Aecon Group Inc. (TSX: ARE) — November 24, 2026 equity research
Our maximum entry price is C$37.00 per share. The regular, unadjusted Toronto Stock Exchange close on November 24, 2026 was C$54.05, so the rule is Wait; base fair value is C$49.39. The strongest contrary assumption is that a 60-basis-point construction margin shortfall persists while C$60 million of extra working capital is required in each of 2027–31: fair value falls to C$38.17 and the entry ceiling to C$37.99 before whole-dollar rounding. September cash includes C$537 million in joint-operation accounts that Aecon cannot directly access, and the C$320 million preferred-share purchase closed on November 3. The base case gives credit for improved project mix and the record backlog, but not for repeating the nine-month working-capital release. All amounts are Canadian dollars unless stated. Q3 MD&A, cash and debt, physical pp. 22–23 · November 3 completion announcement · November 24 TSX closing record.
- Market close (CAD)
- C$54.05
- Base fair value (CAD)
- C$49.39
Company details
- Maximum entry price (CAD)
- C$37.00
Valuation cutoff: November 24, 2026. Horizon: November 24, 2031. Next review: the 2026 annual filing and the first 2027 cash-flow disclosure. Stock Price History and public model.
Closing Prices
| Date | Close (CAD) | Entry (CAD) |
|---|---|---|
| 2026-11-20 | 49.35 | |
| 2026-11-23 | 53.37 | |
| 2026-11-24 | 54.05 | 37.00 |
Investment Thesis
Aecon builds and services Canadian and US infrastructure across construction, utilities, nuclear, transport and concessions. A C$14.56 billion September backlog provides activity visibility, but contract value is not profit. The investment case depends on retaining more gross margin after the last legacy fixed-price job, without consuming the customer advances that aided 2026 cash. Q3 MD&A, backlog and legacy projects · Q3 results, segment tables.
Market Mispricing
At C$54.05 the stock trades C$4.66 above our C$49.39 base fair value and C$17.05 above the C$37 entry. The base five-year after-cost shareholder return is 6.90% a year at the close, versus 7.49% for the modeled after-cost XIC, 0.59 percentage point behind. The entry rule requires XIC plus two percentage points, then protects against the paired operating and working-capital stress. These are analyst forecasts, not issuer guidance.
Recent Developments
Q3 2026 revenue grew 26% year on year to C$1,920.6 million; adjusted EBITDA rose to C$130.2 million. Aecon completed the C$320 million cash purchase of the Aecon Utilities preferred shares on November 3, eliminating that preferred claim. We reflect the cash use once and value the utility subsidiary on the resulting full-ownership basis. Q3 results, consolidated highlights · November 3 announcement.
Earnings Outlook
Our 2027 revenue forecast of C$6.8 billion and 5.8% EBITDA margin imply C$394.4 million of EBITDA. We model 6% annual revenue growth through 2031 and a 7.0% terminal-year margin. That margin path requires backlog execution without a comparable new fixed-price loss. Forecast worksheet.
Valuation Summary
The FCFF model discounts five annual cash flows at 8.5% and capitalizes 2032 FCFF at 2.5% perpetual growth. C$3,889.58 million enterprise value, less C$358 million net claims, yields C$3,531.58 million equity value and C$49.39 per 71.506 million diluted shares. The shareholder entry calculation is separate from present fair value. Equity bridge.
Recommended Action and Entry Price
Wait at C$54.05. The hurdle-only ceiling is C$47.95; the joint-stress ceiling is C$37.99, rounded down to C$37.00. At that entry the base five-year after-cost annual return is 15.31%, versus 7.49% for XIC. The stressed return is approximately the required 9.49% before rounding. No trade is instructed.
Catalysts
The 2026 annual filing should reveal cash after the buyout and year-end project receipts. In 2027, quarterly construction margin, conversion of backlog to revenue, and operating cash before working-capital swings will test the model. A resolution of the K+S legacy dispute would also narrow an unmodeled tail risk. Q3 financial statements, contingencies, physical pp. 24–25.
Primary Risks to Thesis
Cash trapped in joint operations, reversals of advances, cost overruns and the K+S claim can jointly depress owner cash. The C$537 million joint-operation cash is excluded from the parent cash bridge; a C$60 million annual working-capital need and 60-basis-point margin miss reduce fair value by C$11.22 per share. MD&A cash table.
