First Majestic Silver Corp. (AG)
AG offers silver-price exposure and operating-recovery potential, but San Dimas disruption and heavy reinvestment warrant a cautious stance. AG trades at approximately 19.8 times reported trailing common earnings and 2.57 times common book, versus PAAS at 11.1 times and 2.36 times on the reviewed basis. The principal risks are prolonged San Dimas interruption, weaker precious-metal prices, higher peso-linked and sustaining costs, Los Gatos execution problems, tax cash outflows and Jerritt Canyon delays or overspending.
Current Price
CAD 22.41
Street Consensus
CAD 34.25
Company details
Sector
Basic Materials
Industry
Silver
Market Capitalization
$11B
Primary Exchange
Toronto
Benchmark
XIC - Canada
Status
Held
Current Price
CAD 22.41
Street Consensus
CAD 34.25
Sector
Basic Materials
Industry
Silver
Market Capitalization
$11B
Primary Exchange
Toronto
Benchmark
XIC - Canada
Status
Held
AG offers silver-price exposure and operating-recovery potential, but San Dimas disruption and heavy reinvestment warrant a cautious stance. AG trades at approximately 19.8 times reported trailing common earnings and 2.57 times common book, versus PAAS at 11.1 times and 2.36 times on the reviewed basis. The principal risks are prolonged San Dimas interruption, weaker precious-metal prices, higher peso-linked and sustaining costs, Los Gatos execution problems, tax cash outflows and Jerritt Canyon delays or overspending.
Current Price
CAD 22.41
Street Consensus
CAD 34.25
Sector
Basic Materials
Industry
Silver
Market Capitalization
$11B
Primary Exchange
Toronto
Benchmark
XIC - Canada
Status
Held
Key Catalysts
A mutually acceptable San Dimas labour resolution and safe restart are the most immediate operating tests. Improved Los Gatos sequencing and throughput, Santa Elena development milestones, clearer tax settlement terms and disciplined quarterly cash conversion could strengthen the case. Jerritt Canyon engineering, rehabilitation, equipment arrival and progress toward the targeted second-half 2027 restart provide longer-dated milestones. Realized silver and gold prices remain major earnings variables. Each milestone should be assessed against spending, timing and cash returns rather than announcement value alone.
Earnings Outlook
Near-term earnings depend on realized metal prices, operating continuity, Los Gatos mine sequencing, unit costs and tax outcomes. Earlier San Dimas annual guidance cannot anchor an uninterrupted production forecast after its withdrawal. Q3 IFRS operating cash flow of US$101.8 million was materially below the US$214.3 million measure before working capital and taxes, illustrating the importance of cash conversion. Jerritt Canyon requires spending before potential 2027 production. The base case is gradual operational progress with uneven cash conversion; prolonged disruption and weaker prices define the adverse case, while a safe, durable recovery supports the favorable case.
Investment Thesis
AG offers silver-price exposure and operating-recovery potential, but San Dimas disruption and heavy reinvestment warrant a cautious stance. Substantial liquidity supports the continuing Mexican operations and Jerritt Canyon restart work, while higher realized prices have lifted common earnings. The investment case depends on safe production recovery, reliable Los Gatos execution and disciplined conversion of earnings into cash attributable to common shareholders. Liquidity is a source of resilience; durable per-share cash returns remain the test of value creation.
Valuation Summary
AG trades at approximately 19.8 times reported trailing common earnings and 2.57 times common book, versus PAAS at 11.1 times and 2.36 times on the reviewed basis. The comparison converts CAD capitalization to USD using the dated Bank of Canada rate and excludes non-controlling interests from earnings and book equity. Metal mix, scale, acquisitions and exceptional items limit the comparison. The C$22.41 quote is below consensus mean and median targets of C$34.25 and C$32.50, but those targets are external expectations. Operating recovery must justify the premium and capital demands.
Recommended Action
Favor a watchful, selective stance until San Dimas restart visibility and common-shareholder cash conversion improve. The balance sheet supports patience and continued monitoring, while the reported earnings premium to PAAS argues against treating the consensus gap as sufficient evidence for a new commitment. Greater conviction requires safe and sustained output, manageable tax cash flows and disciplined Jerritt Canyon spending. Prolonged interruption, weaker prices or worsening capital efficiency would warrant a more defensive assessment.
Recent Developments
Q3 2026 revenue rose 38% year over year to US$394.1 million, while common-shareholder earnings reached US$74.5 million. Attributable silver and gold output declined. San Dimas operations were suspended following the September labour disruption, and the November release withdrew its annual production and cost guidance. Legacy forward silver purchase tax assessments were settled and paid, pending administrative steps, while the separate Primero matter remained under a proposed settlement framework. Del Toro was sold in June. Jerritt Canyon restart work advanced toward targeted production in the second half of 2027.
Primary Risks To Thesis
The principal risks are prolonged San Dimas interruption, weaker precious-metal prices, higher peso-linked and sustaining costs, Los Gatos execution problems, tax cash outflows and Jerritt Canyon delays or overspending. Water, tailings, safety, community and security failures could compound these pressures. Non-controlling interests, investment gains and adjusted measures can obscure the earnings and cash attributable to common shareholders. A premium reported earnings multiple becomes vulnerable if operating recovery or reinvestment fails to produce durable per-share value.
Market Mispricing Rationale
Relative Performance
Historical return vs XIC · 2025-06-01–2026-06-01
The possible opportunity is that the market discounts prolonged operating uncertainty while giving limited credit for a successful recovery. The counterargument is substantial: on the reviewed common-equity basis, AG already trades at a higher reported earnings multiple than PAAS. Consensus expectations are more constructive than the current quote, but the gap does not establish a recovery probability. A defensible mispricing case therefore requires evidence that restart timing, costs, taxes and growth spending are better than the risks reflected in the current price.
Street
bull
Market-Implied
base
Most Likely
base
Confidence
low
Assessment Rationale
The consensus mean of C$34.25 and median of C$32.50 exceed the C$22.41 quote, while the reported target range is C$30 to C$42. This is consistent with a constructive recovery outlook, so the street is classified toward the bull case for narrative comparison. These external targets do not establish independent scenario values or probabilities and may incorporate assumptions different from this report.
The current quote is used as the starting point for a base-case comparison. It sits below consensus targets, but the quote alone cannot identify a unique market forecast or invert the probability of a mine restart. The working base frame balances current liquidity and metal exposure against San Dimas disruption, tax uncertainty and reinvestment demands.
A conditional base case best balances the observed financial strength with unresolved operating risks. It assumes continuing production at the other operations and gradual progress on labour, mine planning and restart work, with volatile metal prices and capital requirements. A prompt full recovery belongs in the upside case; prolonged interruption and weaker prices belong in the downside case. Confidence remains low because the timing and economics of key outcomes are unsettled.
Case labels organize the current evidence into qualitative operating outcomes. No calibrated scenario probability or independently calculated price range is supplied. San Dimas restart visibility, realized prices, tax cash flows and Jerritt Canyon capital delivery are the main reasons confidence is low.
