis
9M 2026 income from mining operations was US$501.0 million and net income US$258.5 million. Q3 net income was US$66.7 million, including financial-instrument and FX marks; normalized mine cash and development funding matter more than headline EPS. Q3 statements, physical p. 3.
Balance Sheet Analysis
September 30 cash was US$419.0 million, debt carrying value US$500.9 million, and provisions US$39.4 million. The model subtracts US$121.3 million for debt less cash plus provisions. The issuer's principal net debt is only US$46.5 million; we use carrying debt consistently and disclose the US$35.4 million difference. Q3 statements, physical pp. 2, 13; Q3 MD&A, physical p. 4.
Cash Flow Analysis
9M CFO of US$385.5 million includes US$82.0 million Marmato stream deposits. Investing cash outflow was US$334.8 million, including US$300.4 million property/equipment and US$32.8 million capitalized interest. Subtracting the stream deposit from CFO gives US$303.5 million recurring-before-growth cash, below investing cash outflow. Q3 statements, physical p. 6.
Earnings Quality
The stream deposits are financing-like consideration reported in CFO, so gross CFO overstates repeatable operating cash in a fresh-dividend analysis. FX losses and instrument gains also cause net income to diverge from cash. Q3 statements, physical pp. 3, 6.
Nonrecurring Items
2025 reported earnings included a Soto Norte stream termination loss and fair-value instrument losses; 2026 included financial instrument gains. The model does not capitalize either mark. FY25 statements, physical p. 6; Q3 statements, physical p. 3.
Funding and Cash Conversion
9M growth and expansion capital was US$286.9 million and sustaining capital US$51.8 million. Management's adjusted FCF after expansion was negative US$47.0 million. Toroparu's US$1.005 billion initial funding requirement exceeds September cash; the model therefore forecasts zero shareholder payments and risk-weights project value. Q3 MD&A, physical pp. 4, 20; Toroparu PFS, physical p. 41.
Key Ratios
At C$17.59, basic market equity is about C$3.64 billion on 206.655 million issued shares, versus 210.5 million economically diluted shares in the NAV. Dividing the dated close by FY2025 basic EPS of US$0.42 translated at 1.4296 gives 29.3x. Using current issued shares against total 2025 earnings instead would give 32.5x; the peer table uses the same historical-EPS convention for every stock. Gold price and projects make either ratio a weak standalone valuation. Q3 statements, physical p. 5; FY25 statements, physical p. 6.
Forward Outlook
Three frozen forecasts: (1) 2027 Marmato produced gold, koz: 2026 low-guidance 35–50, base 100, downside 70, upside 150; settle with FY27 production disclosure and the updated NI 43-101 report. (2) 2027 Segovia output, koz: 2026 guidance 265–300, base 280, downside 240, upside 300; also require P&P reserves at or above 1.8 Moz at the next annual reserve report to sustain the reserve-life thesis. (3) cumulative cash distributed per common share through December 2027, CAD: current zero, base/downside zero, upside up to C$0.50 only if Marmato growth capital and Toroparu funding are fully covered; settle from FY27 cash flow and share disclosures. A failure of (1) and a lower gold deck together move the entry toward C$5.00, as shown in the joint downside.
Model Choice
This is a finite reserve cash NAV, not an EBITDA multiple. Segovia's explicit 1.920 Moz and Marmato's 3.200 Moz determine forecast length. Toroparu is anchored to its new PFS after-tax NPV10 rather than the issuer's NPV5 and then risked for licence, construction and funding. Soto Norte is zero while its environmental pathway remains unresolved. Public Python worksheet reads frozen inputs.
Growth
Segovia forecast ounces sum to 1.920 Moz over seven years; Marmato forecast ounces sum to 3.200 Moz over 17 years. No unproved discovery ounces are in NAV. Toroparu's PFS plans 5.6 Moz over 29 processing years, with 32 months of build; its project NPV includes that finite plan. Segovia update; Toroparu PFS, physical p. 40.
Profitability
Mine cash each year equals modeled ounces times gold less effective AISC, taxed at 35%, then less incremental growth capital. Marmato's 10.5% delivered stream at 18% spot reduces realized gold by 8.61%; at US$3,600 this is US$310/oz. Toroparu PFS cash already deducts its PMPA delivery cost of US$1.888 billion across mine life; no second stream liability is taken. Marmato PFS, physical p. 26; Toroparu PFS, physical p. 41.