Company Overview
Aecon is a Toronto-listed construction and infrastructure company. It reports Construction and Concessions. The Q3 2026 operating mix is overwhelmingly Construction; small concession revenue hides equity-method investments and distributions. Q3 results, reporting segments.
Products and Services
Construction covers transport, nuclear, utilities, civil works and industrial work. Concessions holds interests in infrastructure projects, including the Bermuda airport. This mix makes contract risk and capital requirements more useful than a single sales multiple. 2025 annual report, business review.
Business Model
Construction receives progress billings as work advances, incurs labor, materials and subcontracting costs, then settles receivables and unbilled contract assets. Concession returns accrue through equity-method income and cash distributions. Timing of project cash must be separated from earned margin. Q3 FS, cash-flow statement.
Revenue Drivers
Awards, backlog conversion, project progress and acquisition contributions drive revenue. September reported backlog was C$14.56 billion, up from C$10.78 billion one year earlier, but its timing and profitability are not guaranteed. Our 2027 C$6.8 billion revenue implies 47% of September backlog, before new awards and cancellations, illustrating why the backlog cannot be treated as a fixed five-year revenue schedule. Q3 release, backlog.
Cost Structure
Direct project cost controls gross profit; central marketing, general and administrative expense consumed C$272.2 million in the first nine months of 2026, up from C$171.1 million a year earlier. Depreciation was C$86.7 million. Fixed-price overruns expose Aecon to cost inflation, while collaborative contracts can share some risks. Q3 FS, income statement, physical p. 5.
Operating Levers
Our five-year margin ramp is the key lever: each 60-basis-point persistent shortfall, with other assumptions fixed, lowers fair value materially. Management cites over 80% of backlog in collaborative or non-fixed-price models; the share of revenue realized at acceptable margin is the actual test. Q3 release, CEO remarks.
Distribution
Aecon distributes cash through a quarterly common dividend. The latest approved amount visible at cutoff was C$0.1925 per share; future payment dates and 2% yearly growth in this edition are estimates, not declarations. The complete date-by-date projection appears in the payment worksheet. Issuer dividend notice · estimated payments.
Geographic Exposure
Aecon serves Canada and the United States and has international concession exposure. The stronger US and international revenue in 2025 partly reflected acquisitions, so extrapolating that rate as organic growth would be aggressive. 2025 annual report, geographic review.
Regulatory Environment
Public infrastructure procurement, nuclear qualification, labor rules and project environmental permits govern eligibility and costs. These create entry barriers but can delay notices to proceed. We assume no separate windfall from prospective infrastructure budgets. 2025 annual report, risks.
Industry Structure
Infrastructure buyers select among large contractors, engineering firms and specialist trades. Aecon often participates in consortiums, so awards and cash in joint operations are not equivalent to wholly controlled assets. Q3 MD&A, joint arrangements.
Growth and Cyclicality
Long project lives moderate demand swings once construction starts; procurement and financing can still defer awards. Our 6% annual revenue growth is an analyst assumption below the Q3 26% reported increase, which included a much stronger prior-year comparison and acquired capacity. Q3 release.
Competitors
Stantec and WSP are useful public Canadian infrastructure comparators, but both emphasize professional services and net-revenue margins rather than Aecon's gross construction revenue. PCL and other contractors are private, limiting clean listed peers. The comparison below is a margin context check, not a direct multiple transfer. Stantec Q3 release · WSP Q3 release.
Market Share
We have no reliable same-scope total market denominator at the cutoff. Backlog measures Aecon's own awards, not national market share; assigning a percentage from unsourced sector estimates would overstate precision. We instead test revenue conversion against its C$14.56 billion backlog. Q3 results, backlog.
Competitive Advantages
Nuclear fabrication and utilities capacity, qualifications and multi-year client relationships support tender access. Their financial value appears in modeled margin and sustained awards; there is no separate brand premium in enterprise value. The planned additional fabrication capacity is a future investment, with timing uncertain at the cutoff. Q3 release, strategic investments.