Case Narratives
Bear Case
Prolonged disruption and weaker cash conversion
San Dimas remains interrupted, Los Gatos sequencing or costs disappoint, and weaker metal prices compress margins. Tax cash requirements and Jerritt Canyon investment consume liquidity while common-shareholder cash returns fall short of reported earnings. The reported earnings premium to PAAS becomes harder to sustain. The case describes downside operating conditions without assigning an unsupported price target.
What Must Go Right: Continuing mines must preserve safe output and positive cash generation, management must restrain discretionary capital and distributions, and available cash and credit must bridge the interruption. Progress on tax resolution and preservation of asset integrity would limit damage even in a difficult operating environment.
What Must Go Wrong: The labour dispute lasts longer, a safe restart is delayed, metal prices weaken or peso-linked costs remain high, and development or restart spending fails to yield timely output. Adverse tax, water, tailings or security outcomes could deepen cash demands and reduce financial flexibility.
Base Case
Gradual recovery with substantial execution demands
The continuing operations support liquidity while the company works toward a safe San Dimas resolution, better Los Gatos sequencing and measured development at Santa Elena. Jerritt Canyon remains a funded project targeting second-half 2027 production rather than an immediate earnings contributor. Strong recent prices are treated cautiously, and taxes, working capital and reinvestment keep cash conversion uneven.
What Must Go Right: Mine output and recoveries at continuing sites remain reliable, labour negotiations progress, tax settlements stay manageable, and restart engineering and equipment delivery stay within funding capacity. Capital allocation must protect liquidity and translate operating improvements into cash attributable to common shareholders.
What Must Go Wrong: A slower labour resolution, disappointing grades or recoveries, higher costs, lower realized prices or additional tax cash outflows could push the business toward the bear case. Conversely, a faster safe restart with sustained margins and disciplined capital spending would support migration toward the bull case.
Bull Case
Operating recovery converts metal exposure into cash returns
A safe and durable San Dimas restart combines with improved Los Gatos execution and Santa Elena development while favorable precious-metal prices support margins. Jerritt Canyon milestones advance within a disciplined funding plan and tax uncertainty recedes. Higher sustainable common-shareholder cash generation would make the consensus upside more credible, although the street targets remain external comparisons.
What Must Go Right: Labour and operational constraints resolve promptly, production and recoveries strengthen, price gains outpace costs and tax demands, and growth capital achieves its intended operating milestones. Governance and capital discipline must preserve per-share value as the portfolio develops, with common-shareholder earnings and cash separated from minority interests.
What Must Go Wrong: The bull case fails if a restart is unsafe or delayed, new production misses expectations, metal prices reverse, capital budgets expand or tax outcomes consume more cash than expected. A high reported earnings multiple offers limited protection if operating improvements do not become durable common-shareholder cash returns.
Street Targets
Reference Price
$22.41
Street Mean Target
$34.25
Price-only Change
+52.8%
Street consensus is a comparison. This price-only change excludes dividends and uses the stored reference price.
Street Target Range
Current vs low/median/mean/high target prices
Growth
Modelled EPS Sensitivity and Revision Range
Top: Street estimate level by period (low to high with mean). Bottom: source-provided estimate change metric (%).
Sources: yfinance_parsed_snapshots, valuation.street_targets
Growth rests on restoring reliable output at San Dimas, improving Los Gatos mine sequencing and throughput, advancing Santa Elena development, and executing the Jerritt Canyon restart. Q3 revenue growth was driven primarily by realized metal prices while attributable silver and gold output declined. The withdrawn San Dimas guidance prevents treating earlier annual targets as an uninterrupted production base. Jerritt Canyon's targeted second-half 2027 restart offers potential additional gold production but requires spending and execution before cash returns. A growth premium should depend on realized per-share cash generation, not extrapolation of peak metal prices.
Profitability
Margin Breakdown
Driver contributions from revenue to net income
Q3 mine operating earnings of US$170.1 million on US$394.1 million revenue imply a margin near 43.2%. Strong metal prices supported earnings despite lower production, but San Dimas disruption, Los Gatos operating costs, peso exposure and price-linked charges constrain extrapolation. Common earnings of US$74.5 million differ from consolidated earnings and adjusted measures. Taxes, investment gains and the silver-equivalent conversion ratio also affect comparisons. Sustainable profitability should be judged across lower-price and interrupted-production conditions as well as the recent strong price environment.
Reinvestment
Reinvestment must fund sustaining development, reserve replacement, equipment, water and tailings controls, exploration and restart work. Q3 attributable capital expenditures were US$101.9 million, including substantial Jerritt Canyon investment; these uses compete with dividends, buybacks and debt obligations. The cash balance provides flexibility, but cash committed to restoring or expanding production is not freely distributable. A valuation framework should distinguish maintenance from growth spending and recognize the timing and probability of restart cash returns. No new numerical capital schedule is established by the current report.
Discounting (WACC)
Implied Discount Rate
—
Cost Of Equity
15.20%
Beta
2.19
Equity Weight
97.05%
Debt Weight
2.95%
More Inputs
Risk Free Rate
4.25%
Equity Risk Premium
5.00%
Illustrative estimate from profile and statement data. See More Inputs for the assumptions.
The report does not establish a newly reviewed numerical discount rate or WACC. Required return should reflect commodity exposure, Mexican operating and tax risk, labour interruption, Nevada restart execution, joint-venture ownership and capital intensity. The TSX share price and street targets are in CAD, while issuer statements and the reviewed comparable earnings and book equity are in USD; currency conversion must remain explicit. A lower discount rate cannot be justified simply by recent high metal prices or the size of the cash balance. Discount-rate sensitivity remains necessary before relying on a discounted-cash-flow estimate.
Terminal Value
A perpetuity based on the latest quarter would overstate certainty for a depleting mineral business. Any terminal assessment must account for economic reserves, exploration conversion, sustaining capital, closure and rehabilitation obligations, commodity cycles and the useful lives of individual mines. Jerritt Canyon's restart target is a project assumption rather than evidence of perpetual production. The report supplies no newly reviewed terminal growth rate or terminal multiple. Near-term operating recovery and reserve-backed cash generation therefore carry more evidential weight than an unsupported long-duration residual value.
Comparables
The reviewed comparison uses common-shareholder earnings and attributable book equity, excluding non-controlling interests, for AG and reserved peer PAAS. At the current CAD market capitalizations, AG trades at approximately 19.8 times reported trailing common earnings and 2.57 times common book, versus PAAS at 11.1 times and 2.36 times. USD earnings and equity are paired with CAD capitalization using the Bank of Canada's November 9 rate of C$1.4123 per US dollar. Different metal mixes, scale, acquisitions, exceptional items and equity-accounted assets limit interpretation. Unsupported sales, enterprise-value and forecast multiples remain unavailable; these two ratios do not establish a relative-value ranking.
Valuation Conclusion
AG offers exposure to silver prices and potential operating recovery, supported by substantial liquidity, but its reported common-earnings multiple exceeds PAAS on the reviewed basis. That difference requires durable operating delivery rather than a mechanical assumption of peer convergence. At C$22.41, consensus mean and median targets of C$34.25 and C$32.50 indicate potential upside as external expectations, not independent intrinsic values. The San Dimas suspension, tax framework and Jerritt Canyon reinvestment create material uncertainty. A cautious stance is warranted until stronger evidence connects operating recovery and capital deployment to sustainable common-shareholder cash returns.