Reinvestment or Required Capital
Segovia extra growth capital is US$80 million in 2027, then tails to US$25 million annually; Marmato is US$180 million in 2027 and US$70 million in 2028, then declines. These are analyst estimates against 9M 2026 growth capital of US$286.9 million, and they are in addition to AISC sustaining capital. Toroparu's PFS NPV10 already deducts construction, ongoing capital and closure; its pre-2031 cash profile only rolls NAV forward into the exit and is not subtracted twice. Q3 MD&A, physical p. 4; Toroparu PFS, physical p. 41.
Discount Rate
An 11% nominal USD rate for Colombian reserve cash and corporate costs reflects gold and country risk; it is an analyst required return, not a measured WACC. Toroparu's disclosed NPV10 is used as the project anchor, delayed 1.5 years and multiplied by 45% probability. Its disclosed NPV5 of US$2.828 billion is US$1.268 billion higher than NPV10, or US$8.61 per diluted share at the dated FX before risk. Toroparu PFS, physical p. 41, table 1.12.
Terminal Economics
There is no perpetual mine terminal value. At November 2031, the exit comprises remaining reserve-limited Segovia and Marmato cash NAV, residual risked Toroparu project NAV, retained 2027–31 mine cash, less unchanged net claims. The Toroparu roll-forward uses assumed 2027–31 project cash of -300, -400, -305, 0 and +150 US$M multiplied by 45%; it reconciles the initial PFS anchor to a residual claim and should not be read as company guidance. No cash distributions or buybacks are forecast.
Bridge to One Common Share
The diluted basis is 210.5 million from the issuer's November 4 capital structure, compared with 206.655 million issued at September 30 and 209.278 million weighted diluted in Q3. The model subtracts debt carrying value US$500.928 million, adds US$419.022 million cash, and subtracts US$39.437 million provisions. Marmato US$207.698 million and Toroparu US$84.0 million deferred stream revenues are excluded from debt because stream deliveries are already reflected in mine/project cash. A contingent Soto Norte 6 million-share clause remains an unmodeled dilution risk and is disclosed here. Issuer capital structure; Q3 statements, physical pp. 2, 16.
| Measure (US$M unless noted) | Base | Joint downside |
|---|---|---|
| Segovia reserve cash NAV | 1141.2 | 627.0 |
| Marmato reserve cash NAV | 928.6 | 228.1 |
| Corporate cost NAV | -264.2 | -264.2 |
| Risked Toroparu PFS NAV | 600.3 | 173.3 |
| Debt less cash and closure provision | 121.3 | 121.3 |
| Common NAV | 2284.5 | 642.8 |
| Retained 2027–31 cash | 1146.7 | 349.1 |
| 2031 residual Toroparu NAV | 1564.2 | 537.7 |
| 2031 common exit NAV | 3824.9 | 1195.0 |
| Fair value (CAD/diluted share) | 15.52 | 4.37 |
| 2031 exit (CAD/diluted share) | 25.98 | 8.12 |
| Hurdle price (CAD/share) | 16.4942 | 5.1534 |
| Actionable entry (CAD/share) | 5.00 | 5.00 |
Price-Implied Expectations
Holding the non-gold inputs fixed, the C$17.59 close implies about US$3,751 long-term gold. Holding gold at US$3,600 instead, it implies 68% Toroparu success probability, above the 45% base. Holding all operations constant, the five-year required exit is C$27.70, C$1.72 above our base. None of these solves proves that the market is wrong; each states the minimum change that reconciles price or the hurdle.
Independent Cross-Check
Toroparu's 5% to 10% NPV drop is directly observable in the PFS, an unusually large sensitivity that supports risk-weighting. A price-to-2025 earnings shortcut would value a high-gold-price, capex-heavy producer on a changing denominator and does not defeat the mine NAV. The Segovia reserve cover test is independent of a multiple: 1.920 Moz / 300 koz is just 6.4 years absent conversion. Toroparu PFS, physical p. 41; Segovia update.
Conclusion and Change from Prior Edition
This is ARIS's first edition without a predecessor. There is no predecessor entry or value to attribute. At the cutoff the base fair value is below the close, and the joint stress justifies a much lower maximum entry. Recalculate after the first Marmato CIP operating data, Toroparu permit/financing terms and the updated reserve report.
Peer Selection
ARIS is compared cautiously with gold-heavy Agnico Eagle and the diversified precious-metals miner Pan American Silver. Both have different reserve, country and funding mixes. This NAV decision does not assume their multiples transfer to ARIS.