Pricing and Cost Position
Collaborative contracts can reduce uncompensated inflation but do not guarantee high margin. Aecon's first-nine-month gross margin was 9.5% versus 6.4% a year earlier; a repeat shortfall of 60 basis points in EBITDA margin is our primary stress. Q3 results, consolidated table.
Entry Barriers and Substitutes
Bonding capacity, project record, specialized labor and nuclear certification are barriers. Owners can defer or rebid projects, and consortium partners can substitute for Aecon on some work. We do not assume exclusivity from the current backlog. 2025 annual report, business and risks.
Supplier and Customer Dynamics
Subcontractor scarcity can lift direct costs while customer progress payments temporarily increase cash. Q3 2026 working-capital inflows demonstrate that customer financing is reversible. We do not capitalize the C$351.1 million nine-month inflow. Q3 FS, cash flows, physical p. 8.
Regulation and Structural Risks
A public-contract award may carry political, permitting and community conditions. Delays can consume overhead and keep equipment idle. Our stress holds lower margin for five explicit forecast years rather than assuming a permanent loss from a single project. 2025 annual report, risks.
Historical Performance
Revenue rose from C$4.243 billion in 2024 to C$5.435 billion in 2025. Nine-month 2026 revenue reached C$4.809 billion versus C$3.893 billion in 2025. Adjusted EBITDA rose from C$82.6 million in 2024 to C$234.6 million in 2025, then C$244.6 million in nine-month 2026. Annual report, physical p. 18 · Q3 release, highlights.
Income Statement Analysis
Nine-month 2026 operating profit of C$111.5 million improved from C$22.9 million; reported shareholder loss was C$73.1 million because financing costs included a C$122.8 million preferred fair-value loss. That noncash remeasurement cannot be both normalized out of earnings and ignored in the balance-sheet transaction. We remove the C$320 million cash purchase once in the bridge. Q3 FS, income and cash-flow statements.
Balance Sheet Analysis
September 30 cash was C$1,065.7 million, of which C$537 million sat in joint operations inaccessible directly. Post-November 3 pro forma cash outside those operations is C$209 million if the C$320 million purchase was funded from parent-accessible cash. Actual November 24 cash and its split are undisclosed; this is a dated pro forma, not a reported balance. Q3 MD&A, physical pp. 22–23 · buyout completion.
Cash Flow Analysis
Nine-month 2026 CFO was C$532.0 million, of which C$351.1 million came from changes in operating balances. CFO before that swing was C$180.9 million. Net PP&E and intangible outlay was C$94.2 million, and acquisitions used C$108.5 million. Subtracting both from pre-working-capital CFO leaves about negative C$21.8 million before dividends; acquisitions are discretionary growth investment, but represent real capital use in the observed period. Q3 FS, cash-flow statement.
Earnings Quality
The C$351.1 million working-capital release included higher deferred revenue and payables, so it cannot be a perpetual FCFF base. Conversely, the C$122.8 million noncash preferred mark obscured improved project earnings. The model forecasts operating cash from EBIT, tax and reinvestment rather than extrapolating either accounting artifact. Q3 FS, notes 17 and 27.
Nonrecurring Items
The November 3 preferred-share purchase is treated as a C$320 million cash outflow and removes the matching preferred liability. No 27.5% continuing subsidiary minority discount is added. Litigation collections are excluded from the base until resolved. Q3 FS, preferred note · completion notice.
Funding and Cash Conversion
The model assumes C$155 million 2027 capex, rising to C$190 million in 2031, with C$15–25 million annual incremental working capital. FCF after dividends is retained in the exit bridge at zero interim interest, which is conservative against the 9.5% carry applied only to shareholder dividends. A shortfall would require debt, asset sales or reduced payouts; the stress explicitly consumes C$60 million more each year. Public forecast.
Key Ratios
The nine-month adjusted EBITDA margin improved from 3.5% in 2025 to 5.1% in 2026; 2027's modeled 5.8% is an additional 70-basis-point step. September accessible pro forma cash of C$209 million covers only part of C$342 million revolver borrowings, before recourse long debt. These ratios argue against treating headline consolidated cash as surplus. Q3 release · MD&A debt table.
