Aris Mining (TSX: ARIS) — finite-mine-life investment edition

Our maximum entry price is C$5.00 per share. The November 24, 2026 TSX close was C$17.59, so the decision is Wait. The five-year base case to November 24, 2031 offers 8.09% net annual return at that close, versus 7.49% for a 7.5% gross XIC assumption and a required 9.49% stock return. The strongest contrary assumption is US$3,000/oz gold together with a 30% Marmato volume miss and 20% Toroparu permit-and-funding success probability; it cuts fair value to C$4.37 and the hurdle entry to C$5.15, supporting the C$5.00 rounded ceiling. The base case is preferred because Segovia added reserves in November and Marmato's plant was in commissioning, but neither outcome is yet a shareholder distribution. The first test is the December 2026 Marmato gold pour and its 2027 quarterly ramp.

Stock Price History

Market close (CAD)
C$17.59
Base fair value (CAD/share)
C$15.52
Company details
Maximum entry price (CAD/share)
C$5.00
Five-year base exit (CAD/share)
C$25.98
Expected annual return at close, net
8.09%
XIC assumed annual return, net
7.49%
Required net spread
2.00 pp

The model uses a US$3,600/oz common gold deck and the Bank of Canada November 24 USD/CAD observation of 1.4296. The close is the unadjusted TSX regular-session CAD price, matched by the November 24 BlackRock XIC holdings and the batch price history; XIC closed at C$54.34 on that same date, used only to align the benchmark start, not to infer its future return. Dates and figures in this edition were available by the November 24 information cutoff. Stock Price History

Investment Thesis

ARIS owns Segovia and Marmato in Colombia and Toroparu in Guyana. Segovia's November 10 reserve update gives 1.920 million ounces of proven and probable gold, only 6.4 years at management's 300 koz steady-state ambition, so the model explicitly exhausts that reserve. Marmato is modeled through its 3.2 Moz reserve and stream burden. Toroparu's November 12 PFS is risked for a pending licence, financing and a 32-month build. Soto Norte receives zero value pending an executable permit and funding plan. Segovia reserve update, table 1; Toroparu PFS, physical pp. 40–41.

Market Mispricing

The market close exceeds the C$15.52 base NAV by C$2.07. With other inputs fixed, approximately US$3,751/oz gold, rather than US$3,600, reconciles that price. Alternatively Toroparu success probability must rise from 45% to about 68%; neither is a claim about consensus. The close also requires a C$27.70 five-year exit to clear the XIC plus 200 bp hurdle, versus our C$25.98. These are three conditional market-price acceptance tests, not three independent explanations to add together.

Recent Developments

Q3 production was 69.3 koz, including just 5.8 koz from Marmato. The issuer guided toward the low end of 300–350 koz for 2026, planned first CIP gold in December, and expected 4,000 tpd by mid-2027 and 5,000 tpd by end-2027. Segovia reserves rose from 1.503 to 1.920 Moz. Toroparu's new PFS displaced the older PEA: 5.6 Moz of planned output over 29 processing years and US$1.005 billion initial funding requirement. Q3 MD&A, physical p. 4; Segovia update, table 1; Toroparu PFS, physical p. 40.

Earnings Outlook

At US$3,600 gold, forecast Segovia output is 280, 300 and 300 koz in 2027–29; Marmato is 100, 160 and 190 koz, then 200 koz as the new plant ramps. These are Peralta forecasts below the combined 500 koz steady-state aspiration, which is not yet achieved. No dividend or buyback is forecast through 2031 because accumulated operating cash must support expansion and possible Toroparu funding.

Valuation Summary

Reserve-limited Segovia and Marmato cash NAVs are US$1,141 million and US$929 million; risked Toroparu is US$600 million. Corporate costs of US$264 million and US$121 million of net claims yield US$2,285 million common NAV, divided by 210.5 million diluted shares at 1.4296 CAD/USD. See the generated valuation bridge and code below.

Recommended Action and Entry Price

Wait at C$17.59. The unstressed five-year required-return ceiling is C$16.4942, or C$16.50 at half-dollar precision. Joint downside lowers that ceiling to C$5.1534; rounding down to the next C$0.50 sets C$5.00. Base-case return at the entry is 39.01% annually, separately from 8.09% at the observed close; stressed return at entry is 10.15%, above the required 9.49%. The downside present NAV of C$4.37 is 12.7% below entry, so the rule does not promise capital preservation.

Catalysts

Marmato's first CIP gold in December 2026, the first full 2027 operating quarter, a Q1 2027 updated Marmato technical report, Toroparu's large-scale licence and construction financing, and the next Segovia reserve roll-forward are the measurable tests. Q3 release; Toroparu PFS, physical p. 40.

Primary Risks to Thesis

A gold-price reversal, Marmato ramp delay, Toroparu construction funding/dilution, and the need to replace Segovia ounces could overturn the base case. The combined case is quantified in Scenarios; the nearest operational test is 2027 Marmato output.