Convergence Probability
Confidence in convergence to consensus targets is limited and conditional. The current evidence does not support a calibrated numerical probability or an independently modeled fair-value convergence forecast. Operational recovery, metal prices, taxes and reinvestment can materially change the path and timing of returns.
Convergence Probability Rationale
The gap between the CAD quote and consensus targets is observable, but closing it depends on outcomes the price-target range alone cannot establish. A safe San Dimas restart, consistent Los Gatos execution, disciplined Jerritt Canyon spending and clearer tax resolution would strengthen confidence. Prolonged interruption, weaker metal prices or rising cash requirements would weaken it. The reviewed common-equity comparison also shows that the subject already commands a higher reported earnings multiple than PAAS. This combination argues for conditional scenario analysis rather than assigning a precise probability from consensus upside.
Thesis Specific Risks
The central risk is that strong precious-metal prices and reported common earnings fail to translate into durable per-share cash generation. San Dimas restart uncertainty, Los Gatos sequencing, Jerritt Canyon capital intensity and the unresolved Primero framework are concrete tests. Del Toro was sold in June 2026; future receipts include delayed or contingent consideration and should not be treated as recurring operating income. The proposed San Martin disposal remains distinct from an assured completed sale. Los Gatos non-controlling interests mean total-company earnings and equity overstate the amounts attributable to common shareholders. Governance, safety, tailings, water and community controls must remain effective as the portfolio changes. A deterioration in any of these areas can offset metal-price strength and weaken the investment case.
Regulatory And Legal Risks
Operations depend on concessions, environmental approvals, water rights, land access, labour law, tax compliance, royalties and closure obligations across Mexico and the United States. The annual filing describes Mexican mining and water-law changes, concession risks, tax disputes and reclamation liabilities. Q3 settlements resolved prior forward-silver-purchase-agreement assessments, pending administrative steps, but the separate Primero advance-pricing dispute remained subject to a proposed settlement framework. Settlement discussions do not establish final resolution or a known ultimate cash cost. San Dimas also faced a contested strike process. Adverse legal, permitting, environmental, tax or labour outcomes could restrict operations, consume liquidity, raise compliance costs or reduce asset values.
Financial And Liquidity Risks
High metal prices support liquidity but also raise royalties, worker participation and some other costs. A fall in realized silver or gold prices, weaker output, stronger peso, rising capital expenditure or adverse tax cash flows could narrow the liquidity cushion. At September 30, 2026, cash and equivalents were US$1.0708 billion, with restricted cash separately held; management-defined liquidity of about US$1.04 billion is not unrestricted cash alone. Q3 IFRS operating cash flow was US$101.8 million after working-capital and tax outflows, below the US$214.3 million pre-working-capital/pre-tax measure. Restart spending, dividends, buybacks, debt service and distributions to Los Gatos minority owners compete for cash. Investment gains and non-recurring disposal proceeds should not be assumed to recur.
Business And Operational Risks
Mine execution and labour continuity are immediate risks. San Dimas operations were suspended after a labour disruption beginning September 18, 2026, and the company withdrew its annual production and cost guidance in November. The duration of the dispute and safe restart timing remain uncertain. Los Gatos depends on mine sequencing, ground conditions, dewatering, recoveries and development, while La Encantada remains sensitive to water, energy and maintenance availability. Jerritt Canyon is a capital-consuming restart project targeting the second half of 2027, with engineering, rehabilitation and equipment delivery still required. Annual disclosures also identify reserve-estimation, tailings, environmental, security, contractor and geological risks. Holding a diversified mine portfolio does not eliminate site interruption or joint-venture execution risk.
Industry And Competitive Risks
Silver combines industrial and investment demand, while much mine supply is a by-product of other metals. USGS describes substitution, photovoltaic thrifting, recycling and fluctuations in industrial and investment consumption, so demand growth cannot be treated as uniform or assured. First Majestic competes for skilled people, contractors, equipment, infrastructure and economically attractive mineral properties. Reserve replacement requires exploration spending without assurance of commercial discoveries. Metal prices, interest rates, exchange rates, inflation and capital-market conditions can change the economics of development and acquisitions. Non-GAAP silver-equivalent unit costs vary with conversion ratios and ownership scope, limiting superficial peer comparisons and exposing apparent operating improvements to changes in metal-price mix.
Business Model
First Majestic acquires, explores, develops and operates silver and gold mineral properties, converting ore into payable dore and concentrates sold through metals-market channels. The Mexican portfolio includes a 70% Los Gatos joint-venture interest; reported consolidated statements include non-controlling interests that must be distinguished from common-shareholder earnings. First Mint sells investment-grade silver bullion directly to customers. Cash generation depends on metal prices, production continuity, grades, recoveries, operating costs, taxes, working capital and capital expenditure, including the Jerritt Canyon restart program.
Cost Structure
Costs include mine production, labour, contractors, energy, consumables, maintenance, royalties, worker participation, smelting and refining, depreciation, corporate administration and sustaining development. Q3 2026 costs were affected by the San Dimas labour disruption, Los Gatos maintenance and mine sequencing, La Encantada energy and maintenance spending, and a stronger Mexican peso. Cash costs and all-in sustaining costs per silver-equivalent ounce also depend on the metal conversion ratio, so reported unit-cost changes do not measure physical operating efficiency alone. Suspended assets incur holding costs and Jerritt Canyon requires restart capital.
Revenue Drivers
Revenue depends on payable metal sales, realized silver and gold prices, the production and sales mix, streaming arrangements, smelting and refining deductions, and shipment and inventory timing. Q3 2026 revenue was US$394.1 million, up 38% year over year, with 62% from silver and 28% from gold. Higher realized metal prices offset lower attributable production. Finished-goods holdings of 760,832 silver ounces and 1,960 gold ounces were excluded from quarterly revenue. Production at Los Gatos includes zinc, lead and copper by-products; consolidated financial results and attributable operating measures have different ownership scopes.
Company Overview
First Majestic Silver Corp. produces silver and gold from a Mexican mine portfolio comprising San Dimas, Santa Elena, La Encantada and a 70% joint-venture interest in Los Gatos. San Dimas operations were temporarily suspended following a labour disruption beginning September 18, 2026; the November 5 results release describes three continuing producing operations and withdraws San Dimas production and cost guidance pending restart visibility. The company also owns First Mint in Nevada and the suspended Jerritt Canyon gold complex, where a restart plan targets resumption in the second half of 2027, subject to execution and permitting risks.
Geographic Exposure
First Majestic's production base is concentrated in Mexico, with San Dimas in Durango and Sinaloa, Santa Elena in Sonora, Los Gatos in Chihuahua, and La Encantada in Coahuila. Its U.S. exposure includes the Jerritt Canyon Gold Mine in Nevada and the First Mint facility in Nevada. This footprint exposes the business to Mexican and U.S. mining, environmental, tax, water, labour, community, security, permitting and reclamation regimes, as well as foreign-exchange and cross-border trade conditions.