Forward Outlook
Three frozen tests: (1) 2027 consolidated adjusted EBITDA margin, defined as consolidated adjusted EBITDA / consolidated revenue, base at least 5.8%, downside 5.2%, upside 6.4%, settled by 2027 annual segment tables; (2) 2027 consolidated CFO before working-capital changes less net PP&E/intangibles, base at least C$150 million, downside under C$90 million, upside over C$210 million, settled by 2027 cash-flow statement and MD&A; (3) 2027 revenue / September 2026 backlog, base about 47%, downside below 42%, upside above 52%, with new awards separately disclosed, settled by 2027 revenue and backlog roll-forward. These are analyst thresholds and mix organic and acquired operations. Q3 release, segment and backlog tables.
Model Choice
We value consolidated operations using nominal CAD FCFF and WACC, then subtract debt and add only cash accessible outside joint operations. This method forces project economics, reinvestment and senior claims into one bridge; a backlog multiple alone would omit profitability and capital. Worksheet.
Growth
The first forecast of C$6.8 billion revenue is C$450.2 million above trailing September 2026 revenue of C$6,349.8 million, calculated as FY2025 less nine-month 2025 plus nine-month 2026. Annualizing nine months mechanically would miss Q4 seasonality and acquisitions. From 2027 we assume 6% annual growth, less than Q3's 26% reported rate. No separate project award is assigned value. 2025 annual report, seasonality · Q3 release.
Profitability
| Trailing to 2027 FCFF, C$m | Amount |
|---|---|
| Trailing Sep 2026 adjusted EBITDA | 341.90 |
| 2027 revenue change at trailing EBITDA margin | +24.24 |
| 2027 EBITDA margin / mix change | +28.26 |
| 2027 forecast EBITDA | 394.40 |
| Depreciation | (125.00) |
| After-tax EBIT | 199.36 |
| Add depreciation | +125.00 |
| Capital spending | (155.00) |
| Incremental working capital | (15.00) |
| 2027 FCFF | 154.36 |
EBITDA margin rises from 5.8% in 2027 to 7.0% in 2031, versus 5.1% in nine-month 2026. We model depreciation rising from C$125 million to C$160 million and cash tax at 26% of positive EBIT. A 60-basis-point margin miss is independently tested, with no offsetting cost cut. Forecast.
Reinvestment or Required Capital
Capex grows from C$155 million to C$190 million, exceeding depreciation each year; incremental working capital rises from C$15 million to C$25 million. The 2026 year-to-date net asset spend was C$94.2 million, so 2027 implies a substantial capital step. Acquisitions are excluded from the forecast; if growth requires acquisitions beyond this capex, value is overstated. Q3 cash flows.
Discount Rate
The analyst WACC is 8.5% nominal CAD, with 2.5% perpetual growth. It is a judgment rather than a market beta estimate; construction cash cyclicality and bid risk argue against a utility-like rate. A 100-basis-point increase with the same downside entry rule cuts base fair value to C$41.26 and lowers the entry below C$37. Sensitivity.
Terminal Economics
| Terminal continuity, C$m | 2031 explicit | 2032 first terminal |
|---|---|---|
| EBITDA | 600.94 | 615.96 |
| Depreciation | 160.00 | 164.00 |
| EBIT after 26% tax | 326.29 | 334.45 |
| Net investment (capex + WC − D&A) | 55.00 | 56.37 |
| FCFF | 271.29 | 278.08 |
In 2031 the base has C$601 million EBITDA, about C$441 million EBIT and C$271 million FCFF. The first terminal-year FCFF is C$278.08 million, with the C$25 million 2031 incremental working-capital investment carried forward and 2.5% growth. The C$60 million annual cash stress ends after 2031; the 60-basis-point margin shortfall persists into the terminal year. If 2031 capex were held at C$190 million instead of growing 2.5%, terminal FCFF rises only modestly; a higher sustained reinvestment need would lower value. Forecast · bridge.