Dated Ratio Table
| Observation | ARIS, Nov 24 2026 | Agnico Eagle, Nov 24 2026 | Pan American Silver, Nov 24 2026 |
|---|---|---|---|
| Primary metal | Gold | Gold | Silver and gold |
| TSX CAD regular close | 17.59 | 223.35 | 44.40 |
| FY2025 basic EPS, USD | 0.42 | 8.89 | 2.56 |
| Close / (EPS × 1.4296 CAD/USD) | 29.3x | 17.6x | 12.1x |
All prices are November 24 TSX CAD regular closes; all EPS denominators are reported FY2025 basic USD per share, translated at the November 24 Bank of Canada 1.4296 rate. This is a precisely matched historical P/E, but recent gold prices and acquisition mix make it a poor intrinsic-value anchor. ARIS FY25 statements, physical p. 6; Agnico FY25 annual, physical p. 96; Pan American FY25 annual, physical p. 75; Agnico TSX quote; Pan American TSX history.
Comparability Adjustments
Pan American reports attributable silver and gold metrics and has minority mine interests; Agnico's broader mine base changes reserve and financing risk. ARIS's CMP margin and Wheaton streams need explicit treatment, making reported AISC and EBITDA multiples less portable.
Implications for Value
ARIS's 29.3x reported 2025 P/E exceeds the two peers' 17.6x and 12.1x, giving no cheapness signal. The reserve and project cash bridge remains the decision instrument; future comparisons should use same-date attributable cash flow and reserve-adjusted capital needs.
Bear Case
The joint downside uses US$3,000 gold, 70% of planned Marmato volume, and 20% Toroparu success probability; Segovia reserve ounces remain fixed. Fair value is C$4.37, a 75.2% decline from close, and November 2031 exit is C$8.12. The downside is a modeled state, not a probability-weighted point estimate.
Base Case
US$3,600 gold, full reserve-limited mine schedules and 45% Toroparu probability produce C$15.52 current fair value and C$25.98 five-year exit. Forecast distributions are zero. At C$17.59, net stock CAGR is 8.09%, 0.60 percentage points above assumed net XIC but 1.40 points short of the required 2-point spread.
Bull Case
At US$4,200 gold with other inputs fixed, fair value is C$23.76 and 2031 exit C$38.49. This is a price sensitivity, not a claim that current spot holds for two decades. It is bounded by the same disclosed reserve ounces and project probability.
Outcomes at Close and Entry
| Assumption | Close | Fair value | Maximum entry | Price rule |
|---|---|---|---|---|
| Base | C$17.59 | C$15.52 | C$5.00 | Wait |
| Gold US$3,000 only | C$17.59 | C$7.27 | C$8.50 | Wait |
| Marmato 70% only | C$17.59 | C$13.08 | C$14.00 | Wait |
| Toroparu 20% only | C$17.59 | C$13.25 | C$13.50 | Wait |
| Joint downside | C$17.59 | C$4.37 | C$5.00 | Wait |
| Gold US$4,200 only | C$17.59 | C$23.76 | C$24.00 | Buy |
| Scenario | Fair CAD | 2031 exit CAD | Present NAV gain/loss at C$17.59 | Net annual return at C$17.59 |
|---|---|---|---|---|
| Joint downside | 4.37 | 8.12 | -75.2% | -14.3% |
| Base | 15.52 | 25.98 | -11.8% | 8.09% |
| Gold US$4,200 | 23.76 | 38.49 | +35.1% | 17.0% |
At the C$5.00 entry, base net annual return is 39.01%; joint downside net annual return is 10.15%, while downside present NAV is 12.7% below entry. The latter distinction matters for a forced sale before the five-year exit.
Market-Implied Case
The close implies US$3,751 gold or ~68% Toroparu success, each with all other assumptions fixed. It requires a C$27.70 exit to meet the benchmark hurdle. Because Marmato and Toroparu are not fully operating, that premium could reflect both future gold and execution optimism.
Analyst Assessment
The base has better evidence than the downside on reserve addition and commissioning progress. Yet the cost of being early is large: Toroparu needs external funding and Segovia reserve conversion. The actionable entry protects the spread in the defined joint case; a higher ceiling needs a proved Marmato ramp or a materially funded Toroparu construction plan.
Operating Risks
If Marmato produces under 70 koz in 2027, reassess plant availability, ore delivery and the US$1,950 cost assumption. If Segovia produces below 240 koz, reassess throughput and 1.920 Moz reserve scheduling. Both failures would reduce cash NAV.