Key Operating Levers
Operating levers include payable metal volumes, realized prices, ore grades, recoveries, throughput, development rates, mine sequencing, equipment and water availability, labour continuity, and reserve replacement. The San Dimas disruption and Los Gatos deferral of higher-grade production illustrate the dependence on uninterrupted access and mine planning. Metal-price-driven royalties and worker participation, Mexican peso costs, the silver-equivalent conversion ratio and inventory sales timing influence reported margins. Jerritt Canyon restart engineering, rehabilitation and equipment installation are additional execution requirements.
Products And Services
First Majestic's primary products are precious metals, silver and gold, produced in dore and concentrate form. The company also realizes by-product revenue from lead, zinc and copper, including base-metal production at Los Gatos. Through First Mint, it turns a portion of mined silver into 0.999+ fine silver cast bars, rounds, coins, ingots and custom medallion products for direct sale to bullion customers and for third-party manufacturing demand.
Distribution And Go To Market
First Majestic sells mined metals through commodity and customer channels rather than a consumer-only distribution model. The AIF states that silver and gold are global commodities traded on the London Bullion Market and COMEX, and that the company assigns silver and gold from dore sales to several major metal brokers. The company also sells concentrate to independent smelters, has streaming obligations for Santa Elena and San Dimas, and sells a portion of silver output directly to retail bullion customers through First Mint as fine silver rounds, cast bars and custom medallion products.
Regulatory And Operating Environment
First Majestic operates in a heavily regulated mining environment. Its mines and development projects are subject to laws and regulations covering exploration, development, production, exports, taxes, mining royalties, environmental levies, labour standards, mining claims, land use, local land claims, water use, waste disposal, power generation, environmental protection and remediation, reclamation, mine safety, occupational health, and hazardous substances. The sources also describe Mexican mining-law amendments affecting concession duration, concession transfers, water availability, social and environmental requirements and financial assurances, as well as site-level permits such as Mexican environmental licenses, water rights, federal land occupation concessions and Nevada environmental oversight at Jerritt Canyon.
Industry Description
First Majestic operates in silver and gold mining, developing and processing mineral deposits primarily in Mexico, with Nevada exposure through Jerritt Canyon and First Mint. Its Mexican mine portfolio includes San Dimas, Santa Elena, La Encantada and a 70% interest in Los Gatos. The Q3 2026 presentation identifies the San Dimas labour disruption and continuing development at the other operations; Jerritt Canyon remains a restart project targeting the second half of 2027. Silver is both an industrial material and an investment metal. USGS identifies electronics, photovoltaics, industrial applications, coins, bars and jewellery among its uses.
Competitive Landscape
The Form 40-F describes the mining industry as highly competitive in all phases. First Majestic competes with companies that may be more mature or later-stage producers and may be better positioned to attract talent, equipment and materials. Competitors may also have greater financial resources, larger capital-equipment bases and more mining infrastructure for development, exploration, acquisition of mineral interests and recruitment of qualified employees and mining contractors. Competition therefore centers on mineral rights, operating assets, capital access, skilled people, contractors, equipment, materials and the ability to convert resources into economic production.
Market Share And Positioning
First Majestic is a silver-focused precious-metals producer with Mexican underground operations and additional gold exposure. The annual filing reports 2025 attributable silver production of 15.4 million ounces and gold production of 147,433 ounces. The Q3 2026 presentation reports 3.4 million silver ounces for the quarter and 10.8 million ounces year to date, alongside approximately 30,000 and 99,000 gold ounces respectively. These issuer attributable measures should not be mixed mechanically with world mine-output statistics to claim a precise market share. Los Gatos adds a joint-venture ownership structure and base-metal credits, while the San Dimas disruption reduces currently operating capacity.
Supplier And Customer Dynamics
First Majestic sells silver and gold through a small number of international metal brokers that act as intermediaries with the London Bullion Market or end customers, and it delivers production to refineries before refined metal moves to the physical market. The Form 40-F says the company normally receives 95% to 98% of the value of dore sales on delivery to a refinery, with final settlement after refined-metal outturn less processing fees. The source says it is not economically dependent on any one broker or refinery, although approximately 72% of 2025 revenue came through two metal brokers. Supply-side dependencies include qualified employees and contractors, energy, materials, equipment, consumables, transportation, refineries and infrastructure; the source also notes that public-health disruptions can affect suppliers, refineries, consumable availability and refining timelines.
Competitive Advantages And Moat
First Majestic's supported advantages are an operating portfolio, silver focus, integrated bullion channel and specialized operating capability. The Form 40-F says the company operates four producing mines in Mexico, owns a temporarily suspended gold mine in Nevada, has two care-and-maintenance silver mines, an advanced-stage silver development project and several exploration projects. It also describes First Mint as a wholly owned minting facility that vertically integrates investment-grade fine silver bullion production and lets the company sell a larger portion of silver output directly to shareholders and bullion customers. Those advantages are operational rather than protected by patents: the source states the business is not materially affected by intangibles such as licences, patents or trademarks.
Industry Growth And Cyclicality
Growth depends on reserve replacement, exploration, mine development, acquisitions and the economics of metal prices. Silver demand combines industrial consumption and investment flows, which can move differently. USGS estimates global 2025 consumption at 35,700 tonnes, below 36,100 tonnes in 2024, while mine production rose from 25,300 to 26,000 tonnes. It reports continued supply deficit concerns alongside lower photovoltaic silver loadings. These historical market estimates do not establish a future price path. First Majestic illustrates operating cyclicality: Q3 prices supported higher revenue while lower metal production, currency costs and labour disruption constrained operations. Earlier annual guidance cannot be treated as a current uninterrupted production forecast.
Pricing Power And Cost Position
Silver and gold are globally traded commodities, leaving First Majestic with limited direct power to set benchmark prices. Its operating leverage comes from payable output, realized prices, ore grades, recovery, development, labour, royalties and currency costs. The Q3 presentation shows AISC of US$30.45 per attributable silver-equivalent ounce versus US$20.90 a year earlier. The comparison is affected by a change in the silver-to-gold conversion ratio from 87:1 to 75:1 and a stronger Mexican peso, as well as operating costs. AISC is a company-defined non-GAAP measure and does not establish a standardized peer cost ranking. San Dimas labour continuity and mine sequencing at Los Gatos remain significant operating variables.
Barriers To Entry And Substitutes
New mine supply requires mineral rights, resource definition, economic reserves, infrastructure, capital, specialist labour, processing capability, permits, water access and community support. Existing mines also require continuing development and reserve replacement. USGS notes that silver is mainly obtained as a by-product from lead-zinc, copper and gold mines, limiting the link between silver prices and new silver-only capacity. Substitution and thrifting constrain demand in some applications, including reduced photovoltaic silver loadings, digital imaging, alternative reflective metals and alternative battery technologies. These factors complement, rather than remove, the permitting and operating barriers identified in the annual filing.
Industry Regulation And Structural Risks
The sector is structurally exposed to permitting, tax, environmental, labour, community, safety, infrastructure, country and metal-price risks. The Form 40-F says mining laws and regulations vary by jurisdiction and cover matters including exploration, development, production, exports, taxes, royalties, environmental levies, labour standards, expropriation, mining claims, land use, water use, waste disposal, power generation, remediation, reclamation, safety and hazardous substances. It also notes that Mexican operations are subject to corporate income tax, special mining duty, environmental duty, value-added taxes, profit-sharing taxes and mining-rights taxes. Other risks described in the source include social licence, community relations, political and country risk in Mexico and the United States, environmental contamination, closure and reclamation obligations, labour strikes, work stoppages and volatile metal prices.