Bridge to One Common Share
The generated bridge below uses C$529 million September parent-accessible cash and deducts the C$320 million November purchase before C$342 million revolver, C$204.2 million recourse long debt including leases, and C$20.8 million nonrecourse project debt. The C$537 million joint-operation cash is excluded; the preferred claim is zero after closing. The C$71.506 million share denominator comes from Q3 weighted diluted shares, not the 68.577 million basic closing count. MD&A cash and debt, physical pp. 22–23 · Q3 FS, EPS note, physical p. 30.
| Bridge | C$m or stated unit |
|---|---|
| PV 2027–31 FCFF | 807.34 |
| 2032 terminal FCFF | 278.08 |
| Terminal enterprise value at 2031 | 4,634.62 |
| PV terminal enterprise value | 3,082.23 |
| Enterprise value | 3,889.58 |
| Parent-accessible September cash | 529.00 |
| November 3 preferred buyout, cash used | (320.00) |
| Revolver | (342.00) |
| Recourse long debt including leases | (204.20) |
| Nonrecourse project debt | (20.80) |
| Net claims / cash | -358.00 |
| Equity value | 3,531.58 |
| Diluted shares (million) | 71.51 |
| Base fair value CAD/share | 49.39 |
| 2031 exit CAD/share incl retained residual cash | 70.46 |
| Dated dividend future value CAD/share | 5.06 |
| Net XIC annual return | 7.4871% |
| Required annual return | 9.4871% |
| Hurdle-only ceiling CAD/share | 47.95 |
| Stressed ceiling CAD/share | 37.99 |
| Final whole-dollar entry CAD/share | 37.00 |
| Stress attribution | Fair value CAD/share | Hurdle ceiling CAD/share |
|---|---|---|
| Base | 49.39 | 47.95 |
| Margin -60bp only | 41.47 | 40.66 |
| Working-capital +C$60m/year through 2031 only | 46.08 | 45.29 |
| Joint | 38.17 | 37.99 |
Price-Implied Expectations
| Price reconciliation, CAD/share | Amount |
|---|---|
| Nov 24 close | 54.05 |
| Close to fair value | -4.66 |
| Base fair value | 49.39 |
| Fair value to maximum entry | -12.39 |
| Maximum entry | 37.00 |
At C$54.05, the base C$70.46 exit and C$5.06 carried dividends give only 6.90% after costs. To clear 9.49% without changing dividends, the exit must rise to C$80.06, C$9.60 above the base exit; at the same net claims and retained cash that requires approximately C$687 million more terminal enterprise value, or about C$41 million more terminal FCFF at a 6% capitalization spread. That means a sustained approximately 0.65-percentage-point higher EBITDA margin at the 2031 revenue level, before taxes. The next margin disclosures can falsify this. Model.
Independent Cross-Check
The 2027 modeled EBITDA of C$394 million implies the C$54.05 equity market value of about C$3.87 billion plus C$358 million net claims, or enterprise value about C$4.22 billion, equal to 10.7 times 2027 EBITDA. This is high for an execution-sensitive construction case and omits any value for joint-operation cash beyond its project use. The check supports a wait, but the EBITDA multiple is not our valuation method. Close · model.
Conclusion and Change from Prior Edition
This is the first authored ARE edition; there is no prior Peralta entry or fair value to bridge. Fair value is C$49.39; the maximum entry is C$37 after the shareholder hurdle, paired downside and rounding. The key unresolved observation is 2027 cash conversion following the 2026 progress receipts.
Peer Selection
WSP and Stantec are listed Canadian infrastructure-service comparators as of the cutoff. Their engineering-heavy net-revenue economics differ materially from Aecon's gross construction contracts. We use only disclosed operating margins for context, not their stock multiples as a direct fair-value input. WSP Q3 release · Stantec Q3 release.
Dated Ratio Table
| Issuer / period | Adjusted EBITDA C$m | Revenue basis C$m | Adjusted EBITDA / revenue |
|---|---|---|---|
| Aecon, 9M Sep 30 2026 | 244.6 | Gross 4,808.6 | 5.1% |
| WSP, 9M Sep 25 2026 | 2,301.8 | Net 12,208.3 | 18.9% |
| Stantec, 9M Sep 30 2026 | 997.0 | Net about 5,332.0 | 18.7% |
Aecon data: Q3 release; WSP: Q3 release, financial table; Stantec: Q3 release, nine-month table.
Comparability Adjustments
The same numerator label is non-IFRS and company-defined; Aecon divides by gross construction revenue while WSP and Stantec use net service revenue. Their higher percentages do not imply Aecon should reach the same margin. Applying their margin to Aecon would be a category error. Currency is CAD throughout and periods are nine months ending September 2026.
