# TECK-B first-edition independent review record Cutoff 2026-11-23 America/Vancouver. Edition identity TECK-B; TSX Class B quote TECK.B. All times Vancouver on November 23, 2026 unless noted. The earlier structured report dated May 12 is not a Markdown predecessor. Original Markdown head was null. Runtime Python 3.12.13, canonical preflight at main aab652f9143180a2578b7f532c3d0502663143d2; unrelated files untouched. | Stage | Time | Evidence | | --- | --- | --- | | Initial research candidate | 19:31 | Issuer originals, 19-file inventory, full report headings, claims diagnostic | | Initial independent review | 19:32 | Quote/ownership/advances/capex/citation defects; draft not ready | | Numerical mine and merger worksheet | 20:25–20:37 | Frozen nav.json; finite FCF/claims, scenario and merger outputs | | Second independent review | 20:26–20:40 | Separate JS arithmetic reconstruction, mine basis and deal threshold challenge; no remaining decision-changing defect | | Full draft-ready structural gate | 20:39 | Full-report checker and generated decision table pass; 31-file package | | Governed reviewer | 20:40 | Trusted review accepted 33 files, 16 public, expected head null; digest recorded outside edition | | Immutable live evaluation | Pending | Reader, highlights, worksheets, phone and checkout to inspect after release | ## Material source and calculation review - Teck Q3 2026 physical p31 guidance includes 100% QB/CDA but Antamina already Teck's 22.5% interest. 2027 attributable midpoint is 434.5kt, 2028 373.5kt. The 2025 AIF copper reserve table gives 3.82Mt QB recoverable metal at Teck's 60% interest; modeled 2027–46 Teck share about 3.00Mt is below it. Reserve sufficiency does not independently prove the grade schedule. - Q3 pp38–40 nine-month asset cost rows broadly match annual forecast scale: QB C$1.468bn operating/transport before annualizing versus C$1.9bn forecast gross; HVC C$761m versus C$950m; Antamina C$435m including royalties versus C$600m; CDA C$239m versus C$330m. The Q3 revenue C$8.054bn exceeds 407kt × US$6.06/lb × C$1.39 by about C$0.49bn. Byproduct forecast is an analyst allocation, not a reported standalone figure. - Q3 pp65,73–74 show C$6.685bn consolidated cash, C$4.786bn debt/leases, C$729m restricted QBSA cash and C$4.977bn QB partner advances. The 60% QB asset/claim basis deducts C$2.986bn advances, 60% QB project debt and shares QBSA restricted cash. It does not deduct minority equity again. Note 15 limits added marketable/debt securities to C$728m; settlement receivables and embedded derivatives are excluded. - The independent reviewer reconstructed original 2027–31 FCF and C$4.79 NAV, then identified all-asset strike shock, missing byproducts, CDA permit life, finance cash and merger decision defects. Corrections changed the modeled standalone NAV to C$10.37 and mine-only entry to C$9. These are decision-changing corrections to the model, even though Wait survives. - Final model PV C$7.701bn finite unlevered FCF and claims about -C$2.610bn yield C$5.092bn / 491m = C$10.37. Five-year shareholder fund deducts C$450m annual modeled financing before tax shield; enterprise value deducts debt claims once. The 9% NAV discount and 9.48% investor hurdle have different roles. - TECK.B C$75.10 and AAL 3,332 GBX close were cross-checked to dated price rows; Bank of Canada GBP/CAD 1.8734 yields 1.3301 × GBP33.32 × 1.8734 = C$83.03 conditional parity. The 90% completion probability and benchmark Anglo total return are analyst illustrations. The unrounded hurdle crosses at 99.3% completion under fixed parity; whole-dollar entry stays C$75 or less even at 100%, so Wait at C$75.10. This is not an independent Anglo intrinsic valuation. - HVC MLE C$2.1–2.4bn total spans 2025–28. 2025 C$0.33bn plus 2026 C$0.9–1.2bn leave C$0.57–1.17bn, so modeled 2027–28 HVC C$1.7bn also contains sustaining/stripping, not a second project total. CDA 2032–38 permit probability weights output, operating cost, investment and closure; 40% failure closure is taken in 2031. - Peer screen uses November 23 TSX closes and nine-month adjusted EBITDA annualized 4/3; issuer EBITDA conventions, minority and high copper prices limit comparability. It is a check, not the valuation driver. ## Public reader evidence standard Owner-only issuer originals stay in the archive. Public Peralta-authored factual exhibit has 16 claim-specific pages with source publisher URLs and physical locators; key thesis, advances, HVC capex, shares and ownership claims link its highlighted text before the external original. The PDF pages were rendered and visually checked. Some material claims remain external-only with precise publisher/page references; cite these limitations honestly. No redistribution right for full issuer PDFs is asserted. ## Uncertainty and decision The C$68 ceiling is sensitive to the unverified 90% deal probability and Anglo benchmark-return assumption. At deal probabilities 50%, 75%, 95% and 100%, rounded entries are C$42, C$58, C$72 and C$75. A lower Anglo/FX parity reduces the ceiling. The standalone no-deal NAV is deliberately conservative: no unapproved QB expansion/resource option, a finite QB mine life to 2046 and probability-weighted CDA permits. This conservative downside is not a forecast of the no-deal market quote. Independent review recommends release with explicit conditional assumptions; do not convert a technical pass into claimed economic certainty.