Balance Sheet Analysis
Balance Sheet Snapshot
Capital structure composition and liquidity ratios
At September 30, 2026, assets were US$5.0314 billion and liabilities US$1.5808 billion. Cash and cash equivalents were US$1.0708 billion; US$162.9 million of non-current restricted cash is separate. Current assets of US$1.4677 billion exceeded current liabilities of US$585.4 million. Total equity was US$3.4506 billion, comprising US$3.0485 billion attributable to owners and US$402.1 million of non-controlling interests. Debt facilities totaled US$307.8 million before leases. The substantial cash balance provides flexibility but does not remove the cash demands of taxes, capital expenditure, mine disruption and restart work.
Forward Financial Outlook
The November 5 release withdrew San Dimas annual production and cost guidance because restart timing remained uncertain following the labour dispute. A full-year forecast cannot simply roll forward the earlier consolidated guidance. Near-term results depend on labour resolution, safe production resumption, mine sequencing at Los Gatos, throughput initiatives at Santa Elena and realized metal prices. Jerritt Canyon restart work targets production in the second half of 2027 and requires engineering, rehabilitation, equipment delivery and capital spending before operating cash generation. These are management objectives subject to execution risk rather than assured earnings.
Income Statement Analysis
Income Statement Levels
Revenue (USD) and profitability margins (% of revenue)
Q3 2026 revenue increased to US$394.1 million from US$285.1 million, driven primarily by higher realized silver and gold prices despite lower attributable metal production. Mine operating earnings rose to US$170.1 million from US$99.1 million. IFRS operating earnings were US$152.3 million, with US$19.3 million of investment and other income and US$9.6 million of finance costs. Consolidated net earnings of US$86.6 million include US$12.1 million attributable to non-controlling interests, leaving US$74.5 million for common shareholders and reported basic and diluted EPS of US$0.15. These ownership bases must remain distinct.
Cashflow Statement Analysis
Cash Flow Composition
Operating, investing, and financing cash flow by period
IFRS cash generated from operating activities was US$101.8 million in Q3, below US$112.5 million a year earlier. This differs from management's US$214.3 million operating cash flow before working capital and taxes. The quarter absorbed US$38.8 million of working-capital outflows and US$73.7 million of income-tax payments. Investing used US$90.1 million and financing US$33.7 million. Including a US$0.4 million adverse currency effect, cash declined by approximately US$22.5 million to US$1.0708 billion. Nine-month IFRS operating cash flow was US$547.2 million versus US$258.1 million in the comparative period.
Historical Performance Summary
The nine months to September 2026 generated US$1.2863 billion in revenue compared with US$793.2 million a year earlier, and US$586.8 million of operating earnings compared with US$153.8 million. Earnings attributable to owners increased to US$312.1 million from US$81.8 million. The latest quarter nevertheless shows that price gains and operating execution can diverge: attributable silver production fell 11% and gold production 17% year over year while revenue rose 38%. The San Dimas disruption, Los Gatos sequencing and changing metal-price mix limit extrapolation from either the stronger first quarter or annual acquisition-affected comparisons.
Key Financial Ratios And Metrics
Q3 mine operating earnings represented approximately 43.2% of revenue, compared with about 34.8% a year earlier. The current ratio was approximately 2.51 times using US$1.4677 billion current assets and US$585.4 million current liabilities. Total liabilities represented approximately 31.4% of assets. These ratios use consolidated statement balances. Reported common earnings and common book equity exclude non-controlling interests. Q3 AISC of US$30.45 per attributable payable silver-equivalent ounce and management free cash flow of US$85.5 million are non-GAAP measures; they should not be equated to IFRS cash flow or standardized peer measures.
Balance Sheet And Cashflow Analysis
Working capital was US$882.3 million and management-defined liquidity approximately US$1.04 billion, including undrawn credit, at September 30. Restricted cash is excluded from the working-capital liquidity measure. These resources support ongoing development and the Jerritt Canyon restart, but the quarter's cash balance declined as tax payments, capital investment and shareholder distributions absorbed funds. Nine-month investing includes US$20.0 million cash proceeds from the completed Del Toro sale, which is not recurring operating cash generation. The company reported compliance with debt covenants at period-end. Future liquidity depends on metal prices, production continuity, tax resolutions and capital discipline.
Non Recurring Items And Trend Extrapolation
Q3 cash taxes included US$36.8 million related to settlement of two reassessments, while earnings included a US$30.7 million legacy tax settlement expense. The release says prior forward silver purchase agreement assessments had been resolved and paid, pending administrative steps, but a separate Primero advance-pricing matter remained under a proposed settlement framework. San Dimas abnormal disruption costs and volatile investment gains also complicate quarterly comparisons. Finished-goods metal worth US$54.1 million was not included in revenue at period-end; its subsequent sale would affect timing rather than create additional production. Capital spending and the non-recurring Del Toro disposal should be separated from sustainable operating cash generation.
Earnings Quality And Accounting Considerations
Reported earnings include investment gains, non-controlling interests and tax items. Q3 investment and other income was US$19.3 million, including gains on silver futures and marketable securities, compared with a US$5.4 million loss a year earlier. The release identifies a US$30.7 million settlement expense concerning a legacy La Encantada tax dispute. Management's adjusted common earnings of US$92.5 million differ from IFRS common earnings of US$74.5 million and use company-defined exclusions. The Los Gatos minority interest means consolidated earnings cannot be divided by common-share market capitalization without an ownership adjustment. Non-GAAP EBITDA, AISC and free cash flow require their disclosed reconciliations.
Growth
[]
Valuation
| P/B | P/E | Peer Set | Currency | Market Cap | Company Name |
|---|---|---|---|---|---|
| 2.36 | 11.14 | PAAS | CAD | $24.7bn | Pan American Silver Corp. |
| 2.57 | 19.80 | CAD | $11.0bn | Subject (AG) |
Profitability
[]
Comparison Basis
Reported P/E uses earnings attributable to common shareholders; P/B uses their book equity. Statement periods: AG 2026-09-30; PAAS 2026-09-30. CAD market capitalizations are converted to USD using the Bank of Canada’s 2026-11-09 indicative rate of C$1.4123 per US dollar. Reported earnings include exceptional items and different commodity and acquisition exposures. Book equity is an accounting balance, not mine fair value. Sales, enterprise-value and forward-earnings multiples and growth/profitability rankings are unavailable because consistent ownership and forecast bases have not been established. These comparisons do not establish a relative-value ranking.