Implications for Value
The peer data confirm that a listed pure-play engineering margin is not an admissible terminal benchmark for Aecon's construction revenue. We retain a 7% 2031 Aecon margin only if its own construction segment demonstrates sustained improvement. No peer premium is embedded in C$49.39 fair value.
Bear Case
The paired downside is a 60-basis-point EBITDA margin shortfall through terminal economics and C$60 million extra working-capital investment in each explicit forecast year. A reversal of C$351 million recent working-capital inflow over five years is of similar order. Fair value falls to C$38.17 and the unrounded hurdle ceiling to C$37.99. Q3 FS, working capital · scenario output.
Base Case
Revenue starts at C$6.8 billion in 2027, grows 6% annually, EBITDA margin improves from 5.8% to 7%, and FCFF reaches about C$271 million in 2031. Base fair value is C$49.39 and the five-year exit is C$70.46 including retained residual cash. Forecast.
Bull Case
As an illustrative upside, if construction conversion raises the EBITDA margin by 60 basis points with all else fixed, value would exceed the base; this is not a separately probability-weighted target. It would need cash generation after capex to confirm that higher earnings become shareholder wealth. The public worksheet's editable margin inputs permit a reader to run that path.
Outcomes at Close and Entry
| Assumption | Close | Fair value | Maximum entry | Price rule |
|---|---|---|---|---|
| Base | C$54.05 | C$49.39 | C$37.00 | Wait |
| Joint margin / working-capital stress | C$54.05 | C$38.17 | C$37.00 | Wait |
| WACC +100bp, same downside rule | C$54.05 | C$41.26 | C$32.00 | Wait |
The stress produces a C$9.96 drop from the C$47.95 hurdle-only ceiling to C$37.99. Whole-dollar flooring makes the final entry C$37, C$10 below the no-stress rounded entry of C$47. At C$54.05 every tested case is Wait. The WACC sensitivity also holds the paired operating downside in its entry rule. Bridge and stress attribution.
Market-Implied Case
Keeping the same C$5.06 dividend future value, C$54.05 needs C$80.06 exit to meet XIC net plus 200 basis points. A sustained improvement above our 2031 EBITDA margin could provide it, but early 2027 cash conversion must also avoid a material advance reversal. That is a conditional market-price acceptance test, not consensus. Model.
Analyst Assessment
The base is more likely than the joint stress because recent mix and backlog have improved, but the September cash split and working-capital gain make the stress credible enough to bind entry. Our next decision test is whether 2027 consolidated margin meets 5.8% while pre-working-capital cash less asset spending reaches C$150 million.
Operating Risks
Execution cost overruns can erode Construction margin despite higher sales; a 60-basis-point persistent miss is in the worksheet. If 2027 consolidated margin falls to 5.2% or below, revisit the 7% endpoint. Q3 segment results.
Financial and Liquidity Risks
Only C$529 million of September cash was outside joint operations, before the C$320 million buyout. C$342 million revolver and C$204.2 million recourse long debt limit flexibility. A C$60 million annual extra working-capital need through 2031 is the paired stress. Q3 MD&A, physical pp. 22–23.
Regulatory and Legal Risks
The K+S legacy contract dispute includes material receivables and counterclaims. We assign no litigation recovery in base value and no precise loss without a judicial outcome; an adverse settlement would reduce cash and possibly trigger project charges. Follow 2026 annual contingencies. Q3 FS, contingencies.
Industry and Competitive Risks
Project deferrals and bid pressure could reduce awards while labor and materials inflate costs. The 6% revenue path assumes Aecon keeps converting backlog, with no forecast of new megaproject success. A 2027 revenue/backlog ratio below 42% would challenge growth. Q3 backlog.
Thesis-Specific Risks and Reconsideration Triggers
The call would improve if 2027 margin clears 6.4% and pre-working-capital cash less net asset spend exceeds C$210 million without a large customer-advance build. It would worsen if margin is 5.2% or lower and that cash measure is below C$90 million. Recompute entry at the annual disclosure rather than treating backlog growth as cash proof.