Financial and Liquidity Risks
Toroparu needs roughly US$1.005 billion initial funding. The PFS assumes a possible US$138 million Wheaton construction payment but also a lifetime stream cost; neither is free equity capital. A dilutive financing or higher debt cost would lower per-share value. Toroparu PFS, physical pp. 40–41.
Regulatory and Legal Risks
Guyanese licence delay or refusal collapses the 45% Toroparu probability; the 20% downside leaves only option value. Colombia community, labour and environmental obligations can raise sustaining and closure costs. The first decisive Toroparu disclosure is the licence and financing package.
Industry and Competitive Risks
At US$3,000 gold, the mine spread shrinks and C$7.27 fair value results even without other stress. Gold and currency volatility dominate a single-year EPS reading. No physical gold hedge or price floor is assumed.
Thesis-Specific Risks and Reconsideration Triggers
The joint stress is decision-changing: entry falls from C$16.50 unstressed to C$5.00. Reconsider if 2027 Marmato output is below 70 koz, Segovia P&P reserves fall below 1.8 Moz, Toroparu funding requires major share issuance, or US$3,000 long-term gold becomes defensible. Reopen the model with the next filed evidence rather than averaging an adverse result away.
Environmental Factors
Tailings, water and closure are material at underground Colombian mines and Toroparu's proposed open pit. The model subtracts recorded provisions of US$39.4 million and the Toroparu PFS already includes US$60 million closure cash, but unpriced remediation could exceed both. Q3 statements, physical p. 2; Toroparu PFS, physical p. 41.
Social Factors
Segovia's CMP program relies on local miners and formalization; interruption or disputes could impair about 39% of 2025 Segovia production that the issuer attributes to CMPs. This is why forecast volume never exceeds the stated reserve. Issuer Segovia operations.
Governance Factors
The March 2026 circular said no known holder controlled 10% or more voting rights. Issued shares rose from 171.0 million at December 2024 to 206.7 million at September 2026, reflecting options, warrants and the Soto transaction. Monitoring future capital issuance is part of the per-share thesis. Circular, physical p. 9; Q3 statements, physical p. 5.
Financially Material Risks and Opportunities
Successful formalization and better tailings systems can preserve permits and volume; environmental failure or weak community consent can delay Toroparu or Soto. The model does not assign separate positive ESG premium. Permit risk is expressed through Toroparu probability and a zero Soto value.
Annual Results
| US$M unless per share | FY2024 | FY2025 |
|---|---|---|
| Revenue | 510.604 | 927.664 |
| Income from mining operations | 147.262 | 432.781 |
| Net income attributable to common | 24.582 | 78.345 |
| Basic EPS (US$) | 0.16 | 0.42 |
Audited FY25 statements, physical p. 6, exact rows.
Interim Results
| US$M unless per share | Q3 2025 | Q3 2026 | 9M 2025 | 9M 2026 |
|---|---|---|---|---|
| Revenue | 258.115 | 295.419 | 619.099 | 998.125 |
| Income from mining operations | 122.740 | 130.147 | 274.716 | 500.962 |
| Net income attributable to common | 42.011 | 66.692 | 27.482 | 258.549 |
| Basic EPS (US$) | 0.21 | 0.32 | 0.15 | 1.25 |
Q3 statements, physical p. 3, exact rows.
Trailing Results
FY25 plus 9M26 less 9M25 gives trailing revenue US$1,306.690 million, mining income US$659.027 million and attributable income US$309.412 million. This mechanical trailing series contains very high 2026 gold realizations and is not the US$3,600 normalized forecast. FY25 p. 6; Q3 p. 3.
Material Adjustments
Net income includes noncash instrument and FX movements; no market-price multiple of trailing net income drives NAV. The mine model starts with ounces and after-AISC margin, then tax and incremental growth capital.
Annual Positions
| US$M | Dec 2024 | Dec 2025 |
|---|---|---|
| Cash | 252.535 | 391.874 |
| Total assets | 1,994.504 | 2,506.980 |
| Debt, current plus long term | 516.234 | 519.462 |
| Total equity | 1,083.107 | 1,446.060 |
FY25 statements, physical p. 5, exact rows.
Interim Positions
| US$M | Dec 2025 | Sep 2026 |
|---|---|---|
| Cash | 391.874 | 419.022 |
| Total assets | 2,506.980 | 3,047.075 |
| Debt carrying value | 519.462 | 500.928 |
| Deferred revenue | 200.813 | 291.698 |
| Total equity | 1,446.060 | 1,875.517 |
Q3 statements, physical p. 2, exact rows.