Annual
| All numbers in thousands except per-share amounts; TTM through 2026-09-30; TTM EPS approximate (USD) | TTM | Dec 2025 | Dec 2024 | Dec 2023 | Dec 2022 |
|---|---|---|---|---|---|
| Total Revenue | 1,750,198 | 1,257,157 | 560,604 | 573,801 | 624,221 |
| Cost of Revenue | 852,058 | 807,112 | 468,704 | 548,159 | 607,469 |
| Gross Profit | 898,140 | 450,045 | 91,900 | 25,642 | 16,752 |
| Operating Expenses | 68,085 | 52,978 | 95,655 | 204,426 | 55,945 |
| Operating Income | 830,055 | 397,067 | -3,755 | -178,784 | -39,193 |
| Finance and Other Costs | -28,541 | 2,041 | 22,699 | 17,131 | 22,211 |
| Pretax Income | 858,596 | 395,026 | -26,454 | -195,915 | -61,404 |
| Income Tax Expense | 393,417 | 184,051 | 75,431 | -60,803 | 52,872 |
| Net Income | 465,179 | 210,975 | -101,885 | -135,112 | -114,276 |
| Net Income Common Stockholders | 395,190 | 164,923 | -101,885 | -135,112 | -114,276 |
| Basic EPS | 0.79 | 0.34 | -0.34 | -0.48 | -0.43 |
| Diluted EPS | 0.79 | 0.34 | -0.34 | -0.48 | -0.43 |
Quarterly
| All numbers in thousands except per-share amounts (USD) | 3 Months Ended 2026-09-30 | 3 Months Ended 2025-09-30 | 9 Months Ended 2026-09-30 | 9 Months Ended 2025-09-30 |
|---|---|---|---|---|
| Total Revenue | 394,108 | 285,063 | 1,286,275 | 793,234 |
| Cost of Sales | 167,229 | 131,122 | 464,714 | 389,978 |
| Depletion Depreciation And Amortization | 56,759 | 54,860 | 161,229 | 191,019 |
| Cost of Revenue | 223,988 | 185,982 | 625,943 | 580,997 |
| Gross Profit | 170,120 | 99,081 | 660,332 | 212,237 |
| Operating Expenses | 17,835 | 20,234 | 73,507 | 58,400 |
| Operating Income | 152,285 | 78,847 | 586,825 | 153,837 |
| Finance and Other Costs | -9,722 | 12,529 | -10,131 | 20,451 |
| Pretax Income | 162,007 | 66,318 | 596,956 | 133,386 |
| Income Tax Expense | 75,401 | 23,356 | 236,971 | 27,605 |
| Net Income | 86,606 | 42,962 | 359,985 | 105,781 |
| Net Income Common Stockholders | 74,526 | 26,978 | 312,057 | 81,790 |
| Minority Interests | 12,080 | 15,984 | 47,928 | 23,991 |
| Basic EPS | 0.15 | 0.06 | 0.63 | 0.18 |
| Diluted EPS | 0.15 | 0.06 | 0.63 | 0.18 |
Annual
| All numbers in thousands (USD) | Dec 2025 | Dec 2024 | Dec 2023 | Dec 2022 |
|---|---|---|---|---|
| • Total Assets | 4,694,915 | 1,979,788 | 1,976,355 | 2,110,009 |
| • Total Current Assets | 1,192,701 | 368,821 | 309,057 | 370,289 |
| • Cash, Cash Equivalents & Short Term Investments | 973,821 | 251,961 | 187,961 | 185,966 |
| Cash And Cash Equivalents | 793,435 | 202,180 | 125,581 | 151,438 |
| • Short Term Investments | 180,386 | 49,781 | 62,380 | 34,528 |
| Available for Sale Securities, Current | 154,218 | 48,498 | 56,101 | 27,871 |
| Other Short Term Investments | 26,168 | 1,283 | 6,279 | 6,657 |
| Cash Restricted or Pledged, Current | -- | -- | -- | 0 |
| • Inventories | 84,753 | 62,524 | 63,690 | 64,761 |
| Raw Materials Consumables and Supplies | 18,836 | 15,193 | 13,415 | 12,826 |
| Work in Process | 3,675 | 4,162 | 7,542 | 9,176 |
| Finished Goods and Merchandise | 62,242 | 43,169 | 42,733 | 42,759 |
| • Trade and Other Receivables, Current | 122,163 | 46,167 | 48,686 | 41,216 |
| Trade/Accounts Receivable, Current | 86,362 | 12,303 | 10,099 | 8,598 |
| Taxes Receivable, Current | 35,801 | 33,864 | 38,587 | 32,618 |
| Assets Held for Sale/Discontinued Operations, Current | -- | -- | 0 | 72,729 |
| Other Current Assets | 11,964 | 8,169 | 8,720 | 5,617 |
| • Total non-current assets | 3,502,216 | 1,610,969 | 1,667,298 | 1,739,720 |
| • Net Property, Plant and Equipment | 574,929 | 402,530 | 433,578 | 477,984 |
| • Gross Property, Plant and Equipment | 1,248,345 | 1,013,599 | 1,000,756 | 969,581 |
| • Properties | 371,928 | 264,860 | 253,783 | 245,670 |
| Land And Improvements | 366,906 | 257,814 | 245,260 | 237,246 |
| Leasehold and Improvements | 5,022 | 7,046 | 8,523 | 8,424 |
| • Machinery Furniture and Equipment | 740,729 | 648,441 | 641,029 | 595,008 |
| Plant and Machinery | 740,729 | 648,441 | 641,029 | 595,008 |
| Construction in Progress and Advance Payments | 85,078 | 43,322 | 48,738 | 73,927 |
| Leased Property Plant and Equipment | 9,447 | 16,853 | 18,761 | 18,225 |
| Other Property Plant and Equipment | 41,163 | 40,123 | 38,445 | 36,751 |
| • Accumulated Depreciation and Impairment | -673,416 | -611,069 | -567,178 | -491,597 |
| • Accumulated Depreciation | -673,416 | -611,069 | -567,178 | -491,597 |
| • Accumulated Depreciation of Properties | -199,270 | -172,915 | -157,626 | -136,987 |
| Accumulated Depreciation of Land and Improvements | -199,270 | -172,915 | -157,626 | -136,987 |
| • Accumulated Depreciation of Machinery Furniture and Equipment | -440,937 | -407,824 | -382,139 | -330,728 |
| Accumulated Depreciation of Plant and Machinery | -440,937 | -407,824 | -382,139 | -330,728 |
| Accumulated Depreciation of Construction in Progress | 0 | 0 | 0 | 0 |
| Accumulated Depreciation of Other Property Plant and Equipment | -33,209 | -30,330 | -27,413 | -23,882 |
| • Net Mineral Property Interests and Exploration Assets | 2,680,048 | 1,034,522 | 998,835 | 1,061,124 |
| Gross Mineral Property Interests and Exploration Assets | 2,680,048 | 1,034,522 | 998,835 | 1,061,124 |
| Accumulated Amortization of Mineral Property Interests and Exploration Assets | -- | -- | -- | -447,824 |
| • Trade and Other Receivables, Non-Current | 16,130 | 15,750 | 14,150 | 12,354 |
| Trade Accounts Receivable, Non-Current | -- | 5,000 | 0 | -- |
| Loans Receivable, Non-Current | 5,000 | 5,000 | -- | -- |
| Taxes Receivable, Non-Current | 11,130 | 10,750 | 14,150 | 12,354 |
| • Prepayments and Deposits, Non-Current | 6,456 | 5,720 | 6,430 | 6,003 |
| Deposits Paid for Business and Fixed Assets, Non-Current | 6,456 | 5,720 | 6,430 | 6,003 |
| Cash Restricted or Pledged, Non-Current | 144,267 | 106,072 | 125,573 | 125,193 |
| Deferred Tax Assets, Non-Current | 80,386 | 46,375 | 88,732 | 57,062 |
| • Total Liabilities | 1,521,949 | 628,717 | 618,235 | 698,711 |