Environmental Factors
Construction projects face site remediation, emissions and permit obligations; overruns would enter project costs and capex, not a separate ESG premium. The 2025 annual risk discussion is the relevant issuer disclosure. We have no verified per-project carbon-cost estimate to add to the model. 2025 annual report, risk factors.
Social Factors
Skilled-labor availability and Indigenous relations affect project delivery. Aecon announced Gold PAIR accreditation in October 2026; this is evidence of a process, not a quantified margin uplift. We watch labor disruptions and community approval as schedule risks. Q3 release, accreditation.
Governance Factors
The board approved the preferred-share buyout and regular dividends, but cash allocation after the buyout remains a test. Management's adjusted EBITDA excludes some accounting costs; our valuation uses tax-paid FCFF and explicit capex rather than the adjusted metric alone. Q3 FS, cash flows.
Financially Material Risks and Opportunities
Nuclear and grid projects can create demand, while safety, permitting and labor failures can reduce margin or defer revenue. We capture these through 6% growth and the 60-basis-point downside, with no independent ESG multiple. Future annual safety and project cash disclosures should be checked against the margin forecasts.
Annual Results
| CAD millions, year ended Dec 31 | FY2024 | FY2025 |
|---|---|---|
| Revenue | 4,242.7 | 5,434.7 |
| Gross profit | 182.5 | 394.1 |
| Operating profit | (60.1) | 87.1 |
| Adjusted EBITDA | 82.6 | 234.6 |
| Profit attributable to common | (59.5) | 15.2 |
2025 annual report, consolidated highlights, physical p. 18.
Interim Results
| CAD millions, nine months ended Sep 30 | 2025 | 2026 |
|---|---|---|
| Revenue | 3,893.5 | 4,808.6 |
| Gross profit | 250.0 | 456.8 |
| Operating profit | 22.9 | 111.5 |
| Adjusted EBITDA | 137.3 | 244.6 |
| Profit attributable to common | (5.6) | (73.1) |
Q3 release, consolidated highlights.
Trailing Results
FY2025 revenue C$5,434.7 million less nine-month 2025 C$3,893.5 million plus nine-month 2026 C$4,808.6 million gives trailing September 2026 revenue C$6,349.8 million. The same roll gives adjusted EBITDA C$341.9 million. This basis is consolidated CAD and includes acquisitions and the fourth quarter of 2025. The C$6.8 billion 2027 revenue forecast is C$450.2 million higher; its implied EBITDA C$394.4 million is C$52.5 million higher, combining a 0.4-point margin step and sales growth. Annual highlights · Q3 release.
Material Adjustments
The nine-month C$122.8 million preferred fair-value loss is not modeled as recurring operating cost. Its economic claim was settled for C$320 million cash on November 3 and the cash bridge reflects that payment. A second write-down of the preferred would double count the transaction. FS cash flows · completion notice.
Annual Positions
| CAD millions, Dec 31 | 2024 | 2025 |
|---|---|---|
| Cash and equivalents | 438.0 | 486.0 |
| Bank indebtedness | 152.8 | 257.4 |
| Total assets | 3,226.2 | 3,990.2 |
| Total equity | 962.4 | 928.8 |
Figures are rounded from the audited annual balance sheet; 2024 total equity was C$962.436 million and total assets C$3,226.224 million. 2025 annual report, consolidated balance sheet.
Interim Positions
| CAD millions | Dec 31 2025 | Sep 30 2026 |
|---|---|---|
| Cash and equivalents | 486.0 | 1,065.7 |
| Current long-term debt | 43.9 | 62.8 |
| Preferred shares of Aecon Utilities | 188.8 | 320.0 |
| Long-term debt | 110.6 | 141.4 |
| Total assets | 3,990.2 | 5,012.5 |
| Total equity | 928.8 | 1,008.1 |
The preferred and C$320 million cash both leave on November 3, after this reported balance sheet. Q3 FS, physical p. 4 · completion notice.
Capital and Claims Reconciliation
C$529 million accessible September cash minus C$320 million purchase equals C$209 million pro forma; subtract C$342 million revolver, C$204.2 million recourse long debt and C$20.8 million project debt to get negative C$358 million net claims. Actual intervening balance changes are unknown. A nonrecourse debt claim is retained against consolidated concession enterprise cash. MD&A cash/debt table.