Capital and Claims Reconciliation
US$500.928 million debt minus US$419.022 million cash plus US$39.437 million recorded provisions equals US$121.343 million claims. Deferred revenue is delivery accounting for streams, already addressed in cash margins, and is excluded from this bridge. The balance-sheet current payables and tax accruals are assumed to settle in ordinary working-capital cash flows, not separately subtracted from mine NAV. Q3 statements, physical pp. 2, 16.
Annual Flows
| US$M | FY2024 | FY2025 |
|---|---|---|
| CFO | 141.237 | 372.974 |
| Investing cash flow | -198.769 | -257.226 |
| Property/equipment additions | -181.449 | -243.906 |
| Financing cash flow | 121.290 | 20.993 |
FY25 statements, physical p. 9, exact rows.
Interim Flows
| US$M | 9M 2025 | 9M 2026 |
|---|---|---|
| CFO | 234.198 | 385.516 |
| Marmato stream deposit in CFO | 0 | 81.984 |
| Investing cash flow | -162.788 | -334.846 |
| Property/equipment additions | -158.861 | -300.372 |
| Financing cash flow | 90.793 | -25.642 |
Q3 statements, physical p. 6, exact rows.
Trailing Flows
FY25 + 9M26 − 9M25 gives trailing CFO US$524.292 million and investing outflow US$429.284 million. Excluding the US$81.984 million new stream deposit reduces trailing CFO to US$442.308 million, before further adjustments for tax timing and working capital.
Reconciliation to Common Shareholders
9M CFO US$385.516 million less stream deposit US$81.984 million is US$303.532 million. Less investing outflow US$334.846 million is negative US$31.314 million before financing. This simplified reconciliation differs from issuer adjusted FCF of negative US$46.986 million because definitions of interest, leases and other adjustments differ; both refute an immediately repeatable dividend. Q3 statements, physical p. 6; MD&A, physical p. 20.
Primary Sources and Locators
Primary originals are Q3 2026 statements, Q3 2026 MD&A, FY2025 statements, FY2025 MD&A, Toroparu PFS, Marmato PFS, 2026 circular, Agnico FY25 annual, and Pan American FY25 annual. Publisher originals: ARIS financial-report index, ARIS technical-report index, ARIS circular, Agnico annual, Pan American annual, November Segovia reserve table, November Toroparu release, Bank of Canada FX. Page numbers in local links are physical PDF pages. Where a new issuer release is HTML only, the public original opens externally at its named table.
Frozen Inputs and Assumptions
Frozen public inputs separate reported cash/debt/reserves and dated FX/close from analyst gold, cash tax, AISC, growth capex, project probability, discount and exit assumptions. The price source is the November 24 TSX/XIC batch observation in the private intake; the public report states its date, listing, currency and adjustment basis. The original issuer statements show precise historical rows; model cash costs are judgments because a complete updated Marmato technical report is not yet filed. Gold sensitivity, dilution and Toroparu financing are therefore material limits.
Worksheets and Saved Outputs
| Worksheet | Output |
|---|---|
| Finite mine life and entry | Decision table · Valuation and exit bridge |
Run from this edition folder with Python 3.12.13: PYTHONDONTWRITEBYTECODE=1 PYTHONPATH=. /Users/johnperalta/johnperalta4vanilla/.venv/bin/python support/valuation.py. It uses only the standard library and rewrites the two Markdown tables and exact machine output. The published tables are pasted from the generated outputs; no owner credentials are needed. Benchmark net return is (1.075^5 × 0.9997 / 1.0003)^(1/5) − 1. Stock return uses exit proceeds after 5 bp sale cost, entry cost 5 bp, exactly five years and zero payments; the hurdle adds 200 bp to benchmark net return. If future dividends are added, each dated amount must compound to November 24, 2031 at 9.5%, using actual/365.25 except exact integer years at horizon anniversaries.
Changes from the Preceding Edition
This is the first edition without a predecessor for ARIS. The intake showed no current Markdown head, no cohort membership and no registered model. A later edition must preserve this immutable cutoff and identify changes in source rows, forecast ounces, gold, capital, shares and entry separately.
| Date | Close (CAD) | Maximum entry (CAD) |
|---|---|---|
| 2026-11-20 | 17.23 | |
| 2026-11-23 | 18.39 | |
| 2026-11-24 | 17.59 | 5.00 |
November 20 and 23 TSX closes come from ARIS TSX daily history; November 24 also matches the BlackRock XIC holdings and batch price history.