| • Total Current Liabilities | 459,139 | 144,307 | 120,138 | 167,399 |
| • Payables and Accrued Expenses, Current | 446,678 | 125,978 | 98,179 | 133,360 |
| • Trade and Other Payables, Current | 365,394 | 84,086 | 56,410 | 92,904 |
| Trade/Accounts Payable, Current | 115,260 | 58,593 | 48,165 | 71,094 |
| • Taxes Payable, Current | 250,134 | 25,493 | 8,245 | 21,810 |
| Income Tax Payable, Current | 239,357 | 22,792 | 5,222 | 18,240 |
| Other Tax Payable, Current | 10,777 | 2,701 | 3,023 | 3,570 |
| Other Payable, Current | -- | -- | -- | 0 |
| Accrued Expenses, Current | 81,284 | 41,892 | 41,769 | 40,456 |
| • Financial Liabilities, Current | 11,280 | 17,040 | 18,202 | 14,378 |
| • Current Debt And Capital Lease Obligation | 11,280 | 17,040 | 18,202 | 14,378 |
| • Current Portion of Long-Term Debt and Capital Lease | 11,280 | 17,040 | 18,202 | 14,378 |
| • Current Portion of Long-Term Debt | 488 | 825 | 832 | 551 |
| Convertible Loans Debentures Current Portion of Long-Term Debt | 151 | 426 | 426 | 431 |
| Bank Institutional Loans Current Portion of Long-Term Debt | 337 | 399 | 406 | 120 |
| Capital Lease Obligations, Current | 10,792 | 16,215 | 17,370 | 13,827 |
| • Provisions, Current | 590 | 709 | 1,456 | 0 |
| Provision for Asset Retirement Obligation Site Restoration and Rehabilitation, Current | 590 | 709 | 1,456 | 0 |
| • Deferred Liabilities, Current | 592 | 580 | 2,301 | 3,383 |
| Deferred Income Customer Advances Billings in Excess of Cost, Current | 592 | 580 | 2,301 | 3,383 |
| Discontinued Operations Liabilities, Current | -- | -- | 0 | 16,278 |
| • Total Non-Current Liabilities | 1,062,810 | 484,410 | 498,097 | 531,312 |
| • Financial Liabilities, Non-Current | 297,460 | 219,977 | 238,312 | 233,567 |
| • Long Term Debt And Capital Lease Obligation | 297,460 | 219,977 | 238,312 | 233,567 |
| • Long Term Debt | 291,729 | 208,657 | 218,980 | 209,811 |
| Convertible Debentures Loans, Non-Current | 291,729 | 208,657 | 198,980 | 189,811 |
| Bank Institutional Loans, Non-Current | 0 | 0 | 20,000 | 20,000 |
| Capital Lease Obligations, Non-Current | 5,731 | 11,320 | 19,332 | 23,756 |
| • Provisions, Non-Current | 187,098 | 159,067 | 151,564 | 149,017 |
| Provision for Asset Retirement Obligation Site Restoration and Rehabilitation, Non-Current | 187,098 | 159,067 | 151,564 | 149,017 |
| • Tax Liabilities, Non-Current | 570,958 | 80,094 | 79,017 | 122,468 |
| Deferred Tax Liabilities, Non-Current | 570,958 | 80,094 | 79,017 | 122,468 |
| • Payables and Accrued Expenses, Non-Current | 0 | 19,685 | 23,612 | 20,605 |
| • Trade and Other Payables, Non-Current | 0 | 19,685 | 23,612 | 20,605 |
| Taxes Payable, Non-Current | 0 | 19,685 | 23,612 | 20,605 |
| Other Non Current Liabilities | 7,294 | 5,587 | 5,592 | 5,655 |
| • Total Equity | 3,172,966 | 1,351,071 | 1,358,120 | 1,411,298 |
| • Equity Attributable to Parent Stockholders | 2,761,005 | 1,351,071 | 1,358,120 | 1,411,298 |
| • Paid in Capital | 3,079,179 | 1,978,101 | 1,879,971 | 1,781,280 |
| • Capital Stock | 3,079,179 | 1,978,101 | 1,879,971 | 1,781,280 |
| Common Stock | 3,079,179 | 1,978,101 | 1,879,971 | 1,781,280 |
| Retained Earnings/Accumulated Deficit | -561,975 | -717,058 | -609,876 | -468,896 |
| Reserves/Accumulated Comprehensive Income/Losses | 243,801 | 90,028 | 88,025 | 98,914 |
| Non-Controlling/Minority Interests | 411,961 | 0 | -- | -- |
| • Balance Sheet, Supplemental | ||||
| Total Liabilities as Reported, Supplemental | 1,521,949 | 628,717 | 618,235 | 698,711 |
| Total Equity as Reported, Supplemental | 2,761,005 | 1,351,071 | 1,358,120 | 1,411,298 |
| • Ordinary Shares Number | 491,322.30 | 301,863.24 | 287,146.72 | 274,491.70 |
| Common Shares Outstanding | 491,322.30 | 301,863.24 | 287,146.72 | 274,491.70 |
| • Debt Maturity Schedule Total | 292,216 | 209,482 | 219,812 | 210,362 |
| Debt Due in Year 1 | 1,980 | 2,444 | 3,104 | 1,847 |
| Debt Due in Year 3 | 58,179 | 231,653 | 25,088 | 22,955 |
| Debt Due in Year 5 | 875 | -- | 230,072 | 230,036 |
| Debt Due Beyond | 350,018 | -- | -- | -- |
| Debt - Interests Charges and Other Adjustments | -118,836 | -24,615 | -38,452 | -44,476 |
| • Capital Lease Obligation Maturity Schedule Total | 16,523 | 27,535 | 36,702 | 37,583 |
| Capital Lease Due in Year 1 | 10,937 | 16,497 | 17,465 | 13,966 |
| Capital Lease Due in Year 3 | 5,496 | 10,631 | 18,624 | 21,337 |
| Capital Lease Due in Year 5 | 1,814 | 3,247 | 3,805 | 5,668 |
| Capital Lease Due Beyond | -- | 197 | 678 | 925 |
| Capital Lease - Interests Charges and Other Adjustments | -1,724 | -3,037 | -3,870 | -4,313 |
| • Other Contractual Obligations Maturity Schedule Total | -- | 113,136 | 100,177 | 123,431 |
| Other Contractual Obligations Due in Year 1 | -- | 107,549 | 94,585 | 116,475 |
| Other Contractual Obligations Due in Year 3 | -- | 329 | 394 | -- |
| Other Contractual Obligations Due in Year 5 | -- | 5,258 | 5,198 | -- |
| Other Contractual Obligations Due Beyond | -- | -- | -- | 6,956 |
| Total Debt | 308,740 | 237,017 | 256,514 | 247,945 |
| Net Debt | -665,081 | -14,944 | 68,553 | 61,979 |
| Working Capital | 733,562 | 224,514 | 188,919 | 202,890 |
| Invested Capital | 3,481,706 | 1,588,088 | 1,614,634 | 1,659,243 |
| Tangible Book Value | 3,172,966 | 1,351,071 | 1,358,120 | 1,411,298 |
| Common Equity Book Value | 2,761,005 | 1,351,071 | 1,358,120 | 1,411,298 |
Quarterly
| All numbers in thousands except per-share amounts (USD) | As At 2026-09-30 | As At 2025-12-31 |
|---|---|---|
| Cash And Cash Equivalents | 1,070,786 | 793,435 |
| Accounts Receivable | 42,081 | 86,362 |
| Inventory | 102,940 | 84,753 |
| Current Assets | 1,467,705 | 1,192,701 |
| Mining Interests | 2,699,958 | 2,680,048 |
| Net PPE | 576,997 | 560,458 |
| Non-current Assets | 3,563,735 | 3,502,214 |
| Total Assets | 5,031,440 | 4,694,915 |
| Current Debt | 54,889 | 487 |
| Current Liabilities | 585,366 | 459,139 |
| Long Term Debt | 252,956 | 291,729 |
| Total Debt | 307,845 | 292,216 |
| Lease Liabilities | 27,543 | 16,523 |