Annual Flows
| CAD millions, year ended Dec 31 | FY2024 | FY2025 |
|---|---|---|
| Operating cash flow | 7.6 | 126.6 |
| Net PP&E/intangible spending | (23.7) | (50.4) |
Annual net asset spending is from the MD&A cash-flow table. The 2027 C$155 million capex assumption is a substantial step above both the C$50.4 million 2025 annual and C$94.2 million first-nine-month 2026 observations; it funds the forecast growth. 2025 annual report, cash-flow discussion.
Interim Flows
| CAD millions, nine months ended Sep 30 | 2025 | 2026 |
|---|---|---|
| CFO before working-capital change | 41.2 | 180.9 |
| Working-capital change | (112.0) | 351.1 |
| CFO | (70.8) | 532.0 |
| Net PP&E/intangible spending | (32.1) | (94.2) |
| Acquisitions, net | (26.1) | (108.5) |
| Dividends paid | (35.9) | (37.7) |
Q3 FS, cash flows, physical p. 8.
Trailing Flows
The nine-month pre-working-capital CFO of C$180.9 million cannot be annualized without seasonal Q4 data. The 2025 full-year CFO of C$126.6 million and 2026 nine-month C$532 million have differing working-capital movements. The model instead translates reported and forecast EBITDA to after-tax operating profit, then deducts explicit asset and working-capital investment. Annual cash-flow discussion · Q3 FS.
Reconciliation to Common Shareholders
Forecast 2027 FCFF is about C$154 million; estimated common dividends use four C$0.1925 payments on 71.506 million shares, about C$55 million, leaving about C$99 million. The residual is retained as cash or debt reduction once in the five-year exit price; no buybacks or acquisitions are separately credited. In the stress, extra working capital consumes C$60 million each year and would first reduce residual, then require funding if negative. Actual 2026 cash after capex and C$108.5 million acquisitions was far weaker than the C$532 million CFO headline. Forecast · payments.
Primary Sources and Locators
The core originals are Aecon's September 30, 2026 interim financial statements, Q3 MD&A, 2025 annual report, October 29 result release, November 3 completed buyout, issuer dividend record and November 24 TSX close. Physical PDF pages in claim links are counted from the first PDF page. Public originals are included for reader highlighting and the publisher links remain available.
Frozen Inputs and Assumptions
Public frozen inputs identify the quote, cash/debt, diluted shares, revenue/margin/capex forecasts, WACC, growth, distributions, fee and XIC assumptions. Reported inputs are from the source rows cited above; forecasts, WACC, future payment dates and terminal multiple are Peralta estimates. Cash after September is a pro forma adjustment for the disclosed November 3 purchase, not a fresh balance sheet. Future dividends are not guaranteed. Payment carry uses actual days / 365.25 to November 24, 2031 at 9.5%.
Worksheets and Saved Outputs
Run PYTHONDONTWRITEBYTECODE=1 /path/to/python3.12 support/valuation.py from this edition folder. It uses only the Python standard library and frozen relative inputs, with no network or credentials. Delete support/outputs/* in a disposable public-only copy, rerun and compare the resulting Markdown and JSON bytes to this package. The entry, bridge, forecast and exact dated payment series are generated together.
| Worksheet | Output |
|---|---|
| Five-year valuation and entry | Decision and scenarios · FCFF forecast · enterprise-to-equity bridge · dated payments · first-year and terminal reconciliation · exact model result |
Changes from the Preceding Edition
The predecessor is the November 24 first ARE edition (publication 76c05e9d-10fa-4cfe-84de-82ac01c711fd). This correction aligns the 2027 margin checkpoint with the consolidated forecast and repairs two PDF page labels; model economics and dated quote are unchanged. The first forecast checkpoint remains the 2026 annual filing and 2027 operating margin/cash-flow disclosures.
| Revision driver | Fair value | Maximum entry |
|---|---|---|
| Prior | C$49.39 | C$37.00 |
| Forecast definition and page labels | C$0.00 | C$0.00 |
| Rounding | C$0.00 | C$0.00 |
| Current | C$49.39 | C$37.00 |