| Non-current Liabilities | 995,456 | 1,062,810 |
| Total Liabilities | 1,580,822 | 1,521,949 |
| Common Stockholders Equity | 3,048,546 | 2,761,005 |
| Minority Interest | 402,072 | 411,961 |
| Stockholders Equity | 3,450,618 | 3,172,966 |
Annual
| All numbers in thousands except per-share amounts; TTM through 2026-09-30 (USD) | TTM | Dec 2025 | Dec 2024 | Dec 2023 | Dec 2022 |
|---|---|---|---|---|---|
| Operating Cash Flow | 815,082 | 526,010 | 151,970 | 55,614 | 18,988 |
| Investing Cash Flow | -185,311 | -28,176 | -114,160 | -153,999 | -213,797 |
| Financing Cash Flow | 4,356 | 88,613 | 42,410 | 64,649 | 113,886 |
| Effect Of Exchange Rate Changes | 1,304 | 4,808 | -3,621 | 2,660 | -346 |
| Cash Reclassification Outside Cash Flows | 0 | 0 | 0 | 5,219 | -5,219 |
| Change In Cash | 635,431 | 591,255 | 76,599 | -25,857 | -86,488 |
| Beginning Cash Position | 435,355 | 202,180 | 125,581 | 151,438 | 237,926 |
| End Cash Position | 1,070,786 | 793,435 | 202,180 | 125,581 | 151,438 |
| Mining Interest Expenditures | -157,813 | -148,561 | -95,097 | -113,994 | -157,975 |
| Capital Expenditure | -85,986 | -62,096 | -20,024 | -31,987 | -59,705 |
| Cash Dividends Paid | -22,589 | -9,840 | -5,297 | -5,868 | -6,867 |
Quarterly
| All numbers in thousands except per-share amounts (USD) | 3 Months Ended 2026-09-30 | 3 Months Ended 2025-09-30 | 9 Months Ended 2026-09-30 | 9 Months Ended 2025-09-30 |
|---|---|---|---|---|
| Operating Cash Flow | 101,774 | 112,520 | 547,190 | 258,118 |
| Investing Cash Flow | -90,141 | -57,953 | -166,930 | -9,795 |
| Financing Cash Flow | -33,718 | -4,545 | -102,173 | -17,916 |
| Effect Of Exchange Rate Changes | -440 | 580 | -736 | 2,768 |
| Change In Cash | -22,525 | 50,602 | 277,351 | 233,175 |
| Beginning Cash Position | 1,093,311 | 384,753 | 793,435 | 202,180 |
| End Cash Position | 1,070,786 | 435,355 | 1,070,786 | 435,355 |
| Mining Interest Expenditures | -47,208 | -40,196 | -126,839 | -117,587 |
| Capital Expenditure | -42,185 | -17,142 | -69,521 | -45,631 |
| Cash Dividends Paid | -7,494 | -2,347 | -20,035 | -7,286 |
Social Factors
The FY2025 report identifies workforce health and safety, human rights, union relationships, security and community engagement as material social topics. It reports a total recordable injury frequency rate of 0.55, nine lost-time injuries and US$2.4 million of community contributions for 2025. These figures describe that reporting period and do not establish current incident rates or uninterrupted labour relations. The company describes joint safety committees, employee and contractor training, grievance channels and local impact assessments, including integration of Los Gatos community practices. Operating continuity depends on effective worker engagement, safe workplaces, community trust and access to skilled employees and contractors; policies and historical indicators alone cannot establish future outcomes.
Governance Factors
The 2026 management circular describes Board oversight, independent-director processes, Audit, Compensation, Corporate Governance and Nominating, and Sustainability committees, and annual assessments. It discloses Board and committee interlocks with First Mining Gold and procedures for declaring conflicts and excluding conflicted directors from votes. The Sustainability Committee reviews material exposures and sustainability reporting. The FY2025 sustainability report describes enterprise risk management, quarterly risk reporting, a code of conduct, anti-bribery training and a confidential whistleblower channel. Governance assessment should distinguish the existence of these structures from their effectiveness, particularly around capital allocation, acquisitions, executive incentives, related interests and regulatory compliance.
Environmental Factors
Water availability, tailings integrity, mine waste, land disturbance, energy use, emissions and closure obligations are material environmental factors. The FY2025 sustainability report covers sites under operational control and includes Los Gatos after its January 2025 acquisition. It describes closed-circuit processing, water monitoring, recycling and mine-dewatering reuse, while identifying drought and extreme-weather exposure. Tailings management spans active and inactive facilities and requires continuing engineering, monitoring and third-party review. The report describes phased implementation of the Global Industry Standard on Tailings Management and a later alignment timetable for Los Gatos. These are disclosed management programs and targets, rather than proof that all facilities have achieved full alignment or that environmental liabilities have been eliminated.
Esg Risks And Opportunities
Environmental incidents, tailings failure, water scarcity, extreme weather, unsafe work, community disputes, security problems and weak compliance controls can interrupt production, increase costs and create long-lived liabilities. The annual and sustainability disclosures identify these exposures across the Mexican and Nevada portfolio. Water reuse, filtered tailings where technically suitable, energy efficiency, stronger safety systems and community engagement offer practical opportunities to reduce operating vulnerability. Los Gatos integration creates opportunities to share processes but also requires consistent controls across a changing portfolio. Silver's use in electrical and solar applications supports an industrial demand opportunity, but it does not offset the issuer's own environmental and social obligations or guarantee demand growth, commodity prices or operating returns.
| Worksheet | Output |
|---|---|
| Reproduce archived values | Recorded values |
- AG Bank of Canada daily exchange rates November 9 2026
- First Majestic Q3 2026 earnings release
- nr 20260512.pdf
The price-history chart preserves the series returned by the original reader on November 20, 2026. The report carries its original publication date.